Notice of Licensee Meeting with Constellation Energy and Entergy Nuclear Northeast to Discuss Nrc'S Assessment of Safety Performance of Nine Mile Point and FitzPatrick for Calendar Year 2008
ML090960217
Person / Time
Site: Nine Mile Point, FitzPatrick  Constellation icon.png
Issue date: 04/06/2009
From: Glenn Dentel
Reactor Projects Branch 1
To:
Dentel, G RGN-I/DRP/BR1/610-337-5233
References
Download: ML090960217 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406-1415 April 6, 2009 No.09-013 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING Licensees: Constellation Energy and Entergy Nuclear Northeast Facility: Nine Mile Point Nuclear Station and James A. FitzPatrick Nuclear Station Docket No. 50-220 and 50-410; 50-333 Date and Time: April 30, 2009 from 2:30 p.m. to 4:30 p.m.

Location: Scriba Town Hall 42 Creamery Rd Oswego, NY, 13126

Purpose:

To discuss the NRCs assessment of the safety performance of Constellations Nine Mile Point Nuclear Station and Entergys James A.

FitzPatrick Nuclear Station for calendar year 2008 and the role of the agency in ensuring safe plant operations.

Attendees:

NRC: G. Dentel, Chief, Projects Branch 1, Region I M. Gray, Chief, Project Branch 2, Region I E. Knutson, Senior Resident Inspector, Nine Mile Point G. Hunegs, Senior Resident Inspector, James A. FitzPatrick D. Dempsey, Resident Inspector, Nine Mile Point S. Rutenkroger, Resident Inspector, James A. FitzPatrick Constellation: T. Syrell, Nine Mile Point Licensing Director B. Byrne, Nine Mile Point Manager Nuclear Safety and Security J. Lyon, Nine Mile Point Communications Representative Entergy: Pete Dietrich, FitzPatrick Site Vice President Kevin Mulligan, FitzPatrick General Manager of Plant Operations Brian Finn, FitzPatrick Director of Safety Assurance Mark Woodby, FitzPatrick Director of Engineering Joe Pechacek, FitzPatrick Licensing Manager Tammy Holden, FitzPatrick Communications Manager

2 Public Participation*: This is a Category 1 Meeting. The NRC staff will hold an open house to discuss Constellations performance at Nine Mile Point and Entegys performance at James. A. FitzPatrick during calendar year 2008 and the role of the agency in ensuring safe plant operations. During the session the public will have the opportunity to talk with the NRC staff on an informal basis.

The NRCs Annual Assessment Letter for Nine Mile Point Nuclear Station can be located in ADAMS with Accession Number ML090630173. The NRCs Annual Assessment Letter for the James A. FitzPatrick Nuclear Station can be located in ADAMS with Accession Number ML090630638. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

Additional information relative to the NRC's Annual Assessment Process and the safety performance of Nine Mile Point and James A. FitzPatrick Nuclear Stations can be found on the NRC's web site at: www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Meeting

Contact:

Glenn Dentel, Chief, Projects Branch 1 (610) 337-5233 E-mail: glenn.dentel@nrc.gov

  • Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by April 27, 2009, via telephone to the NRC meeting contact.

Approved by:

/RA/

Glenn Dentel, Chief Projects Branch 1 Division of Reactor Projects cc w/ encl:

M. Wallace, Vice - Chairman, Constellation Energy H. Barron, President, CEO & Chief Nuclear Officer, Constellation Energy Nuclear Group C. Fleming, Esquire, Senior Counsel, Nuclear Generation, Constellation Energy Group, LLC M. Wetterhahn, Esquire, Winston & Strawn T. Syrell, Director, Licensing, Nine Mile Point Nuclear Station Senior Vice President and COO, Entergy Nuclear Operations Vice President, Oversight, Entergy Nuclear Operations Senior Manager, Nuclear Safety and Licensing, Entergy Nuclear Operations Assistant General Counsel, Entergy Nuclear Operations E. Dorman, Acting Manager, Licensing, Entergy Nuclear Operations J. Spath, Program Director, New York State Energy Research and Development Authority F. Murray, New York State Energy Research and Development Authority P. Eddy, New York State Department of Public Service C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law

