ML070160541

From kanterella
Jump to navigation Jump to search
Yankee Nuclear Power Station Final Status Survey Report, YNPS-FSS-NOL-04-00
ML070160541
Person / Time
Site: Yankee Rowe
Issue date: 08/31/2006
From: Jeffery Lynch
Yankee Atomic Electric Co
To:
Document Control Desk, NRC/FSME
References
BYR 2004-133, BYR-2006-073 YNPS-FSS-NOL-04-00
Download: ML070160541 (107)


Text

YANKEE ATOMIC ELECTRIC COMPANY 49 Yankee Road, Rowe, Massachusetts01367 o/Kl EE August 31, 2006

  • o BYR 2006-073 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-001

References:

(a) License No. DPR-3 (Docket No. 50-29)

(b) BYR 2004-133, Submittal of Revision 1 to the Yankee Nuclear Power Station's License Termination Plan (c) Yankee Nuclear Power Station - Issuance of Amendment 158 Re: License Termination Plan

Subject:

Submittal of YNPS-FSS-NOL04-00, the Final Status Survey Report for Survey Area NOL-04

Dear Madam/Sir:

This letter submits YNPS-FSS-NOL04-00, Final Status Survey Report for survey area NOL-04. This report was written in accordance with Section 5 of the YNPS License Termination Plan, "Final Status Survey Plan," and is consistent with the guidance provided in the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM).

We trust that this information is satisfactory; however if you should have any questions or require any additional information, please contact Alice Carson at (301) 916-3995 or the undersigned at (413)-424-2261.

Sincerely, YANKEE ATOMIC ELECTRIC COMPANY Joseph R. Lynch Regulatory Affairs Manager

Enclosure:

YNPS-FSS-NOL04-00 (2 hard copies plus CDs)

U.S. Nuclear Regulatory Commission BYR 2006-073, Page 2 cc (w/o encl): S. Collins, NRC Region I Administrator Marie Miller, Chief, Decommissioning Branch, NRC Region I J. Kottan, Region I D. Everhart, Region I J. Hickman, NRC Project Manager M. Rosenstein, US Environmental Protection Agency, Region 1 R. Walker, Director, MA DPH W. Perlman, Executive Committee Chair, FRCOG T.W. Hutcheson, Chair, Franklin Regional Planning Board L. Dunlavy, Executive Director, FRCOG P. Sloan, Director of Planning & Development, FRCOG cc (w/encl on CD) D. Howland, Regional Engineer, MA DEP M. Whalen, MA DPH D. Katz, CAN Jonathan Block, CAN

Yankee Nuclear Plant Station Final Status Survey Report For NOL-04 Yankee Atomic Electric Company

YANKEE NUCLEAR POWER STATION FINAL STATUS SURVEY REPORT REPORT NO.: YNPS-FSS-NOL-04-00 Prepared by: Date:

  • hael R n hack, FSS Radiological Engineer Reviewed by: fVA* Ž* Date: 0-(_=_

Christophe r%ý". Messier, FSS Radiological Engineer Approved by: W ,4 *

  • Date: K'//0 z 0o,,

Marti f-Erickson, yS Manager

Report No.: YNPS-FSS-NOL-04-00 Section Table of Contents Page 1.0 EX EC UT IV E SU M M A RY ........................................................................................................................... I 1.1 IDENTIFICATION OF SURVEY A REA AND U NITS ........................................................................................ 1 1.2 DATES(S) OF SURVEY ................................................................................................................................. 1 1.3 N UM BER AND TYPES OF M EASUREM ENTS C OLLECTED ........................................................................... l 1.4 SUM M ARY OF SURVEY R ESULTS ............................................................................................................... 1 1.5 C ONCLUSIONS ............................................................................................................................................ 2 2.0 FSS PRO G RA M O V ERV IEW .................................................................................................................... 2 2.1 SURVEY PLANNING .................................................................................................................................... 2 2.2 SURVEY D ESIGN ......................................................................................................................................... 2 2.3 SURVEY IM PLEMENTATION ....................................................................................................................... 3 2.4 SURVEY DATA A SSESSM ENT ...................................................................................................................... 3 2.5 QUALITY ASSURANCE AND QUALITY CONTROL MEASURES .............................................................. 3 3.0 SU RV EY A R EA IN FO R M A T IO N ..................................................................................................... 3 3.1 SURVEY A REA D ESCRIPTION ..................................................................................................................... 3 3.2 H ISTORY OF SURVEY A REA ....................................................................................................................... 4 3.3 D IVISION OF SURVEY A REA INTO SURVEY UNITS ............................................................................... 4 4.0 SU RV EY U N IT IN FO RM AT IO N ............................................................................................................... 4 4.1

SUMMARY

OF RADIOLOGICAL DATA SINCE HISTORICAL SITE ASSESSMENT (HSA) ........................ 4 4.1.1 Chronology and Description of Surveys Since HSA ........................................................................ 4 4.1.2 RadionuclideSelection and Basis .................................................................................................... 4 4.1.3 Scoping & Characterization............................................................................................................. 4 4.2 BASIS FOR C LASSIFICATION ...................................................................................................................... 4 4.3 R EM EDIAL A CTIONS AND FURTHER INVESTIGATIONS ........................................................................ 5 4.4 U NIQUE FEATURES OF SURVEY A REA ................................................................................................ 5 4.5 A LA RA PRACTICES AND EVALUATIONS ............................................................................................. 5 5.0 SURVEY UNIT FINAL STATUS SURVEY ......................................................................................... 5 5.1 SURVEY PLANNING .................................................................................................................................... 5 5.1.1 FinalStatus Survey Plan andAssociated DQOs ................................................................................. 5 5.1.2 Deviationsfrom the FSS Plan as Written in the L TP ..................................................................... 6 5.1.3 DCGL Selection and Use ............................................................................................................. 6 5.1.4 M easurements ....................................................................................................................................... 7 5.2 SURVEY IM PLEM ENTATION A CTIVITIES ............................................................................................... 7 5.3 SURVEILLANCE SURVEYS .......................................................................................................................... 7 5.3.1 PeriodicSurveillanceSurveys ......................................................................................................... 7 5.3.2 Surveillance Resurveys ................................................. ................ ............................ 8 5.3.3 SurveillanceInvestigations........................................................................................................... 8 5.4 SURVEY RESULTS .......................... ............................................. 8 5.5 DATA Q UALITY A SSESSM ENT ........................................................................... ....................................... 10 6.0 QUALITY ASSURANCE AND QUALITY CONTROL .................................................................... 10 6.1 INSTRUM ENT Q C C HECKS ....................................................................................................................... 10 6.2 SPLIT SAM PLES AND R ECOUNTS ............................................................................................................. 11 6.3 SELF-A SSESSM ENTS ................................................................................................................................. 11 7.0 C O N C LU SIO N ............................................................................................................................................ 11 i

Report No.: YNPS-FSS-NOL-04-00 Table List of Tables Page T A BLE I D A TE O F SU RV EY S ........................................................................................................................................... I TABLE 2 SURVEY AREA NOL-04 DESIGN PARAMETERS ............................................................................................ 6 T ABLE 3 SOIL D C G L V A LUES ........................................................................................................................................ 6 TABLE 4 FSS ACTIVITY

SUMMARY

FOR NOL-04 SURVEY UNITS ............................................................................. 7 TABLE 5 D IRECT M EASUREM ENT SUM MARY ................................................................................................................. 8 TABLE 6 ISO C S SCAN SUM MARY ........................................................................................................... ....................... 9 List of Appendices Appendix A - YNPS-FSSP-NOL-04, "FinalStatus Survey Planning Worksheets Appendix B - YA-REPT-00-015-04, "Instrument Efficiency Determinationfor Use in Minimum Detectable ConcentrationCalculationsin Support of the FinalStatus Survey at Yankee Rowe" Appendix C - ALARA Evaluations, NOL-04 Appendix D - YA-REPT-00-018-05, "Use of In-situ Gamma Spectrum Analysis to Perform Elevated Measurement Comparison in Support of FinalStatus Surveys" List of Attachments Attachment A - Maps and Posting Plots Attachment B - Data Quality Assessment Plots and Curves Attachment C - Instrument QC Records Attachment D - ISOCS Scan Data Attachment E - ORTEC Direct Measurement Data (In the electronic version, every Table of Contents, Figures, Appendices and Attachments, as well as every mention of a Table, Figure,Appendix or Attachment is a hyperlink to the actual location or document.)

ii

Report No.: YNPS-FSS-NOL-04-00 List of Abbreviations and Acronyms AL Action Level ALARA ............... As Low As Reasonably Achievable c/d ....................... Counts per Disintegration DCGL ......... Derived Concentration Guideline Level DCGLEMC ............ DCGL for small areas of elevated activity DCGLw -------- DCGL for average concentration over a wide area, used with statistical tests DQO .................... Data Quality Objectives EMC .................... Elevated Measurement Comparison ETD---------- Easy-to-Detect FSS ...................... Final Status Survey FSSP .................... Final Status Survey Plan GPS .....----------------- Global Positioning System Ho......................... Null Hypothesis HSA Historical Site Assessment HTD Hard-to-Detect ISOCS ................. In-situ Object Counting System LBGR ------------------ Lower Bound of the Grey Region LTP License Termination Plan MARSSIM ---------- Multi-Agency Radiation Survey and Site Investigation Manual MDA ---------- Minimum Detectable Activity MDC Minimum Detectable Concentration PAB ..................... Primary Auxiliary Building QAPP --------- Quality Assurance Project Plan QC ----------------------- Quality Control RCA ..................... Radiological Controlled Area RP Radiation Protection RSS---------- Reactor Support Structure SFP ...................... Spent Fuel Pool VC ----------- Vapor Container VCC Vertical Concrete Cask VSP ...................... Visual Sample Plan YNPS Yankee Nuclear Power Station iii

Report No.: YNPS-FSS-NOL-04-00 1.0 EXECUTIVE

SUMMARY

A Final Status Survey (FSS) was performed of Survey Area NOL-04 in accordance with Yankee Nuclear Power Station's (YNPS) License Termination Plan (LTP). This FSS was

  • conducted as an open land area FSS with soil DCGLs.

1.1 Identification of Survey Area and Units NOL-04 is the land area within the RCA that is bounded by the NOL-05 on the north, NOL-03 on the east, OOL-10 on the south and west. NOL-04 has a single Survey Unit, NOL-04-01 which is a Class I Survey Unit.

1.2 Dates(s) of Survey Table I Date of Surveys Survey Start Survey End DQA Survey Unit Date Date Date NOL-04-01 5/17/2006 6/19/2006 7/20/2006 1.3 Number and Types of Measurements Collected Final Status Survey Plan (FSSP) was developed for this Survey Unit in accordance with YNPS LTP and FSS procedures using the MARSSIM protocol. The planning and design of the survey plan employed the Data Quality Objective (DQO) process, ensuring that the type, quantity and quality of data gathered was appropriate for the decision making process and that the resultant decisions were technically sound and defensible. A total of 20 systematic direct measurement measurements were taken in the Survey Unit, providing data for the non-parametric testing of the Survey Area. In addition to the direct measurement samples, ISOCS and hand-held survey instrument scans were performed to provide 100 percent coverage of the Survey Area.

1.4 Summary of Survey Results Following the survey, the data were reviewed against the survey design to confirm completeness and consistency, to verify that the results were valid, to ensure that the survey plan objectives were met and to verify Survey Unit classification. Direct measurement surveys indicated that none of the systematic measurements exceeded the DCGLw, depicted in Attachment B. Retrospective power curves were generated and demonstrated that an adequate number of samples were collected to support the Data Quality Objectives. Therefore, the null hypothesis (H.) (that the Survey Unit exceeds the release criteria) is rejected.

I

Report No.: YNPS-FSS-NOL-04-00 1.5 Conclusions Based upon the evaluation of the data acquired for the FSS, NOL-04 meets the release requirements set forth in the YNPS LTP. The Total Effective Dose Equivalent (TEDE) to the average member of the critical group does not exceed 25 mrem/yr, including that from groundwater. IOCFR20 Subpart E ALARA requirements have been met as well as the site release criteria for the administrative level DCGLs that ensure that the Massachusetts Department of Public Health's 10 mrem/yr limit will also be met.

2.0 FSS PROGRAM OVERVIEW 2.1 Survey Planning The YNPS FSS Program employs a strategic planning approach for conducting final status surveys with the ultimate objective to demonstrate compliance with the DCGLs, in accordance with the YNPS LTP. The DQO process is used as a planning technique to ensure that the type, quantity, and quality of data gathered is appropriate for the decision-making process and that the resultant decisions are technically sound and defensible. Other key planning measures are the review of historical data for the Survey Unit and the use of peer review for plan development.

2.2 Survey Design In designing the FSS, the questions to be answered are: "Does the residual radioactivity, if present in the Survey Unit, exceed the LTP release criteria?" and "Is the potential dose from this radioactivity ALARA?" In order to answer these questions, the radionuclides present in the Survey Units must be identified, and the Survey Units classified. Survey Units are classified with respect to the potential for contamination: the greater the potential for contamination, the more stringent the classification and the more rigorous the survey.

The survey design additionally includes the number, type and locations of direct measurements/samples (as well as any judgmental assessments required), scanning requirements, and instrumentation selection with the required sensitivities or detection levels. DCGLs are developed relative to the surface/material of the Survey Unit and are used to determine the minimum sensitivity required for the survey.

Determining the acceptable decision error rates, the lower bound of the gray region (LBGR), statistical test selection and the calculation of the standard deviation and relative shift allows for the development of a prospective power curve plotting the probability of the Survey Unit passing FSS.

2

Report No.: YNPS-FSS-NOL-04-00 2.3 Survey Implementation Once the planning and development has been completed, the implementation phase of the FSS program begins. Upon completion of remediation and final characterization activities, a final walk down of the Survey Unit is performed. If the unit is determined to be acceptable (i.e. physical condition of the unit is suitable for FSS), it is turned over to the FSS team, and FSS isolation and control measures are established. After the Survey Unit isolation and controls are in place, grid points are identified for the direct measurements/samples, using Global Positioning System (GPS) coordinates whenever possible, consistent with the Massachusetts State Plane System, and the area scan grid is identified. Data is collected and any required investigations are performed.

2.4 Survey Data Assessment The final stage of the FSS program involves assessment of the data collected to ensure the validity of the results, to demonstrate achievement of the survey plan objectives, and to validate Survey Unit classification. During this phase, the DQOs and survey design are reviewed for consistency between DQO output, sampling design and other data collection documents. A preliminary data review is conducted to include: checking for problems or anomalies, calculation of statistical quantities and preparation of graphical representations for data comparison. Statistical tests are performed, if required, and the assumptions for the tests are verified. Conclusions are then drawn from the data, and any deficiencies or recommendations for improvement are documented.

2.5 Quality Assurance and Quality Control Measures YNPS FSS activities are implemented and performed under approved procedures, and the YNPS Quality Assurance Project Plan (QAPP) assures plans, procedures and instructions have been followed during the course of FSS, as well as providing guidance for implementing quality control measures specified in the YNPS LTP.

3.0 SURVEY AREA INFORMATION 3.1 Survey Area Description NOL-04 is the land area within the RCA that is bounded by the NOL-05 and the radioactive waste warehouse on the north, NOL-03 on the east, OOL-10 on the south and west.

3

Report No.: YNPS-FSS-NOL-04-00 3.2 History of Survey Area In addition to the normal migration of minor levels of contamination in the RCA NOL-04 was contaminated by temporary storage of packaged radioactive material awaiting shipment. The Storm Drain System is an affected (contaminated) system that traverses this survey area.

3.3 Division of Survey Area into Survey Units NOL-04 has a single Survey Unit, NOL-04-01 which is a Class I Survey Unit.

4.0 SURVEY UNIT INFORMATION 4.1 Summary of Radiological Data Since Historical Site Assessment (HSA) 4.1.1 Chronology and Description of Surveys Since HSA Isolation and control measures were implemented for the FSS. The condition of NOL-04 Survey Area at the time of FSS was a bare ground surface.

4.1.2 Radionuclide Selection and Basis During the initial DQO process, Cs-137, Co-60, and Agl08m were identified as the radiological nuclides of concern. Characterization survey data from adjacent Survey Units indicated no other LTP-specified radionuclides warrant consideration in the NOL-04 Survey Area, however, the soil samples were evaluated for all LTP listed nuclides.

4.1.3 Scoping & Characterization Forty samples from the HSA data were used to provide the characterization data for survey unit NOL-04-01. The characterization data weighted sigma is 0.112:

4.2 Basis for Classification Based upon the radiological condition of this Survey Area identified in the operating history and as a result of the decommissioning activities performed to date, Survey Area NOL-04 is identified as a Class 1 Area.

4

Report No.: YNPS-FSS-NOL-04-00 4.3 Remedial Actions and Further Investigations Ten investigations were performed in NOL-04-01. Nine ISOCS investigations were performed, along with one direct sample investigation (64k particle found/removed).

Scans were performed and all results were well below the DCGLw.

4.4 Unique Features of Survey Area Survey Area NOL-04 has no unique features; it is an open land area containing soils.

4.5 ALARA Practices and Evaluations An ALARA evaluation was developed for Survey Area in the NOL-04-01 which concluded that additional remediation was not warranted. This evaluation is found in Appendix C.

5.0 SURVEY UNIT FINAL STATUS SURVEY 5.1 Survey Planning 5.1.1 Final Status Survey Plan and Associated DQOs The FSS for NOL-04 Survey Unit was planned and developed in accordance with the LTP using the DQO process. Form DPF-8856.1, found in YNPS Procedure 8856, "Preparationof Survey Plans," was used to provide guidance and consistency during development of the FSS Plan.

The FSS Plan can be found in Appendix A. The DQO process allows for systematic planning and is specifically designed to address problems that require a decision to be made in a complex survey design and, in turn, provides alternative actions.

The DQO process was used to develop an integrated survey plan providing the Survey Unit identification, sample size, selected analytical techniques, survey instrumentation, and scan coverage. The Sign Test was specified for non-parametric statistical testing for this Survey Unit, if required. The design parameters developed are presented below.

5

Report No.: YNPS-FSS-NOL-04-00 Table 2 Survey Area NOL-04 Design Parameters Suirvey;Unit *Design Parameter'< 2Vfe 7j BasisValue NOL-04-01 Area 978 m2 Class 1, <2,000 m2 Number of Direct Measurements 15 (calculated) (x (Type I) = 0.05

+ 5 (added) 03(Type II) = 0.05 Total: 20 a: 0.123 Bias Samples: 4 Relative Shift: 2 Adjusted LBGR: 0.754 Sample Area 48.9m2 Area / Sample #

Sample Grid Spacing: Triangular 7.5m Square Root (Area/(0.866*Sample #))

Scan area 978 m2 Class 1 Area- 100%

Scan Investigation Level Co-60: 2.9E3 dpm/100cm2 Soil I m 180 Degree Calumniator Cs-137: 1.1 E4 dpm/100cm2 See Appendix D 5.1.2 Deviations from the FSS Plan as Written in the LTP The FSSP design was performed to the criteria of the LTP; therefore, no LTP deviations with potential impact to this Survey Area need to be evaluated.

5.1.3 DCGL Selection and Use For the final evaluation of the NOL-04 Survey Area and throughout this report, the administrative acceptance criterion of 8.73 mr/yr has been set for Soil LTP-listed radionuclides.

Table 3 Soil DCGL Values Soil 8.73 Soil 8.73

<Nuclide mr/yr ~Nucl ide ~ ryr Co-60 1.4E+00 H-3 1.3E+02 Nb-94 2.5E+00 C-14 1.9E+00 Ag-108m 2.5E+00 Fe-55 1.OE+04 Sb-125 1.1E+01 Ni-63 2.8E+02 Cs-1 34 1.7E+00 Sr-90 6.OE-01 Cs-1 37 3.OE+00 Tc-99 5.OE+00 Eu-1 52 3.6E+00 Pu-238 1.2E+01 Eu-154 3.3E+00 Pu-239 1.1E+01 Eu-1 55 1.4E+02 Pu-241 3.4E+02 Am-241 1.OE+01 Cm-243 1.1E+01 6

Report No.: YNPS-FSS-NOL-04-00 5.1.4 Measurements Error tolerances and characterization sample population statistics drove the selection of the number of fixed point measurements. 15 measurements were needed in the event the Sign test may have been used.

