Yankee Nuclear Power Station Final Status Survey Report, YNPS-FSS-AUX-02
ML070160490
Person / Time
Site: Yankee Rowe
Issue date: 09/07/2006
From: Jeffery Lynch
Yankee Atomic Electric Co
To:
Document Control Desk, NRC/FSME
References
BYR 2006-079 YNPS-FSS-AUX-02-00
Download: ML070160490 (115)


Text

YANKEE ATOMIC ELECTRIC COMPANY Telephone (413) 424-5261 49 Yankee Road, Rowe, Massachusetts 01367 KEE September 7, 2006 BYR 2006-079 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-001

References:

(a) License No. DPR-3 (Docket No. 50-29)

(b) BYR 2004-133, Submittal of Revision 1 to the Yankee Nuclear Power Station's License Termination Plan (c) Yankee Nuclear Power Station - Issuance of Amendment 158 Re: License Termination Plan

Subject:

Submittal of YNPS-FSS-AUX02-00, the Final Status Survey Report for Survey Areas AUX-02

Dear Madam/Sir:

This letter submits YNPS-FSS-AUX02-00, Final Status Survey Report for AUX-02.

This report was written in accordance with Section 5 of the YNPS License Termination Plan, "Final Status Survey Plan," and is consistent with the guidance provided in the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM).

We trust that this information is satisfactory; however if you should have any questions or require any additional information, please contact Alice Carson at (301) 916-3995 or the undersigned at (413) 424-2261.

Sincerely, YANKEE ATOMIC ELECTRIC COMPANY Joseph R. Lynch Regulatory Affairs Manager

Enclosure:

YNPS-FSS-AUX02-00 (2 hard copies plus CDs)

U.S. Nuclear Regulatory Commission BYR 2006-079, Page 2 cc (w/o encl): S. Collins, NRC Region I Administrator Marie Miller, Chief, Decommissioning Branch, NRC Region I J. Kottan, Region I D. Everhart, Region I J. Hickman, NRC Project Manager M. Rosenstein, US Environmental Protection Agency, Region 1 R. Walker, Director, MA DPH W. Perlman, Executive Committee Chair, FRCOG T.W. Hutcheson, Chair, Franklin Regional Planning Board L. Dunlavy, Executive Director, FRCOG P. Sloan, Director of Planning & Development, FRCOG cc (w/encl on CD) D. Howland, Regional Engineer, MA DEP M. Whalen, MA DPH D. Katz, CAN Jonathan Block, CAN

Yankee Nuclear Plant Station Final Status Survey Report For AUX-02 Yankee Atomic Electric Company

YANKEE NUCLEAR POWER STATION FINAL STATUS SURVEY REPORT REPORT NO.: YNPS-FSS-AUX-02-00 Prepared by: w --- Date: q-6,o6 hael Ren ack, FSS Radiological Engineer Reviewed by: Date: I- _ý-_(_,

hristopher\', Me sier, FSS Radiological Engineer Approved by: Date:

Marti Erickson, SS Manager

Report No.: YNPS-FSS-AUX-02-00 Section Table of Contents Page 1.0 EXECUTIVE

SUMMARY

1.1 IDENTIFICATION OF SURVEY AREA AND UNITS..............................................

1.2 DATES(S) OF SURVEY...................................................................

1.3 NUMBER AND TYPES OF MEASUREMENTS COLLECTED.......................................

1.4

SUMMARY

OF SURVEY RESULTS..........................................................

1.5 CONCLUSION

S ................................... ..................................................................... 2 2.0 FSS PROGRAM OVERVIEW ...................................................... 2 2.1 SURVEY PLANNING ..................................................................... 2 2.2 SURVEY DESIGN ........................................................................ 2 2.3 SURVEY IMPLEMENTATION .............................................................. 3 2.4 SURVEY DATA ASSESSMENT .............................................................. 3 2.5 QUALITY ASSURANCE AND QUALITY CONTROL MEASURES ............................................................. 3 3.0 SURVEY AREA INFORMATION ..................................................................................................... 4 3.1 SURVEY AREA DESCRIPTION ............................................................. 4 3.2 HISTORY OF SURVEY AREA .............................................................. 4 3.3 DIVISION OF SURVEY AREA INTO SURVEY UNITS ............................................ 4 4.0 SURVEY UNIT INFORMATION ............................................................................................................... 4 4.1

SUMMARY

OF RADIOLOGICAL DATA SINCE HISTORICAL SITE ASSESSMENT (HSA) ........................ 4 4.1.1 Chronology and Descriptionof Surveys Since HSA ...................................................................... 4 4.1.2 RadionuclideSelection and Basis ................................................. 4 4.1.3 S coping & Characterization................................................................................................................. 5 4.2 BASIS FOR CLASSIFICATION .............................................................. 5 4.3 REMEDIAL ACTIONS AND FURTHER INVESTIGATIONS ........................................................................ 5 4.4 UNIQUE FEATURES OF SURVEY AREA ................................................................................................ 5 4.5 ALARA PRACTICES AND EVALUATIONS ............................................................................................. 6 5.0 SURVEY UNIT FINAL STATUS SURVEY ......................................................................................... 6 5.1 S U RV EY P LA N N IN G .................................................................................................................................... 6 5.1.1 FinalStatus Survey Plan and AssociatedDQOs ............................................................................. 6 5.1.2 Deviationsfrom the FSS Plan as Written in the L TP .................................................................... 7 5.1.3 D C GL S election and Use ...................................................................................................................... 8 5.1.4 Measuremen ts ........................... ............................................................................................................ 8 5.2 SURVEY IMPLEM ENTATION ACTIVITIES ............................................................................................... 9 5.3 SURVEILLANCE SURVEYS .......................................................................................................................... 9 5.3.1 P eriodic Surveillance Surveys ............................................................ ................................................. 9 5.3 .2 Resurveys ............................................................................................................................................... 9 5.3 .3 Investigation s ........................................................................................................................................ 9 5.4 S U R V EY R ESU LTS ..................................................................................................................................... 10 5.5 D ATA Q UALITY A SSESSM ENT .................................................................................................................. 11 6.0 QUALITY ASSURANCE AND QUALITY CONTROL .................................................................... 12 6.1 INSTRUM ENT Q C CH ECKS ....................................................................................................................... 12 6.2 SPLIT SAM PLES AND R ECOUNTS ............................................................................................................. 12 6.3 SELF-ASSESSM EN TS ................................................................................................................................. 12 7.0 C O N C LU SIO N ............................................................................................................................................ 13

Report No.: YNPS-FSS-AUX-02-00 Table List of Tables Page TABLE I DATE OF SURVEYS ......................................................................................................... ........ I TABLE 2 SURVEY AREA AUX-02 DESIGN PARAMETERS ............................................................................................ 6 TABLE 3 DCGLw, DCGLEMc AND INVESTIGATION LEVEL FOR ISOCS MEASUREMENTS ............................................... 7 TABLE 4 FSS ACTIVITY

SUMMARY

FOR AUX-02 SURVEY UNITS .............................................................................. 9 TABLE 5 DIRECT M EASUREMENT

SUMMARY

(DPM/O00cM2) ................................................................................. 10 TABLE 6 DIRECT MEASUREMENTS (DPM/100CM2) ........................................................ ..................... 10 TABLE 7 REPLICATE SURVEYS DIRECT MEASUREMENTS (DPM/100CM2) .............................................................. 10 TABLE 8 ORIGINAL AND REPLICATE ISOCS SCAN DATA ............................................................................................. 1I List of Appendices Appendix A - YNPS-FSSP-AUX-02, "FinalStatus Survey Planning Worksheets Appendix B - YA-REPT-00-0 15-04, "Instrument Efficiency Determinationfor Use in Minimum Detectable ConcentrationCalculationsin Support of the FinalStatus Survey at Yankee Rowe" Appendix C - ALARA Evaluations, AUX-02 Appendix D -YA-REPT-00-018-05, "Use of ln-situ Gamma Spectrum Analysis to Perform ElevatedMeasurement Comparison in Support of FinalStatus Surveys" List of Attachments Attachment A - Maps and Posting Plots Attachment B - Data Quality Assessment Plots and Curves Attachment C - Instrument QC Records Attachment D - ISOCS Scan Data (In the electronic version, every Table of Contents, Figures,Appendices and Attachments, as well as every mention of a Table, Figure,Appendix or Attachment is a hyperlink to the actual location or document.)

