3/22/2011 - Notice of Public Meeting to Discuss the Nrc'S Assessment of Safety Performance at the Nine Mile Point Nuclear Station and James A. FitzPatrick Nuclear Power Plant
ML12066A142
Person / Time
Site: Nine Mile Point, FitzPatrick  Constellation icon.png
Issue date: 03/07/2012
From: Mel Gray
Reactor Projects Branch 2
To:
References
12-004
Download: ML12066A142 (4)


Text

No.12-004 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF PUBLIC MEETING March 7, 2012 Licensee: Constellation Energy Nuclear Group, LLC. and Entergy Nuclear Northeast Facilities: Nine Mile Point Nuclear Station and James A. FitzPatrick Nuclear Power Plant Docket Nos. 50-220; 50-410; 50-333 Date and Time: March 22, 2011 4:00 p.m. - 6:00 p.m.

Location: Scriba Town Hall Municipal Building 42 Creamery Road Oswego, NY 13126

Purpose:

The U.S. Nuclear Regulatory Commission (NRC) will meet with the public to discuss the NRCs assessment of safety performance at both the Nine Mile Point Nuclear Station and James A. FitzPatrick Nuclear Power Plant for 2011, as described in the annual assessment letter dated March 5, 2012. The NRC will respond to questions on specific performance issues at the plant and our role in ensuring safe plant operations.

Attendees:

NRC Attendees: G. Dentel, Chief, Division of Reactor Projects, Branch 1 M. Gray, Chief, Division of Reactor Projects, Branch 2 K. Kolaczyk, Senior Resident Inspector, Nine Mile Point E. Knutson, Senior Resident Inspector, James A. FitzPatrick D. Dempsey, Resident Inspector, Nine Mile Point B. Sienel, Resident Inspector, James A. FitzPatrick Public Participation: This is a Category 3 Meeting. The NRC staff will hold an open house to discuss the performance of Constellation and Entergy at Nine Mile Point and FitzPatrick, respectively, during calendar year 2011. NRC staff will be available, in an informational setting, to answer questions from members of the public and discuss issues or concerns related to Nine Mile Point and FitzPatrick.

Meeting

Contact:

Mel Gray, Chief, Projects Branch 2 (610) 337-5209 E-mail: mel.gray@nrc.gov

2 The NRCs annual assessment letter regarding Nine Mile Point Nuclear Station performance during 2011 can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession Number ML12061A297. The NRCs annual assessment letter regarding James A. FitzPatrick Nuclear Power Plant performance during 2011 can be found in ADAMS with Accession Number ML12061A061. ADAMS is accessible from the NRC website at: http://www.nrc.gov/reading rm/adams.html.

Additional information relative to the NRC's annual assessment process and the safety performance of Nine Mile Point Nuclear Station and James A. FitzPatrick Nuclear Power Plant can be found on the NRC's website at: www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

The NRCs Policy Statement, Enhancing Public Participation in NRC Meetings, effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, http://www.nrc.gov/reading-rm/doc-collections/commission/policy/67fr36920.html, and contains information regarding visitors and security.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate.

If you need a reasonable accommodation to participate in this meeting, or need the meeting notice or other information from the meeting in another format (e.g., Braille, large print), please notify the NRCs meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.

Attendance by other NRC personnel at this meeting should be made known by March 19, 2012, via telephone to the NRC meeting contact.

Meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances.

Please confirm the meeting schedule on the NRC website under public meetings.

Approved by:

/RA/

Mel Gray, Chief Projects Branch 2 Division of Reactor Projects cc: Distribution via ListServ

ML12066A142 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME BBickett GDentel/np for MGray DATE 3/5/12 3/5/12 3/06/12 3

Distribution:

Executive Director for Operations, OEDO (RIDSEDOMAILCENTER)

Deputy Executive Director for Reactor Programs, OED (RIDSEDOMAILCENTER)

Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)

Deputy Director, Office of Nuclear Reactor Regulation NRR (RIDSNRROD)

Director, Division of Inspection & Regional Support, NRR/DIRS (RIDSNRRDIRS)

Director, Division of Operating Reactor Licensing, NRR/DORL (RIDSNRRDORL)

Asst. General Counsel Materials Litigation & Enforcement, OGC (RIDSOGCMAILCENTER)

W. Dean, RA D. Lew, DRA J. Tappert, DRP J. Clifford, DRP C. Miller, DRS P. Wilson, DRS L. Chang, RI OEDO K. Kolaczyk, DRP D. Dempsey, DRP E. Knutson, DRP B. Seinel, DRP K, Kolek, DRP N. Sheehan, PAO D. Screnci, PAO N. McNamara, SLO D. Tifft, SLO G. Matakas, ORA C. ODaniell, ORA K. Heater, DRP L. Pinkham, DRP D. Bearde, DRS T. Haverkamp, DNMS L. Larche, DRM V. Lewis, RI Receptionist ROPreportsResource@nrc.gov PMNS