In addition to the 15 statistical measurements needed, 5 additional samples were added to the statistical measurements, 4 biased, I recount, 2 split, and I investigation samples were also collected.

The direct measurement sampling grid was developed as a systematic grid with spacing consisting of a triangular pitch pattern with a random starting point. Sample measurement locations are provided in Attachment A.

5.2 Survey Implementation Activities Table 3 provides a summary of daily activities performed during the Final Status Survey of Survey Units in NOL-04.

Table 4 FSS Activity Summary for NOL-04 Survey Units

'Survey, Unfit. Date, Adctivi NOL-04-01 5-16-06 Performed walk-down of Survey Unit 5-12-06 Established Isolation and Controls 5-10-06 Performed Job Hazard Analysis 5-8-06 Performed Unit Classification 5-11-06 Performed Sample Quantity Calculations, established DQOs 5-11-06 Generated FFS Sample Plans 5-17-06 to 6-19-06 Initiated Scans, and Direct measurements.

7-20-06 Performed DQA, FSS Complete 5.3 Surveillance Surveys 5.3.1 Periodic Surveillance Surveys Upon completion of the FSS of Survey Area NOL-04, the Survey Unit was placed into the program for periodic surveillance surveys on a quarterly basis in accordance with YNPS procedure DP-8860, "Area Surveillance Following Final Status Survey." These surveys provide assurance that areas with successful FSS remain unchanged until license termination.

7

Report No.: YNPS-FSS-NOL-04-00 5.3.2 Surveillance Resurveys A resurvey was performed on 08/03/2006 due to non-radioactive contaminant remediation performed post FSS in the southern portion of the area. The resurvey sample results were evaluated against the original FSS sample data and no statistical differences were found. The resurvey demonstrated that there was no change in the Survey Area's status due to the post FSS remediation of the non-radioactive contaminant.

5.3.3 Surveillance Investigations No additional investigations were required for this Survey Unit due to surveillance surveys.

5.4 Survey Results Direct measurement surveys indicated that NOL-04-01 had no systematic measurements that exceeded the DCGLw, depicted in Attachment B. Retrospective power curves were generated and demonstrated that an adequate number of samples were collected to support the Data Quality Objectives. Therefore, the null hypothesis (Ho) (that the Survey Units exceeds the release criteria) is rejected.

Table 5 Direct Measurement Summary Sample Sum of Description Fractions NOL-04-01-001-F 0.005 NOL-04-01-002-F 0.008 NOL-04-01-003-F 0.009 NOL-04-01-004-F 0.009 NOL-04-01-005-F 0.011 NOL-04-01-006-F 0.014 NOL-04-01-007-F 0.025 NOL-04-01-008-F 0.005 NOL-04-01-010-F 0.044 NOL-04-01-011-F 0.022 NOL-04-01-012-F 0.003 NOL-04-01-013-F 0.239 NOL-04-01-014-F 0.006 NOL-04-01-015-F 0.165 NOL-04-01-016-F 0.008 NOL-04-01-017-F 0.045 NOL-04-01-018-F 0.001 NOL-04-01-019-F 0.141 NOL-04-01-020-F 0.306

  • NOL-04-01-026-F-I 0.054 8

Report No.: YNPS-FSS-NOL-04-00 Maximum Sum of Fractions 0.306 Normalized Standard Deviation 0.074

  • Sample NOL-04-01-009 was mislabeled as NOL-04-01-026-I. It is not an investigation, it was mislabeled.

Table 6 ISOCS Scan Summary Sample Title. it. Sample Title . Uiity Sample Title t Unity NOL-04-01-101-F-G 0 NOL-04-01-144-F-G 0 NOL-04-01-185-F-G-I 0 NOL-04-01-102-F-G 0 NOL-04-01-145-F-G 0.983 NOL-04-01-186-F-G-I 0 NOL-04-01-103-F-G 0 NOL-04-01-146-F-G 0 NOL-04-01-187-F-G-I 0 NOL-04-01-104-F-G 0 NOL-04-01-147-F-G 0.09 NOL-04-01-188-F-G-I 0 NOL-04-01-105-F-G 0 NOL-04-01-148-F-G 0 NOL-04-01-189-F-G-I 0 NOL-04-01-106-F-G 0 NOL-04-01-149-F-G 0 NOL-04-01-190-F-G-I 0 NOL-04-01-107-F-G 0 NOL-04-01-150-F-G 0 NOL-04-01-191-F-G-I 0 NOL-04-01-108-F-G 0.726 NOL-04-01-151 -F-G 0 NOL-04-01-192-F-G-1 0.183 NOL-04-01-109-F-G 0.172 NOL-04-01-152-F-G 0.163 NOL-04-01-193-F-G-I 0 NOL-04-01-110-F-G 0 NOL-04-01-153-F-G 0 NOL-04-01-194-F-G-I 0 NOL-04-01-111-F-G 0.663 NOL-04-01-154-F-G 0 NOL-04-01-195-F-G-I 0 NOL-04-01-112-F-G 0 NOL-04-01-155-F-G 0 NOL-04-01-196-F-G-l 0 NOL-04-01-113-F-G 0 NOL-04-01-155-F-G 0 NOL-04-01-197-F-G-I 0 NOL-04-01-114-F-G 0.606 NOL-04-01-156-F-G 0 NOL-04-01-198-F-G-I 0.056 NOL-04-01-115-F-G 0.739 NOL-04-01-157-F-G 0 NOL-04-01-199-F-G-I 0 NOL-04-01-116-F-G 1.022 NOL-04-01-158-F-G 0 NOL-04-01-200-F-G-1 0 NOL-04-01-117-F-G 0 NOL-04-01-159-F-G 0 NOL-04-01-201 -F-G-I 0 NOL-04-01-118-F-G 0 NOL-04-01-160-F-G 0.586 NOL-04-01-202-F-G-l 0 NOL-04-01-119-F-G 0 NOL-04-01-161-F-G 0 NOL-04-01-203-F-G-I 0 NOL-04-01-120-F-G 0 NOL-04-01-162-F-G 0.091 NOL-04-01-204-F-G-I 0.045 NOL-04-01-121-F-G 0 NOL-04-01-163-F-G 0 NOL-04-01-205-F-G-1 0 NOL-04-01-122-F-G 0 NOL-04-01-164-F-G 0 NOL-04-01-206-F-G-l 0 NOL-04-01-123-F-G 0 NOL-04-01-165-F-G 0 NOL-04-01-207-F-G-l 0 NOL-04-01-124-F-G 0.192 NOL-04-01-166-F-G 0 NOL-04-01-208-F-G-I 0 NOL-04-01-125-F-G 0 NOL-04-01-167-F-G 0 NOL-04-01-209-F-G-l 0 NOL-04-01-126-F-G 0.396 NOL-04-01-168-F-G 0.114 NOL-04-01-210-F-G-l 0 NOL-04-01-127-F-G 0 NOL-04-01-169-F-G 0 NOL-04-01-21 1-F-G-I 0 NOL-04-01-128-F-G 0 NOL-04-01-170-F-G 0 NOL-04-01-212-F-G-I 0 NOL-04-01-129-F-G 0 NOL-04-01-170-F-G 0.197 NOL-04-01-213-F-G-I 0 NOL-04-01-130-F-G 0 NOL-04-01-171-F-G 0.214 NOL-04-01-214-F-G-l 0.03 NOL-04-01-131-F-G 0 NOL-04-01-172-F-G 0.734 NOL-04-01-215-F-G-I 0 NOL-04-01-132-F-G 0.61 NOL-04-01-173-F-G-I 0 NOL-04-01-216-F-G-I 0 NOL-04-01-133-F-G 0 NOL-04-01-174-F-G-I 0 NOL-04-01-217-F-G-I 0 NOL-04-01-134-F-G 0 NOL-04-01-175-F-G-I 0 NOL-04-01-218-F-G 0 NOL-04-01-135-F-G 0 NOL-04-01-176-F-G-I 0 NOL-04-01-219-F-G 0 NOL-04-01-136-F-G 0 NOL-04-01-177-F-G-1 0 NOL-04-01-220-F-G 0 NOL-04-01-137-F-G 0 NOL-04-01-178-F-G-l 0.331 NOL-04-01-221-F-G 0 NOL-04-01-138-F-G 0 NOL-04-01-179-F-G-I 0 NOL-04-01-222-F-G 0 NOL-04-01-139-F-G 0 NOL-04-01-180-F-G-I 0 NOL-04-01-223-F-G 0 NOL-04-01-140-F-G 0 NOL-04-01-181-F-G-l 0 NOL-04-01-224-F-G 0.076 9

Report No.: YNPS-FSS-NOL-04-00 Sample Titlei Sample Title Unity Sample Title - Unit NOL-04-01-141-F-G 0 NOL-04-01-182-F-G-I 0 NOL-04-01-225-F-G 0 NOL-04-01-142-F-G 0 NOL-04-01-183-F-G-I 0 NOL-04-01-226-F-G-I 0 NOL-04-01-143-F-G 0 NOL-04-01-184-F-G-I 0 5.5 Data Quality Assessment The Data Quality Assessment phase is the part of the FSS where survey design and data are reviewed for completeness and consistency, ensuring the validity of the results, verifying that the survey plan objectives were met, and validating the classification of the Survey Unit.

The sample design and the data acquired were reviewed and found to be in accordance with applicable YNPS procedures DP-8861, "Data Quality Assessment";

DP-8856, "Preparationof Survey Plans"; DP-8853, "Determinationof the Number and Locations of FSS Samples and Measurements"; DP-8857, "Statistical Tests";

DP-8865, "Computer Determination of the Number of FSS Samples and Measurements" and DP-8852, "Final Status Survey Quality Assurance Project Plan".

Upon review of the data set for NOL-04-01, the range of data are within two standard deviation with the exception of one value for each Co-60 and Cs-137 (Co-60= 0.38 pCi/g and Cs-137= 0.46 pCi/g) which were statistically higher than the rest of the data, however, both values were less than their associated DCGLw. The frequency plots show a normal distribution with a slight positive skew. The scatter plots generated graphically illustrate that the data varies about their respective Mean with the exception of the above mentioned two data points. The quantile plots are skewed slightly to the right with some asymmetry in the bottom indicative of a large number of low values in the data set. The posting plots do not clearly reveal any systematic spatial trends. Based upon the graphical representation of the data, the data set verifies the assumptions of the statistical test.

The Data Quality Assessment power curves, scatter, quantile and frequency plots are found in Attachment B. Posting Plots are found in Attachment A.

6.0 QUALITY ASSURANCE AND QUALITY CONTROL 6.1 Instrument QC Checks Operation of the portable ISOCS was in accordance with DP-8871,"Operationof the Canberra PortableISOCS System," with QC checks performed in accordance with DP-8869,"In-situ (ISOCS) Gamma Spectrum Assay System CalibrationProcedure" and DP-8871, "Operation of the CanberraPortable ISOCS System." Operation of the E-600 w/SPA-3 was in accordance with DP-8535,"Setup and Operation of the Eberline E-600 Digital Survey Instrument," with QC checks preformed in 10

Report No.: YNPS-FSS-NOL-04-00 accordance with DP-8540, "Operation and Source Checks of Portable Friskers."

Instrument response checks were performed prior to and after use for the E-600 w/SPA-3 and once per shift for the Portable ISOCS. Any flags (i.e. anomalies in the QC results) encountered during the ISOCS QC Source Count were corrected/

resolved prior to surveying. All instrumentation involved with the FSS of NOL-04 satisfied the above criteria for the survey. QC records are found in Attachment C.

6.2 Split Samples and Recounts One recount and two split 'QC" samples were gathered and within tolerable limits in accordance with DP-8864,"Split Sample Assessment for FinalStatus Survey".

6.3 Self-Assessments No self-assessments were performed during the FSS of NOL-04.

7.0 CONCLUSION

The FSS of NOL-04 has been performed in accordance with YNPS LTP and applicable FSS procedures. Evaluation of the direct measurement data has shown none of the systematic direct measurements exceeded the DCGLw, depicted in Attachment B.

Retrospective power curves were generated and demonstrated that an adequate number of samples were collected to support the Data Quality Objectives. Therefore, the null hypothesis (Ho) is rejected.

NOL-04 meets the objectives of the Final Status Survey.

Based upon the evaluation of the data acquired for the FSS, NOL-04 meets the release requirements set forth in the YNPS LTP. The Total Effective Dose Equivalent (TEDE) to the average member of the critical group does not exceed 25 mrem/yr, including that from groundwater. IOCFR20 Subpart E ALARA requirements have been met as well as the site release criteria for the administrative level DCGLs that ensure that the Massachusetts Department of Public Health's 10 mrem/yr limit will also be met.

II

Report No.: YNPS-FSS-NOL-04-00 List of Appendices Appendix A - YNPS-FSSP-NOL-04, "FinalStatus Survey Planning Worksheets Appendix B - YA-REPT-00-0 15-04, "Instrument Efficiency Determinationfor Use in Minimum Detectable ConcentrationCalculationsin Support of the FinalStatus Survey at Yankee Rowe" Appendix C - ALARA Evaluations, NOL-04 Appendix D - YA-REPT-00-018-05, "Use of In-situ Gamma Spectrum Analysis to Perform Elevated Measurement Comparison in Support of FinalStatus Surveys" List of Attachments Attachment A - Maps and Posting Plots Attachment B - Data Quality Assessment Plots and Curves Attachment C - Instrument QC Records Attachment D - ISOCS Scan Data Attachment E - ORTEC Direct Measurement Data (In the electronic version, every Table ofContents, Figures,Appendices and Attachments, as well as every mention of a Table, Figure,Appendix or Attachment is a hyperlink to the actual location or document.)

12

Final Status Survey Planning Worksheet Page 1 of 9 GENERAL SECTION Survey Area No.: NOL-04 [Survey Unit No.: 01 Survey Unit Name: Southwestern Upper RCA Yard FSSP Number: YNPS-FSSP-NOL04-01-00 PREPARATION FOR FSS ACTIVITIES Check marks in the boxes below signify affirmative responses and completion of the action.

1.1 Files have been established for survey unit FSS records. 0 1.2 ALARA review has been completed for the survey unit. 0 Refer to YA-REPT-00-003-05 1.3 The survey unit has been turned over for final status survey. 0 1.4 An initial DP-8854 walkdown has been performed and a copy of the completed Survey Unit Walkdown Evaluation is in the survey area file. r7 1.5 Activities conducted within area since turnover for FSS have been reviewed. 0 Based on reviewed information, subsequent walkdown: 01 not warranted El warranted If warranted, subsequent walkdown has been performed and documented per DP-8854. El OR The basis has been provided to and accepted by the FSS Project Manager for not performing a subsequent walkdown. El 1.6 A final classification has been performed. 0 Classification: CLASS 1 0 CLASS 2 El CLASS 3 El DATA QUALITY OBJECTIVES (DQO) 1.0 State the problem:

Survey Area NOL-04 consists of the surface area of Southwestern Upper RCA Yard. The open land area is owned by YNPS and is comprised of soil. Survey Unit NOL-04-01 is a sub unit of survey area NOL-04 and is bordered by NOL-05-01 & 02 to its north, NOL-03 to its east and OOL-10-01 to its west and south. It is approximately 978 square meters of surface area.

The problem as defined by this survey plan is to demonstrate that the years of plant operation did not result in an accumulation of plant-related radioactivity that exceeds the release criteria.

The planning team for this effort consists of the FSS Project Manager, FSS Radiological Engineer, FSS Field Supervisor, and FSS Technicians. The FSS Radiological Engineer will make primary decisions with the concurrence of the FSS Project Manager.

2.0 Identify the decision:

Does residual plant-related radioactivity, if present in the survey unit, exceed the release criteria? Alternative actions may include no action, investigation, resurvey, remediation and reclassification.

DPF-8856.1 Page 1 of 9 YNPS-FSSP- NOL-04-01-00

3.0. Identify the inputs to the decision:

Sample media: Soil Types of measurements: Soil samples, ISOCS Assays and gamma scans Radionuclides-of-concern: Cs-137, Co-60, Agl08m Applicable DCGL: The DCGLs applied under this survey plan correspond to annual doses of 8.73 mrem/y (the 10-mrem/y DCGL adjusted for the dose contributions from sub-surface concrete structures and tritium in ground water).

DCGL Nuclide DCGL DCGL Nuclide (pCi/g) (pCi/g) Nuclide (pCi/g)

Co-60 1.4E+0 Eu-152 3.6E+O Sr-90 6.OE-1 Nb-94 2.5E+0 Eu-154 3.31E+0 Tc-99 5.OE+0 Agl08m 2.5E+0 Eu-155 1.4E+2 Pu-238 1.2E+I Sb125 1.LE+1 H-3 1.3E+2 Pu-239/240 1.1E+1 Cs-134 1.7E+0 C-14 1.9E+0 Pu-241 3.4E+2 Cs-137 3.OE+0 Fe-55 1.OE+4 Am-241 1.0E+1 Ni-63 2.8E+2 Cm-243/244 1.1E+1 Forty (40) samples from the HSA data were used to provide the characterization data for survey unit NOL-04-01. The data is sufficient to support FSS planning of Survey Unit NOL-04-01.

Based on a review of the characterization data, Co-60, Cs-137 and Ag-108m are the only plant-related radionuclides that were identified consistently in the characterization samples analyzed. The results from the characterization data are summarized below:

" Co-60 (11 detects) Co-60 is present in 27.5 % of the characterization samples.

" Cs-137 (16 detects) Cs-137 is present in 40 % of the characterization samples.

" Ag-108m (3 detects) Ag-108m is present in 8 % of the characterization samples.

" Other YNPS ETD There were no other easy to detect nuclides identified >MDA.

  • YNPS HTD There were no hard to detect nuclides identified in the four samples analyzed.

The presence of all LTP-listed radionuclides (gamma-emitters, HTD beta-emitters, and TRUs) in the soil will be evaluated under this survey plan. The YNPS Chemistry Dept. will analyze each FSS soil sample for all LTP-listed gamma-emitting nuclides, except Cm-243/244. In addition, 2 FSS soil samples will be sent to an independent laboratory for analyses of gamma-emitters, HTD beta-emitting radionuclides, and alpha-emitting radionuclides, which will include Cm-243/244.

Survey Design IRelease Criteria Classification: Class 1 Average Cs-13 7 concentration: 0.106 pCi/g Standarddeviation Cs- 137 (a): 0.259 pCi/g Average Co-60 concentration: 0.04lpCi/g Standarddeviation Co-60 (o): 0.118 pCi/g Average Ag-l08m concentration. 0.016 pCi/g 0 DPF-8856.1 Page 2 of 9 YNPS-FSSP- NOL-04-0 1-00

StandarddeviationAg-108m (a): 0.053 pCi/g Weighted sum (a): 0.122 SurrogateDCGL: N/A (a surrogate DCGL will not be used)

LBGR Initial = 0.5xDCGL = 0.5 Adjusted = 0.76 Number of Samples Calculated = 15 Survey Unit Area 978 m2 GridArea (A/N) 65.2 m2 DCGLEMac: Cs-137 8.671 pCi/g (based on AF = 2.9)

DCGLEMc: Co-60 1.968 pCi/g (based on AF = 1.4)

DCGLEMc: Ag-I 08m 3.046 pCi/g (based on AF = 1.2)

Investigation Levelfor soil 0 >DCGLEMC for either Cs-137, Co-60 or Ag-108m -or-samples: 0 A sum of DCGLEMC fractions > 1.0 -or-

  • >DCGL for Cs-137, Co-60 or Ag-108m and a statistical outlier as defined in the LTP.

Note: The same criteria will be applied to any other LTP-listed nuclide if identified in the soil samples.

ISOCS Assay Coverage: 100% of the surface area, ensured by overlapping field-of-views using ISOCS in the Im-detector height with 180' open collimation configuration.

Investigation Levelfor ISOCS

  • 0.28 pCi/g Co-60 measurements.:
  • 0.42 pCi/g Ag-108m o -or- a sum of their fractions >1.0 Note: The investigation levels for the ISOCS assays were derived by multiplying the DCGLEMc associated with a 1m2 area by the ratio of the MDC for the full field of view (38.5m 2) to the MDC for a 1m2 area at the edge of the full field of view. Additional details regarding the investigation levels for ISOCS assays can be found in YA-REPT 018-05. The investigation levels developed in this manner are sensitive enough to detect the DCGLEMC values, based on the grid area.

