Notice of Significant Meeting with Entergy Nuclear Northeast Regarding the Nrc'S Assessment of the Safety Performance of the James A. FitzPatrick Nuclear Power Plant for Calendar Year 2006
ML071350127
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 05/15/2007
From: Cobey E
Reactor Projects Branch 2
To:
Cobey, Eugene W. RI/DRP/PB2/610-337-5171
References
MN 07-025
Download: ML071350127 (4)


Text

May 15, 2007 MN No.07-025 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF SIGNIFICANT MEETING Licensee: Entergy Nuclear Northeast Facility: James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 Date and Time: June 5, 2007, from 12:30 p.m. to 2:00 p.m.

Location: Joint News Center Oswego County Airport County Route 176 Fulton, NY 13069

Purpose:

The NRC requested an Annual Assessment Meeting with Entergy to discuss the NRCs assessment of the safety performance of the James A. FitzPatrick Nuclear Power Plant for calendar year 2006. The NRCs assessment is documented in a letter dated March 2, 2007.

Attendees*:

NRC: E. Cobey, Chief, Projects Branch 2, Region I G. Hunegs, Senior Resident Inspector D. Dempsey, Resident Inspector Entergy: P. Dietrich, Site Vice President K. Mulligan, General Manager of Plant Operations S. Bono, Director of Engineering W. Rheaume, Acting Director of Nuclear Safety Assurance Public Participation: This is a Category 1 Meeting. The public is invited to observe this meeting and will have opportunities to communicate with the NRC staff following the business portion, but before the meeting is adjourned.

The NRCs Annual Assessment Letter - James A. FitzPatrick Nuclear Power Plant, can be located in ADAMS (Accession Number ML070610609). ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

Additional information relative to the NRC's Annual Assessment Process and the safety performance of James A. FitzPatrick Nuclear Power Plant can be found on the NRC's web site at: www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

2 Meeting

Contact:

Eugene W. Cobey, Chief, Projects Branch 2 610-337-5171 E-mail: ewc@nrc.gov

  • Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by May 29, 2007, via telephone to the NRC meeting contact.

Approved by: /RA By J. Daniel Orr For/

Eugene W. Cobey, Chief Projects Branch 2 Division of Reactor Projects cc w/encl:

G. J. Taylor, Chief Executive Officer, Entergy Operations M. R. Kansler, President, Entergy Nuclear Operations, Inc.

J. T. Herron, Senior Vice President for Operations M. Balduzzi, Senior Vice President, Northeastern Regional Operations W. Campbell, Senior Vice President of Engineering and Technical Services C. Schwarz, Vice President, Operations Support T. Vitale , General Manager, Plant Operations O. Limpias, Vice President, Engineering (ENO)

J. McCann, Director, Licensing (ENO)

C. Faison, Manager, Licensing (ENO)

M. Colomb, Director of Oversight (ENO)

W. Rheaume, Director, Nuclear Safety Assurance J. Costedio, Manager, Regulatory Compliance T. McCullough, Assistant General Counsel (ENO)

M. Balboni, Deputy Secretary,New York State Energy Research and Development Authority P. Eddy, New York State Department of Public Service S. Lyman, Oswego County Administrator Supervisor, Town of Scriba C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law J. Sniezek, PWR SRC Consultant M. Lyster, PWR SRC Consultant S. Lousteau, Treasury Department, Entergy Services J. Spath, Program Director, New York State Energy Research and Development Authority

3 Meeting

Contact:

Eugene W. Cobey, Chief, Projects Branch 2 610-337-5171 E-mail: ewc@nrc.gov

  • Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by May 29, 2007, via telephone to the NRC meeting contact.

Approved by: /RA By J. Daniel Orr For/

Eugene W. Cobey, Chief Projects Branch 2 Division of Reactor Projects Distribution:

Executive Director for Operations, OEDO (RIDSEDOMAILCENTER)

Deputy Executive Director for Reactor Programs, OEDO (RIDSEDOMAILCENTER)

Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)

Associate Director, Office of Operating Reactor Oversight and Licensing, NRR/ADRO (RIDSNRRADRO)

Director, Division of Inspection and Regional Support, NRR/DIRS (RIDSNRRDIRS)

Director, Division of Operating Reactor Licensing, NRR/DORL (RIDSNRRDORL)

Project Directorate I-1 (PD1/2), NRR (RIDSNRRDIPMLPDI)

Asst. General Counsel Materials Litigation and Enforcement, OGC (RIDSOGCMAILCENTER) S. Collins, RA M. Dapas, DRA D. Lew, DRP J. Clifford, DRP E. Cobey, DRP D. Jackson, DRP J. Lamb, RI OEDO M. Kowal, NRR J. Boska, PM NRR J. Hughey, NRR G. Hunegs, DRP, Senior Resident Inspector D. Dempsey, DRP, Resident Inspector K. Kolek, Resident OA PMNS Region I Docket Room (with concurrences)

SUNSI Review Complete: ____JDO_______ (Reviewers Initials)

DOCUMENT NAME: C:\FileNet\ML071350127.wpd After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/PAO RI/DRP NAME DOrr DScrenci ECobey/JDO FOR/

DATE 05/14/07 05/14/07 05/14/07 OFFICIAL RECORD COPY Accession No: ML071350127

Agenda NRCs Annual Assessment Meeting James A. FitzPatrick Nuclear Power Plant June 5, 2007 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (5 minutes)

Review of Reactor Oversight Process . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (10 minutes)

Discussion of James A. FitzPatrick Nuclear Station Performance . . . . . . . . . NRC (10 minutes)

Entergys Response and Remarks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Entergy (25 minutes)

Closing Remarks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (5 minutes)

Short Break . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (5 minutes)

NRC to address public questions . . . . . . . . . . . . . . . . NRC/Members of the Public (as needed)