II

Report No.: YNPS-FSS-AUX-02-00 List of Abbreviations and Acronyms AL Action Level ALARA As Low As Reasonably Achievable c/d ------------ Counts per Disintegration DCGL-------- Derived Concentration Guideline Level DCGLEMC ............ DCGL for small areas of elevated activity DCGLw ................ DCGL for average concentration over a wide area, used with statistical tests DQO .................... Data Quality Objectives EMC .................... Elevated Measurement Comparison ETD ---------- Easy-to-Detect FSS ...................... Final Status Survey FSSP --------- Final Status Survey Plan GPS ---------- Global Positioning System H -- -- -- -- -- - - Null Hypothesis HSA Historical Site Assessment HTD Hard-to-Detect ISOCS --------- In-situ Object Counting System LBGR --------- Lower Bound of the Grey Region LTP License Termination Plan MARSSIM .......... Multi-Agency Radiation Survey and Site Investigation Manual MDA--------- Minimum Detectable Activity MDC Minimum Detectable Concentration PAB ..................... Primary Auxiliary Building QAPP-------- Quality Assurance Project Plan QC ....................... Quality Control RCA ..................... Radiological Controlled Area RP Radiation Protection RSS ...................... Reactor Support Structure SFP ...................... Spent Fuel Pool VC ----------- Vapor Container VCC Vertical Concrete Cask VSP ...................... Visual Sample Plan YNPS Yankee Nuclear Power Station iii

Report No.: YNPS-FSS-AUX-02-00 1.0 EXECUTIVE

SUMMARY

A Final Status Survey (FSS) was performed of Survey Area AUX-02 in accordance with Yankee Nuclear Power Station's (YNPS) License Termination Plan (LTP). This FSS was conducted as a structure surface FSS with building occupancy Derived Concentration Guideline Levels (DCGLs) even though the AUX-02 structure will be subsurface at license termination. This practice conservatively implements LTP criteria that subsurface structure surfaces be evaluated for the presence of contamination.

1.1 Identification of Survey Area and Units AUX-02 consists of that portion of the Primary Auxiliary Building. (PAB) that was not designed to contain portions of the primary (radioactive) operating systems of the plant. The design of the AUX-02 portion of the PAB did not provide for collection and control of radioactive liquid and gaseous spills or releases, if they occurred within this portion of the PAB. All areas within AUX-02 had floor drains that channeled liquids to the storm drain system. These spaces were not ventilated through the Primary Ventilation System. AUX-02 is bounded by NOL-01 and NOL-06 on the north, AUX-01 on the east, NOL-05 on the south and NOL-06 on the west.

1.2 Dates(s) of Survey Table I Date of Surveys Survey Start Survey End DQA Survey Unit Date Date Date AUX-02-01 6/16/2006 6/22/2006 7/24/2006 AUX-02-02 6/16/2006 6/22/2006 7/24/2006 1.3 Number and Types of Measurements Collected Final Status Survey Plan (FSSP) was developed for these Survey Units in accordance with YNPS LTP and FSS procedures using the MARSSIM protocol. The planning and design of the survey plan employed the Data Quality Objective (DQO) process, ensuring that the type, quantity and quality of data gathered was appropriate for the decision making process and that the resultant decisions were technically sound and defensible. A total of 40 systematic fixed-point measurements were taken in the 2 Survey Units, providing data for the non-parametric testing of the Survey Area. In addition to the fixed-point samples, ISOCS and hand-held survey instrument scans were performed to provide 100 percent coverage of the Survey Area.

1.4 Summary of Survey Results I

Report No.: YNPS-FSS-AUX-02-00 Following the survey, the data were reviewed against the survey design to confirm completeness and consistency, to verify that the results were valid, to ensure that the survey plan objectives were met and to verify Survey Unit classification. Fixed point surveys indicated that none of the systematic measurements exceeded the DCGLw, depicted in Attachment B. Retrospective power curves were generated and demonstrated that an adequate number of samples were collected to support the Data Quality Objectives. Therefore, the null hypothesis (Ho) (that the Survey Unit exceeds the release criteria) is rejected.

1.5 Conclusions Based upon the evaluation of the data acquired for the FSS, AUX-02 meets the release requirements set forth in the YNPS LTP. The Total Effective Dose Equivalent (TEDE) to the average member of the critical group does not exceed 25 mrem/yr. IOCFR20 Subpart E ALARA requirements have been met as well as the site release criteria for the administrative level DCGLs that ensure that the Massachusetts Department of Public Health's 10 mrem/yr limit will also be met.

2.0 FSS PROGRAM OVERVIEW 2.1 Survey Planning The YNPS FSS Program employs a strategic planning approach for conducting final status surveys with the ultimate objective to demonstrate compliance with the DCGLs, in accordance with the YNPS LTP. The DQO process is used as a planning technique to ensure that the type, quantity, and quality of data gathered is appropriate for the decision-making process and that the resultant decisions are technically sound and defensible. Other key planning measures are the review of historical data for the Survey Unit and the use of peer review for plan development.

2.2 Survey Design In designing the FSS, the questions to be answered are: "Does the residual radioactivity, if present in the Survey Unit, exceed the LTP release criteria?" and "Is the potential dose from this radioactivity ALARA?" In order to answer these questions, the radionuclides present in the Survey Units must be identified, and the Survey Units classified. Survey Units are classified with respect to the potential for contamination: the greater the potential for contamination, the more stringent the classification and the more rigorous the survey.

The survey design additionally includes the number, type and locations of fixed measurements/samples (as well as any judgmental assessments required), scanning requirements, and instrumentation selection with the required sensitivities or detection levels. DCGLs are developed relative to the surface/material of the Survey Unit and are used to determine the minimum sensitivity required for the survey.

Determining the acceptable decision error rates, the lower bound of the gray region 2

Report No.: YNPS-FSS-AUX-02-00 (LBGR), statistical test selection and the calculation of the standard deviation and relative shift allows for the development of a prospective power curve plotting the probability of the Survey Unit passing FSS.

2.3 Survey Implementation Once the planning and development has been completed, the implementation phase of the FSS program begins. Upon completion of remediation and final characterization activities, a final walk down of the Survey Unit is performed. If the unit is determined to be acceptable (i.e. physical condition of the unit is suitable for FSS), it is turned over to the FSS team, and FSS isolation and control measures are established. After the Survey Unit isolation and controls are in place, grid points are identified for the fixed measurements/samples, using Global Positioning System (GPS) coordinates whenever possible, consistent with the Massachusetts State Plane System, and the area scan grid is identified. Data is collected and any required investigations are performed.

2.4 Survey Data Assessment The final stage of the FSS program involves assessment of the data collected to ensure the validity of the results, to demonstrate achievement of the survey plan objectives, and to validate Survey Unit classification. During this phase, the DQOs and survey design are reviewed for consistency between DQO output, sampling design and other data collection documents. A preliminary data review is conducted to include: checking for problems or anomalies, calculation of statistical quantities and preparation of graphical representations for data comparison. Statistical tests are performed, if required, and the assumptions for the tests are verified. Conclusions are then drawn from the data, and any deficiencies or recommendations for improvement are documented.

2.5 Quality Assurance and Quality Control Measures YNPS FSS activities are implemented and performed under approved procedures, and the YNPS Quality Assurance Project Plan (QAPP) assures plans, procedures and instructions have been followed during the course of FSS, as well as providing guidance for implementing quality control measures specified in the YNPS LTP.

3

Report No.: YNPS-FSS-AUX-02-00 3.0 SURVEY AREA INFORMATION 3.1 Survey Area Description AUX-02 consists of that portion of the PAB that was not designed to contain portions of the primary (radioactive) operating systems of the plant. The design of the AUX-02 portion of the PAB did not provide for collection and control of radioactive liquid and gaseous spills or releases, if they occurred within this portion of the PAB. All areas within AUX-02 had floor drains that channeled liquids to the storm drain system. These spaces are not ventilated through the Primary Ventilation System.

AUX-02 is bounded by NOL-01 and NOL-06 on the north, AUX-01 on the east, NOL-05 on the south and NOL-06 on the west. Survey Unit AUX-02-02 consists of the north face of the south PAB wall in the west end section of the former structure and contains a total surface area of 58 m2. Survey Unit AUX-02-01 consists of the west face of the east PAB wall in the west end section of the former structure and contains a total surface area of 16 m2.

3.2 History of Survey Area The AUX-02 area of the PAB was identified as a contaminated area as a result of a cross-contaminating event where water spilled from the seal water system vent.

Contamination of AUX-02 also occurred when the Safety Injection Tank heating system pump leaked resulting in contamination of the floor and floor drains in the lower level of the PAB. Over the operating history of the YNPS, this portion of the plant has been decontaminated, in order to maintain it as a non-contaminated area.

The majority of the PAB was demolished to -3ft above ground level.

3.3 Division of Survey Area into Survey Units AUX-02 consists of two Survey Units, AUX-02-01, and AUX-02-02.

4.0 SURVEY UNIT INFORMATION 4.1 Summary of Radiological Data Since Historical Site Assessment (HSA) 4.1.1 Chronology and Description of Surveys Since HSA Isolation and control measures were implemented for the FSS. The condition of AUX-02 Survey Units at the time of FSS was smooth to heavily remediated steel reinforced concrete.

4.1.2 Radionuclide Selection and Basis 4

Report No.: YNPS-FSS-AUX-02-00 During the initial DQO process, Co-60 was identified as the radiological nuclide of concern due to its more restrictive DCGL value when compared to Cs-137 (sampling of soil adjacent to the concrete indicated a relationship of approximately 80% Co-60 to 20% Cs-137). Adjacent soil characterization and survey data indicate no other LTP-specified radionuclides warrant consideration in the AUX-02 Survey Units.

4.1.3 Scoping & Characterization The identities of the radionuclides-of-concern for this survey effort, as well as the statistical data, are based on results acquired from the FSS of survey units AUX-0 1-01 and AUX-0 1-02 as well as information provided in the free release effort. Pre-remediation and investigation data indicates a 70/30 to 80/20 Cs-137 to Co-60 ratio. In addition to the pre-remediation data, ISOCS assays of AUX-01-02 indicate the major isotopic contributor to be Cs-137. If a weighted DCGLw were to be calculated utilizing this data the resultant values would be considerably higher than using the DCGL value for Co-60 alone. In keeping with the previous conservative approach to the PAB concrete surfaces (i.e. protocols used for AUX-01-01 and AUX-01-02), the survey plan used the DCGL values for the most limiting isotope Co-60 for AUX-02 FSSP calculations.