MDC's for ISOCS measurements: MDC MDC MDC Nuclide (pCi/g) Nuclide (pCi/g) Nuclide (pCi/g)

Co-60 1.97E-1 Sb-125 1.34E+0 Eu-152 4.31E-1 Nb-94 3.03E-1 Cs-134 3.65E-1 Eu-154 4.32E-1 Ag-108m 3.05E-1 Cs-137 8.67E-1 Eu-155 1.67E+1 Note: The MDC's listed in the above table are 10% of the DCGLEMC values (based on nuclide-specific AF value for 75 m2 from LTP, Appendix 6Q). If the MDC values in the above table cannot be achieved in a reasonable count time, then an MDC no greater than 5X the table value must be achieved.

. DPF-8856.1 Page 3 of 9 YNPS-FSSP- NOL-04-01-00

SPA-3 Gamma Scan SPA-3 scans will be performed for surface soil within the field-of-view Coverage: of an ISOCS assay or surrounding a FSS sample location that exceeds the investigation criteria. The SPA-3 scan will cover 100% of the ISOCS assay total field-of-view area (38.5m 2) or a 1-m radius around the FSS sample location (3.14m 2).

Investigation Levelfor SPA-3 Reproducible indication above background using SPA-3 and audible Scans.: discrimination. The expected background range for SPA-3 scans is between 7,000 cpm and 15,000 cpm.

Radionuclidesfor analysis: All LTP nuclides with the focus on Cs-137, Co-60 and Ag-108m MDCsfor gamma analysis of Nuclide 10% - 50% of DCGL (pCi/g) soil samples: Co-60 I.4E 7.OE-01 Nb-94 2.5E 1.3E+00 Ag-108m 2.5E 1.3E+00 Sb-125 1.1E+00 - 5.6E+00 Cs-134 1.7E 8.7E-01 Cs-137 3.OE 1.5E+00 Eu-152 3.6E 1.8E+00 Eu-154 3.3E 1.7E+00 Eu-155 1.4E+01 - 6.9E+01 The desired MDCs in the laboratory analyses of FSS soil samples will be the 10% DCGL values. If it is impractical to achieve those, the 50%

DCGL values must be achieved in the laboratory analyses of the FSS soil samples.

MDC'sfor HTD nuclide.: Nuclide 10% - 50% DCGL (pCi/g)

H-3 1.3E+01 - 6.4E+01 C-14 1.9E 9.7E-01 Fe-55 1.OE+03 - 5.1E+03 Ni-63 2.8E+01 - 1.4E+02 Sr-90 6.OE 3.OE-01 Tc-99 5.OE 2.5E+00 Pu-238 1.2E+00 - 5.8E+00 Pu-239 1.1E+00 - 5.3E+00 Pu-241 3.4E+01 - 1.7E+02 Am-241 1.0E+00 - 5.1E+00 Cm-243 1.1E+00 - 5.6E+00 The MDC values for difficult to detect nuclides will be conveyed to the outside laboratory via the sample chain-of-custody form DPF-8823.1 which will accompany the soil samples.

MDCR for SPA-3." The accompanying table in Attachment 1 provides MDCR values by various background levels.

MDC (/DCGL......yo..... for SPA-3 The accompanying table in Attachment 1 provides MDC values by scans: various background levels.

QC checks and measurements:

  • QC checks for ISOCS will be in accordance with DP-8869 and DP-8871.
  • DPF-8856.1 Page 4 of 9 YNPS-FSSP- NOL-04-0 1-00

o QC checks for the Leica GPS will be performed in accordance with DP-8859.

o QC checks for the SPA-3 will be performed in accordance with DP-8504.

o Two QC split samples will be collected (note: this is in accordance with and exceeds DP-8852 requirements.)

o One QC recount for soil samples will be performed by the YNPS Chemistry Lab (note: this is in accordance with DP-8852 requirements.)

4.0 Define the boundaries of the survey:

  • Boundaries of Survey Unit NOL-04-01 are as shown on the attached map. This area is bordered by NOL-05-01 & 02 to its north, NOL-03 to its east and OOL-10-01 to its west and south.

" The survey will be performed under appropriate weather conditions (as defined by instrumentation limitations and human tolerance). Surveys may be performed on any shift of work.

5.0 Develop a decision rule:

Upon review of the FSS data collected under this survey plan:

(a) If all the sample data show that the soil concentrations of plant related nuclides are below the 8.73 mrem/year DCGLs and the sum of fractions of nuclides are below unity, then reject the null hypothesis (i.e., Survey Unit NOL-04-01 meets the release criteria).

(b) If the investigation levels are exceeded, then perform an investigation survey.

(c) If the average concentration of any LTP-listed nuclide exceeds its respective DCGLW or the average sum of fractions for any LTP-listed nuclide exceeds one, then accept the null hypothesis (i.e., Survey Unit NOL-04-01 fails to meet the release criteria).

Note: Alternate actions beyond investigations are not expected to be necessary within this survey unit.

6.0 Specify tolerable limits on decision errors:

Null hypothesis: Residual plant-related radioactivity in Survey Unit NOL-04-01 exceeds the release criteria.

Probabilityof type I error: 0.05 Probabilityof type II error: 0.05 LBGR: The applicable soil (8.73-mrem/y) DCGL + 2 LBGR = 0.5 (Unity Rule) 7.0 Optimize Design:

Type of statistical test: WRS Test El Sign Test l] (background will not be subtracted)

Number and Location of Samples: Twenty (20) soil samples will be collected at locations based on a random start, systematic triangular grid (refer to accompanying DPF-8853.2).

Biased samples: A minimum of four (4) biased sample locations will be selected before, or at the time of

. sample collection and their locations will be added to the map, with the letter "B" added to the sample DPF-8856.1 Page 5 of 9 YNPS-FSSP- NOL-04-01-00

number. The addition of these samples and the relocation of any samples may be added to the map without requiring a revision. The coordinates of the biased sample locations will be determined and added to the record.

Biased sample locations: 9 The four (4) biased sample locations will be determined in the field by the Rad Engineer based on historical data and process knowledge of the area.

GENERAL INSTRUCTIONS

1. Where possible, measurement locations will be identified using GPS in accordance with DP-8859. Each location will be marked to assist in identifying the location. Any locations that are not suitable for soil sampling will be relocated to the nearest suitable location and documented in the field log in accordance with DP-8856.
2. Soil samples will be collected in accordance with DP-8120.
3. Chain of Custody form will be used in accordance with DP-8123 for all soil samples sent to an off-site laboratory.
4. All soil samples will be received and prepared in accordance with DP-8813. Note: Split samples to be sent to an off-site lab will not be dried prior to counting on site or shipping.
5. Collect ISOCS measurements in accordance with DP-8871 to provide 100% scan coverage of the survey unit.
6. Survey instrument: Operation of the E-600 w/SPA-3 will be in accordance with DP-8535 with QC checks performed in accordance with DP-8504. The instrument response checks shall be performed before issue and after use.
7. All SPA-3 scans will be performed with the audible feature activated. FSS Technicians will listen for upscale readings to which they will respond by slowing down or stopping the probe to distinguish between random fluctuations in the background and greater than background readings.
8. The job hazards associated with the Survey described in this package are addressed in the accompanying Job Hazard Assessment (JHA) for NOL-04-01.
9. All personnel participating in this survey shall be trained in accordance with DP-8868.

SPECIFIC INSTRUCTIONS

1. All designated measurement locations will be identified by GPS per DP-8859 or by use of reference points and tape measure as necessary. If a designated sample location is obstructed for any reason, the FSS Radiological Engineer or the FSS Field Supervisor will select an alternate location in accordance with DP-8856. A detailed description of the alternate location will be recorded on form DPF-8856.2, the survey unit map will be annotated appropriately, and the alternate location will be conspicuously marked to facilitate re-visiting to identify and record the coordinates with GPS in accordance with DP-8859 or by measurement from a known reference point when GPS is not available.
2. Sample Requirements:

Collect twenty (20) random 1-liter soil samples in accordance with DP-8120. Two (2) of the twenty (20) random soil samples will be analyzed as QC split samples to fulfill the QC requirement of DP-8852. The same QC split samples will also be analyzed for Hard-to-Detect nuclides in accordance with section 5.6.3.2.1 of the LTP and DP-8856.

  • Collect four (4) biased I-liter soil samples in accordance with DP-8120. The radiological engineer assigned to this survey unit will determine the locations of the biased samples.

. DPF-8856.1 Page 6 of 9 YNPS-FSSP- NOL-04-01-00

3. Soil Sample Designation:

FSS soil samples: NOL-04-01-001-F through NOL-04-01-020-F corresponding to FSS sample locations 001 through 020.

Biased soil samples: NOL-04-01-021-F-B through NOL-04-01-024-F-B corresponding to the biased sample locations 021 through 024.

QC split samples: NOL-04-01-012-F-S and NOL-04-01-020-F-S are to be designated as QC split samples. These samples will be sent to the off-site laboratory as collected from the field (i.e., without drying). YNPS Chemistry will count these samples in the "wet" condition prior to shipment to the offsite laboratory.

Recount samples: NOL-04-01-006-F-RC is to be counted twice on site. The results will be compared in accordance with DP-8864.

4. Sample Analysis:

" Gamma analysis will be performed on all soil samples. If any of the gamma analyses show that an investigation level has been exceeded an investigation survey will be conducted at that sample location as directed in specific instruction # 6.

" YNPS Chemistry will analyze NOL-04-01-001-F through NOL-04-01-020-F and NOL-04-0t-021-F-B through NOL-04-01-024-F-B for gamma-emitting nuclides.

" YNPS Chemistry will analyze NOL-04-01-006-F as a sample recount. The recounted sample will possess the naming convention NOL-04-01-006-F-RC.

" YNPS Chemistry will analyze NOL-04-01-012-F-S and NOL-04-01-020-F-S for gamma-emitting nuclides prior to being sent to the off-site laboratory. These samples will be analyzed for gamma-emitting nuclides and HTD at the off-site laboratory.

  • On-site gamma analysis of the FSS samples shall achieve the MDC values stated in the DQO section of this plan. The MDC's will be communicated to the laboratory using an attachment to the Chain-of- Custody form.
5. ISOCS Assays.
  • Collect the appropriate number of ISOCS measurements in accordance with DP-8871 to provide 100% scan coverage of the survey unit.
  • ISOCS assays are designated as NOL-04-01-xxx -F-G where "xxx" continues sequentially from the last number assigned to an FSS measurement.

" QC checks shall be performed at least once per shift in accordance with DP-8869 and DP-8871.

Resolve flags encountered prior to survey.

" ISOCS assays to be performed with 180' collimator at lm unless otherwise directed by the FSS Engineer. Make note on the daily survey journal (DPF-8856.2) if other geometries are used.

" For ISOCS assay locations shown on map "ISOCS Scans", position the detector downward facing keeping the detector perpendicular to the ground.

  • Designate additional assay locations in continuing sequence from the last number assigned to an FSS measurement. Record detailed information about additional assay locations on the daily

. DPF-8856.1 Page 7 of 9 YNPS-FSSP- NOL-04-01-00

survey journal.

If the results on any ISOCS assay exceed an investigation level, investigate the area within the field of view (7m diameter - 3 8.5m 2 area for 180'- 1m) for that assay as directed in Specific Instruction # 7.

  • Remove standing water prior to performance of ISOCS assays. Contact the FSS Engineer for directions if conditions are such that standing water cannot be removed.
6. If the results of any FSS sample (statistical and/or biased points) analysis exceed an investigation level, perform a first level investigation as follows:

Note: Detailed descriptions of investigation actions shall be recorded in the daily survey journal (DPF-8856.2).

  • Review ISOCS data for assays in which the sample requiring investigation may have been in the field of view.
  • Scan a 1m radius footprint around the sample location with a SPA-3 in rate-meter mode moving the detector at a speed of O.25m or less per second, keeping the probe at a distance of approximately 3" from the surface and following a serpentine path that includes at least 3 passes across each square meter. The area of scan should be increased as necessary to bound any areas of elevated activity identified.
  • Mark the boundaries around any detected elevated areas in the soil and identify the boundaries on a survey map. Measure the total area of each outlined area in square centimeters.

" Mark the location of the highest identified activity for each of the elevated areas in the soil and on the survey map.

" At each of the highest identified activity area o Perform and record a 1-minute scaler mode SPA-3 measurement. Designate the reading as "NOL-04-01 -xxx-F-SC-I" where "xxx" continues sequentially from the last number assigned to an FSS measurement.

o Obtain a soil sample at the location. Designate the sample as "NOL-04-01 -xxx-F-I" where "xxx" continues sequentially from the last number assigned to an FSS measurement.

o Perform and record a post sample 1-minute SPA-3 measurement. Designate the reading as described above.

7. If the results of an ISOCS assay exceed an investigation level, perform a first level investigation as follows:

Note: Detailed descriptions of investigation actions shall be recorded in the daily survey journal (DPF-8856.2).

0 Scan the ISOCS footprint with a SPA-3 in rate-meter mode moving the detector at a speed of 0.25m or less per second, keeping the probe at a distance of approximately 3" from the surface and following a serpentine path that includes at least 3 passes across each square meter.

  • Mark the boundaries around any detected elevated areas in the soil and identify the boundaries on

. DPF-8856.1 Page 8 of 9 YNPS-FSSP- NOL-04-01-00

a survey map. Measure the total area of each outlined area in square centimeters.

" Mark the location of the highest identified activity for each of the elevated areas in the soil and on the survey map.

  • At each of the highest identified activity area o Perform and record a 1-minute scalermode SPA-3 measurement. Designate the reading as "NOL-04-01-xxx-F-SC-I" where "xxx" continues sequentially from the last number assigned to an FSS measurement.

o Obtain a soil sample at the location. Designate the sample as "NOL-04-01-xxx-F-I" where "xxx" continues sequentially from the last number assigned to an FSS measurement.

o Perform and record a post sample 1-minute SPA-3 measurement. Designate the reading as described above.

" Re-perform the ISOCS assay. Designate the assay as "NOL-04-01 -xxx-F-G-l" where "xxx" continues sequentially from the last number assigned to an FSS measurement.

("I

\// //

Prepared by

  • I Date --7 //-- -

FSS R~3ciinloQica1 Fn4*i.neeV 1N. Tomalc 4 Date 51/1 /O0 Reviewed byI a-rC-. 2ZA(

7* '~ Fý'kadio&oi6'4/Ngineer Approvedby" "So 0 "P - Date _,/*/o ¢ F Project M/*ager

. DPF-8856.1 Page 9 of 9 YNPS-FSSP- NOL-04-01-00

YNPS-FSSP-NOL-04-01 -00 Attachment 1 SPA-3 Scan Table BKG(cpm) j MDCR MDC(fDCGLemc) 7000 845 6.21E-01 8000 904 6.64E-01 9000 959 7.04E-01 10000 1011 7.42E-01 11000 1060 7.78E-01 12000 1107- 8.13E-01 13000 1152 8.46E-01 14000 1196 8.78E-01 15000 1238 9.09E-01 16000 1278 9.39E-01 17000 1318 9.67E-01 18000 1356 9.95E-01 19000 1393 1.02E+00 20000 1429 1.05E+00 21000 1464 1.08E+00 22000 1499 1.10E+00 23000 1533 1.13E+00 24000 1565 1.15E+00

,/,r

< .ýOlou

TECHNICAL REPORT TITLE PAGE Copy Instrument Efficiency Determination for Use in Minimum Detectable Concentration Calculations in Support of the Final Status Survey at Yankee Rowe Title YA-REPT-00-015-04 REV. 0 Technical Report Number Approvals,\ (Print & Sign Name)

Preparer: Date:"

Review4 1 AAA OX Date: (i et/£4-Approver (Cozant Manager):- . Date: /6 /7/0 YA-REPT-O0-015-04 Rev. 0

/

Page 1 of 26

/

TABLE OF CONTENTS Page 1.0 Executive Summary: .......................................................................................... 4 2.0

Introduction:

................................................................................................ 4 3.0 Calibration Sources: .......... ........................ ...................... 4 4.0 Efficiency Determination: ............................................... 6 4.1 Alpha and Beta Instrument Efficiency (si): ............................................. ...... 6 4.2 Source to Detector Distance Considerations: ...................................................... 7 4.2.1 Methodology .............................................................................. 7 4.3 Source (or Surface) Efficiency (6s) Determination: ............................................ 8 5.0 Instrument Conversion, Factor (E) (Instrument Efficiency for Scanning): ..... ...................... 9 6.0 Applying Efficiency Corrections Based on the Effects of Field Conditions for Total Efficiency:... 9 7.0 C onclusion: ................................................................................................... 10 8.0 R eferences: .................................................................................................... 11 Tables Table 3.1 Nuclides and Major Radiations: Approximate Energies ....................................... 5 Table 4.1 Instrument Efficiencies (ci) ....................................................................... 7 Table 4.2 Source to Detector Distance Effects on Instrument Efficiencies for a- 03Emitters ........... 8 Table 4.3 Source Efficiencies as listed in ISO 1703-1: .................................................... 8 Table 5.1 Energy Response and Efficiency for Photon Emitting Isotopes: ............................. 9 Appendix APPENDIX A MicroShield, SPA-3 Soil scan- 28 cm radius IpCi/cm3 Co-60 ..................... 12 APPENDIX B Microsoft Excel Co-60 Calculation Sheet ............................................... 13 APPENDIX C MicroShield, SPA-3 Soil scan - 28 cm radius lpCi/cm3 Nb-94 ................... 14 APPENDIX D Microsoft Excel Nb-94 Calculation Sheet ............................................. 15 YA-REPT-00-015-04 Rev. 0 Page 2 of 26

APPENDIX E MicroShield, SPA-3 Soil scan - 28 cm radius lpCi/cm3 Ag-108m ................. 16 APPENDIX F Microsoft Excel Ag- 108m Calculation Sheet ............................................. 17 APPENDIX G MicroShield, SPA-3 Soil scan -28 cm radius lpCi/cm3 Sb-125 ................... 18 APPENDIX H Microsoft Excel Sb- 125 Calculation Sheet ............................................. 19 APPENDIX I MicroShield, SPA-3 Soil scan -28 cm radius lpCi/cm3 Cs-134 ................... 20 APPENDIX J Microsoft Excel Cs-134 Calculation Sheet ............................................. 21 APPENDIX K MicroShield, SPA-3 Soil scan -28 cm radius lpCi/cm3 Cs-137 ................... 22 APPENDIX L Microsoft Excel Cs-137 Calculation Sheet ................................................ 23 APPENDIX M MicroShield, SPA-3 Soil scan- 28 cm radius I pCi/cni3 Cs-137 ................... 24 APPENDIX N Microsoft Excel Cs- 137 Calculation Sheet ............................................. 25 APPENDIX 0 Calculated Energy Response ................................................................ 26 YA-REPT-00-015-04 Rev. 0 Page 3 of 26

1.0 Executive Summary:

The minimum detectable concentration (MDC) of the field survey instrumentation is an important factor affecting the quality of the final status survey (FSS). The efficiency of an instrument inversely impacts the MDC value. The objective of this report is to determine the instrument and source efficiency values used to calculate MDC. Several factors were considered when determining these efficiencies and are discussed in the body of this report. Instrument efficiencies (si), and source efficiencies (Fs), for alpha beta detection equipment under various field conditions, and instrument conversion factors (E1 ), for gamma scanning detectors were determined and the results are provided herein.

