Notice of Meeting with Entergy Nuclear Northeast Management Regarding the Results of the NRC Team Inspection Covering the Scoping and Aging Management Portions of the James A. FitzPatrick Nuclear Plant Application for a Renewed License
ML071550279
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 06/04/2007
From: Conte R
Engineering Region 1 Branch 1
To:
References
MN 07-026
Download: ML071550279 (4)


Text

MN No.07-026 June 4, 2007 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF SIGNIFICANT MEETING Licensee: Entergy Nuclear Northeast Facility: James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 Date and Time: June 21, 2007, 6:30 p.m. to 7:30 p.m.

Location: Joint News Center Oswego County Airport County Route 176 Fulton, NY 13069

Purpose:

NRC staff will inform Entergy management of the results of the NRC team inspection covering the scoping and aging management portions of the James A. FitzPatrick Nuclear Power Plant application for a renewed license.

Attendees:

NRC: J. Tappert, Deputy Director, Division of Reactor Safety (DRS), Region I R. Conte, Chief, Engineering Branch 1, DRS G. Meyer, Senior Reactor Inspector \ Team Leader, DRS R. Auluck, Chief, License Renewal Branch B, NRR Entergy: P. Dietrich, Site Vice President K. Mulligan, General Manager of Plant Operations S. Bono, Director of Engineering W. Rheaume, Acting Director of Nuclear Safety Assurance Public Participation: This is a Category 1 Meeting. The public is invited to observe this meeting. Following the business portion, but before the meeting is adjourned, the public will have opportunities to communicate with the NRC staff regarding the FitzPatrick application for a renewed license and the role of NRC in ensuring safe plant operations. Handicapped persons requiring assistance to attend the meeting should make their requests to the NRC contact no later than two business days prior to the meeting.

Contact:

Glenn W. Meyer 610-337-5211; E-mail: gwm@nrc.gov

2 Information relative to the NRC's license renewal process and the application for James A.

FitzPatrick Nuclear Power Plant can be found on the NRC's website at:

http://www.nrc.gov/reactors/operating/licensing/renewal/applications/FitzPatrick.html Approved by: /RA/

Richard J. Conte, Chief Engineering Branch 1 Division of Reactor Safety cc w/encl:

G. J. Taylor, Chief Executive Officer, Entergy Operations M. R. Kansler, President, Entergy Nuclear Operations, Inc.

J. T. Herron, Senior Vice President for Operations M. Balduzzi, Senior Vice President, Northeastern Regional Operations W. Campbell, Senior Vice President of Engineering and Technical Services C. Schwarz, Vice President, Operations Support T. Vitale , General Manager, Plant Operations O. Limpias, Vice President, Engineering (ENO)

J. McCann, Director, Licensing (ENO)

C. Faison, Manager, Licensing (ENO)

M. Colomb, Director of Oversight (ENO)

W. Rheaume, Director, Nuclear Safety Assurance J. Costedio, Manager, Regulatory Compliance T. McCullough, Assistant General Counsel (ENO)

M. Balboni, Deputy Secretary,New York State Energy Research and Development Authority P. Eddy, New York State Department of Public Service S. Lyman, Oswego County Administrator Supervisor, Town of Scriba C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law J. Sniezek, PWR SRC Consultant M. Lyster, PWR SRC Consultant S. Lousteau, Treasury Department, Entergy Services J. Spath, Program Director, New York State Energy Research and Development Authority

2 Information relative to the NRC's license renewal process and the application for James A.

FitzPatrick Nuclear Power Plant can be found on the NRC's website at:

http://www.nrc.gov/reactors/operating/licensing/renewal/applications/FitzPatrick.html Approved by: /RA/

Richard J. Conte, Chief Engineering Branch 1 Division of Reactor Safety Distribution:

Executive Director for Operations, OEDO J, Trapp, DRS (RIDSEDOMAILCENTER) J. White, DRS Deputy Executive Director for Reactor Programs, L. Doerflein, DRS OEDO (RIDSEDOMAILCENTER) J. Rogge, DRS Director, Office of Nuclear Reactor Regulation, NRR M. Sykes, DRS (RIDSNRROD) G. Meyer, DRS Associate Director, Office of Operating Reactor C. Miskey, DRS Oversight and Licensing, E. Cobey, DRP NRR/ADRO (RIDSNRRADRO) B. Welling, DRP Director, Division of Inspection and Regional Support, C. Hott, DRP NRR/DIRS (RIDSNRRDIRS) J. Lamb, RI OEDO Director, Division of Operating Reactor Licensing, M. Kowal, NRR NRR/DORL (RIDSNRRDORL) J. Boska, PM NRR Project Directorate I-1 (PD1/2), NRR J. Hughey, NRR (RIDSNRRDIPMLPDI) G. Hunegs, DRP, Senior Resident Inspector Asst. General Counsel Materials Litigation and D. Dempsey, DRP, Resident Inspector Enforcement, OGC (RIDSOGCMAILCENTER) S. K. Kolek, Resident OA Collins, RA PMNS M. Dapas, DRA Region I Docket Room (with concurrences)

M. Gamberoni, DRS J. Tappert, DRS R. Conte, DRS SUNSI Review Complete: GWM (Reviewers Initials)

DOCUMENT NAME: C:\FileNet\ML071550279.wpd After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS RI/DRS RI/DRP NAME GMeyer/GWM RConte/RJC ECobey/BEW FOR DATE 06/04/07 06/04/07 06/04/07 OFFICIAL RECORD COPY ML071550279

Agenda NRCs License Renewal Exit Meeting James A. FitzPatrick Nuclear Power Plant June 21, 2007 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (5 minutes)

Review of License Renewal Process . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (10 minutes)

Inspection Conclusions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (20 minutes)

Entergys Response and Remarks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Entergy (15 minutes)

Closing Remarks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (5 minutes)

Short Break . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (5 minutes)

NRC to address public questions . . . . . . . . . . . . . . . . NRC/Members of the Public (as needed)