4.2 Basis for Classification Based upon the radiological condition of this survey area identified in the operating history and as a result of the decommissioning activities performed to date, survey area AUX-02 is identified as a Class I Area.

4.3 Remedial Actions and Further Investigations No investigations were performed in AUX-02.

4.4 Unique Features of Survey Area Survey Area AUX-02 exhibited surface characteristics ranging from smooth surfaces to heavily remediated irregular surfaces. Most of the pits and irregularities increased the source-to-detector distance by approximately 1/ - 1/22 inch, although some increase it as much as I - 2 inches. These types of irregularities in the concrete surfaces were taken into account through the efficiency factor applied to the measurements collected with the HP-100. Technical report YA-REPT-00-015-04 (Appendix B) provides instrument efficiency factors (ci) for various source-to-detector distances.

The ci value for a source-to-detector distance of 1 inch was selected as a representative efficiency for data collected with the HP-100 from the irregular surfaces because it accounts for the 1/2 inch stand-off and the most common depth of pits and surface irregularities ('/4 - 1/2 inch). In contrast to the irregular surfaces, the vertical walls of the structures are relatively smooth. Table 4.2 of the YA-REPT 5

Report No.: YNPS-FSS-AUX-02-00 015-04 (Appendix B) provides instrument efficiency factors (ci) for various source-to-detector distances. Detector efficiencies (HP-100QC) were applied as follows:

smooth surface 0.0603 c/d, irregular surface 0.0373 c/d.

4.5 ALARA Practices and Evaluations An ALARA evaluation was developed for each Survey Unit in the AUX-02 Survey Area which concluded that additional remediation was not warranted. These evaluations are found in Appendix C.

5.0 SURVEY UNIT FINAL STATUS SURVEY 5.1 Survey Planning 5.1.1 Final Status Survey Plan and Associated DQOs The FSS for AUX-02 Survey Units was planned and developed in accordance with the LTP using the DQO process. Form DPF-8856.1, found in YNPS Procedure 8856, "Preparationof Survey Plans," was used to provide guidance and consistency during development of the FSS Plan.

The FSS Plans can be found in Appendix A. The DQO process allows for systematic planning and is specifically designed to address problems that require a decision to be made in a complex survey design and, in turn, provides alternative actions.

The DQO process was used to develop an integrated survey plan providing the Survey Unit identification, sample size, selected analytical techniques, survey instrumentation, and scan coverage. The Sign Test was specified for non-parametric statistical testing for this Survey Unit, if required. The design parameters developed are presented below.

Table 2 Survey Area AUX-02 Design Parameters

.Su.rvey Unit

.. . egn .. Parameter ... ... . Basis AUX-02-01 Class 1, Concrete, < 100 Survey Unit Area 16 m2 m2 Number of Direct 15 (calculated) a (Type I) = 0.05 Measurements + 5 (added) 13 (Type II) = 0.05 Total: 20 C: 636 Relative Shift: 2 DCGLw: 7200 LBGR: 5928 Critical Value (20/2)+(1.645/2)* Square 14 for Sign test. Root (20)

Gridded Sample Area Size Area / Number of Factor 0.8m2 Samples (16 m2/20)

Sample Grid Spacing: Square Root (16 Triangular: Im m2/(0.866"20))

6

Report No.: YNPS-FSS-AUX-02-00 SurveyUnit Design Parameter Va ue* . *, Basis Direct Measurement Class I Area: >

Investigation Level > DCGLemc or > DCGLw + 3 DCGLemc or > DCGLw Sigma + 3 Sigma Scanning Coverage Class 1 Concrete Area:

Requirements 16 m2 100%

Co-60: 2.9E3 dpm/100cm2 Class I Area: >

Scan Investigation Level Cs-137: 1.1E4 dpm/I00cm2 DCGLemc AUX-02-02 Class 1, Concrete, < 100 Survey Unit Area 58 m2 m2 Number of Direct 15 (calculated) U (Type 1) = 0.05 Measurements + 5 (added) 3 (Type 11)= 0.05 Total: 20 a: 636 Relative Shift: 2 DCGLw: 7200 LBGR: 5928 Critical Value (20/2)+(1.645/2)* Square 14 for Sign test. Root (20)

Gridded Sample Area Size Area / Number of Factor 2.9m2 Samples (58 m2/20)

Sample Grid Spacing: Square Root (58 Triangular: 1.8m m2/(0.866*20))

Direct Measurement Class I Area: >

Investigation Level > DCGLemc or > DCGLw + 3 DCGLemc or> DCGLw Sigma + 3 Sigma Scanning Coverage Class I Concrete Area:

Requirements 58 m2 100%

Co-60: 2.9E3 dpm/100cm2 Class I Area: >

Scan Investigation Level Cs-137: 1.1E4 dpm/100cm2 DCGLemc 5.1.2 Deviations from the FSS Plan as Written in the LTP Investigation levels for the fixed measurements were set at a greater than three sigma from the mean and >DCGLw or >DCGLEMC. The scan MDCs for the ISOCS measurements were set at the DCGLEMC. All MDCs for the surveys of AUX-02 were met in accordance with YNPS LTP. DCGL values and the associated MDC values can be found in Table 3.

Table 3 DCGLw, DCGLEMC and Investigation Level for ISOCS measurements Investigation Level DCGLEMC (ISOCS Based on (ISOCS based on source area = Im 2, DCGLw source area = 1m2) 2m 90d collimated)

Bldg Surface NuBildgucme a Bldg Surface N uc lide (d p m /10 0 CM 2) at d m1 0 C 2( Bldg Surface p / 0 M) 8.73 mrem/y (dpm/100 cm 2) (dpm/100 cm 2)

Co-60 7.2E+03 4.6E+04 2.9E+03 Cs-137 2.2E+04 1.7E+05 1.1E+04 7

Report No.: YNPS-FSS-AUX-02-00 The FSSP design was performed to the criteria of the LTP; therefore, no subsequent LTP deviations with potential impact to this Survey Area need to be evaluated.

5.1.3 DCGL Selection and Use It must be noted that for the final evaluation of the AUX-02 Survey Units and throughout this report, the acceptance criteria of Building Surface LTP-listed DCGL values has been applied. However, given that all of the remaining slab and foundation structure will be at least a few feet subsurface before site grading is complete and will be in such a state at license termination, the LTP, section 5.6.3.1.2, "Exterior Surfaces of Building Foundations," establishes the applicable guidance, as it addresses methods that may be applied to determine if subsurface structure surfaces will be acceptable by meeting LTP-required concrete volumetric DCGLs.

With the established LTP guidance, given that Co-60 and Cs-137 have been found to be the only radionuclides of significance in the area of concern, and conventional hand-held instrument survey criteria techniques being conservatively based on Co-60 beta emissions, performing a Class I survey applying Building Surface DCGLs has led to a very conservative approach in determining the final status of the Survey Unit.

5.1.4 Measurements Error tolerances and characterization sample population statistics drove the selection of the number of fixed point measurements.

The fixed-point sampling grid was developed as a systematic grid with spacing consisting of a triangular pitch pattern with a random starting point. Sample measurement locations are provided in Attachment A.

A total of 17 ISOCS scans were performed in the Survey Units providing 100 percent coverage of the Survey Area. The ISOCS scan grid used a 2.6-m point-to-point grid with no perimeter points farther than 1.3 m from the survey unit boundary. The ISOCS scan grid did not require a random start. ISOCS scans were performed at a height of 2 m from the surface positioned perpendicular to the scan point using a 90-degree collimator.

The adjusted investigation levels, referenced in Table 3, for the ISOCS 2

were derived by multiplying the DCGLEMC (DCGLw

  • AF for a 1-mi elevated area) by the ratio of MDCs obtained from the 12.6-M 2 field of view relative to the MDC obtained for a 1-mi2 area at the edge of the 12.6-m 2 field of view, as this leads to a conservative model. The values developed for the I -M 2 elevated area at the edge of the field of view used for the ISOCS scan investigative levels are sensitive enough to detect the 8

Report No.: YNPS-FSS-AUX-02-00 elevated comparison values for the 12.6-M2 area. MDC values for the Portable ISOCS scans were set at the DCGLEMC for the individual radionuclides. The technical basis for the use of the ISOCS is documented in Technical Report YA-REPT-00-018-05, "Use of In-situ Gamma Spectrum Analysis to Perform Elevated Measurement Comparison in Support of FinalStatus Surveys." (Appendix D).

5.2 Survey Implementation Activities Table 3 provides a summary of daily activities performed during the Final Status Survey of Survey Units in AUX-02.

Table 4 FSS Activity Summary for AUX-02 Survey Units Survey Unit , Date . ,ivite A. '-- " '- .

AUX-02-01 6/13/2006 Performed Job Hazard Analysis 6/13/2006 Performed Unit Classification 6/16/2006 Performed Sample Quantity Calculations, established DQOs 6/20/2006 Performed walk-down of Survey Unit 6/20/2006 Established Isolation and Controls 6/20/2006 Generated FFS Sample Plans 6/21/2006 Initiated Scans, and Direct measurements.

