ML20147A188

From kanterella
Jump to navigation Jump to search
Notice of Category 3 Public Meeting: Annual Assessment Meeting for FitzPatrick, Ginna, and Nine Mile for 2019
ML20147A188
Person / Time
Site: Nine Mile Point, Ginna, FitzPatrick  Constellation icon.png
Issue date: 05/26/2020
From:
Division Reactor Projects I
To:
Shared Package
ML20147A182 List:
References
MN 20-005
Download: ML20147A188 (3)


Text

MN No.20-005 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF PUBLIC MEETING May 26, 2020 Licensees: Exelon Generation Company, LLC Facilities: James A. FitzPatrick Nuclear Power Plant (FitzPatrick), Unit 1 R.E. Ginna Nuclear Power Plant (Ginna), Unit 1 Nine Mile Point Nuclear Station (Nine Mile Point), Units 1 and 2 Docket Nos: 50-333 (FP), 50-244 (GN), 50-220 (NMP1), 50-410 (NMP2)

Date/ Time: Wednesday, June 24, 2020 5:30 p.m.

Location: Webinar (advance registration required)

Purpose:

The NRC staff will host a webinar to present the NRCs assessment of safety performance at FitzPatrick, Ginna, and Nine Mile Point for 2019, as described in the 2019 annual assessment letters. Following the presentation, the NRC will respond to questions specific to the safety performance of the stations and the NRCs role in ensuring safe plant operations.

NRC Attendees: E. Carfang, Chief, Division of Reactor Projects (DRP), Branch 1 E. Miller, Senior Resident Inspector, FitzPatrick J. Schussler, Senior Resident Inspector, Ginna G. Stock, Senior Resident Inspector, Nine Mile Point Public Participation: This is a Category 3 Meeting. The webinar will begin with a presentation by NRC staff on the NRCs assessment of performance for the sites during 2019. Then, following the presentation, members of the public will have the opportunity to ask questions specific to the safety performance and the NRCs role in ensuring safe plant operations. Those wishing to submit questions can do so in writing or verbally during the webinar. The NRC staff will provide guidance during the webinar on the methods available to ask a question. Alternatively, questions may be submitted in advance to Erin.Carfang@nrc.gov.

Interested members of the public must register at the internet address below. After registering, a confirmation email will be sent with details for joining the webinar. This is a virtual public meeting where participants will be able to see the presentation on a computer screen and hear the presenters through their devices speaker system. There is also the option to join via phone with a call-in number. Attendees must register to obtain the phone call-in number.

2 In order to participate, please register for the webinar no later than one business day prior to the June 24, 2020, meeting at:

https://usnrc.webex.com/usnrc/onstage/g.php?MTID=e85647808233952b9d9 843a3f3329c782 System Requirements for Attendees for the webinar:

https://help.webex.com/en-us/1vek5r/Webex-Meetings-System-Requirements-and-Cross-Platform-Information#Webex-Meetings-Suite-System-Requirements If you have any questions or should need assistance concerning registration for the meeting, please call or email the meeting contact.

Meeting

Contact:

Erin Carfang, Projects Branch 1 (610) 337-5120 E-mail: Erin.Carfang@nrc.gov The NRCs annual assessment letters regarding each sites performance during 2019 (2019q4) can be found at: https://www.nrc.gov/reactors/operating/oversight/listofasmrpt.html. Additional information related to the NRCs annual assessment process and the safety performance of each site can be found on the NRCs website at:

https://www.nrc.gov/reactors/operating/oversight.html.

The NRCs Policy Statement, Enhancing Public Participation in NRC Meetings, effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, http://www.nrc.gov/reading-rm/doc-collections/commission/policy/67fr36920.html.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate.

If you need a reasonable accommodation to participate in this webinar or need the meeting notice or other information from the meeting in another format (e.g., Braille, large print), please notify the NRCs meeting contact. Determinations on requests will be made on a case-by-case basis. Persons requiring assistance to attend the webinar shall make their requests known to the NRC meeting contact no later than two business days prior to the June 24, 2020, meeting.

Meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances.

Please confirm the meeting schedule on the NRC website (www.NRC.gov) under public meetings.

X /RA/

Signed by: Erin E. Carfang Approved by:

Erin E. Carfang, Chief Projects Branch 1 Division of Reactor Projects cc: Distribution via ListServ

ML20147A188 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME CLally per email ECarfang DATE 5/22/20 5/26/20 19