2.0

Introduction:

Before performing Final Status Surveys of building surfaces and land areas, the minimum detectable concentration (MDC) must be calculated to establish the instrument sensitivity. Table 5.4 of the License Termination Plan (LTP) [8.6] lists the available instrumentation and nominal detection sensitivities; however for the purposes of this basis document, efficiencies for the 100cm 2 gas proportional and the 2"x2" Nal (TI) detectors will be determined. Efficiencies for the other instrumentation listed in the LTP shall be determined on an as needed basi's. The 100 cm 2 gas propoitional probe will be used to perform surveys (i.e. fixed point measurements). A 2" x2" Nal (T1) detector will be used to perform gamma surveys (i.e., surface scans) of portions of land areas and possibly supplemental structural scans at the Yankee Rowe site. Although surface scans and fixed point measurements can be performed using the same instrumentation, the calculated MDCs will be quite different. MDC is dependent on many factors and may include but is not limited to:

  • instrument efficiency "background "integration time "surface type "source to detector geometry "source efficiency A significant factor in determining an instrument MDC is the total efficiency, which is dependent on the instrument efficiency, the source efficiency and the type and energy of the radiation. MDC values are inversely affected by efficiency, as efficiencies increase, MDC values will decrease. Accounting for both the instrument and source components of the total efficiency provides for a more accurate assessment of surface activity.

3.0 Calibration Sources:

For accurate measurement of surface activity it is desirable that the field instrumentation be calibrated with source standards similar to the type and energy of the anticipated contamination. The nuclides listed in Table 3.1 illustrate the nuclides found in soil and building surface area DCGL results that are listed in the LTP.

Instrument response varies with incident radiations and energies; therefore, instrumentation selection for field surveys must be modeled on the expected surface activity. For the purposes of this report, isotopes with max beta energies less than that of C-14 (0.158 MeV) will be considered difficult to detect (reference table 3.1). The detectability of radionuclides with max beta energies less than 0.1.58 MeV, utilizing gas proportional detectors, will be negligible at typical source to detector distances of approximately 0.5 YA-REPT-00-015-04 Rev. 0 Page 4 of 26

inches. The source to detector distance of 1.27 cm (0.5 inches) is the distance to the detector with the attached standoff (DP-8534 "Operation and Source Checks of Proportional Friskers")[8.5]. Table 3.1 provides a summary of the LTP radionuclides and their detectability using Radiological Health Handbook

[8.4] data.

Table 3.1 Nuclides and Maor Radiaions: Approximate Energies (Reference 8.4)

Nuclide a Energy Ep.- (MeV) Average Photon Energy (MeV) a Detectable. 3 Detectable v (MeV) Ep wl Gas w/ Gas Detectable (MeV) Proportional Proportional w/ Nal 2x2" H-3 0.018 0.005 C-14 0.158 0.049 Fe-55 0.23 (0.004%)

bremsstrahlung Co-60 0.314 0.094 1.173 (100%), 1.332 *

(100%)

Ni-63 0.066 0.017 Sr-90 0.544 0.200 "4 2.245 (Y-90) 0.931 Nb-94 0.50 0.156 0.702 (100%), 0.871 7/ T (100%)

Tc-99 0.295 0.085 Ag- 1.65 (Ag- 0.624 0.434 (0.45%), 0,511 --

108m 108) (Ag- (0.56%)

108) 0.615 (0.18%), 0.632 (1.7%)

Sb-125 0.612 0.084 0.6, 0.25, 0.41, 0.46, 0.68, 0.77, 0.92, 1.10, 1.34 Cs-1 34 1.453 0.152 0.57 (23%), 0.605 (98%)

0.796 (99%), 1.038 (1.0%)

1.168 (1.9%), 1.365 (3.4%)

Cs-1 37 1.167 0.195 0.662 (85%) Ba-137m X- /

rays Eu-152 1.840 0.288 0.122 (37%), 0.245 (8%)

0.344 (27%), 0.779 (14%)

0.965 (15%), 1.087 (12%)

1.113 (14%), 1.408 (22%)

Eu-154 1.850(10%) 0.228 .........

Eu-1 55 0.247 0.044 0.087 (32%), 0.105 (20%)

Pu-238 5.50 (72%) 0.099 (8E-3%) '4 5.46(28%) 0.150 (1E-3%)

0.77 (5E-5%)

Pu-239 5.16 (88%) 0.039 (0.007%), 0.052 '4 5.11 (11%) (0.20%), 0.129 (0.005%)...

Pu-241 4.90 0.021 0.005 0.145 (1.6E-4%)

(0.0019%)

4.85 (0.0003%)

Am-241 5.49 (85%) 0.060 (36%), 0.101 5.44 (13%) (0.04%)...

Cm-243 6.06 (6%) 0.209 (4%), 0.228 (12%),

  • 5.99 (6%) 0.278 (14%)

5.79 (73%)

5.74

_ _ __ (11.5%) _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

YA-REPT-00-015-04 Rev. 0 Page 5 of 26

NUREG- 1507 and ISO 7503-1 provide guidance for selecting calibration sources and their use in determining total efficiency. It is common practice to calibrate instrument efficiency for a single beta energy; however the energy of this reference source should not be significantly greater than the beta energy of the lowest energy to be measured.

Tc-99 (0.295 MeV max) and Th-230 (4.68 MeV at 76% and 4.62 MeV at 24%) have been selected as the beta and alpha calibration standards respectively, because their energies conservatively approximate the beta and alpha energies of the plant specific radionuclides.

4.0 Efficiency Determination:

Typically, using the instrument 47t efficiency exclusively provides a good approximation of surface activity. Using these means for calculating the efficiency often results in an under estimate of activity levels in the field. Applying both the instrument 2at efficiency and the surface efficiency components to determine the total efficiency allows for a more accurate measurement due to consideration of the actual characteristics of the source surfaces. ISO 7503-1 [8.2] recommends that the total surface activity be calculated using:

A Rs---R Rs+B - RB where:

A, is the total surface activity in dpm/cm ,

Rs+B is the gross count rate of the measurement in cpm, RB is the background count rate in cpm, ei is the instrument or detector 27c efficiency 6,is the efficiency of the source W is the area of the detector window (cm 2) 4.1 Alpha and Beta Instrument Efficiency (ci):

Instrument efficiency (si) reflects instrument characteristics and counting geometry, such as source construction, activity distribution, source area, particles incident on the detector per unit time and therefore source to detector geometry. Theoretically the maximum value of Si is 1.0, assuming all the emissions from the source are 27c and that all emissions from the source are detected. The ISO 7503-1 methodology for determining the instrument efficiency is similar to the historical 47r approach; however the detector response, in cpm, is divided by the 2a surface emission rate of the calibration source. The instrument efficiency is calculated by dividing the net count rate by the 27r surface emission rate (q 2x)

(includes absorption in detector window, source detector geometry). The instrument efficiency is expressed in ISO 7503-1 by:

YA-REPT-00-015-04 Rev. 0 Page 6 of 26

RS, B-RB q 2 A.

where:

Rs÷B is the gross count rate of the measurement in cpm, RB is the background count rate in cpm, q 2,is the 27c surface emission rate in reciprocal seconds Note that both the 27c surface emission rate and the source activity are usually stated on the certification sheet provided by the calibration source manufacturer and certified as National Institute of Standards and Technology (NIST) traceable. Table 4.1 depicts instrument efficiencies that have been determined during calibration using the 27c surface emission rate of the source.

Table 4.1 Instrument Efficiencies (si Source Emission Active Area of Effective Area 100 cm2 Gas Proportional Source (cm2) of Detector HP-100 Instrument Efficiency (es)

(Contact)

Tc-99 15.2 100 cm 2 0.4148 Th-230 a 15.2 100 cm 2 0.5545 4.2 Source to Detector Distance Considerations:

A major factor affecting instrument efficiency is source to detector distance. Consideration must be given to this distance when selecting accurate instrument efficiency. The distance from the source to the detector shall to be as close as practicable to geometric conditions that exist in the field. A range of source to detector distances has been chosen, taking into account site specific survey conditions. In an effort to minimize the error associated with geometry, instrument efficiencies have been determined for source to detector distances representative of those survey distances expected in the field. The results shown in Table 4.2 illustrate the imposing reduction in detector response with increased distance from the source. Typically this source to detector distance will be 0.5 inches for fixed point measurements and 0.5 inches for scan surveys on flat surfaces, however they may differ for other surfaces. Table 4.2 makes provisions for the selection of source to detector distances for field survey conditions of up to 2 inches. If surface conditions dictate the placement of the detector at distances greater than 2 inches instrument efficiencies will be determined on an as needed basis.

4.2.1 Methodology

The practical application of choosing the proper instrument efficiency may be determined by averaging the surface variation (peaks and valleys narrower than the length of the detector) and adding 0.5 inches, the spacing that should be maintained between the detector and the highest peaks of the surface. Select the source to detector distance from Table 4.2 that best reflects this pre-determined geometry.

YA-REPT-00-015-04 Rev. 0 Page 7 of 26

Table 4.2 Source to Detector Distance Effects on Instrument Efficiencies for a- f Emitters Source to Detector Instrument Efficiency (F-)

Distance (cm)

Tc-99 Th-230 Distributed Distributed Contact 0.4148 0.5545 1.27 (0.5 in) 0.2413 0.1764 2.54 (1 in) 0.1490 0.0265 5.08 (2 in) 0.0784 0.0002 4.3 Source (or Surface) Efficiency (s) Determination:

Source efficiency (s,), reflects the physical characteristics of the surface and any surface coatings. The source efficiency is the ratio between the number of particles emerging from surface and the total number of particles released within the source. The source efficiency accounts for attenuation and backscatter. E, is nominally 0.5 (no self-absorption/attenuation, no backscatter)-backscatter increases the value, self-absorption decreases the value. Source efficiencies may either be derived experimentally or simply selected from the guidance contained in ISO 7503-1. ISO 7503-1 takes a conservative approach by recommending the use of factors to correct for alpha and beta self-absorption/attenuation when determining surface activity. However, this approach may prove to be too conservative for radionuclides with max beta energies that are marginally lower than 0.400 MeV, such as Co-60 with a P3max of 0.314 MeV. In this situation, it may be more appropriate to determine the source efficiency by considering the energies of other beta emitting radionuclides. Using this approach it is possible to determine weighted average source efficiency. For example, a source efficiency of 0.375 may be calculated based on a 50/50 mix of Co-60 and Cs-137. The source efficiencies for Co-60 and Cs-137 are 0.25 and 0.5 respectively, since the radionuclide fraction for Co-60 and Cs- 137 is 50% for each, the weighted average source efficiency for the mix may be calculated in the following manner:

(0.25X0.5)+ (0.5Xo.5) = 0.375 Table 4.3 lists guidance on source efficiencies from ISO 7503-1.

Table 4.3 Source Efficiencies as listed in ISO 7503-1

> 0.400 MeVmax < 0.400 MeVmax Beta emitters e,= 0.5 e = 0.25 Alpha emitters s,= 0.25 F-= 0.25 It should be noted that source efficiency is not typically addressed for gamma detectors as the value is effectively unity.

. YA-REPT-00-015-04 Rev. 0 Page 8 of 26

5.0 Instrument Conversion Factor (E) ( Instrument Efficiency for Scanning):

Separate modeling analysis (MicroshieldTM ) was conducted using the common gamma emitters with a concentration of 1 pCi/g of uniformly distributed contamination throughout the volume. MicroShield is a comprehensive photon/gamma ray shielding and dose assessment program, which is widely used throughout the radiological safety community. An activity concentration of 1 pCi/g for the nuclides was entered as the source term. The radial dimension of the cylindrical source was 28 cm, the depth was 15 cm, and the dose point above the surface was 10 cm with a soil density of 1.6 g/cmr3. The instrument efficiency when scanning, Ei, is the product of the modeled exposure rate (MicroShieldTM ) in mRhr-/pCi/g for and the energy response factor in cpm/mR/hr as derived from the energy response curve provided by Eberline Instruments (Appendix 0). Table 5.1 demonstrates the derived efficiencies for the major gamma emitting isotopes listed in Table 3.1.

TABLE 5.1 Energy Response and Efficiency for Photon Emitting Isotopes Isotope Calculations for Ei Ei See appendix A through L (cpm/pCi/g)

Co-60 See Appendix Aand B 379 Nb-94 See Appendix C and D 416 Ag-108m See Appendix E and F 637 Sb-125 See Appendix G and H 210 Cs-134 See Appendix I and J 506 Cs-137 See Appendix.K and L 188 Eu-152 See Appendix M and N 344 When performing gamma scan measurements on soil surfaces the effective source to detector geometry is as close as is reasonably possible (less than 3 inches).

6.0 Applying Efficiency Corrections Based on the Effects of Field Conditions for Total Efficiency:

The total efficiency for any given condition can now be calculated from the product of the instrument efficiency si and the source efficiency 6.

stot = Ei X es The following example illustrates the process of determining total efficiency. For this example we will assume the following:

  • Surface activity readings need to be made in the Primary Auxiliary Building (PAB) on the concrete wall surfaces using the E-600 and C-100 gas proportional detector.

"Data obtained from characterization results from the PAB indicate the presence of beta emitters with energies greater than 0.400 Mev.

  • The source (activity on wall) to detector distance is 1.27 cm (0.5 in detector stand off). To calculate the total efficiency, 8 tot, refer to Table 4.2 "Source to Detector Distance Effects on Instrument Efficiencies for a- 0 Emitters" to obtain the appropriate sq value.

"Contamination on all surfaces is distributed relative to the effective detector area.

YA-REPT-00-015-04 Rev. 0 Page 9 of 26

  • When performing fixed point measurements with gas proportional instrumentation the effective source to detector geometry is representative of the calibrated geometries listed in Table 4.2 "Source to Detector Distance Effects, on Instrument Efficiencies for a- 03Emitters".

"Corrections for temperature and pressure are not substantial.

In this example, the value for ei is 0.2413 as depicted in Table 4.2 "Source to Detector Distance Effects on Instrument Efficiencies for a- 13 Emitters". The &svalue of 0.5 is chosen refer to Table 4.3 "Source Efficiencies as listed in ISO 7503-1". Therefore the total efficiency for this condition becomes stot = xi x Fs = 0.2413 x 0.5 = 0.121 or 12.1%.

7.0

Conclusion:

Field conditions may significantly influence the usefulness of a survey instrument. When applying the instrument and source efficiencies in MDC calculations, field conditions must be considered. Tables have been constructed to assist in the selection of appropriate instrument and source efficiencies. Table 4.2 "Source to Detector Distance Effects on Instrument Efficiencies for a-03 Emitters" lists instrument efficiencies (ei) at various source to detector distances for alpha and beta emitters. The appropriate ej value should be applied, accounting for the field condition, i.e. the relation between the detector and the surface to be measured.

Source efficiencies shall be selected from Table 4.3 "Source Efficiencies as listed in ISO 7503-l". This table lists conservative cs values that correct for self-absorption and attenuation of surface activity.

Table 5.1 "Energy Response and Efficiency for Photon Emitting Isotopes" lists Ei values that apply to scanning MDC calculations. The MicroshieldTM model code was used to determine instrument efficiency assuming contamination conditions and detector geometry cited in section 5.6.2.4.4 "MDCs for Gamma Scans of Land Areas" of the License Termination Plan [8.6].

Detector and source conditions equivalent to those modeled herein may directly apply to the results of this report.

YA-REPT-00-015-04 Rev. 0 Page 10 of 26

8.0 References 8.1 NUREG-1507, "Minimum Detectable Concentrations with Typical Radiation Survey Instruments for Various Contaminants and Field Conditions," 1998 8.2 ISO 7503-1, "Evaluation of Surface Contamination - Part I: Beta Emitters and Alpha Emitters," 1988-08-01.

8.3 ISO 8769, "Reference Sources for the Calibration of Surface Contamination Monitors-Beta-emitters (maximum beta energy greater 0.15MeV) and Alpha-emitters," 1988-06-15.

8.4 "Radiological Health Handbook," Revised Edition 1970.

8.5 DP-8534, "Operation and source Checks of Portable Friskers".

8.6 Yankee Nuclear Plant Site License Termination Plan, Rev.0, November 2003.

YA-REPT-00-015-04 Rev. 0 Page II of 26

APPENDIX A MicroShieid v6.02 (6.02-00253)

Page :1 File Ref DOS File :SPA3-EFF-Co-60.ms6 Date Run Date September 10, 2004 By Run Time 8:56:50 AM Checked Duration 00:00:00 Case

Title:

SPA3-EFF-Co-60

Description:

SPA-3 Soil scan - 28 cm radius lpCi/cm3 Co-60 Geometry: 8 - Cylinder Volume - End Shields Source Dimensions:

Height 15.0 cm (5.9 in)

Radius 28.0 cm (11.0 in)

Dose Points Y A X Y z

  1. 1 0 cm 25 cm 0 cm 0.0 in 9.8 In 0.0 in Shields Shield N 'Dimension Material Density 3

Source 3.69e+04 cm Concrete 1.6 Air Gap Air 0.00122 Source Input : Grouping Method - Actual Photon Energies Nuclide curies becquerels pCi/cm 3

Bq/CM 3 Co-60 3.6945e-008 1.3670e+003 1.00OOe-006 3.7000e-002 Buildup : The material reference is - Source Integration Parameters Radial 20 Circumferential 10 Y Direction (axial) 10 Results Energy Fluence 2Rate Fluence 2Rate Exposure Rate Exposure Rate Activity MeV/cm /sec MeV/cm /sec mR/hr mR/hr MeV Photons/sec No Buildup With Buildup No Buildup With Buildup 0.6938 2.230e-01 9.055e-06 1.590e-05 1.748e-08 3.070e-08 1.1732 1.367e+03 1.098e-01 1.669e-01 1.962e-04 2.982e-04 1.3325 1.367e+03 1.293e-01 1.904e-01 2.244e-04 3.303e-04 Totals 2.734e+03 2.391e-01 3.573e-01 4.205e-04 6.286e-04 YA-REPT-00-0 15-04 Rev. 0 Page 12 of 26

APPENDIX B YA-REPT-00-015-04 Rev. 0 Page 13 of 26

APPENDIX C MicroShield V6.02 (6.02-00253)

Page "i File Ref DOS File :SPA3-EFF-Nb-94.ms6 Date Run Date September 16, 2004 By Run Time 3:22:38 PM Checked Duration 00:00:00 Case

Title:

SPA3-EFF-Nb-94

Description:

SPA-3 Soil scan - 28 cm radius 1pCi/cm3 Nb-94 Geometry: 8 - Cylinder Volume - End Shields Source Dimensions:

Height 15.0 cm (5.9 in)

Radius 28.0 cm (11.0 in)

Dose Points A X y z

  1. 1 0 cm 25 cm 0 cm 0.0 in 9.8 in 0.0 in Shields Shield N Dimension Material Density Source 3.69e+04 cm 3 Concrete 1.6 Air Gap Air 0.00122 Source Input: Grouping Method - Actual Photon Energies Nuclide curies becquerels PCI/cm3 Bq/cm3 Nb-94 3.6945e-008 1.3670e+003 1.00OOe-006 3.7000e-002 Buildup : The material reference is - Source Integration Parameters Radial 20 Circumferential 10 Y Direction (axial) 10 Results Energy Activity Fluence Rate Fluence Rate Exposure Rate Exposure Rate MeV/cm2/sec MeV/cm 2 /sec mR/hr mR/hr MeV Photons/sec No Buildup With Buildup No Buildup With Buildup 0.0023 9.067e-02 1.391e-10 1.430e-10 1.86le-10 1.913e-10 0.0174 4.834e-01 8.762e-09 9.129e-09 4.729e-10 4.927e-10 0.0175 9.260e-01 1.719e-08 1.792e-08 9.104e-10 9.491e-10 0.0196 2.720e-01 7.924e-09 8.356e-09 2.925e-10 3.085e-10 0.7026 1.367e+03 5.643e-02 9.872e-02 1.088e-04 1.904e-04 0.8711 1.367e+03 7.464e-02 1.228e-01 1.405e-04 2.312e-04 Totals 2.736e+03 1.311e-01 2.216e-01 2.493e-04 4.216e-04 YA-REPT-00-015-04 Rev. 0 Page 14 of 26

APPENDIX D YA-REPT-00-015-04 Rev. 0 Page 15 of 26

APPENDIX E MicroShield v6.02 (6.02-00253)

Page :1 File Ref DOS File :SPA3-EFF-Ag-108m.ms6 Date Run Date September 16, 2004 By Run Time 3:30:40 PM Checked Duration 00:00:00 Case

Title:

SPA3-EFF-Ag-108m

Description:

SPA-3 Soil scan - 28 cm radius lpCi/cm3 Ag-108m Geometry: 8 - Cylinder Volume - End Shields Source Dimensions:

Height 15.0 cm (5.9 in)

Radius 28.0 cm (11.0 In)

Dose Points A X Y z Y #1 0 cm 25 cm 0 cm 0.0 in 9.8 in 0.0 in I:

Shields Shield N Dimension Material Density Source 3.69e+04 cm 3 Concrete 1.6 Air Gap Air 0.00122 Source Input: Grouping Method - Actual Photon Energies Nuclide curies becquerels pCi/cm 3 Bq/cm3 Ag-108m 3.6945e-008 1.3670e+003 1.00OOe-006 3.7000e-002 Buildup : The material reference is - Source Integration Parameters Radial 20 Circumferential 10 Y Direction (axial) 10 Results Energy Fluence Rate Fluence Rate Exposure Rate Exposure Rate Activity MeV/cm 2 /sec MeV/cm 2 /sec mR/hr mR/hr MeV Photons/sec No Buildup With Buildup No Buildup With Buildup 0.0028 6.580e+01 1.252e-07 1.287e-07 1.351e-07 1.388e-07 0.003 7.853e+00 1.568e-08 1.612e-08 1.612e-08 1.657e-08 0.021 2.491e+02 9.534e-06 1.015e-05 2.824e-07 3.007e-07 0.0212 4.727e+02 1.862e-05 1.985e-05 5.389e-07 5.744e-07 0.022 7.024e+00 3.202e-07 3.434e-07 8.233e-09 8.831e-09 0.0222 1.330e+01 6.251e-07 6.714e-07 1.568e-08 1.685e-08 0.0238 1.501e+02 9.273e-06 1.010e-05 1.863e-07 2.029e-07 0.0249 4.289e+00 3.145e-07 3.464e-07 5.492e-09 6.050e-09 0.0304 2.902e-04 4.431e-1l 5.248e-11 4.230e-13 5.010e-13 0.0792 9.687e+01 2.008e-04 4.802e-04 3.190e-07 7.629e-07 0.4339 1.229e+03 2.705e-02 5.514e-02 5.294e-05 1.079e-04 0.6144 1.236e+03 4.282e-02 7.808e-02 8.347e-05 1.522e-04 0.7229 1.237e+03 5.300e-02 9. 194e-02 1.019e-04 1.768e-04 Totals 4.768e+03 1.231e-O1 2,257e-01 2.398e-04 4.389e-04 YA-REPT-00-015-04 Rev. 0 Page 16 of 26

APPENDIX F YA-REPT-00-015-04 Rev. 0 Page 17 of 26

APPENDIX G MicroShield v6.02 (6.02-00253)

Page :1 File Ref DOS File :SPA3-EFF-Sb- 125.ms6 Date Run Date  : September 16. 2004 By Run Time :3:34:07 PM Checked Duration  : 00:00:00 Case

Title:

SPA3-EFF-Sb-125

Description:

SPA-3 Soil scan - 28 cm radius I pCi/cm3 Sb-125 Geometry: 8 - Cylinder Volume - End Shields Source Dimensions:

Height 15.0 cm (S.9 in)

Radius 28.0 cm (11.0in)

V Dose Points A X Y z

  1. I 0cm 25cm Ocm 0.0 in 9.8 in 0.0 in Shields Shield N Dimension Material Density Source 3.69e+04 cm3 Concrete 1.6 Air Gap Air 0.00122 Source Input : Grouping Method - Actual Photon Energies Nuclide curins gccquercls pCi/cm, Bq.coo 2 7

Sb-125 3.6945e-009 1.3670e+003 I .O000e.006 3. 000e.002 Buildup: The material reference is - Source Integration Parameters Radial 20 Circumferential 10 Y Direction (axial) to Results Energy Fluence Rate Fluence Rate Exposure Rate Exposure Rate Activity Photons/sec MeV/emn9sec MeV/cmrlscc mR/hr mR/hr MeV No Buildup With Buildup No Buildup With Buildup 0.0038 6.762e+0 I 1.708e-07 1.756e-07 1.388c-07 1.427e-07 0.0272 1.748e+02 I. 785e-05 2.020e-05 2.376e-07 2.689e-07 0.0275 3.262e+02 3.453e-05 3.922e-05 4.461 e-07 5.067e-07 0.031 I. 132e+02 1.857e-05 2.22 Ie-05 1.670e-07 1.997e-07 0.0355 5.693e+01 1.492e.05 1.9 18e-05 9.090e-08 I. 169e-07 0.117 3.568e+00 1.380e-05 3.71 Se-05 2.146e-08 5.778e-08 0.159 9.53 1e-01 5.634e-06 1.499e-05 9.416e-09 2.505e-08 0.1726 2.478e'-00 1.634e-05 4.295e-05 2.787e-08 7.326e-08 0.1763 9.422e+O 1 6.392e-04 1.674e-03 1.096e-06 2.870c-06 0.2041 4.4 10e+00 3,630c-05 9.230e-05 6.435e-08 1.636e-07 0.2081 3.324e+00 2.805e-05 7.103e-05 4.994"-O8 1.264e-07 0.2279 1.796e+00 1.708e-05 4.229c-05 3.098e-08 7.670e.08 0.321 5.70 1e+00 8.474e-05 1.899e-04 1.620e-07 3.632e-07 0.3804 2.045e+0 I 3.792e-04 8.052e-04 7.364e-07 1.564e-06 0.408 2.486e+00 5.051 e-05 1.049e-04 9.853e-08 2.047e-07 0.4279 4.009e+02 8.668e-03 1.774e-02 1.695e-05 3.470e-05 0.4435 4.130e+00 9.356e-05 1.894e-04 1.832e-07 3.709e-07 6

0.4634 1.415e+02 3.395e-03 6.78 1e-03 6.658e-0 1.330e-05 0.6006 2.430e+02 8.174e-03 1.501e-02 1.595e-05 2.930e-05 0.6066 6.864e+01 2.340e-03 4.283e-03 4.564e-06 8.355e-06 0.6359 1.548e+02 5.609e-03 1.012c-02 1.091e-05 1.967e-05 0.6714 2.478e+01 9.640e-04 1.710e-03 1.867e-06 3.311 e-06 Totals 1.916e-+03 3.060e-02 5.901e-02 6.046e-05 1.158e-04 YA-REPT-00-015-04 Rev. 0 Page 18 of 26

APPENDIX H YA-REPT-00-015-04 Rev. 0 Page 19 of 26

APPENDIX I MicroShield v6.02 (6.02-00253)

Page :1 pile Ref DOS File :SPA3-EFF-Cs- 134.ms6 Date Run Date September 16, 2004 By Run Time 3:39:09 PM Checked Duration 00:00:00 Case

Title:

SPA3-EFF-Cs-134

Description:

SPA-3 Soil scan - 28 cm radius lpCi/cm3 Cs-134 Geometry: 8 - Cylinder Volume - End Shields Source Dimensions:

Height 15.0 cm (5.9 in)

Radius 28.0 cm (11.0 in)

Dose Points Y A X Y z

  1. 1 0 cm 25 cm 0 cm

.0.0 in 9.8 in 0.0 in Shields Shield N Dimension Material Density 3

Source 3.69e+04 cm Concrete 1.6 Air Gap Air 0.00122 Source Input: Grouping Method - Actual Photon Energies 3

Nuclide curies becquerels pCi/cm Bq/cms Cs- 134 3.6945e-008 1.3670e+003 1.00OOe-006 3.7000e-002 Buildup : The material reference is - Source Integration Parameters Radial 20 Circumferential 10 Y Direction (axial) 10 Results Fluence Rate Fluence Rate Exposure Rate Exposure Rate Energy Activity MeV/cm2/sec MeV/cm2/sec mR/hr mR/hr MeV Photons/sec No Buildup With Buildup No Buildup With Buildup 0.0045 1.222e+00 3.658e-09 3.760e-09 2.507e-09 2.577e-09 0.0318 2.931e+00 5.271e-07 6.386e-07 4.391e-09 5.320e-09 0.0322 5.407e+00 1.014e-06 1.236e-06 8.157e-09 9.943e-09 0.0364 1.968e+00 5.611e-07 7.321e-07 3.188e-09 4.160e-09 0.2769 4.839e-01 5.931e-06 1.391e-05 1.113e-08 2.610e-08 0.4753 1.996e+01 4.950e-04 9.808e-04 9.712e-07 1.924e-06 0.5632 1.146e+02 3.545e-03 6.648e-03 6.940e-06 1.302e-05 0.5693 2.109e+02 6.619e-03 1.237e-02 1.295e-05 2.421e-05 0.6047 1.334e+03 4.529e-02 8.300e-02 8.836e-05 1.619e-04 0.7958 1.167e+03 5.668e-02 9.564e-02 1.079e-04 1.820e-04 0.8019 1.193e+02 5.852e-03 9.853e-03 1.113e-05 1.874e-05 1.0386 1.367e+01 9.377e-04 1.472e-03 1.717e-06 2.696e-06 1.1679 2.461e+01 1.964e-03 2.990e-03 3.514e-06 5.349e-06 1.3652 4.156e+01 4.055e-03 5.936e-03 6.993e-06 1.024e-05 Totals 3.058e+03 1.254e-01 2.189e-01 2.405e-04 4.202e-04 YA-REPT-00-015-04 Rev. 0 Page 20 of 26

. YA-REPT-00-015-04 Rev. 0 Page 21 of 26

APPENDIX K MicroShied v4t.6102 (6.02-00253)

Page :1 File Ref DOS File :SPA3-EFF-Cs-137.ms6 Date Run Date September 10, 2004 By Run Time 8:52:18 AM Checked Duration 00:00:00 Case

Title:

SPA3-EFF-Cs-137

Description:

SPA-3 Soil scan - 28 cm radius lpCi/cm3 Cs-137 and Daughters Geometry: 8 - Cylinder Volume - End Shields Source Dimensions:

Height 15.0 cm (5.9 in)

Radius 28.0 cm (11.0 in)

Dose Points A X Y z

  1. 1 0 cm 25 cm 0 cm 0.0 in 9.8 in 0.0 in Shields Shield N Dimension Material Density 3

Source 3.69e+04 cm Concrete 1.6 Air Gap Air 0.00122 Source Input: Grouping Method - Actual Photon Energies Nuclide curies becquerele JCi/cm3 Bq/cm 3

Ba- 137m 3.4950e-008 1.2932e+003 9.4600e-007 3.5002e-002 Cs-137 3.6945e-008 1.3670e+003 1.0000e-006 3.7000e-002 Buildup : The material reference is - Source Integration Parameters Radial 20 Circumferential 10 Y Direction (axial) 10 Results Fluence Rate Fluence Rate Exposure Rate Exposure Rate Energy Activity MeV/cmz/sec MeV/cm 2/sec mR/hr mR/hr MeV Photons/sec No Buildup With Buildup No Buildup With Buildup 0.0045 1.342e+01 4.020e-08 4.133e-08 2.755e-08 2.833e-08 0.0318 2.677e+01 4.815e-06 5.834e-06 4.011e-08 4.860e-08 0.0322 4.939e+01 9.260e-06 1.129e-05 7.452e-08 9.084e-08 0.0364 1.797e+01 5.126e-06 6.688e-06 2.912e-08 3.800e-08 0.6616 1.164e+03 4.442e-02 7.913e-02 8.61le-05 1.534e-04 Totals 1.271e+03 4.444e-02 7.915e-02 8.628e-05 1.536e-04 YA-REPT-00-0 15-04 Rev. 0 Page 22 of 26

APPENDIX L YA-REPT-00-015-04 Rev. 0 Page 23 of 26

APPENDIX M MicroShield v6.02 (6.02-00253)

.¢ "' *.....

....... . . .... ...... ....... t................. . . .... .............. .... .. . . . . . . . . . . . . .. .

Page :1 File Ref DOS File :SPA3-EFF-Eu-152.ms6

ýDate Run Date October 7, 2004 .By Run Time 11:25:11AM Checked Duration 00:00:00 Case

Title:

SPA-3-EFF-Eu-152

Description:

SPA-3 Soil scan - 28cm radius 1 pCI/cm3 Eu-152 Geometry: 8 - Cylinder Volume - End Shields Source Dimensions:

Height 15.0 cm (5.9 In)

Radius 28.0 cm: (11.0 In)

Dose Points A X Y z

  1. 1 0 cm 25 cm 0 cm 0.0 In 9.8 In 0.0 In Shields Shield N Dimension Material Density 3

Source 3.69e+04 cm Concrete 1.6 Air Gap Air 0.,00122 Source Input: Grouping Method - Standard Indices Number of Groups :25 Lower Energy Cutoff: 0.015 Photons - 0.015 : Included Library : Grove Nuclide curies becquerels IPCi/cms sq/cmz Eu-152 3.6945e-008 1.3670e+003 1.00DOe-006 3.7000e-002 Buildup ; The material reference is - Source Integration Parameters Radial 20

'Circumferential 10 Y Direction (axial) 10 Results Exposure Fluence 2Rate Fluence Rate Rate Exposure Rate Energy Activity MeV/cm /sec 2 MeV/cm /sec mR/hr mR/hr meV Photons/sec No Buildup With Buildup No With Buildup Buildup 0.015 2.077e+02 2.087e-06 2.146e-06 1.790e-07 1.84le-07 0.04 8.088e+02 3.13le-04 4.331e-04 1.385e-06 1.916e-06 0.05 2.022e+02 1.507e-04 2.467e-04 4.014e-07 6.572e-07 0.1 3.887e+02 1.189e-03 3.118e-03 1.819e-06 4.770e-06 0.2 1.024e+02 8.207e-04 2.097e-03 1.448e-06 3.700e-06 0.3 3.696e+02 5.029e-03 1.151e-02 9.540e-06 2.184e-05 0.4 8.590e+01 1.70le-03 3.555e-03 3.314e-06 6.926e-06 0.5 7.711e+00 2.043e-04 3.984e-04 4.010e-07 7.819e-07 0.6 5.797e+01 1.948e-03 3.579e-03 3.802e-06 6.985e-06 0.8 2.434e+02 1.190e-02 2.005e-02 2.263e-05 3.813e-05 1.0 5.849e+02 3.820e-02 6.058e-02 7.042e-05 1.117e-04 1.5 3.171e+02 3.490e-02 4.999e-02 5.871e-05 8.41le-05 Totals 3.376e+03 9.635e-02 1.556e-01 1.740e-04 2.817e-04 YA-REPT-00-015-04 Rev. 0 Page 24 of 26

APPENDIX N YA-REPT-00-015-04 Rev. 0 Page 25 of 26

APPENDIX 0 Calculated Energy Response (Eberline Instruments)

CPM/mR/h 100000000: ~-a.

Th~

I~~

D B I

~1.~-

10000000:

- _______________ .0-*-

I E

-4 i1-'

V-l 1000000: I I x N,

IIH 100000 10 I00 1000 10000 ENERGY (key)

YA-REPT-00-015-04 Rev. 0 Page 26 of 26

Generic ALARA Evaluation Comparison Worksheet Survey Area: NOL-04 Survey Unit: 01 Reference Generic ALARA Evaluation No.: YA-REPT-00-003-05 Applicable Generic ALARA AL: 165 Radionuclide Average Concentration DCGL fraction DCGL

1. Co-60 0.04 1.4 0.03
2. Cs-137 0.11 3.0 0.04 3.

4.

Z(fraction DCGL) = 0.07 If the X(fraction DCGL) < the generic ALARA AL, then the generic ALARA evaluation is applicable to the survey unit.

Check one:

X Generic ALARA AL IS satisfied.

Generic ALARA AL IS NOT satisfied.

Prepared by:_-*AS Date: 7-> OQ adiologic, eer Reviewed by: r -Date:A6Date:

FSS rojec- anager DPF-8867.1 Rev. 2 Page 1 of 1

Use Of In-Situ Gamma Spectrum Analysis To Perform Elevated Measurement Comparisons In Support Of Final Status Surveys YA-REPT-00-018-05 Approvals (Print & Sign Name)

Preparer: Greg Astrauckas/ Date: Ic/Ico Preparer: Gordon Madison, C Date:

Reviewer: Jim Hummer, CHP/ Date: I V,/t 6 / o -

Approver (FSS Manager):

Dann Smith, CIIP/ Date: ///-//O,"

Rev. 0

YA-REPT-0O0-018-05 Rev. 0 Technical Report YA-REPT-00-0l18-05, Rev. 0 Use Of In-Situ Gamma Spectrum Analysis To Perform Elevated Measurement Comparisons In Support Of Final Status Surveys TABLE OF CONTENTS 1.0 Report ............................................................................................................ 2 1.1 Introduction ........................................................................................... 2 1.2 Discussion .............................................................................................. 2 1.2.1 Detector Description .................................................................... 2 1.2.2 Traditional Approach ................................................................ 3 1.2.3 Innovative Approach ................................................................... 4 1.2.4 Investigation Level ...................................................................... 4 1.2.5 Detector Sensitivity ................................................................... 8 1.2.6 Area Coverage ............................................................................ 8 1.2.7 Moisture Content in the Soil Matrix .......................................... 9 1.2.8 Discrete Particles in the Soil M atrix ........................................ 10 1.2.9 Procedures and Guidance Documents ..................................... 10 1.2.10 Environmental Background ....................................................... 11 1.2.11 Quality Control .............................................................................. 11 1.2.12 Data Collection ........................................................................ 12 1.2.13 Efficiency Calibration .............................................................. 13 1.2.14 Data Management ..................................................................... 13 1.3 Conclusions/Recommendations ............................................................ 14 1.4 References .............................................................................................. 14 Attachments Attachment 1, ISOCS Detector System Photos .................................................... 15 Attachment 2, Field-Of-View Characterization ..................................................... 16 Attachment 3, Typical Grid Pattern For In-Situ Gamma Spectroscopy ................. 18 YA-REPT-00-018-05 Rev. 0 1.0 REPORT 1.1 Introduction The ISOCS In-Situ Gamma Spectrum detector system manufactured by Canberra Industries is being employed to perform elevated measurement comparison (EMC) surveys in support of the Final Status Surveys at Yankee Atomic's Yankee Rowe facility. This system uses an HPGe detector and specialized efficiency calibration software designed to perform in-situ gamma-spectroscopy assays. The ISOCS system will primarily be employed to evaluate survey units for elevated measurement comparisons. The ISOCS system can obtain a static measurement at a fixed distance from a pre-determined location. Count times can be tailored to achieve required detection sensitivities. Gamma spectroscopy readily distinguishes background activity from plant-related licensed radioactivity. This attribute is particularly beneficial where natural radioactivity introduces significant investigation survey efforts. Additionally, background subtraction or collimation can be employed where background influences are problematic due to the presence of stored spent fuel (ISFSI).

This technical report is intended to outline the technical approach associated with the use of ISOCS for implementing a MARSSIM-based Final Status Survey with respect to scanning surveys for elevated measurement comparisons for both open land areas and building surfaces. While the examples and discussions in this report primarily address open land areas, the same approach and methodology will be applied when deriving investigation levels, grid spacing and measurement spacing for evaluating building surfaces.

Validation of the ISOCS software is beyond the scope of this technical report.

Canberra Industries has performed extensive testing and validation on both the MCNP-based detector characterization process and the ISOCS calibration algorithms associated with the calibration software. The full MCNP method has been shown to be accurate to within 5% typically. ISOCS results have been compared to both full MCNP and to 119 different radioactive calibration sources. In general, ISOCS is accurate to within 4-5% at high energies and 7-11% at 1 standard deviation for low energies. Additionally, the ISOCS technology has been previously qualified in Yankee Atomic Technical Report YA-REPT-00-022-04, "Use Of Gamma Spectrum Analysis To Evaluate Bulk Materials For Compliance With License Termination Criteria."

1.2 Discussion 1.2.1 Detector Description Two ISOCS-characterized I-PGe detectors manufactured by Canberra Industries have been procured. Each detector is a reverse-electrode HPGe YA-REPT-00-018-05 Rev. 0

  • detector rated at 50% efficiency (relative to a Nal detector). Resolution for these detectors is 2.2 keV @ 1332 keV. As the project progresses, other ISOCS detectors (e.g. standard electrode coaxial), if available, may be used to increase productivity. The key element regarding the use of other types of ISOCS detectors is that specific efficiency calibrations will be developed to account for each detector's unique characteristics.