7/24/2006 Performed DQA, FSS Complete AUX-02-02 6/13/2006 Performed Job Hazard Analysis 6/13/2006 Performed Unit Classification 6/16/2006 Performed Sample Quantity Calculations, established DQOs 6/20/2006 Performed walk-down of Survey Unit 6/20/2006 Established Isolation and Controls 6/20/2006 Generated FFS Sample Plans 6/21/2006 Initiated Scans, and Direct measurements.

7/24/2006 Performed DQA, FSS Complete 5.3 Surveillance Surveys 5.3.1 Periodic Surveillance Surveys There is no footprint to base a periodic surveillance survey upon, so Survey Area AUX-02 was not placed into the program for periodic surveillance surveys in accordance with YNPS procedure DP-8860, "Area Surveillance FollowingFinal Status Survey."

5.3.2 Resurveys No resurveys were performed.

5.3.3 Investigations 9

Report No.: YNPS-FSS-AUX-02-00 No additional investigations were required for this Survey Unit due to surveillance surveys.

5.4 Survey Results Direct measurement surveys indicated that no Survey Units had systematic measurements that exceeded the DCGLw, depicted in Attachment B. Retrospective power curves were generated and demonstrated that an adequate number of samples were collected to support the Data Quality Objectives. Therefore, the null hypothesis (Ho) (that the Survey Units exceeds the release criteria) is rejected.

Table 5 Direct Measurement Summary (DPM/100cm2)

Sunity Survy Sytemtic tan~rd Syseample Samples Averag~e StnadMaximum Above IAbove TSamples Unt SmlsDeviation A& DCGI-w jDCGLemc AUX-02-01 20 620 420 1372 0 0 AUX-02-02 20 574 277 974 0 0 Table 6 Direct Measurements (DPM/I 0Ocm2)

!Samile Description Activity Sample Description, Aictiity AUX-02-01-001-F-FM 1,372 AUX-02-02-001-F-FM 625 AUX-02-01-002-F-FM 1,239 AUX-02-02-002-F-FM 377 AUX-02-01-003-F-FM 642 AUX-02-02-003-F-FM 526 AUX-02-01-004-F-FM 261 AUX-02-02-004-F-FM 824 AUX-02-01-005-F-FM 1,140 AUX-02-02-005-F-FM 974 AUX-02-01-006-F-FM 891 AUX-02-02-006-F-FM 509 AUX-02-01-007-F-FM 1,040 AUX-02-02-007-F-FM 808 AUX-02-01-008-F-FM 625 AUX-02-02-008-F-FM 62 AUX-02-01-009-F-FM 824 AUX-02-02-009-F-FM 659 AUX-02-01-010-F-FM 858 AUX-02-02-010-F-FM 742 AUX-02-01 -011-F-FM 791 AUX-02-02-01 1-F-FM 78 AUX-02-01-012-F-FM (21) AUX-02-02-012-F-FM 841 AUX-02-01-013-F-FM 443 AUX-02-02-013-F-FM 344 AUX-02-01-014-F-FM 426 AUX-02-02-014-F-FM 625 AUX-02-01-015-F-FM 95 AUX-02-02-015-F-FM 194 AUX-02-01-016-F-FM 543 AUX-02-02-016-F-FM 824 AUX-02-01-017-F-FM 775 AUX-02-02-017-F-FM 692 AUX-02-01-018-F-FM 493 AUX-02-02-018-F-FM 592 AUX-02-01-019-F-FM 95 AUX-02-02-019-F-FM 941 AUX-02-01-020-F-FM (121) AUX-02-02-020-F-FM 244 Table 7 Replicate Surveys Direct Measurements (DPM/100cm2)

Sample Description Activity "Activity

'SampleDescription AUX-02-01-001-Q-FM 961 AUX-02-02-001-Q-FM 528 AUX-02-01-002-Q-FM 943 AUX-02-02-002-Q-FM 1,308 AUX-02-01-003-Q-FM 1,009 AUX-02-02-003-Q-FM 1,407 AUX-02-01-004-Q-FM 578 AUX-02-02-004-Q-FM 213 10

Report No.: YNPS-FSS-AUX-02-00 ISarple Description ~Activity* Sampl Description Activitv AUX-02-01-005-Q-FM 760 AUX-02-02-005-Q-FM 313 AUX-02-01-006-Q-FM 727 AUX-02-02-006-Q-FM 1,225 AUX-02-01-007-Q-FM 1,175 AUX-02-02-007-Q-FM 1,109 AUX-02-01-008-Q-FM 843 AUX-02-02-008-Q-FM 1,125 AUX-02-01-009-Q-FM 1,739 AUX-02-02-009-Q-FM 1,175 AUX-02-01-010-Q-FM 1,092 AUX-02-02-01 0-Q-FM 429 AUX-02-01 -011-Q-FM 1,606 AUX-02-02-01 1-Q-FM 479 AUX-02-01-012-Q-FM 893 AUX-02-02-012-Q-FM 180 AUX-02-01-013-Q-FM 1,474 AUX-02-02-013-Q-FM 993 AUX-02-01-014-Q-FM 246 AUX-02-02-014-Q-FM 711 AUX-02-01-015-Q-FM 462 AUX-02-02-015-Q-FM 1,524 AUX-02-01-016-Q-FM 1,258 AUX-02-02-016-Q-FM 1,125 AUX-02-01-017-Q-FM 1,457 AUX-02-02-017-Q-FM 877 AUX-02-01-018-Q-FM 1,076 AUX-02-02-018-Q-FM 528 AUX-02-01-019-Q-FM 993 AUX-02-02-019-Q-FM -268 AUX-02-01-020-Q-FM 1,192 AUX-02-02-020-Q-FM -69 Table 8 Original and Replicate ISOCS Scan Data Sample Title Unity Sample Title Unity Sample Title Unity AUX-02-01 -101 -F-G 0.00 AUX-02-02-104-F-G 0.00 AUX-02-02-109-Q-G 0.00 AUX-02-01 -101 -Q-G 0.00 AUX-02-02-104-Q-G 0.00 AUX-02-02-1 10-F-G 0.00 AUX-02-01-102-F-G 0.00 AUX-02-02-105-F-G 0.00 AUX-02-02-1 10-Q-G 0.00 AUX-02-01-102-Q-G 0.00 AUX-02-02-105-Q-G 0.00 AUX-02-02-1 11 -F-G 0.06 AUX-02-01-103-F-G 0.00 AUX-02-02-106-F-G 0.00 AUX-02-02-1 11 -Q-G 0.00 AUX-02-01-103-Q-G 0.00 AUX-02-02-106-Q-G 0.00 AUX-02-02-112-F-G 0.00 AUX-02-02-1 01 -F-G 0.00 AUX-02-02-107-F-G 0.00 AUX-02-02-112-Q-G 0.00 AUX-02-02-101 -Q-G 0.00 AUX-02-02-107-Q-G 0.00 AUX-02-02-113-F-G 0.00 AUX-02-02-102-F-G 0.00 AUX-02-02-108-F-G 0.00 AUX-02-02-113-Q-G 0.00 AUX-02-02-102-Q-G 0.00 AUX-02-02-108-Q-G 0.00 AUX-02-02-114-F-G 0.00 AUX-02-02-103-F-G 0.00 AUX-02-02-109-F-G 0.00 AUX-02-02-114-Q-G 0.00 AUX-02-02-103-Q-G 0.00 5.5 Data Quality Assessment The Data Quality Assessment phase is the part of the FSS where survey design and data are reviewed for completeness and consistency, ensuring the validity of the results, verifying that the survey plan objectives were met, and validating the classification of the Survey Unit.

A data review was performed and statistical quantities were calculated. The final standard deviations for both units were less than the estimated standard deviations used for the DQOs. The data were within three standard deviations of their respective mean. The frequency and scatter plots for AUX-02-01 exhibit a normal Poisson distribution with the data distributed about the mean. The frequency and scatter plots for AUX-02-02 indicate a slight skew to the right accounting for some asymmetry in the upper quartile; however neither posting plot clearly reveal any 11

Report No.: YNPS-FSS-AUX-02-00 systematic spatial trends. The data for both units verifies the assumptions for the statistical test.

The sample design and the data acquired were reviewed and found to be in accordance with applicable YNPS procedures DP-886 1, "Data Quality Assessment";

DP-8856, "Preparationof Survey Plans"; DP-8853, "Determination of the Number and Locations of FSS Samples and Measurements"; DP-8857, "Statistical Tests";

DP-8865, "Computer Determination of the Number of FSS Samples and Measurements" and DP-8852, "Final Status Survey Quality Assurance Project Plan".

The Data Quality Assessment power curves, scatter, quantile and frequency plots are found in Attachment B. Posting Plots are found in Attachment A.

6.0 QUALITY ASSURANCE AND QUALITY CONTROL 6.1 Instrument QC Checks Operation of the E-600 w/SPA-3 was in accordance with DP-8535,"Setup and Operation of the Eberline E-600 Digital Survey Instrument," with QC checks preformed in accordance with DP-8540, "Operationand Source Checks of Portable Friskers." Instrument response checks were performed prior to and after use for the E-600 w/SPA-3. All instrumentation involved with the FSS of AUX-02 satisfied the above criteria for the survey. QC records are found in Attachment C.

6.2 Split Samples and Recounts DP-8864,"Split Sample Assessment for Final Status Survey" deals strictly with soil samples and provides no criteria for fixed-point measurements therefore no measurement comparison were made.

