Annual Performance Assessment James A. FitzPatrick Nuclear Power Plant Calendar Year 2006
2
Introductions
Nuclear Regulatory Commission 3/4Gene Cobey, Branch Chief 3/4Gordon Hunegs, Senior Resident Inspector 3/4Doug Dempsey, Resident Inspector Entergy
3 Purpose 3/4Discuss Entergys performance as described in the NRC Annual Assessment Letter 3/4 Public Outreach 3/4Question and answer period
4 Agenda 3/4Describe Who We Are 3/4Review of NRC Reactor Oversight Process 3/4NRC Assessment of Plant Performance 3/4Entergy Response and Remarks 3/4NRC Closing Remarks 3/4Break 3/4NRC available to answer questions
5 NRC - Who We Are The NRC is an independent agency established by Congress 3/4Headquarters and four Regional Offices 3/4Region I Office oversees inspections at FitzPatrick Nuclear Power Plant 3/4Inspections are conducted by two full-time resident inspectors with additional inspections by region-based specialist inspectors
6 Samuel J. Collins Regional Administrator Marc L. Dapas Deputy Regional Administrator David C. Lew Director Division of Reactor Projects James W. Clifford Deputy Director Marsha K. Gamberoni Director Division of Reactor Safety John R. Tappert Deputy Director Eugene Cobey Branch Chief Regional Specialists FitzPatrick Resident Inspectors Gordon Hunegs - SRI Doug Dempsey - RI Region I Organization
7 NRC Strategic Goals 3/4Safety: Ensure protection of public health and safety and the environment.
3/4Security: Ensure the secure use and management of radioactive materials.
3/4Openness: Ensure openness in our regulatory process.
3/4Effectiveness: Ensure that NRC actions are effective, efficient, realistic, and timely.
3/4Management: Ensure excellence in agency management to carry out the NRCs strategic objective.
8 Reactor Oversight Process INITIATING EVENTS MITIGATING SYSTEMS BARRIER INTEGRITY EMERGENCY PREPAREDNESS Cornerstones PUBLIC RADIATION SAFETY OCCUPATIONAL RADIATION SAFETY PHYSICAL PROTECTION Strategic Performance Areas REACTOR SAFETY RADIATION SAFETY SAFEGUARDS HUMAN PERFORMANCE SAFETY CONSCIOUS WORK ENVIRONMENT PROBLEM IDENTIFICATION AND RESOLUTION PUBLIC HEALTH AND SAFETY AS A RESULT OF CIVILIAN NUCLEAR REACTOR OPERATION NRCs Overall Safety Mission Exhibit 1: REGULATORY FRAMEWORK Cross-Cutting Areas
9 Reactor Oversight Process Safety Cornerstones Baseline Inspection Results Significance Threshold Action Matrix Significance Threshold Performance Indicator Results Regulatory Response Strategic Performance Areas Safety Cornerstones Baseline Inspection Results Significance Threshold Action Matrix Significance Threshold Performance Indicator Results Regulatory Response Strategic Performance Areas
10 Action Matrix Concept 3/4Increasing Safety Significance 3/4Increasing NRC Inspection Efforts 3/4Increasing NRC/Licensee Management Involvement 3/4Increasing Regulatory Actions Lic ense e Res pon se Re gula tory Re spon se D egra ded C orn erst one Mul tiple /Re p.
D eg rade d C or ners ton e Un ace pta ble Per for m an ce Licensee
Response
Regulatory
Response
Degraded Cornerstone Multiple/Rep.
Degraded Cornerstone Unacceptable Performance Reactor Oversight Process
11 NRC Inspection Activities 3/44745 hours of inspection and related activities 3/42 resident inspectors assigned to the site 3/48 regional specialists inspections 3/43 team inspections
12 James A. FitzPatrick Annual Assessment 3/4At the end of CY2006, FitzPatrick was in the Licensee Response Column of the Action Matrix 3/4All Findings of Very Low Safety Significance (Green) 3/4All NRC Performance Indicators Green 3/4NRC plans baseline inspections at FitzPatrick
13 James A. FitzPatrick Annual Assessment 3/4Entergy operated FitzPatrick Nuclear Power Plant in a manner that preserved public health and safety 3/4All cornerstone objectives were met
14 Entergy Response and Remarks Mr. Pete Dietrich Site Vice President James A. FitzPatrick Nuclear Power Plant
15 Contacting the NRC 3/4 Report an emergency 3/41-301-816-5100 (call collect) 3/4 Report a safety concern 3/41-800-695-7403 (toll free) 3/4Allegation@nrc.gov 3/4 General information or questions 3/4www.nrc.gov 3/4Select What We Do for Public Affairs
16 Reference Sources Reference Sources 3/4 Reactor Oversight Process 3/4 http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html 3/4 Public Electronic Reading Room 3/4 http://www.nrc.gov/reading-rm.html 3/4 Public Document Room 3/4 1-800-397-4209 (toll free)