The HPGe detector is mounted on a bracket designed to hold the detector /

cryostat assembly and associated collimators. This bracket may be mounted in a wheeled cart or in a cage-like frame. Both the wheeled cart and frame permit the detector to be oriented (pointed) over a full range from a horizontal to vertical position. The frame's design allows the detector to be suspended above the ground. Photographs of the frame-mounted system are presented in Attachment 1. During evaluations of Class1 areas for elevated radioactivity, the detector will generally be outfitted with the 90-degree collimator. Suspending the detector at 2 meters above the target surface yields a nominal field-of-view of 12.6 m2.

The InSpector (MCA) unit that drives the signal chain and the laptop computer that runs the acquisition software (Genie-2000) are mounted either in the frame or on the wheeled cart. These components are battery powered.

Back-up power supplies (inverter or UPS) are available to support the duty cycle. A wireless network has been installed at the site so that the laptop computers used to run the systems can be completely controlled from any workstation at the facility. This configuration also enables the saving of data files directly to a centralized file server. Radio communication will be used to coordinate system operation.

1.2.2 Traditional Approach With respect to Class 1 Survey Units, small areas of elevated activity are evaluated via the performance of scan surveys. The size of the potential area of elevated activity affects the DCGLEMc and is typically determined by that area bounded by the grid points used for fixed measurements. This area in turn dictates the area factor(s) used for deriving the associated DCGLEMC.

These scan surveys are traditionally conducted with hand-held field instruments that have a detection sensitivity sufficiently low to identify areas of localized activity above the DCGLEMC. Occasionally, the detection sensitivity of these instruments is greater than the DCGLEMc. In order to increase the DCGLEMc to the point where hand-held instrumentation can be reasonably employed, the survey design is augmented to require additional fixed-point measurements. The effect of these additional measurement points is to tighten the fixed measurement grid spacing, thus reducing the area applied to deriving the DCGLEMc and increasing the detection sensitivity

_ criteria.

YA-REPT-00-018-05 Rev. 0 Background influences (from the ISFSI) and natural terrestrial sources further impact the sensitivity of these instruments. To address these impacts, the fixed-point grid spacing would again need to be reduced (requiring even more samples) in order to increase the DCGLEMc to the point where hand-held instrumentation can be used. Generally, the collection of additional fixed measurements (i.e. samples) increases project costs.

Survey designs for Class 2 and Class 3 survey units are not driven by the elevated measurement comparison because areas of elevated activity are not expected. In Class 2 areas, any indication of activity above the DCGLw requires further investigation. Similarly, in Class 3 areas, any positive indication of licensed radioactivity also requires further investigation.

Because the DCGLEMc is not applicable to Class 2 or Class 3 areas, adjustments to grid spacing do not occur. However, the increased field-of-view associated with the in-situ gamma spectroscopy system improves the efficiency of the survey's implementation.

1.2.3 Innovative Approach In-situ assays allow fixed-point grid spacing to be uncoupled from the derivation of applicable investigation levels. In contrast to the traditional approach where the DCGLEMc (based on grid size) determines both investigation levels and detection sensitivities, the use of this technology provides two independent dynamics as follows:

" Detection sensitivity is determined by the DCGLEMc associated with the (optimal) fixed-point grid spacing.

" Investigation levels are based on the detector's field-of-view and adjusted for the smallest area of concern (i.e. 1 mi2).

1.2.4 Investigation Level Development of the investigation (action) levels applied to in-situ assay results is a departure from the traditional approach for implementing a MARSSIM survey. Examples are provided for both open land areas (i.e. soil) and for building surfaces, however the approach for both is identical.

To support the use of in-situ spectroscopy to evaluate areas of elevated activity the -PGe detector's field-of-view was characterized. Attachment 2 presents data from the field-of-view characterization for a detector configured with a 90-degree collimator positioned 2 meters from the target surface.

Alternate configurations will be evaluated in a similar manner before being employed. As exhibited in Attachment 2, when the detector is positioned at 2 meters above the target surface the field-of-view has a radius of at least 2.3 YA-REPT-00-018-05 Rev. 0 meters. This value was rounded down to 2.0 meters for implementation purposes, introducing a conservative bias (approximately.9%) in reported results. The example provided in this technical report assumes a 2-meter source-to-detector distance, yielding a nominal field-of-view surface area of 12.6 in 2 .

Occasionally, alternate source-to-detector distances (using the 90-degree collimator) may be employed, particularly in a characterization or investigation capacity. In such cases, the detector's field-of-view will be calculated by setting the radius equal to the source-to-detector distance, thereby maintaining the conservative attribute previously described. If alternative collimator configurations are used to perform elevated measurement comparisons, then specific evaluations will be documented in the form of a technical evaluation or similar. Associated investigation levels will be derived using the same approach and methodology outlined below in this section.

After the detector's field-of-view is determined, an appropriate investigation level is developed to account for a potential one-meter square area of elevated activity. DCGLEMC values for a one-square meter area are presented in Table 1.

2 TABLE 1, SOIL DCGLEMc FOR 1 mn Soil Soil DCGLEMc 2

DCGLw DCGLW Area Factor for I mn (pCi/g) (pCi/g) for 1M2 (pCi/g)

(NOTE 1) (NOTE 2) (NOTE 3) (NOTE 4)

Co-60 3.8 1.4 11 15 Ag-108m 6.9 2.5 9.2 23 Cs-134 4.7 1.7 16 28 Cs-137 8.2 3.0 22 66 NOTE 1 - LTP Table 6-1 NOTE 2 - Adjusted to 8.73 mRem/yr NOTE 3 - LTP Appendix 6Q NOTE 4 - Soil DCGLw (adjusted to 8.73 mRem/yr) for a 1 mTarea The '"2DCGLEMC values listed in Table 1 do not account for a source positioned at the edge of the field-of-view. Therefore, the "mDCGLEMc values are adjusted via a correction factor. To develop this correction factor, a spectrum free of plant-related radioactivity was analyzed using two different efficiency calibrations (i.e. geometries). The first scenario assumes radioactivity uniformly distributed over the detector's 12.6 mi2 field-of-view.

The second scenario assumes radioactivity localized over a 1 m 2 situated at the edge of the detector's field-of-view. The resultant MDC values were compared to characterize the difference in detection efficiencies between the two scenarios. As expected, the condition with localized (1 M 2 ) radioactivity at the edge of the detector's field-of-view yielded higher MDC values. The ratio between the reported MDC values for the two scenarios is used as a correction factor. This correction factor is referred to as the offset geometry YA-REPT-00-018-05 Rev. 0 adjustment factor. The investigation levels for soils presented in Table 2 were calculated as follows:

Nuclide Investigation Level (pCi/g) = (DCGLEMc)

  • CF Where: DCGLEMc = (DCGLw or DCGLsuyR)
  • AF(1In), and CF = Mean offset geometry adjustment factor TABLE 2, SOIL INVESTIGATION LEVEL DERIVATION INVESTIGATION MDC DCGLEMc LEVEL pCi/g MDC pCi/g RATIO for 1 m2 pCi/g (NOTE 1) (NOTE 2) (NOTE 3) (NOTE 5) (NOTE 6)

Co-60 0.121 1.86 0.0651 15 1.0 Ag-108m 0.184 2.82 0.0652 23 1.5 Cs-134 0.189 2.90 0.0652 28 1.8 Cs-137 0.182 2.78 0.0655 66 4.3 Offset Geometry Adjustment Factor 0.0653 (NOTE 4)

NOTE 1 - Assumed activity distributed over the 12.6 m2 field-of-view.

NOTE 2 - Efficiency calibration modeled for a I n' area situated (off-set) at the edge of the detector's field-of-view. The model assumes that all activity is distributed within the I ire.

NOTE 3 - Ratio = (12.6 ml MDC + I rn1MDC).

NOTE 4 - The mean value of the ratios is applied as the off-set geometry adjustment factor.

NOTE 5 - DCGLEMc values for I m2 (from Table 1)

NOTE 6 - Investigation levels derived by applying of the off-set geometry adjustment factor (e.g. 0.0653) to the 2

DCGLEMc for a 1 mn area for each radionuclide.

With respect to building surfaces, the development of the investigation level is identical to that for soil surfaces. The one-meter square DCGLEMc for building surfaces are presented in Table 3.

TABLE 3, BUILDING SURFACE DCGLEMc FOR 1 m2 DCGLEMc 2

Bldg DCGLw Bldg DCGLw Area Factor For 1 mn (dpm/100ml) (dpm/100cm2) For 1 m2 (dpmr1l00cm')

(NOTE 1) (NOTE 2) (NOTE 3) (NOTE 4)

Co-60 18,000 6,300 7.3 46,000 Ag-108m 25,000 8,700 7.2 62,600 Cs-134 29,000 10,000 7.4 74,000 Cs-137 63,000 22,000 7.6 167,000 NOTE I- LTP Table 6-1 NOTE 2- Adjusted to 8.73 mRem/yr NOTE 3- LTP Appendix 6S NOTE 4- Building DCGLw (adjusted to 8.73 mnRem/yr) for a I m' area Using the same approach described for soils, a correction factor to account for efficiency differences due to geometry considerations is developed the one-meter square DCGLEMc. ISOCS efficiency calibrations for activity distributed over the detector's field-of-view and for activity within one-square meter located at the edge of the detector's field-of-view were developed. The MDC values for these two geometries were compared to characterize the difference in detection efficiencies. As expected, the condition with localized (1 in 2 )

YA-REPT-00-018-05 Rev. 0 radioactivity at the edge of the detector's field-of-view yielded higher MDC values. The ratio between the reported MDC values for the two scenarios is used as the offset geometry adjustment factor. The MDC values, the associated ratios, and the derived investigation level for building surfaces are presented in Table 4.

TABLE 4, BUILDING SURFACE INVESTIGATION LEVEL DERIVATION BUILDING 2 2 SURFACE 12.6 n 1M DCGLEMC INVESTIGATION MDC MDC For 1 ml LEVEL (dpm/100cm') (dpm/100cm2) RATIO (dpm/100cm') (dpmn/100cm')

(NOTEI) (NOTE2) (NOTE 3)5) (OTE 6)

Co-60 785 12,400 0.0633 46,000 2,900 Ag-108m 839 13,000 0.0645 62,600 3,900 Cs- 134 900 14,200 0.0634 74,000 4,700 Cs-137 922 14,600 0.0632 167,000 10,600 Offset Geometry Adjustment Factor 0.0636 (NOTE 4)

NOTE I - Assumed activity distributed over the 12.6 ml field-of-view.

NOTE 2 - Efficiency calibration modeled for a I m2 area situated (off-set) at the edge of the detector's field-of-view. The model assumes that all activity is distributed within the I MI.

NOTE 3 - Ratio = (12.6 m' MDC + I an MDC).

NOTE 4 - The mean value of the ratios is applied as the off-set geometry adjustment factor.

NOTE 5 - DCGL-Mc values for I m2 (from Table 3)

NOTE 6 - Investigation levels derived by applying of the off-set geometry adjustment factor (e.g. 0.0636) to the one-square meter DCGLEmc.

In summary, effective investigation levels for both open land areas (i.e. soils) and for building surfaces can be derived and applied to in-situ gamma spectroscopy results. Note the MDC values associated with the detector's field-of-view were well below the derived investigation levels.

The investigation levels presented in Table 2 and Table 4 do not address the use of surrogate DCGLs. Use of surrogate DCGLs will be addressed in Final Status Survey Plans, particularly where it is necessary to evaluate non-gamma emitting radionuclides on building surfaces. When surrogate DCGLs are employed, investigation levels will be developed on a case-by-case basis using the approach outlined in this document. Similarly, the offset geometry adjustment factor presented in Table 2 and Table 4 will vary for different geometries. Although unlikely, if different geometries are employed, this value will be determined on a case-by-case basis using the methodology reflected in Table 2 and will be documented in the applicable Final Status Survey Plan.

For both open land areas and for building surfaces, when an investigation level is encountered, investigatory protocols will be initiated to evaluate the presence of elevated activity and bound the region as necessary. Such evaluations may include both hand-held field instrumentation as well as the in-situ HPGe detector system. After investigation activities are completed, YA-REPT-00-018-05 Rev. 0 subsequent (follow-up) scanning evaluations will most likely be conducted using the in-situ gamma spectroscopy system.

1.2.5 Detector Sensitivity For Class 1 scan surveys, the minimum detectable concentration is governed by the DCGLEMc associated with the grid area used to locate fixed-point measurements. The system's count time can be controlled to achieve the required detection sensitivity. Therefore, the grid spacing for the fixed-point measurements can be optimized thus eliminating unnecessary increases to the number of fixed-point measurements while ensuring that elevated areas between fixed measurement locations can be identified and evaluated.

Based on preliminary work, it has been determined that a count time of 900 seconds will yield an acceptable sensitivity for many areas on the site. This count time provides MDC values well below the investigation levels presented in Table 2 and Table 4. Count times will be adjusted as necessary as survey unit-specific investigation levels are derived or where background conditions warrant to ensure that detection sensitivities are below the applicable investigation level. Since each assay report includes a report of the MDC values achieved during the assay, this information is considered technical support that required MDC values were met.

1.2.6 Area Coverage 2

Based on the nominal 12.6 mn field-of-view, a 3-meter spacing between each survey point will result in well over 100% of the survey unit to be evaluated for elevated activity. This spacing convention typically employs a grid pattern that is completely independent from the grid used to locate fixed-point measurements. An example of the grid pattern and spacing is presented in Attachment 3.

Alternate spacing conventions may be applied on a case-by-case basis. For instance, spacing may be decreased when problematic topographies are encountered. Note that decreased grid spacing in this context is not associated to the fixed-point measurements. Occasionally it may be necessary to position the detector at one meter or less from the target surface to evaluate unusual (e.g. curved) surfaces or to assist in bounding areas of elevated activity. In cases where it may be desirable to increase the field-of-view via collimator or source-to-detector distances, grid-spacing conventions (and applicable investigation levels) will be determined using the approach described in this document.

YA-REPT-00-018-05 Rev. 0 1.2.7 Moisture Content in the Soil Matrix In-situ gamma spectroscopy of open land areas is inherently subject to various environmental variables not present in laboratory analyses. Most notably is the impact that water saturation has on assay results. This impact has two components. First, the total activity result for the assay is assigned over a larger, possibly non-radioactive mass introduced by the presence of water.

Secondly, water introduces a self-absorption factor.

The increase in sample mass due to the presence of water is addressed by the application of a massimetric efficiency developed by Canberra Industries.

Massimetric efficiency units are defined as [counts per second]/[gammas per second per gram of sample]. Mathematically, this is the product of traditional efficiency and the mass of the sample. When the efficiency is expressed this way, the efficiency asymptotically approaches a constant value as the sample becomes very large (e.g. infinite). Under these conditions changes in sample size, including mass variations from excess moisture, have little impact on the counting efficiency. However, the massimetric efficiency does not completely address attenuation characteristics associated with water in the soil matrix.

To evaluate the extent of self-absorption, (traditional) counting efficiencies were compared for two densities. Based on empirical data associated with the monitoring wells, typical nominally dry in-situ soil is assigned a density of 1.7 g/cc. A density of 2.08 g/cc, obtained from a technical reference publication by Thomas J. Glover, represents saturated soil. A density of 2.08 g/cc accounts for a possible water content of 20%. A summary of this comparison is presented in Table 5.

TABLE 5, COUNTING EFFICIENCY COMPARISONS Efficiencies Deviation due to density keV 1.7 g/cc 2.08 g/cc increase (excess moisture) 434 3.3 E-6 2.7 E-6 -18.7%

661.65 2.9 E-6 2.4 E-6 -17.5%

1173.22 2.5 E-6 2.1 E-6 -15.4%

1332.49 2.4 E-6 2.1 E-6 -14.8%

In cases when the soil is observed to contain more than "typical" amounts of water, potential under-reporting can be addressed in one of two manners. One way is to adjust the investigation level down by 20%. The second way is to reduce the sample mass by 20%. Either approach achieves the same objective: to introduce a conservative mechanism for triggering the investigation level where the presence of water may inhibit counting efficiency. The specific mechanism to be applied will be prescribed in implementing procedures.

YA-REPT-00-018-05 Rev. 0 The presence of standing water (or ice or snow) on the surface of the soil being assayed will be accounted for in customized efficiency calibrations applied during data analysis activities.

1.2.8 Discrete Particles in the Soil Matrix Discrete particles are not specifically addressed in the License Termination Plan. However, an evaluation was performed assuming all the activity in the detector's field-of-view, to a depth of 15 cm, was situated in a discrete point-source configuration. A concentration of 1.0 pCi/g (Co-60), corresponding to the investigation level presented in Table 2, correlates to a discrete point-source of approximately 3.2 jtCi. This activity value is considered as the discrete particle of concern. Since the presence of any discrete particles will most likely be accompanied by distributed activity, the investigation level may provide an opportunity to detect discrete particles below 3.2 jtCi.

Discrete particles exceeding this magnitude would readily be detected during characterization or investigation surveys. The MDCs associated with hand-held field instruments used for scan surveys are capable of detecting very small areas of elevated radioactivity that could be present in the form of discrete point sources. The minimum detectable particle activity for these scanning instruments and methods correspond to a small fraction of the TEDE limit provided in 10CFR20 subpart E. Note that the MDC values presented in Table 2 are significantly lower than those published in Table 5-4 of the License Termination Plan.

When the investigation level in a Class 1 area is observed, subsequent investigation surveys will be performed to include the use of hand-held detectors. The detection sensitivities of instruments used for these surveys have been previously addressed in the LTP. Furthermore, discrete point sources do not contribute to the uniformly distributed activity of the survey unit. It is not expected that such sources at this magnitude would impact a survey unit's ability to satisfy the applicable acceptance criteria.

Noting that Class 2 or Class 3 area survey designs do not employ elevated measurement comparisons, associated investigation levels are based on positive indications of licensed radioactivity above the DCGLw or above background. Because such areas are minimally impacted or disturbed, potential discrete particles would most likely be situated near the soil surface where detection efficiencies are highest.

1.2.9 Procedures And Guidance Documents General use of the portable ISOCS system is administrated by departmental implementing procedures that address the calibration and operation activities as well as analysis of the data. These procedures are listed as follows:

YA-REPT-00-01 8-05 Rev. 0

  • DP-8869, "In-Situ (ISOCS) Gamma Spectrum Assay System Calibration Procedure."

" DP-8871, "Operation Of The Canberra Portable ISOCS Assay System."

" DP-8872, "ISOCS Post Acquisition Processing And Data Review."

Where the portable ISOCS system is used for Final Status Surveys, the applicable FSS Plan will address detector and collimator configurations, applicable (surrogated) investigation levels, MDC requirements, and appropriate Data Quality Objectives, as applicable.

A secondary application of the portable ISOCS system is to assay surfaces or bulk materials for characterization or unconditional release evaluations. Use of the portable ISOCSO system for miscellaneous evaluations will be administrated under a specific guidance document (e.g. Sample Plan, etc.).

Operating parameters such as physical configuration, efficiency calibrations, count times, and MDCs will be applied so as to meet the criteria in the associated controlling documents. Such documents will also address any unique technical issues associated with the application and may provide guidance beyond that of procedure AP-0052, "Radiation Protection Release of Materials, Equipment and Vehicles."

1.2.10 Environmental Backgrounds If background subtraction is used, an appropriate background spectrum will be collected and saved. Count times for environmental backgrounds should exceed the count time associated with the assay. In areas where the background radioactivity is particularly problematic (e.g. ISFSI), the background will be characterized to the point of identifying gradient(s) such that background subtractions are either appropriate or conservative.

Documentation regarding the collection and application of environmental backgrounds will be provided as a component of the final survey plan.

1.2.11 Quality Control Quality Control (QC) activities for the ISOCS system ensure that the energy calibration is valid and detector resolution is within specifications. A QC file will be set up for each detector system to track centroid position, FWHM, and activity. Quality Control counts will be performed on a shiftly basis prior to the system's use to verify that the system's energy calibration is valid. The Na-22 has a 1274.5 keV photon which will be the primary mechanism used for performance monitoring. If the energy calibration is found to be out of an acceptable tolerance (e.g. greater than +4 channels), then the amplifier gain may be adjusted and a follow-up QC count performed. If the detector's resolution is found to be above the factory specification, then an evaluation

-11 -

YA-REPT-00-018-05 Rev. 0 will be performed to determine if the detector should be removed from service and/or if the data is impacted. Evaluations associated with QC counts shall be documented. Such documentation may be limited to a remark directly on the applicable QC report or in a logbook if the resolution does not render the system out of service. Otherwise the evaluation should be separately documented (e.g. Condition Report, etc.) so as to address the impact of any assay results obtained since the last acceptable QC surveillance.