6.3 Self-Assessments Replicate surveys were performed on AUX-02-01 and AUX-02-02 to satisfy the quality control requirements of the QAPP, APF-8852. A replication of five percent of the direct measurements are suggested in APF-8852, however the decision was made to replicate all 40 measurements in this Survey Area to add additional quality to the evaluation. The true variance of the replicate survey sample results were evaluated against the estimated variance of the original FSS sample data. Two statistical differences were found out of 40 samples. However the two differences were due to an extremely low variance in the source data, and did not adversely affect the radiological status of the survey unit. No Type I errors occurred and no data were greater than 1/3 of the DCGLw. A copy of the replicate survey evaluations is found in Attachment B.

12

Report No.: YNPS-FSS-AUX-02-00

7.0 CONCLUSION

The FSS of AUX-02 has been performed in accordance with YNPS LTP and applicable FSS procedures. Evaluation of the fixed-point data has shown none of the systematic fixed-point measurements exceeded the DCGLw, depicted in Attachment B.

Retrospective power curves were generated and demonstrated that an adequate number of samples were collected to support the Data Quality Objectives. Therefore, the null hypothesis (H0 ) is rejected.

AUX-02 meets the objectives of the Final Status Survey.

Based upon the evaluation of the data acquired for the FSS, AUX-02 meets the release requirements set forth in the YNPS LTP. The Total Effective Dose Equivalent (TEDE) to the average member of the critical group does not exceed 25 mrem/yr, including that from groundwater. I0CFR20 Subpart E ALARA requirements have been met as well as the site release criteria for the administrative level DCGLs that ensure that the Massachusetts Department of Public Health's 10 mrem/yr limit will also be met.

13

Report No.: YNPS-FSS-AUX-02-00 List of Appendices Appendix A - YNPS-FSSP-AUX-02, "FinalStatus Suirvey Planning Worksheets Appendix B - YA-REPT-00-01 5-04, "InstrumentEfficiency Determinationfor Use in Minimum Detectable ConcentrationCalculationsin Support of the FinalStatus Survey at Yankee Rowe" Appendix C - ALARA Evaluations, AUX-02 Appendix D -YA-REPT-00-018-05, "Use of ln-situ Gamma Spectrum Analysis to Perform Elevated Measurement Comparison in Support of Final Status Surveys" List of Attachments Attachment A - Maps and Posting Plots Attachment B - Data Quality Assessment Plots and Curves Attachment C - Instrument QC Records Attachment D - ISOCS Scan Data (In the electronic version, every Table of Contents, Figures, Appendices and Attachments, as well as every mention of a Table, Figure,Appendix or Attachment is a hyperlink to the actual location or document.)

14

Final Status Survey Planning Worksheet GENERAL SECTION Survey Area #: AUX-02 TSurvey Unit #: 01 Survey Unit Name: PAB West End FSSP Number: YNPS-FSSP-AUX02-01-00 PREPARATION FOR FSS ACTIVITIES

  • Checkmarks in the boxes below signify affirmative responses and completion of the action.

1.1 Files have been established fIor,,urvey unit FSS records. Z 1.2 ALARA review has been completed for the survey unit. Z 1.3 The survey unit has been turned over for final status survey. Z 1.4 An initial DP-8854 walkdown has been performed and a copy of the completed Survey Unit Walkdown Evaluation is in the survey area file. Z 1.5 Activities conducted within area since turnover for FSS have been reviewed. Z Based on reviewed information, subsequent walkdown: Z not warranted El warranted If warranted, subsequent walkdown has been performed and documented per DP-8854. E OR The basis has been provided to and accepted by the FSS Project Manager for not performing a subsequent walkdown.

1.6 A final classification has been performed. Z Classification: CLASS 1 Z CLASS 2 F] CLASS 3 []

DATA QUALITY OBJECTIVES (DQO) 1.0 State the problem:

Survey Unit AUX-02-01 has been selected to have a replicate survey. This is the FSS survey.

The replicate survey is a subset of this plan.

Survey Unit AUX-02-01 consists of the west face of the east PAB wall in the west end section of the former structure and contains a total surface area of 16 m2.'

This wall, in conjunction with the remaining PAB walls, was originally part of a "free release" effort prior to demolition of the PAB structure.

The identities of the radionuclides-of-concern for this survey effort, as well as the statistical data, are based on results acquired from the FSS of survey units AUX-01 -01 and AUX-01-02 as well as information provided in the "free release" effort. Pre-remediation and investigation data indicates a 70/30 to 80/20 Cs 137 \ Co 6" ratio. In addition to the pre-remediation data, ISOCS assays of AUX-01-02 indicate the major isotopic contributor to be Cs' 37 . If a weighted DCGLw were to be calculated utilizing this data the resultant values would be considerably higher than using the DCGL value for Co 60 alone. In keeping with the previous conservative approach to the PAB concrete surfaces (i.e. protocols used for AUX-01-01 and AUX-01-02), this survey plan will use the DCGL values for the most limiting isotope Co 61 for AUX-02-01 FSSP calculations.

DPF-8856.1 YNSP-FSSP-AUX02-01-00 Page 1 of 7

Data used to determine the number of samples are derived from the FSS of survey unit AUX-01-02.

Initial HSA and surveys prompted a LTP MARSSIM Classification of 1 for AUX-02, and due to remedial activities performed in adjacent areas, AUX-02-01 will remain a Class 1 area.

The problem, therefore, is to determine and demonstrate that residual licensed radioactive materials, if present in AUX-02-01, meets the LTP release criterion The planning team for this effort consists of the FSS Project Manager, FSS Radiological Engineer, FSS Field Supervisor, and FSS Technicians. The FSS Radiological Engineer will make primary decisions with the concurrence of the FSS Project Manager.

2.0 Identify the decision:

The decision to be made can be 'stated "Does residual plant-related radioactivity, if present in the survey unit, exceed the release criteria?"

Alternative actions that may be employed are investigation, re-survey and remediation or disposal.

3.0 Identify the inputs to the decision:

Sample media: Concrete surfaces.

Types of measurements: Systematic measurements, scans and concrete sampling (if required for investigations).

Radionuclides-of-concern: All nuclides listed in Table 1 of this FSSP will be included in analysis with the primary emphasis on Co6 °.

DCGLs:

Applicable DCGLw: 7200 dpm/100cm 2 (Co 60 assulned as a conservative measure)

Note: The DCGLw value corresponds to-&73mrehi/y.

/4)

Some surfaces contain pits and irregular surfaces, which will increase the source-to-detector distance for some localized areas under the 100cm 2 window of the detector. Most of the pits and irregularities increase the source-to-detector distance as much as 1 inch. These types of irregularities in the concrete surfaces will be taken into account through the efficiency factor applied to the measurements collected with the HP-100. Technical report YA-REPT-00-015-04 provides instrument efficiency factors (ci) for various source-to-detector distances. The si value for a source-to-detector distance of 1 inch was selected as a representative efficiency for data collected with the HP-100 on irregular surfaces. The si value for a distance of 1/2/ inch will be applied to HP-100 data collected from smooth concrete surfaces. The efficiency factors provided in YA-REPT-00-015-04 are used below:

" *i = 0.2413 c/e for smooth concrete surfaces (reflects a source to detector distance = 1/22 inch), and

= 0.149 c/e for pitted/irregular surfaces (reflects a source to detector distance = 1 inch)

" * , = 0.25 e/d (consistent with the Co 60 assumption)

DPF-8856.1 YNSP-FSSP-AUX02-01 -00 Page 2 of 7

" total efficiency for smooth surface = Ei " F, = 0.2413 c/e 0.25 e/d = 0.0603 c/d

  • total efficiency for pitted/irregular surfaces = si
  • F, = 0.149 c/e
  • 0.25 e/d = 0.0373 c/d 2

Gross measurement DCGLw (for IIP-100): 7200 dpm/100cm

" for smooth concrete surface: 7200 dpm/100cm 2

  • 0.0603 c/d = 434 cpm/100cm 2 2
  • for pitted/irregular surface: 7200 dpm/100cm2
  • 0.0373 c/d = 269 cpm/100cm Applicable DCGLEMc for 2 fixed-point measurements: DCGLw
  • AF = 7200 dpmI/100cm 2
  • 7.3 = 52,600 dpm/100cm 2

" for smooth concrete surface: 52,600 dpm/1OOcm

  • 0.0603 c/d

- 3170 cpm/100cm 2

" for pitted/irregular surface: 52,600 dpm/100cm2

  • 0.0373 c/d = 1960 cpm/100cm2 .

Note: The DCGLw and DCGLEMc values refer to above-background radioactivity.

Investigation Level forfixed-point measurement:

  • for smooth concrete surface: >3170 cpm/1 00cm 2 above background
  • for pitted/irregular concrete surface: >1960 cpm/100cm 2 above background Investigation Level for HP-100 scans: Reproducible indication above background using an audible signal. Refer to Attachment 3 for HP-100 MDCR and MDCf(DCGLEMC) values.

InvestigationLevel for ISOCS scans: 1m90d scan height: 1 .7E+04 dpm/100cm 2 (Co 6l).

2m90d scan height: 2 .9 1 E+°3 dpm/1OOcm 2 (Co 6°).

