ML072910320

From kanterella
Jump to navigation Jump to search
Notice of Forthcoming Meeting with Entergy Nuclear Operations, Inc. and General Electric Concerning the Use of GNF2 Fuel at the James A. FitzPatrick Nuclear Power Plant
ML072910320
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 10/22/2007
From: Boska J
NRC/NRR/ADRO/DORL/LPLI-1
To: Mark Kowal
NRC/NRR/ADRO/DORL/LPLI-1
Boska J, NRR, 301-415-2901
References
Download: ML072910320 (7)


Text

October 22, 2007 MEMORANDUM TO: Mark G. Kowal, Chief Plant Licensing Branch I-1 Division of Operating Reactor Licensing FROM: John Boska, Senior Project Manager /RA/

Plant Licensing Branch I-1 Division of Operating Reactor Licensing

SUBJECT:

FORTHCOMING MEETING WITH ENTERGY NUCLEAR OPERATIONS, INC. AND GENERAL ELECTRIC CONCERNING THE USE OF GNF2 FUEL AT THE JAMES A. FITZPATRICK NUCLEAR POWER PLANT DATE & TIME: Wednesday, November 7, 2007 10:00 a.m. - 12:00 p.m.

LOCATION: U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike, Room O-3B4 Rockville, Maryland PURPOSE: The purpose of the meeting is to discuss the plans and licensing requirements associated with the use of GNF2 fuel at the James A.

FitzPatrick Nuclear Power Plant.

CATEGORY 1:* This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

Proprietary information will be discussed at certain times during this meeting. These portions of the meeting will be closed to members of the public who have not been granted access to the information by the owner of the information.

PARTICIPANTS: Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR).

NRC (NRR) ENTERGY GE J. Boska J. McCann R. Augi R. Reeves B. Ford J. Harrison P. Clifford J. Costedio A. Lingenfelter A. Mendiola F. Smith R. Fawcett J. Kim R. Plasse M. Kowal G. Rorke Docket No. 50-333

Enclosure:

Agenda cc w/encl: See next page MEETING CONTACT: John Boska, NRR 301-415-2901 jpb1@nrc.gov

  • Commission's Policy Statement on AEnhancing Public Participation in NRC Meetings@

(67 FR 36920), May 28, 2002

ML OFFICE LPL1-1/PM LPL1-1/LA LPL1-1/BC NAME J. Boska S. Little M. Kowal DATE 10/19/07 10/22/07 10/22/07 DISTRIBUTION:

PMNS PUBLIC LPL1-1 Reading File RidsNrrDorl RidsNrrDorlLpl1-1 RidsNrrDirsltsb RidsNrrPMJBoska RidsNrrLASLittle RidsNrrWpcMail ECobey, RI MKowal RReeves PClifford AMendiola JKim RidsOGCMailCenter RidsEDOMailCenter RidsOPAMail RidsRgn1MailCenter RidsAcrsAcnw&mMailCenter Receptionist, OWFN Receptionist, TWFN cc: Plant Mailing List

FitzPatrick Nuclear Power Plant cc:

Mr. Michael R. Kansler Mr. John A. Ventosa President & CEO / CNO GM, Engineering Entergy Nuclear Operations, Inc. Entergy Nuclear Operations, Inc.

1340 Echelon Parkway 440 Hamilton Avenue Jackson, MS 39213 White Plains, NY 10601 Mr. John T. Herron Mr. John F. McCann Sr. Vice President Director, Nuclear Safety & Licensing Entergy Nuclear Operations, Inc. Entergy Nuclear Operations, Inc.

1340 Echelon Parkway 440 Hamilton Avenue Jackson, MS 39213 White Plains, NY 10601 Sr. Vice President Ms. Charlene D. Faison Engineering & Technical Services Manager, Licensing Entergy Nuclear Operations, Inc. Entergy Nuclear Operations, Inc.

1340 Echelon Parkway 440 Hamilton Avenue Jackson, MS 39213 White Plains, NY 10601 Mr. Peter T. Dietrich Mr. Ernest J. Harkness Site Vice President Director, Oversight Entergy Nuclear Operations, Inc. Entergy Nuclear Operations, Inc.

James A. FitzPatrick Nuclear Power Plant 1340 Echelon Parkway P.O. Box 110 Jackson, MS 39213 Lycoming, NY 13093 Mr. Michael J. Colomb Mr. Kevin J. Mulligan Director of Oversight General Manager, Plant Operations Entergy Nuclear Operations, Inc.

Entergy Nuclear Operations, Inc. 440 Hamilton Avenue James A. FitzPatrick Nuclear Power Plant White Plains, NY 10601 P.O. Box 110 Lycoming, NY 13093 Director, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.

Mr. Oscar Limpias James A. FitzPatrick Nuclear Power Plant Vice President Engineering P.O. Box 110 Entergy Nuclear Operations, Inc. Lycoming, NY 13093 1340 Echelon Parkway Jackson, MS 39213 Mr. James Costedio Manager, Licensing Mr. Joseph P. DeRoy Entergy Nuclear Operations, Inc.

Vice President, Operations Support James A. FitzPatrick Nuclear Power Plant Entergy Nuclear Operations, Inc. P.O. Box 110 1340 Echelon Parkway Lycoming, NY 13093 Jackson, MS 39213

FitzPatrick Nuclear Power Plant cc:

Mr. William C. Dennis Supervisor Assistant General Counsel Town of Scriba Entergy Nuclear Operations, Inc. Route 8, Box 382 440 Hamilton Avenue Oswego, NY 13126 White Plains, NY 10601 Mr. James H. Sniezek Regional Administrator, Region I BWR SRC Consultant U.S. Nuclear Regulatory Commission 5486 Nithsdale Drive 475 Allendale Road Salisbury, MD 21801-2490 King of Prussia, PA 19406 Mr. Michael D. Lyster Resident Inspector's Office BWR SRC Consultant James A. FitzPatrick Nuclear Power Plant 5931 Barclay Lane U. S. Nuclear Regulatory Commission Naples, FL 34110-7306 P.O. Box 136 Lycoming, NY 13093 Mr. John Doering BWR SRC Consultant Mr. Michael Balboni P.O. Box 189 Deputy Secretary for Public Safety Parker Ford, PA 19457 State Capitol, Room 229 Albany, NY 12224 Mr. Michael A. Balduzzi Sr. Vice President & COO Mr. Charles Donaldson, Esquire Regional Operations, NE Assistant Attorney General Entergy Nuclear Operations, Inc.

New York Department of Law 440 Hamilton Avenue 120 Broadway White Plains, NY 10601 New York, NY 10271 Mr. John P. Spath New York State Energy, Research, and Development Authority 17 Columbia Circle Albany, NY 12203-6399 Mr. Paul Eddy New York State Dept. of Public Service 3 Empire State Plaza Albany, NY 12223-1350 Oswego County Administrator Mr. Steven Lyman 46 East Bridge Street Oswego, NY 13126

MEETING AGENDA NOVEMBER 7, 2007 10 a.m. to 12 p.m.

U.S. NUCLEAR REGULATORY COMMISSION ONE WHITE FLINT NORTH, ROOM O-3B4 10:00 a.m. Welcome and Opening Remarks 10:10 a.m. Present Reload Plans and Schedules for FitzPatrick and Pilgrim 10:40 a.m. Present New Fuel Introduction Scope of Work for FitzPatrick 11:10 a.m. Review Status of GNF-2 Fuel 11:20 a.m. Public Questions and Comments 11:30 a.m. Meeting Closed for Proprietary Discussions 12:00 p.m. Adjourn Enclosure