3 Supervisor, Town of Scriba P. Church, Oswego County Administrator T. Judson, Central NY Citizens Awareness Network D. Katz, Citizens Awareness Network J. Evans, LIPA G. Detter, Manager, Corp Nuclear Safety and Security, Constellation Energy M. Bockstein, Chairman and Executive Director, State Consumer Protection Board S. Kempf, Regional Director, DHS, Region II P. Eddy, New York State Department of Public Service P. Church, Oswego County Administrator Supervisor, Town of Scriba C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law S. Lousteau, Treasury Department, Entergy Services

2 Public Participation*: This is a Category 1 Meeting. The NRC staff will hold an open house to discuss Constellations performance at Nine Mile Point and Entegys performance at James. A. FitzPatrick during calendar year 2008 and the role of the agency in ensuring safe plant operations. During the session the public will have the opportunity to talk with the NRC staff on an informal basis.

The NRCs Annual Assessment Letter for Nine Mile Point Nuclear Station can be located in ADAMS with Accession Number ML090630173. The NRCs Annual Assessment Letter for the James A. FitzPatrick Nuclear Station can be located in ADAMS with Accession Number ML090630638. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

Additional information relative to the NRC's Annual Assessment Process and the safety performance of Nine Mile Point and James A. FitzPatrick Nuclear Stations can be found on the NRC's web site at: www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Meeting

Contact:

Glenn Dentel, Chief, Projects Branch 1 (610) 337-5233 E-mail: glenn.dentel@nrc.gov

  • Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by April 27, 2009, via telephone to the NRC meeting contact.

Approved by:

/RA/

Glenn Dentel, Chief Projects Branch 1 Division of Reactor Projects Distribution w/encl: (VIA E-MAIL)

Executive Director for Operations, OEDO (RIDSEDOMAILCENTER RESOURCES)

Deputy Executive Director for Reactor Programs, OEDO (RIDSEDOMAILCENTER RESOURCES)

Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)

Deputy Director, Office of Nuclear Reactor Regulation, NRR/ADPR (RIDSNRROD)

Director, Division of Regulatory Improvement Programs, NRR (RIDSNRRDRIP)

Director, Division of Inspection Program Management, NRR (RIDSNRRDIPM)

Director, Division of Licensing Project Management, NRR (RIDSNRRDLPM)

Project Directorate I-1 (PD1/2), NRR (RIDSNRRDIPMLPDI)

Asst. General Counsel Materials Litigation and Enforcement, OGC (RIDSOGCMAILCENTER)

S. Collins, RA D.Roberts, DRS M Gray, DRP B. Bickett, DRP M. Dapas, DRA E. Cobey, DRS G. Dentel, DRP N. Perry, DRP S. Campbell, RI OEDO P. Wilson, DRS D. Screnci, PAO D. Bearde, DRP D. Pickett, NRR N. Sheehan, PAO G. Hunegs, DRP PMNS R. Guzman, NRR N. McNamara, SLO K. Kolek, Resident OA V. Bhalchandra, NRR D. Tifft, SLO Regional Administrator Secretary, RI J. Boska, NRR DRP Division Secretary, RI Deputy Regional Administrator Secretary, RI DRS Division Secretary, RI DNMS Division Secretary, RI DRM Division Secretary, RI Region I Docket Room (w/concurrences) Region I Receptionist SUNSI Review Complete: GTD (Reviewer=s Initials) Non-Public Designation Category: MD 3.4 Non-Public N/A (A.3 - A.7 or B.1)

DOCUMENT NAME: S:\ROP-9 EOC Review\Branch 2\Fitz NMP AA Mtg Notice (2).doc ML090960217 After declaring this document AAn Official Agency Record@ it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME MGray/AAR for* GDentel/GTD DATE 04/03/09 04/03/09

  • see prior concurrence OFFICIAL RECORD COPY