Note: The investigation levels for the ISOCS scans were derived by multiplying the DCGLEMC associated with a lm 2 area by the ratio of the MDC for the full field of view (12.6m 2 for 2m scan height and 3.14m 2 for im scan height) to the MDC for a 1m 2 area at the edge of the full field of view. The investigation levels developed in this manner are sensitive enough to detect the Co 60 DCGLEMC value based on the grid area (52,600 dpm/100cm 2). If other LTP-listed gamma-emitting radionuclides are identified in the ISOCS assays, the investigation level will be evaluated using the same criteria applied in the development of the investigation level for Co 60 and in turn thef(DCGLEMc) will be compared to Unity (i.e. SOF<l).

M-DCsfor ISOCS measurements:

Table 1 MDC values for LTP ISOCS Measurements C005200 Sb12 29,000 Eu11,000 Nb7600 CI 8600 Eul5 10,000 Ag 108r 7300 -- Cs137- 19,000 Eul 5 190,000 Note: The MDCs listed in the above table are 10% of the DCGLEMC values (based on concrete surface DCGLs & nuclide-specific AF value for 6m 2 from LTP, Appendix 6S). If the MDC values in the above table cannot be achieved in a reasonable count time, then an MDC no greater than 5X the table value must be achieved.

MDCft-*d: Refer to Attachments 1 and 1A.

Scan coverage: ISOCS and/or HP-100/Spa-3 scan measurements providing 100% coverage of all AUX-02-01 surfaces.

DPF-8856.1 YNSP-FSSP-AUX02-01-00 Page 3 of 7

QC checks and measurements: QC checks for the survey instruments will be performed in accordance with DP-8534 and DP-8540. Pre and post-use instrument QC checks will be performed. QC checks for the ISOCS will be in accordance with DP-8869 and DP-8871.

Investigation level for SPA-3 scans: Reproducible indication above background using an audible signal. A shielded SPA-3 probe should be used for these scans due to the close proximity to the ISFSI.

Note: If ISOCS scans are utilized then SPA-3 gamma scans are not applicable. If beta scans are used then the MDCR andj(DCGLEMc) developed for the SPA-3 scans will be implemented for those Spa-3 scans. (Refer to Attachment 2).

4.0 Define the boundaries of the survey:

AUX-02-01 is comprised of the west face of the south PAB wall in the west end section of the former structure and contains a total surface area of 16 mi2 . Note: A random-start systematic grid has been developed to identify the fixed-point measurement locations.

Surveying of AUX-02-01 will be performed when weather conditions will not adversely affect the data acquisition.

5.0 Develop a decision rule:

(a) If all of the data show that the concentrations of all plant-related nuclides are below the DCGLw and the sum of their DCGL fractions are less than unity then reject the null hypothesis (i.e. the Survey Unit meets the release criteria).

(b) If the action levels are exceeded, then perform an investigation survey.

(c) If the average of the FSS measurements is below the DCGLw, but some individual measurements exceed the DCGLw, then apply a statistical test as the basis for accepting or rejecting the null hypothesis.

(d) If the average concentration exceeds the DCGLW then accept the null hypothesis (i.e.

the Survey Area does not meet the release criteria).

6.0 Specify tolerable limits on decision errors:

Null hypothesis: The null hypothesis (H0 ), as required by MARSSIM, is stated and tested in the negative form: "Residual licensed radioactive materials in Survey Unit AUX-02-01 exceeds the release criterion".

Probabilityof type I (a) error: 0.05 Probabilityof type H (fl)error: 0.05 LBGR: DCGLw/2 = 3600 dpm/1 00cm 2 (systematic measurements) 7.0 Optimize Design:

DPF-8856.1 YNSP-FSSP-AUX02-01-00 Page 4 of 7

Type of statistical test: Sign Test Number of measurements: 20 (Systematic grid from a random start point.)

GENERAL INSTRUCTIONS

1. Survey instrument: Operation of the E-600 w/SPA-3 will be in accordance with DP-8535, with QC checks preformed in accordance with DP-8540. Operation and source checking of the E-600 w/HP-100 will be in accordance with DP-8534. The instrument response checks shall be performed before issue and after use
2. Collect ISOCS measurements in accordance with DP-8871.
3. If any surface areas are not accessible with the ISOCS, scan with the E600/HP-100 in accordance with DP-8534.
4. The job hazards associated with the FSS in Survey Unit 01 are addressed in the accompanying JHA.
5. All personnel participating in this survey shall be trained in accordance with DP-8868.

SPECIFIC INSTRUCTIONS

1. Grid AUX-02-01 for 100% scan coverage as necessary to achieve 100% scan coverage.

Sequentially number each scan location starting with number 101. Indicate the approximate ISOCS scan location and the sequence number (AUX-02-01-xxx-F-G [xxx is the sequential number starting at 101]-F-G on the maps. Using the 900 collimator, position the ISOCS detector directly at each marker 2 meters from the surface to be scanned. Angle the detector as necessary perpendicular to the scan surface and perform an analysis in accordance with DP-8871 employing a preset count time sufficient to meet the MDAs referenced in this survey plan. Review the report to verify that the MDAs have been met for the nuclides.

Identify radionuclides representing licensed radioactive material and compare their concentration to their respective DCGLEMC value.

Note: If multiple radionuclides are identified in any single ISOCS assay, then, in addition to comparing each individual nuclide to it's action (investigation) level; the assay will be compared to unity (SOF<I).

2. If any ISOCS scan measurement is equal to or greater than the action (investigation) level, or the SOF >1, then an investigation of that scan area footprint shall be performed as follows:

(a) Using the SPA-3 at a slow speed scan rate (approximately 5" per second), scan the entire ISOCS footprint. Scanning will be performed in the rate-meter mode with the audible feature "on".

Note: If the background level exceeds 19000 cpm, contact the FSS Engineer prior to continuing.

(b) Mark (outline on the surface) locations where detectable-above-background readings are found. Identify each outlined areas on a survey map.

(c) Measure the total area (square centimeters) of each outlined elevated area. Indicate on the map (and with black marker on the actual location) the location of the highest indicated activity spot. Record the highest SPA-3 reading observed for each outlined DPF-8856.1 YNSP-FSSP-AUX02-01-00 Page 5 of 7

area.

(d) On the spot indicating the highest SPA-3 reading observed for each outlined area, perform and record a 1-minute scaler reading using the E600/SHP1 00.

Note: Should further investigative measures be required (i.e. concrete core sampling) a specific investigative sample plan will be developed.

Detailed descriptions of investigative actions will be recorded on form DPF-8856.2 and the location of the investigation analyses will be recorded on the survey map. The location description must provide ample detail to allow revisiting the spot at a later time.

3. If performing beta scans execute the following:

(a) Perform the HP-100 scans by moving the detector at a speed no greater than 2 inches per second, using a 2 inch standoff.

(b) FSS Technicians will wear headphones while scanning and the survey instrument will be in the rate-meter mode. Surveyors will listen for upscale readings and respond to readings that exceed the investigation level.

Note: Contact FSS Engineer if HP-100 background levels exceed 1000 cpm prior to or during scans.

(c) If the HP- 100 scan investigation level is exceeded:

(1) Confirm that the above background indication is reproducible and cannot be attributed to a nearby source.

(2) If a nearby source is identified, have it removed or shielded, document the finding on DP-8856.2, and repeat the scan, (3) If reproducible and not caused by a nearby source, collect a fixed-point measurement at the location of the highest reading observed during the scan, (4) The designation for a fixed-point measurement collected during a first-level investigation will continue in sequence beginning with AUX-02-01-021-F-FM-I.

Record all investigation fixed-point measurements "as read" (in units of cpm) on the attached Form 1 (even if the measurement was logged).

(5) Clearly mark the location of any fixed-point measurement collected during this level of investigation. The FSS Radiological Engineer is responsible for assessing the need for further investigation. If further investigation is required, it will be conducted under a separate survey plan.

Note: Record information relevant to the HP-100 scans on DPF-8856.2 accompanied by a survey map of the area scanned.

4. If beta scans are performed then gamma scans will be performed on irregular surfaces and cracks in the concrete as follows:

(a) Perform SPA-3 scans on the irregular surfaces and over cracks by moving the detector slowly (no greater than 0.13m/s) and keeping it < 3 inches from the surface.

Note: If background levels exceed 19000 cpm contact the Radiological Engineer prior to starting the scan or continuing scans.

Note: When performing SPA-3 scans, (investigations not included) no less than 50% of the time will be monitored and timed by the FSS Field Supervisor.

(b) FSS Technicians will wear headphones while scanning with the survey instrument in the rate-meter mode. Surveyors will listen for upscale readings and respond to readings that exceed the SPA-3 investigation level.

DPF-8856.1 YNSP-FSSP-AUX02-01-00 Page 6 of 7

(c) If a SPA-3 reading exceeds the investigation level:

(1) Confirm that the above-background indication is reproducible and cannot be attributed to a nearby source, (2) If a nearby source is identified, have it removed or shielded, document the finding on DP-8856.2, and repeat the scan, (3) If the reading is reproducible and not caused by a nearby source, collect a fixed-point measurement with the HP-100 at the highest reading observed during the scan and clearly mark that location. Designate the investigation fixed-point measurement as describe in step 3(c)(4) above. Record all investigation fixed-point measurements "as read" (in units, of cpm) on the attached Form 1 (even if the measurement was logged). The FSS Radiological Engineer is responsible for assessing the need for further investigation. If further investigation is required, it will be conducted under a separate survey plan.