Where it is determined that background subtraction is necessary, a baseline QC background will be determined specific to that area or region. When background subtraction is required, a QC background surveillance will be performed before a set of measurements are made to verify the applicability of the background to be subtracted. Due to the prevailing variability of the background levels across the site, the nature and extent of such surveillances will be on a case-by-case basis and should be addressed in the documentation associated with the applicable survey plan(s).

In addition to the routine QC counts, each assay report is routinely reviewed with respect to K-40 to provide indications where amplifier drift impacts nuclide identification routines. This review precludes the necessity for specific (i.e. required) after-shift QC surveillances. It also minimizes investigations of previously collected data should the system fail a before-use QC surveillance on the next day of use.

1.2.12 Data Collection Data collection to support FSS activities will be administered by a specific Survey Plan. Survey Plans may include an index of measurement locations with associated spectrum filenames to ensure that all the required measurements are made and results appropriately managed. Personnel specifically trained to operate the system will perform data collection activities.

Data collection activities will address environmental conditions that may impact soil moisture content. Logs shall be maintained so as to provide a mechanism to annotate such conditions to ensure that efficiency calibration files address the in-situ condition(s). In extreme cases (e.g. standing water, etc.) specific conditions will be addressed to ensure that analysis results reflect the conditions. As previously discussed with respect to water, when unique environmental conditions exist that may impact analysis results, conservative compensatory factors will be applied to the analysis of the data.

YA-REPT-00-018-05 Rev.O0 1.2.13 Efficiency Calibration The central feature of the portable ISOCS technology is to support in-situ gamma spectroscopy via the application of mathematically derived efficiency calibrations. Due to the nature of the environment and surfaces being evaluated (assayed), input parameters for the ISOCS efficiency calibrations will be reviewed on a case-by-case basis to ensure the applicability of the resultant efficiency. Material densities applied to efficiency calibrations will be documented. In practice, a single efficiency calibration file may be applied to the majority of the measurements.

The geometry most generally employed will be a circular plane assuming uniformly distributed activity. Efficiency calibrations will address a depth of 15 cm for soil and a depth up to 5 cm for concrete surfaces to account for activity embedded in cracks, etc. Other geometries (e.g. exponential circular plane, rectangular plane, etc.) will be applied if warranted by the physical attributes of the area or surface being evaluated. Efficiency calibrations are developed by radiological engineers who have received training with respect to the ISOCSsoftware. Efficiency calibrations will be documented in accordance with procedure DP-8869, "In-Situ (ISOCS) Gamma Spectrum Assay System Calibration Procedure."

1.2.14 Data Management Data management will be implemented in various stages as follows:

" An index or log will be maintained to account for each location where evaluations for elevated activity are performed. Raw spectrum files will be written directly or copied to a central file server.

  • Data Analysis - After the spectrum is collected and analyzed, a qualified Radiological Engineer will review the results. The data review process includes application of appropriate background, nuclide libraries, and efficiency calibrations. Data reviews also verify assay results with respect to the applicable investigation levels and the MDCs achieved. Data reviews may include monitoring system performance utilizing K-40. When the data analysis is completed, the analyzed data file will be archived to a unique directory located on a central file server.

" Data Reporting - The results of data files whose reviews have been completed and are deemed to be acceptable may be uploaded to a central database for subsequent reporting and statistical analysis.

YA-REPT-00-018-05 Rev. 0

  • Data Archiving - Routinely (daily) the centralized file server(s) where the raw and analyzed data files are maintained will be backed up to tape.

1.3 Conclusions/Recommendations The in-situ gamma spectroscopy system is a cost-effective technology well-suited to replace traditional scanning survey techniques to evaluate areas for elevated radioactivity. The static manner in which this system is operated eliminates many variables and limitations inherent to hand-held detectors moving over a surface. This system provides a demonstrably lower detection sensitivity than those offered by hand-held field instruments. This attribute qualifies this system as an alternative technology in lieu of hand-held NaI field instruments in areas where background radiation levels would prohibit the use of such detectors to evaluate for elevated gross activity. The MDC to which this system will be operated satisfies (or exceeds) criteria applied to traditional scan surveys using hand-held field instruments.

Effective investigation levels for both open land areas (i.e. soils) and for building surfaces can be derived and applied to in-situ gamma spectroscopy results. Where surrogate DCGLs are employed, investigation levels will developed on a case-by-case basis using the approach outlined in this document.

The manner in which investigation levels are derived employs several conservative decisions and assumptions. Additionally, adequate spacing applied to scanning survey locations yields an overlap in surface coverage providing 100-percent coverage of Class 1 areas and redundant opportunities in a significant portion of the survey area to detect localized elevated activity.

1.4 References

1. YNPS License Termination Plan, Revision 1
2. Multi-Agency Radiation Survey And Site Investigation Manual (MARSSIM)

Revision 1, 2000

3. Canberra User's Manual Model S573 ISOCS Calibration Software, 2002
4. Decommissioning Health Physics - A Handbook for MARSSIM Users, E.W.

Abelquist, 2001

5. Canberra's Genie 2000 V3.0 Operations Manual, 2004
6. In-Situ (ISOCS) Gamma Spectrum Assay System Calibration Procedure DP-8869, Revision 0
7. Operation of the Canberra Portable ISOCS Assay System DP-8871 Revision 0
8. Technical Ref., by Thomas J. Glover.

YA-REPT-00-018-05 Rev. 0 Attachment 1 Portable ISOCS Detector System Photos YA-REPT-00-0 18-05 A Rev. 0 Attachment 2 Field-Of-View Characterization Generally, the HPGe detector will be outfitted with a 90-degree collimator situated at 2 meters perpendicular to the surface being evaluated. Note that characterizing the detector's field-of-view could be performed without a source by comparing ISOCS-generated efficiencies for various geometries. If a different collimator configuration is to be employed, a similar field-of-view characterization will be performed.

To qualify the field-of-view for this configuration, a series of measurements were made at various off-sets relative to the center of the reference plane. The source used for these measurements was a 1.2 gCi Co-60 point-source with a physical size of approximately 1 cm 3. Each spectrum was analyzed as a point source both with and without background subtract. It was observed that the detector responded quite well to the point source.

Figure 1 presents the results with background subtraction applied. Note that there is a good correlation with the expected nominal activity and that outside the 2-meter radius of the "working" field-of-view (i.e. at 90 inches) some detector response occurs. This validates that the correct attenuation factors are applied to the algorithms used to compute the efficiency calibration.

FIGURE I POINT SOURCE TEST (background subtracted)

>Q 1.5

? 0.5 U9 0 0 18 48 60 66 72 78 84 90 Offset (inches)

Figure 2 shows the effect of plant-derived materials present in the reference background, which indicates an increasing over-response the further the point source is moved off center. Detector response outside the assumed (i.e. 2-meter) field-of-view would yield conservative results.

Normally, source term adjacent to the survey units should be reduced to eliminate background interference.

YA-REPT-00-018-05 Rev. 0 FIGURE 2 POINT SOURCE TEST U6- (background NOT subtracted)

-5 3.

<2 00 0 18 48 60 66 72 78 84 90 Offset (inches)

YA-REPT-00-018-05 Rev. 0 Attachment 3 Typical Grid Pattern For In-Situ Gamma Spectroscopy Typical Scan Grid Pattern (For 2m scan height using 90° collimator.)

=Scan Point Location Q =Scan Area Footprint (4m Odifor wM w lIghQ onuc NOL-04 Attachment A Maps Attachment A - Maps and Posting Plots List of Figures Figure Page FIGURE 1 NOL-04-01 POSTING PLOT .......................................................... 2 I

NOL-04 Attachment A Maps Figure 1 NOL-04-01 Posting Plot 2

NOL-04 Attachment B Data Quality Assessment Plots and Curves Attachment B Data Quality Assessment Plots and Curves List of Figures Figure Page FIGURE 1 NOL-04-01 PROSPECTIVE POWER CURVE ....................................................................................... 2 FIGURE 2NOL-04-01 RETROSPECTIVE POWER CURVE .................................................................................. 2 FIGURE 3 NOL-04-O1 SUM OF FRACTIONS SCATTER PLOT .................................................................................. 3 FIGURE 4 NOL-04-01 SUM OF FRACTIONS QUANTILE PLOT ........................................................................... 3 FIGURE 5 NOL-04-01 SUM OF FRACTIONS FREQUENCY PLOT ....................................................................... 4 The LBGR on the Power Curves have been adjusted to demonstrate the actual power of the survey.

I

NOL-04 Attachment B Data Quality Assessment Plots and Curves Figure 1 NOL-04-01 Prospective Power Curve

- FecmaIo Frors RequiredSamle Sire-Survey UkID: Alpha Beta. Survey Unit 2 0 r.sign Test, r WRS Test 2CGL F clitical V LBG1F.8 3 -1.3 UM rm- :d LA I PrbbM~y that theBox e Uun Passes Click 1.0 - - - - -

the Vaphuto powercurv UMagNOW6 enerd paramster a4--------- value Cno---

Figure 2 NOL-04-01 Retrospective Power Curve Survey Uný D:

Raicuicide:

PCGL I 3 [i~B&ha-WRSB Test

~ Beta:~xv red Sample Si

[Dezrirs Una 20 ]

F41t Critia O Vam: LLOR FT-9~ A/c, - 1.3S

  • L Probabi1t IththeSry Ur dt Pass~itesza Cfick 1.0:

~the rph aB powercurve entered a4 j paranete 0.4 T 0.0*

2

NOL-04 Attachment B Data Quality Assessment Plots and Curves Figure 3 NOL-04-OlSum of Fractions Scatter Plot NOL-04-01 Sample Results Scatter Plot DCGLw= 1 SOF 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 0.5 0.4 -

  • 0.38 0.3 0.2 0.1-- -- - -- - - . . .. 0 0.11 00

-0.1

-0.2 I

  • Activity - Average-- "+3SDev-- -- 3StDev?

Figure 4 NOL-04-01 Sum of Fractions Quantile Plot NrL-4-o1 SWaVW Rmsait Qmr~ie Pot 0.45 0.4 0.35 0.3- 7I 0.15 02 0 S 0Q15 0.05- 01 I*-4-0--8-*--------.

40 -0 410-......x . .. .. ... .. . .

0 0 10 20 30 40 50 60 70 80 SO 100 PIeren:le o IDrecI bJuIrrts-nmecal - - 751,Ft~nutle - - -- -50M Pauwt~le 3

NOL-04 Attachment B Data Quality Assessment Plots and Curves Figure 5 NOL-04-01 Sum of Fractions Frequency Plot I*-O4-01 Frmqaey Pict 12 10 S8-6-

z 2-0.03 0.07 0.11 0.15 0.19 0.22 0.26 0.3 0.34 0.38 Loper BEd Value 4

x Data - - - Sample Mean --- - Investigate ----- Action t Off Scale 6 1.3 --

2 7

9 1.2 ----------------------------------------------------------- ------------------------------

A C

t i

V Kx xx x i xx t

y 0.9 _____ _____

I 0.8 2

7 4

5115/06 5/20106 5/25106 5/30/06 6/4/06 6/9/06 6/114/06 6119/06 6/24)06 6/29/06 Measurement Date/Time QA Filename SS:\1 BlueRover (6279)\Archived QC Files\6279(AfterFeb06).QAF Parameter Description 6279 Activity @ 1274 keV (uCi)

Selection Dates 5/15/06 12:00:00 AM - 6/25/06 12:00:00 AM Sample Mean +1-Std Dev 1.023 +/- 0.056

NOL-04-01 ISOCS DETECTOR 6279 FVHM @1461 KeV (as obtained from assay results) 2.3 2.1 1.9 1.7

>I 1.5 1.3 1.1 0.9 0.7 0.5 Centroid @1461 KeV (as obtained from assay results) 5863 5858 5853 5848 --------------- - - - - - - - - - - - - - - - - - - - - - -

'. 5843 -- -- ---- ---

5838 5833 5828 5823

x Data - - - Sample Mean - Investigate Action

  • Off Scale 7 1.4-7 2 1.3 2 1.2 ------

A C

t i 1.1 x _X - x T -

v i

X t 1 y

0.9- x 1

2 0.8 _........ -_

7 4

0.7- -

5/15106 5/20106 5125106 5/30/06 614/06 6/9106 6/14/06 6/19106 6/24/06 6/29/06 Measurement Dats/Time QA Filename S:\3BrownRover (7722)\Achived QC Files\7722.QAF Parameter Description 7722 Activity @ 1274 keV (uCi)

Selection Dates 5115106 12:00:00AM - 6/25/06 12:00:00AM Sample Mean +1-Std Dev: 1.060 +/-0.079

NOL-04-01 ISOCS DETECTOR 7722 FWHM @1461 KeY (as obtained from assay results) 2.3 2.1 1.9 --------------------------------- ---- ------ - --- --------

1.7 ---- -- -- ------ ----- - ---------- --- ------- - - ---

'p 1.5 1.3 1.1 0.9 0.7 0.5 Centroid @1461 KeV (as obtained from assay results) 5863 5858 5853 5848 -------------------------- ---- -----------------------

'p 5843 ý/ .......

5838 5833 5828 5823

x Data - - - Sample Mean - Investigate ----- Action ) Off Scale 7 1.15 - -------- I_-------

7 8

0 1.1......................................................................

A C

t i 1.05 -

v i

t x X Xx>4 Xx X x x y x I

0.95 ----------------------------------------------- ---------------- -------------------

2 7

4 5115/06 5/20/06 5/25/06 5/30/06 6/4/06 619/06 6/14/06 6/19/06 6/24/06 6/29/06 Measurement Date/Time QA Filename  : S:\4GreenRover (7780)Wrchived QC Files\7780.QAF Parameter Description 7780 Activity @ 1274 keV (uCi)

Selection Dates 5115/06 12:00:00AM - 6/25/06 12:00:00AM Sample Mean +/-Std Dev: 1.022 +1-0.025

NOL-04-01 ISOCS DETECTOR 7780 FWHM @1461 KeY (as obtained from assay results) 3 2.5 t ------------------------------------------------------------ -

2 --------------------------------------------- ----------- -----

0>

1.54-1 0.5 Centroid @1461 KeV (as obtained from assay results) 5863 5858 5853 5848 0

5843 ------------ ---------------------------------

5838 5833 5828 5823

X Data - - - Sample Mean - Investigate ----- Action X Off Scale 7 1.105 8

1 0

1.05 I_____________

A C

t i 1 X -

V x A X Xx X y x N< /

i t

0.95 _ _ -_ __-_ -_

y 0.9 7_

2 7

4 0.851 5/15/06 5/20/06 5/25/06 5130/06 6/4106 619106 6114106 6/19106 6/24/06 6/29/06 Measurement Data/Time QA Filename S:\5YellowRover (7810)\Archived QC Files\7810.QAF Parameter Description 7810 Activity @ 1274 keV (uCi)

Selection DatBs 5/15/06 12:00:00 AM - 6/25/06 12:00:00 AM Sample Mean +/-Std Dev: 0.991 +/-0.022

NOL-04-01 ISOCS DETECTOR 7810 FVHM @1461 KeV (as obtained from assay results) 3 2.5 OM5 ONLY ONE MEASURMENT MADE WITH DETECTOR 7810 Centroid @1461 KeV (as obtained from assay results) 5863 5858 5853 5848 S 5843 .. . . . .. .

58 38 --- ---- -- ---- --- ---- --- --- ---- --- ---- --

5833 -

5828 5823 ONLY ONE MEASURMENT MADE WITH DETECTOR 7810

Daily Survey Journal Page 1 of .

Survey AreaUnitNo.: 'h'- 'o4t!4-0 Survey Date: 51 -.P SurveyPlan#: 4JP5, - FSIP - 4Dcot, 4 -OI- O0 Supervisor: 6,JeeL. Crew: 7.5pgjc,.jSKl, Mj4 .$w ', S. W4cM.14-MAWuA Instruments: b5. wA6636 . (p. s) ....

Model: I.uc (BL-ve _____________

Serial#: 2--G* -o - 4,_.

Cal. Due. o3/f7/____7 Pre-op source  : Sat. Sat. F" Post-op source  : Sat.&bDate: Sat.ErDate: Sat.0 Date:

TIME NOTES FOR SURVEY DATE 0700 &tjbJcrtb ?P,:L4 OfVM-3'J1pa lbp,"t*b "Me1.F$o . )Jet, 0*1o-,oI-o-9WSrAKC 00 &Jrr UV' I,0CS S;CA, AWL) S&(.. !A-Wfteci IGC-ArMc4. R*Fc-4M 0835 /A.SOC: SCAi'.S BFC.AN pLDT, 4 BAsza,, A/t'i &LvcE tZzAVEZS 1006 ISOC-S. LocAT-r, :v k'" - I -\1 0 X M*\ fb T;WA-v'- ",'r-k t-)'AST

________ TD Sr W ~i-gtl z4 /

______ &L SA04#PIJ  ?)rc-A-v IAA bf bI2,P A.4 AAjS.- VLo-CI-0O 16 3D~ tsniL SAMvPui dc 04iArea I:& fTOE OM.

_________v 6# soCVEJIr W00--wo Completed by fi"a Date FSS Field Supervisor Reviewed by \.k " - ? Date _J(9OL FSS'R.aiological Engineer DPF-8856.2 Rev. 5 Page 1 of 2

Daily Survey Journal Page 1 of !

Survey Area Unit No.: NtL0'- 0, , bI Survey Date: -.

Survey Plan #: e - - F5f- 5 dm- oq -oo- -o Supervisor: p.* Crew: S. fJCiAg M. . t ZEAa,, r: ID.PWALK FL, giet Instruments:

Model: ( oIo e-o . __ __ __ __ _

Serial #: __ _-_ 1-71o __O Cal. Due. o4,/,- 04A7_______

Pre-op source .Sat.: / Sat._ _

Post-op source ":Sat.ate: Sat.Jibate: Sat.L Date:

NOTES FOR SURVEY DATE 01 C4:> DAIL'f 'AFE-i 1VtMTjtt)4 F5S.P ,-.J-~A L' - rB

_____ c-iANt' Cjerr Ct#S 04J N'ACtE &S SCAJ (A:dOf1

~&i j~~Lo~-t AW rJAr~owlf AR g&,,sc #Autt-- 1) V 7b fLtV.ATT1b cP ý5r -Ptr-L' PtA,,i-l. C l. . '.Z ,irr e- /*,, '/ ,a,,

0915 59. WA"-KO1b 2, tl'erj AR6" ,,-SA( . Colt 7.-wrVpu,< g*.-6 1s26 115- AbbEt ~ 1 W 4it 114 - comeLtVr /007s &Vwp ,

"I9ED401T~ Th NJUCHeeRICT - 5 _Sdr-r-TS A /ff/AD,/4 AJ--Te I&___ A L1, 5A-MP1,e6es F(4o ,, T' ui'Ji P fC e Z~-

Completed by 4....LýSupervis r Date SA-J'-oc, Rs Spvi Reviewed by DPF-8856.2 K) FSS'Rýliological Engineer Rev. 5 Page I of 2

PORTAULR INSTStMhEq ACCOVMTMZLZWY O ZInstc~ent Typ-e a MzC or Dus8#

Batt t

1Cal DIM e Bra Lo=Cataond/woz a~aa= P=. Use Date and Time out Tech Date a~d TTiNmein Szoe go,/

jO4-3 0-7ZO4-W?

  • d ________________________ -~-

1-9~

1 0- 1llxaT- .. =

~Caeo *f~O

1. 2'2 I.C& eý:w 4&S~~* it V ."t

____________~~~~~ '7-o.DA ~ ~ ~ft! -

RP Supervisor Review (1) If any post-use source check failures occur, ensure that the condition is documented by a Condition Report.