5. For the statistical fixed-point measurements perform the following:

(a) Locate and mark the measurement points at the locations shown in the attached map using small, but readily visible marks. Use the distances shown on the Direct Measurement maps to locate the fixed-point measurements on the vertical walls.

Note: If a measurement location is obstructed such that a measurement cannot be collected, select the nearest suitable location within one meter in accordance with DP-8856.

(b) Collect and record the 20 measurements with the E-600/SHP-100 in accordance with DP-8534 and DP-8535 using the scalar mode (1 minute). Record each fixed-point measurement "as read" (in units of cpm) on the Form 1 indicating whether the concrete surface was smooth (S) or irregular (I).

(c) Designation for fixed-point measurements: AUX-02-01-001-F-FM through AUX 01-020-F-FM corresponding to FSS measurement locations 001 through 020.

6. If necessary, perform a background survey as follows:

(a) Cover the detector with 1/8-inch Lucite shield, or equivalent, and collect a series of 21, one-minute background readings according to the following plan:

(1) Find three locations, as widely separated as possible, that are at least one meter from any edge of the concrete. At each of these locations position the detector one meter from the wall, facing the wall and take a set of seven, one-minute scaler counts.

(2) Mark the approximate location on a blank map (3) Record each background measurement "as read" (in units of cpm) on the background survey map.

Prepared by * '1, Date /_a ____

  • -*ffS~adi Iogic Engingeer -[

Reviewed by Date FSS Radioikt "ngeer Approved by " Date__________

DPF-8856.1 YNSP-FSSP-AUX02-01-00 Page 7 of 7

Final Status Survey Planning Worksheet GENERAL SECTION Survey Area #: AUX-02 Survey Unit #: 02 Survey Unit Name: PAB West End FSSP Number: YNPS-FSSP-AUX02-02-00 PREPARATION FOR FSS ACTIVITIES Check marks in the boxes below signify affirmative responses and completion of the action.

1.1 Files have been established for survey unit FSS records. Z 1.2 ALARA review has been completed for the survey unit. Z 1.3 The survey unit has been turned over for final status survey. Z 1.4 An initial DP-8854 walkdown has been performed and a copy of the completed Survey Unit Walkdown Evaluation is in the survey area file. Z 1.5 Activities conducted within area since turnover for FSS have been reviewed. Z Based on reviewed information, subsequent walkdown: Z not warranted El warranted If warranted, subsequent walkdown has been performed and documented per DP-8854. D OR The basis has been provided to and accepted by the FSS Project Manager for not performing a subsequent walkdown.

1.6 A final classification has been performed. Z Classification: CLASS I Z CLASS 2 M] CLASS 3 FI DATA QUALITY OBJECTIVES (DQO) 1.0 State the problem:

Survey Unit AUX-02-02 has been selected to have a replicate survey. This is the FSS survey.

The replicate survey is a subset of this plan.

Survey Unit AUX-02-02 consists of the north face of the south PAB wall in the west end section of the former structure and contains a total surface area of 58 m 2 .

This wall, in conjunction with the remaining PAB walls, was originally part of a "free release" effort prior to demolition of the PAB structure.

The identities of the radionuclides-of-concern for this survey effort, as well as the statistical data, are based on results acquired from the FSS of survey units AUX-0 1-01 and AUX-0 1-02 as well as information provided in the "free release" effort. Pre-remediation and investigation data indicates a 70/30 to 80/20 Cs 13 7 \ Co60 ratio. In addition to the pre-remediation data, ISOCS assays of AUX-01 -02 indicate the major isotopic contributor to be Cs"'. If a weighted DCGLw were to be calculated utilizing this data the resultant values would be considerably higher than using the DCGL value for Co 60 alone. In keeping with the previous conservative approach to the PAB concrete surfaces (i.e. protocols used for AUX-01-01 and AUX-01-02), this survey plan will use the DCGL values for the most limiting isotope Co 60 for AUX-02-02 FSSP calculations.

DPF-8856.1 YNSP-FSSP-AUX02-02-00 Page 1 of 7

Data used to determine the number of samples are derived from the FSS of survey unit AUX-01-02.

Initial HSA and surveys prompted a LTP MARSSIM Classification of 1 for AUX-02, and due to remedial activities performed in adjacent areas, AUX-02-02 will remain a Class 1 area.

The problem, therefore, is to determine and demonstrate that residual licensed radioactive materials, if present in AUX-02-02, meets the LTP release criterion The planning team for this effort consists of the FSS Project Manager, FSS Radiological Engineer, FSS Field Supervisor, and FSS Technicians. The FSS Radiological Engineer will make primary decisions with the concurrence of the FSS Project Manager.

2.0 Identify the decision:

The decision to be made can be stated "Does residual plant-related radioactivity, if present in the survey unit, exceed the release criteria?"

Alternative actions that may be employed are investigation, re-survey and remediation or disposal.

3.0 Identify the inputs to the decision:

Sample media: Concrete surfaces.

Types of measurements: Systematic measurements, scans and concrete sampling (if required for investigations).

Radionuclides-of-concern: All nuclides listed in Table 1 of this FSSP will be included in analysis with the primary emphasis on Co 60 DCGLs:

Applicable DCGLw: 7200 dpm/100cm 2 (Co 60 assumed as a conservative measure)

Note: The DCGLw value corresponds to 10 mremr/y.

Some surfaces contain pits and irregular surfaces, which will increase the source-to-detector distance for some localized areas under the 100cm 2 window of the detector. Most of the pits and irregularities increase the source-to-detector distance as much as 1 inch. These types of irregularities in the concrete surfaces will be taken into account through the efficiency factor applied to the measurements collected with the HP-100. Technical report YA-REPT-00-015-04 provides instrument efficiency factors (Fi) for various source-to-detector distances. The ei value for a source-to-detector distance of 1 inch was selected as a representative efficiency for data collected with the HP-100 on irregular surfaces. The Si value for a distance of V2 inch will be applied to HP-100 data collected from smooth concrete surfaces. The efficiency factors provided in YA-REPT-00-015-04 are used below:

  • si = 0.2413 c/e for smooth concrete surfaces (reflects a source to detector distance = 1/2/2 inch), and

= 0.149 c/e for pitted/irregular surfaces (reflects a source to detector distance = 1 inch)

  • Fs = 0.25 e/d (consistent with the Co 60 assumption)

DPF-8856,1 YNSP-FSSP-AUJX02-02-00 Page 2 of 7

  • total efficiency for smooth surface = q " &,= 0.2413 c/e
  • 0.25 e/d = 0.0603 c/d 0 total efficiency for pitted/irregular surfaces = Fi " s = 0. 149 c/e 0.25 e/d = 0.0373 c/d 2

Gross measurement DCGLw (for HP-100): 7200 dpm/100cm

  • for smooth concrete surface: 7200 dpm/100cm 2
  • 0.0603 c/d = 430 cpm/100cm 2 2

" for pitted/irregular surface: 7200dpm/100cm2

  • 0.0373 c/d = 270 cpm/100cm Applicable DCGLEMC for fixed-point measurements: DCGLw
  • AF = 7200 dpm/100cm 2
  • 2.4 = 17300 dpm/100cm 2 2 2

" for smooth concrete surface: 17300 dpm/IOOcm

  • 0.0603 c/d = 1040 cpm/100cm
  • for pitted/irregular surface: 17300 dpmr/100cm2
  • 0.0373 c/d = 640 cpm/I00cm2 .

Note: The DCGLw and DCGLEMC values refer to above-background radioactivity.

Investigation Level forfixed-point measurement:

" for smooth concrete surface: >1040 cpm/1 00cm 2 above background

" for pitted/irregular concrete surface: >640 cpm/1 00cm 2 above background Investigation Level for HP-100 scans: Reproducible indication above background using an audible signal. Refer to Attachment 3 for HP- 100 MDCR and MDCf(DCGLEMC) values.

Investigation Levelfor ISOCS scans: lm9Od scan height: 17,280 dpm/100cm 2 (co 60 ).

2m90d scan height: 2910 dpm/1 00cm 2 (Co 6").

Note: The investigation levels for the ISOCS scans were derived by multiplying the DCGLEMC associated with a 1m2 area by the ratio of the MDC for the full field of view (12.6m 2 for 2m scan height and 3.14m 2 for im scan height) to the MDC for a Im2 area at the edge of the full field of view. The investigation levels developed in this manner are sensitive enough to detect the Co 60 DCGLEMC value based on the grid area (52,600 dpm/1OOcm 2). If other LTP-listed gamma-emitting radionuclides are identified in the ISOCS assays, the investigation level will be evaluated using the same criteria applied in the development of the investigation level for Co 60 and in turn thef(DCGLEMc) will be compared to Unity (i.e. SOF<l).

MDCsfor ISOCS measurements:

Table 1 MDC values for LTP ISOCS Measurements Nb" 2500 CS'3 4 2900 EU154 3300 Ag m 2400 Cs 6300 Eu" 2400 Note: The MDCs listed in the above table are 10% of the DCGLEMC values (based on concrete surface DCGLs & nuclide-specific AF value for 4m 2 from LTP, Appendix 6S). If the MDC values in the above table cannot be achieved in a reasonable count time, then an MDC no greater than 5X the table value must be achieved.

MDCfg,,e: Refer to Attachments 1 and IA.