. DPF-8504.1 Rev. 17

PORTABLE/GAMA k"". A SOURCE CHECK WORM Meter 616357 Detector Detector Type Type Source Net Number ID Net Acceptance Acceptance Criteria Criteria

- 20% + 20%

PRE USE CHECKS POST USE CHECKS Date Time Audible Alarm BKG SRC Net Int Date Time Audible Check Check Counts Counts Counts Alarm BKG SRC Net Int Check Check Counts Counts Counts

_P+00 6 9y

____ _ v .4[A- ;255tq(0 -2'fO 52L9-0 g sv4er q o a'f'W~o -moto

.7-1 54T:-

, ,vi, * ;q g1,4ro d .6 3A6 g,, , fj3o 4, ,_.oROW S_

W11 Vk 1,5-PO %o &e a O 40o 1W' _ 0 2t ý .?M"000;

-- ~~o~ M900-0~?C

.ý0o If t-0 SWA AI A-40.0 12.yO e 2,4G(oo 541.C~ itt 5_5 AA- qLoo S'gl :24b 10 ~ -k K2 OA Z'* 600~. 241-

_;-+ AA§rj _o I____.r _

q7 qs _ MOL _

1_ '54 AV9'b vlýt Sol MV__ &2__ 0 _ 1_ ____ -7 co ___o 0_51t __ _ ____ _ I_ ___ ____M 10o 117-50 l I RP Supervisor Review:

-12)

I n" If any post-use source check failures occur, Condition Report. ensure that the condition is documented by a DPF-504.5 Rev. 17

.5 COPY

,(

Daily Survey Journal Page I of "2 SurveyAreaUnitNo.: 1q - 0 P SurveyDate: S.*z-oC.

SurveyPlan#: y pr.V,-0L-oL -o4-co Supervisor: e, m ~ rew S, M.APAAJEVLLA

.ýNYIO- D RLY-Instruments: Mo_________ C___

V__, A_

Model: /!e -?I -&. WA-qaL-l Cho-Serial#: If 0/blo 35o _,610 S-X" Cal. Due. SA-o-/

0*oQ-o.,/vo.G-ot Pre-op source  : Sat &%.5. SOf at.B post-op source : Sat.O Date: Sat.O Date: Sat.O Date:

TIME NOTES FOR SI JRVEY DATE

______ 00 ewNve-rpi 'D k % Aý-T-,A ~cibrygegfri Ne, f P-dOLb of- A, . ICoari&( ScAS

_________L q4v~ §tt. JV OJ'Ia ]ZE~IIAW,5A Md SSUEC. O~ehe T,,Tt tp4 M. ~EfFI

__ _ Akn~ r A/or)ner*, ro ~I AVL___Kb___

___ ('JIr$-

___ 0S.. ____-_

__0__________ re_____

iseF~-,3A-3 IMVrr(4%1i, ~ ~I 1NgA-..rAs

  • /0frJ1rjIEA?

___________ PA I$VJG )j4,hICATgoJS 0, 6%ViTfi0 Acr#tlir' BASEDON ~s Io(c feuLT$

________ 5irJ'4 A SnrgL pLftTr 5dteJbo fo 4AV A6"cf4 -hE1 P/AA Ayz4M

'S

__________poc A, ftiVjp *FOO Mretftp WILL pe *rEpt'erLD A4ew *lb 4oftie 1Lrnsl -H6MISW4-6~ 5errv-s 7b ge- v~j~x4 wvu~eo BOTyz..

13J 0 .SCAM OP ISoe, J III-AIJO P- I.- 224,o a' ,c7rgor4 ..

_______oF 1LblJ,AlT*elj Ie-T,/J-rY Fot,,4 iN f~oJ.v JALL IeAIJ!I4' PVW "fca*Uc&

4 I_q0_ _ _ Sc.A' .E 10 (j.ICs'./A l Pq~ SE0r. oAB:-i&K-Ir-r- 4oIlJlvlvbiS Completed by I Date S. ").2. v0, FS I p ~So Reviewed by \

J FSS Zioloj~al Engineer Date DPF-8856.2 Rev. 5 Page 1 of 2

Daily Survey Jou~rnal Arca/Unit# M61-4-01 Page ZofZ ~ Date: S;~

TIMM NOTES FOR SURVEY DATE

- L~VSL~fA.~ 00 (NOICATIO(4S OF E-LE%/ATEr3 jAC-rl Vrq gq+4S IW~JVSTIC.A~II4 ICPrN of 60cs~-s& %(a ls~ I¶yItC(V

____________No ipjbIc~tloiS oF fLa0I-re Ac-riVITY rdurJb.

li ItoibIcj 1i oss

.No-_____ tF rLev..MTb 4e-rrvtrY ICJP-Completed by __ ____ _ . _ _-

Date rS Field Suervisor Reviewed by \ex "' Date ( 4 Q FSS adi o cal Engineer DPF-8856.2 Rev. 5 Page 2 of 2

Daily Survey Journal Page 1 of_

SurveyAreaUnitNo.: hjot,-o*-*l Survey Date: (0.- O0 i SurveyPlan#: ywps- Fss kt, Oq- o 1 -oo

-Supervisor:-s--ý, _,-bw: M.NA~(.6-jCL, t. -S.,er-Instruments:

Model:; .15oc-s (13LU -) .... '..

Serial #- .1 Cal. Due. 3 o07 Preoop source :Sat.

4 Sat.O_

Post-op source ': : Sat.O Date: Sat.O Date: Sat.0 Date:

TIME

  • NOTES FOR SUlRVEY DATE O,.Ls 6,Nb uCTer 641LY S3tfFTA-PP-t-IF1,.j4ý 7$&.'9 F55 Aeriviri*s oqq 5 & r
  • COFD1/AJR.4L /I PLA/ c. Be*AIVJl.e Ioes.

btýTE.AIAIM*Y d*o C,-4-o-. 7b - # (08,11-,

1 INIL-,

-6Z q g,f~, 0-17,2-, *63 AoL Oft SC, ,pu. rlto -m ,yu,'Dt$

Am gd~uriir '/0 CVeL.L/MArma WL 6'E W9KE#I /jjA A___

,rT'MC TTH 0f9556Cm4. 5rAsL7-rJ Ar ifl OP^IP Z irr

_____0__ OIrd~rL C. 616i 4& NoJe--04 -of- /60O- F-4 Fok Zinw evuoL/r Tt w' FS5 M5 Stier

  • w OO, i-,, -ft- 7 3 nAoIA

_0_9_____ FS R f 4TJ4' !;NOT Cf~veouv- r,&s r14-mz,E 7z, r4-/kAJ I__W_0 _ fp2a F,-s QJ41 5Th" 5f*o COV~rNT i eAN41)-14o 0/ fOV 4AJ 1IqOL~

1131 PcIP pC-"* E P-. V EN'4 LT4 S~ twT- r, ow

. 2.a, 3 or eU* -. -nTI'& e vP.,,,,, b *l 10 cH q4kwtp b'Acg r.0 &%'

I *a .

l "f ] r4 -l ( r .......

30 f'mFe-s EAJiIoo An-rn~f,,,4At- ý Nor ~e12 INVCT-1AT,,pJA94 L__Iv_ Ve (oXptL- VckX OI *,-~4 5 ur-Completed by j4 J-Li Date (

Reviewed by \ fielSupervisor DPF-8856.2 (JFSS "l1ogical Engineer Date '-)kqL__G Rev. 5 Page 1 of 2

Daftly Survey Journal AreafUnit# d44O#/ Page 2 of_?_ Date:______

TIME NOTES FOR SURVEY DATE

/1~~3e5ý,~V7Zt~7/gni aI rA)1 414 Ifri6//

7Z) F7AiJ 16 S475 If At, e53/46/.

~ 3 fJVCS7-IaAT1QJ LVV7rnt-WJ

/Vg.. & fo_'ITt tC /R A ,0 A/lW-A7-traA/Y,

___l_ __- F-5 O- F-CJ 1- //y F-

_____ P N~r 4v,.70 PI u??

Completed by Date (0'1-0(e Reviewed by e Supervisor Date XT[0Lo I

<2 - Sdi logical Engineer DPF-8856.2 Rev. 5 Page 2 of 2

Daily Survey Journal Page 1 of -

Survey Area Unit No.: MOL 0 Survey Date: 4.~~

Survey Plan #: YNsIV- ý-KLo46 Supervisor. E.! Crw: (,RjPPEW 3. fpisslarx M 1W VM.

Instruments: _ _ _ I__

Model: qSOCS (uc G&00 /SA I ____________

Serial #: & -- I42ýQ/ L20*~ 6 Pre-op source E_________d Sat.

Pos-o source ~:Sat.0 Date: jSat.0 Date: Sat.O0 Date:

TME NOTES FOR S' RVEY DATE iO(-3o r__tb_0__re Mit-'1 SAevfi- 3Wg~cr,0 D(j^Aa r~ ,4M(rffSie O7,S 8E(4JIM~i,J i4oc:s~ tAlJW&1-riCaripdAi svl7r4 31-ae R~oven 7o' cW~l

__________ 0(,14d~j, ISk. 3 INwrimiArtoAs oF ibuinfF~Di5JeI4--padJ of- I izklIej-ptA. F~s taJe. oitp.b AIZeA 1/)ewJriPctý BY' isorX iA1VeSr -

4AftIT, w#)ste Aoxas It4. fIt-F-4, 4*,jo M-F-r, 1

08ceb ISOeS 'AIVEsr~ C.A r ptIS C4D-E-ceL~TE &

11 ~~ ~'9/).-S ~~ ,f ei,.2' 1/1

,/,~~~~~~~ ~ A~2 C~d~-04Vp~ Lv&

Completed by VS *L O'M f-0ed Supervisor Date 4'7-.Ole Reviewed by \ e k Date (ovfL.

i~1iological Engineer DPF-8856.2 Rev. 5 Page I of 2

Daily Survey Journal Area/Unit# , 0_.o_ Page 2- of 2- Date: (, .D TIME NOTES FOR SURVEY DATE

/30 /A(V6ST14#&rn'o4 SoIL -SAnpILt epaaCT1b A-r ZoC~ypmv

_________ b4fr- thi'f PA1ZTICiC- WAS Le0ctT-e-_ q4&h6

_________ ŽC,41'ATECA 5 AIot, oq. 6 1~.0S - tl/~o jet L*tV Qfll-M IN\ Ci;0P~rJor 0 ý4tYO' 0 I~orJS SCAI4 PRfK~qawxrq AT'

_____m_ 1'J rDcOL)~--T

~

4

+

+

Completed by FS.I S or Date 6'4-FS Svri Reviewed by V Date lqlo

-ISS Radiol& Engineer DPF-8856.2 Rev. 5 Page 2 of 2

CO-NT-oL ,VO~TA PrORTAMA f~ N.

1-smg~ -CCONAI~YWR is at Type Batt Cal Sze Location and/or~ Date and Tech Dateandj _znee a ThEC or nDisS # Due /r Peason Paz Use T~ime out N40=6 Time, in fe

/ out

-ice .62-ý5CZM' -6 -' -. "

600

-6 v*

-ý A OPC4__

5 IM~a 16-,r 1 x)4 RP Supervisor Review (1)

(1) If any post-use source check failures occur, ensure that the condition is documented by a Condition Report.

OPF-8504.1 Copy

gORTABLE/GAK4A Pk,. A SOURCE CHECK FORM Meter Detector Detector Type Type Source Net Net Number ID Acceptance Acceptance Criteria Criteria 7 20% + 20%

PRE USE CHECKS POST USE CHECKS Date Time Audible Alarm BKG SRC Net Int Date Time Audible Alarm BKG SRC Net mnt Check Check Counts Counts Counts Check Check Counts Counts Counts

.5-1I-o~o 6*00O ______ w 51f 0 2ZrOLTO ,Ij =q 0j- ,f .5 5aý IAn~ Apati{A 7Z) 6'-i*-o h,~ 6____ 10__ 2ueo 9,0R A 10Kr '51k 0 f'A A116 )_-C: a4 lg 5-'!rŽII 7-5 5Vofr 41*

.. AL.. f a -Z25 .2osZ04O A.Q4k6.iL ~ ~ I*

F'l$-c*O Or~t I'4. f 1 70rc- OC

- 1 916 54 -,6W - ________

b-A-10 q*Z-% -j... 2&(04D OI I JO ~~t1 1'102

(; 2X1'oo ZZo!&3,0tc

____ ____ 5m-r- 't4- L2' Clq 14f4*>

5 'S OA 4f?.o0 '_(uoz'qV~w RP Supervisor Review: & i k (1, tq-StV. 4 If any post-use source check failures occur, ensure that the condition is documented by a Condition Report.

DPF-8504.5 Rev.

2 17

-)

cOPY

PORTABLE/GA. M, ,,. .A SOURCE CHECK FORM Meter Detector Detector

- a2ý,7 We'oo o -7*

Type Source Net Net Type Number ID Acceptance Acceptance Criteria Criteria

- 20% + 20%

PRE USE CHECKS POST USE CHECKS Date Time Audible Alarm BKG SRC Net Int Date Time Audible Alarm BKG SRC Net Int Check Check Counts Counts Counts Check Check Counts Counts Counts 5,S-.(-,,0 O-Wo jj ' ,/,- .i_0 2_-v d.- "- t.'o Sb.. Jj4+/-, .s't, 5,56S-6 (Ap

  • Si=,

L'-1T<4 oJ,.jg- s.rt 04- 0C______ e -*-

  • '5-°, -,;,o ,.+- ,- *j *bCUO *.!-o ,6 -. - __ _

0 5q5- Sr 4- ;Z5- 0o 9'91l- ,4-I- S fAo Is*a 6W d .

ircoooo 2t3r~ crrf+/--/-

6ý17,Ul I+* (r? -*--v

. AG4 90 ok-,*l ....z2tz1 5AT*

a*-t-- Me "d*.,.a.ro.,

AI.

3u,7 I.*

R3`5&10

£1LqL cZ¶LI* 50 0J )M1 I$iz 1~a 1)LA,3 g.6A 00v8 qA "(A- S6"0 .1(4t

  • to* r q-4,C, gA tW Cola W)tO 27Q-W RP Supervisor Review: ~&km & 146 11) ..4- oT \, S-6 I t') If any post-use source check failures occur, ensure that the condition is Condition Report. documented by a DPF-8504.5 Rev. 17

)

COPY

Daily Survey Journal Page ! of!

Survey Area Unit No.: NOL-04-01 / NOL-05-01 Survey Date: 06/15/06 Survey Plan #: YNPS-FSSP-NOL-04-01-00 and YNPS-FSSP-NOL-05-01-00 Supervisor: Neel / Sprucinski Crew: S. Pennock Instruments:

Model: ISOCS (Blue) E-600 / SPA-3 Serial #: 6279 Cal. Due. :03/07 Pre-op source v : Sat. o Sat. o_

Post-op source / : Sat. 0 Date: Sat. u Date: Sat. 0 Date:

TIME NOTES FOR SURVEY DATE 0700 Conducted daily safety briefing and POD for FSS activities.

0815 Excavation of soil above geo-tech fabric in NOL-04-0 I commenced IAW dig plan. No equipment available to load into so soil is being piled for now.

0930 For equipment accessibility the excavation hole near ISOCS shots 109 and 110 is being backfilled with the stockpiled dirt temporarily.

1015 Blue rover is being set up in NOL-05-01 remediation area to obtain investigation scan of the area.

1145 Excavation of geo-tech fabric in NOL 04-01 complete. Stock pile of dirt remains in place until nightshift. Activities halted for now.

Completed by Date 06-15-2006 FSS Field Supervisor Reviewed by Date (7 FSTRa logical Engineer DPF-8856.2 Page 1 of 2

Daily Survey Journal Page lof Survey Area No.: NOL-04 Survey Area Name: Survey Date: 6/15/06 Survey Unit No. and Name: NOL-04-01 Supervisor: Dwayne Neel Crew: Mike Maxwell Jack Sprucinski Mike Sweet Steve Pennock Instruments: ISOCS ISOCS ISOCS CDD Pre-op source Sat. [ Pre-op source Sat. Z Pre-op source Sat. Z Post-op source Sat [0 Date Post-op source Sat. [' Date Post-op source Sat. [El Date TIME NOTES FOR SURVEY DATE 1100 Area cleaned up and all marafie was removed from area 1230 Shot locations inputed with the gps pole and locations delivered to eng. To develop a sampling plan 1500 Have sample plan for NOL-04 area to be used 6/16/06 Completed by Date4*Z4 C-VSS ield Nupervisor Reviewed by Date l~ iq DPF-8856.2 Rev. 5 C-) FS-RM-"ogical Engineer Page 2 of 2

Daily Survey Journal Page 1 of I Survey Area Unit No.: NOL-04-01 7 Survey Date: 6/16/06 survey Plan #: YNPS-FSSP-NOL,04-01.

Supervisor: Jack Sprucinski Crew: Mike Sweet, Dennis Walker Instruments:

Model: ISOCS Blue ISOCS ISOCS Serial #: 6279 Cal.'Due. 3/07_

Pre-op source [: Sat. o Sat. Eo Sat. o Post-op source [: Sat. ol Date: Sat. o Date: Sat. C) Date:

TIME NOTES FOR SURVEY DATE 0715 Established the eight shot locations for the ISOCS after the removal of the landscape fabric. 41 IoU040.o1. 210!- F.4 Ti- (w jo L-.'. *q- 6 1 - ; F1.7 0818 Initiated the final shots for the area 1050 Final shots completed for the remediation of NOL-04-01, Blue ISOCS moved to the NOL-09-02 area.

tp-7. .o -r-C a I q ,O, ls LJICLt AS - o

________ estrey (FCLL- our 'Mr CHAEr4E hmwlz Completed by Date FSS Field Supervisor Reviewed by Date FSS Radiological Engineer DPF-8856.2 Page 1 of 2

Daily Survey Journal Page 1 of I Survey Area Unit No.: NOL-04-01 Survey Date: 06/19/06 Survey Plan #: YNPS-FSSP-OOL-04-01 -00 Supervisor: Dockins Crew: D. Payeur Instruments:

Model:

Serial #:

Cal. Due.

Pre-op source check: Sat. E] Sat. 11 Sat. o1 Pre-op source check: Sat. 0 Date: Sat. 0 Date: Sat. o Date:

TIME NOTES FOR SURVEY DATE 1930 Received instruction from D. Neel that sample number NOL-04-01-009-F needed to be re-sampled due to the geo-tech fabric removal in the survey unit.

2000 Conducted safety briefing and gave instruction for work activities to crew.

2100 Soil sample collected at 2040 by D.P. Sample given # NOL-04-01-026-F.

+

i

+

+

. i

-I-

-I-4

_____I .~

Completed by Date 06-19-2006 1AS Field Supervisor Reviewed by DateAI SS Radio *cal Engineer DPF-8856.2 Page 1 of 2

Daily Survey Journal Page lof Survey Area No.: NOL- Survey Area Name: Survey Date:

04 &05 Survey UnitNo. andName: rv/ o5 -

Supervisor: Dwayne Neel Crew: Mike Maxwell Jack Sprucinski Mike Sweet Steve Pennock Sharon Erickson Jimmy White Instruments: ISOCS ISOCS ISOCS CDD Pre-op source Sat. ED Pre-op source Sat. [ Pre-op source Sat. ED Post-op source Sat. E5 Date Post-op source Sat. [] Date Post-op source Sat. EL Date T.IME NOTES FOR SURVEY DATE 0830 Notified Bruce Joejoe will need to pt mp out water from the tank basin before we start to remove the soil and maraphie. .. .

1300 Work in these areas will not be completed today due to the equipment needed

, being in use else where. Will continue on 6/14/06 1jI gtLR ) .fte~

$p&AA~I- 4a1-6tIj FARIZIC) WAS /enir-ig AF-WRr j~agtt

-Pt-J-6v6%r-5 ")(65CD Vr Jfor mlý O1w ,OtYwit-LZO'nor-~ THtV- syo4je-oi)j e-r. Fse( W&e-~ey) bia.E-e~b TI4. 7-iggrwmpov'in- -foic AflSgOZ Tft F;gAja, -.

Completed by k Date

/

Reviewed by Date DPF-8856.2 Rev. 5 UFSS l61iological Engineer Page 2 of 2