Scan coverage: ISOCS and/or HP-100/SPA-3 scan measurements providing 100% coverage of all AUX-02-02 surfaces.

DPF-8856.1 YNSP-FSSP-AUX02-02-00 Page 3 of 7

QC checks and measurements: QC checks for the survey instruments will be performed in accordance with DP-8534 and DP-8540. Pre and post-use instrument QC checks will be performed. QC checks for the ISOCS will be in accordance with DP-8869 and DP-8871.

Investigation level for SPA-3 scans: Reproducible indication above background using an audible signal. A shielded SPA-3 probe should be used for these scans due to the close proximity to the ISFSI.

Note: If ISOCS scans are utilized then SPA-3 gamma scans are not applicable. If beta scans are used then the MDCR andj(DCGLEMc) developed for the SPA-3 scans will be implemented for those SPA-3 scans. (Refer to Attachment 2).

4.0 Define the boundaries of the survey:

AUX-02-02 is comprised of the north face of the south PAB wall in the west end section of the former structure and contains a total surface area of 58 m2 . Note: A random-start systematic grid has been developed to identify the fixed-point measurement locations.

Surveying of AUX-02-02 will be performed when weather conditions will not adversely affect the data acquisition.

5.0 Develop a decision rule:

(a) If all of the data show that the concentrations of all plant-related nuclides are below the DCGLw and the sum of their DCGL fractions are less than unity then reject the null hypothesis (i.e. the Survey Unit meets the release criteria).

(b) If the action levels are exceeded, then perform an investigation survey.

(c) If the average of the FSS measurements is below the DCGLw, but some individual measurements exceed the DCGLW, then apply a statistical test as the basis for accepting or rejecting the null hypothesis.

(d) If the average concentration exceeds the DCGLw then accept the null hypothesis (i.e.

the Survey Area does not meet the release criteria).

6.0 Specify tolerable limits on decision errors:

Null hypothesis: The null hypothesis (H0 ), as required by MARSSIM, is stated and tested in the negative form: "Residual licensed radioactive materials in Survey Unit AUX-02-02 exceeds the release criterion".

Probabilityof type I (a) error: 0.05 Probabilityof type H (f8) error: 0.05 LBGR: DCGLw/2 = 3600 dpm/100cm 2 (systematic measurements) 7.0 Optimize Design:

DPF-8856.1 YNSP-FSSP-AUX02-02-00 Page 4 of 7

Type of statistical test: Sign Test Number of measurements: 20 (Systematic grid from a random start point.)

GENERAL INSTRUCTIONS

1. Survey instrument: Operation of the E-600 w/SPA-3 will be in accordance with DP-8535, with QC checks preformed in accordance with DP-8540. Operation and source checking of the E-600 w/HP-100 will be in accordance with DP-8534. The instrument response checks shall be performed before issue and after use
2. Collect ISOCS measurements in accordance with DP-8871.
3. If any surface areas are not accessible with the ISOCS, scan with the E600/HP-100 in accordance with DP-8534.
4. The job hazards associated with the FSS in Survey Unit 02 are addressed in the accompanying JHA.
5. All personnel participating in this survey shall be trained in accordance with DP-8868.

SPECIFIC INSTRUCTIONS

1. Grid AUX-02-02 for 100% scan coverage as necessary to achieve 100% scan coverage.

Sequentially number each scan location starting with number 101. Indicate the approximate ISOCS scan location and the sequence number (AUX-02-02-xxx-F-G) (xxx is the sequential number starting at 101) on the maps. Using the 90' collimator, position the ISOCS detector directly at each marker 2 meters from the surface to be scanned. Angle the detector as necessary perpendicular to the scan surface and perform an analysis in accordance with DP-8871 employing a preset count time sufficient to meet the MDAs referenced in this survey plan. Review the report to verify that the MDAs have been met for the nuclides. Identify radionuclides representing licensed radioactive material and compare their concentration to their respective DCGLEMC value.

Note: If multiple radionuclides are identified in any single ISOCS assay, then, in addition to comparing each individual nuclide to it's action (investigation) level; the assay will be compared to unity (SOF<1).

2. If any ISOCS scan measurement is equal to or greater than the action (investigation) level, or the SOF >1, then an investigation of that scan area footprint shall be performed as follows:

(a) Using the SPA-3 at a slow speed scan rate (approximately 5" per second), scan the entire ISOCS footprint. Scanning will be performed in the rate-meter mode with the audible feature "on".

Note: If the background level exceeds 19,000 cpm, contact the FSS Engineer prior to continuing.

(b) Mark (outline on the surface) locations where detectable-above-background readings are found. Identify each outlined areas on a survey map.

(c) Measure the total area (square centimeters) of each outlined elevated area. Indicate on the map (and with black marker on the actual location) the location of the highest indicated activity spot. Record the highest SPA-3 reading observed for each outlined DPF-8856.1 YNSP-FSSP-AUX02-02-00 Page 5 of 7

area.

(d) On the spot indicating the highest SPA-3 reading observed for each outlined area, perform and record a 1-minute scaler reading using the E600/SHP 100.

Note: Should further investigative measures be required (i.e. concrete core sampling) a specific investigative sample plan will be developed.

Detailed descriptions of investigative actions will be recorded on form DPF-8856.2 and the location of the investigation analyses will be recorded on the survey map. The location description must provide ample detail to allow revisiting the spot at a later time.

3. If performing beta scans execute the following:

(a) Perform the HP-100 scans by moving the detector at a speed no greater than 2 inches per second, using a 1/2 inch standoff.

(b) FSS Technicians will wear headphones while scanning and the survey instrument will be in the rate-meter mode. Surveyors will listen for upscale readings and respond to readings that exceed the investigation level.

Note: Contact FSS Engineer if HP-100 background levels exceed 1000 cpm prior to or during scans.

(c) If the HP-100 scan investigation level is exceeded:

(1) Confirm that the above background indication is reproducible and cannot be attributed to a nearby source.

(2) If a nearby source is identified, have it removed or shielded, document the finding on DP-8856.2, and repeat the scan, (3) If reproducible and not caused by a nearby source, collect a fixed-point measurement at the location of the highest reading observed during the scan, (4) The designation for a fixed-point measurement collected during a first-level investigation will continue in sequence beginning with AUX-02-02-021-F-FM-I.

Record all investigation fixed-point measurements "as read" (in units of cpm) on the attached Form 1 (even if the measurement was logged).

(5) Clearly mark the location of any fixed-point measurement collected during this level of investigation. The FSS Radiological Engineer is responsible for assessing the need for further investigation. If further investigation is required, it will be conducted under a separate survey plan.

Note: Record information relevant to the HP-100 scans on DPF-8856.2 accompanied by a survey map of the area scanned.

4. If beta scans are performed then gamma scans will be performed on irregular surfaces and cracks in the concrete as follows:

(a) Perform SPA-3 scans on the irregular surfaces and over cracks by moving the detector slowly (no greater than 0.1 3m/s) and keeping it < 3 inches from the surface.

Note: If background levels exceed 19000 cpm contact the Radiological Engineer prior to starting the scan or continuing scans.

Note: When performing SPA-3 scans, (investigations not included) no less than 50% of the time will be monitored and timed by the FSS Field Supervisor.

(b) FSS Technicians will wear headphones while scanning with the survey instrument in the rate-meter mode. Surveyors will listen for upscale readings and respond to readings that exceed the SPA-3 investigation level.

DPF-8856.1 YNSP-FSSP-AUX02-02-00 Page 6 of 7

(c) If a SPA-3 reading exceeds the investigation level:

(1) Confirm that the above-background indication is reproducible and cannot be attributed to a nearby source, (2) If a nearby source is identified, have it removed or shielded, document the finding on DP-8856.2, and repeat the scan, (3) If the reading is reproducible and not caused by a nearby source, collect a fixed-point measurement with the HP- 100 at the highest reading observed during the scan and clearly mark that location. Designate the investigation fixed-point measurement as describe in step 3(c)(4) above. Record all investigation fixed-point measurements "as read" (in units of cpm) on the attached Form 1 (even if the measurement was logged). The FSS Radiological Engineer is responsible for assessing the need for further investigation. If further investigation is required, it will be conducted under a separate survey plan.

5. For the statistical fixed-point measurements perform the following:

(a) Locate and mark the measurement points at the locations shown in the attached map using small, but readily visible marks. Use the distances shown on the Direct Measurement maps to locate the fixed-point measurements on the vertical walls.

Note: If a measurement location is obstructed such that a measurement cannot be collected, select the nearest suitable location within one meter in accordance with DP-8856.

(b) Collect and record the 20 measurements with the E-600/SHP- 100 in accordance with DP-8534 and DP-8535 using the scalar mode (1 minute). Record each fixed-point measurement "as read" (in units of cpm) on the Form 1 indicating whether the concrete surface was smooth (S) or irregular (I).

(c) Designation for fixed-point measurements: AUX-02-02-001-F-FM through AUX 02-020-F-FM corresponding to FSS measurement locations 001 through 020.

6. If necessary, perform a background survey as follows:

(a) Cover the detector with 1/8-inch Lucite shield, or equivalent, and collect a series of 21, one-minute background readings according to the following plan:

(1) Find three locations, as widely separated as possible, that are at least one meter from any edge of the concrete. At each of these locations position the detector one meter from the wall, facing the wall and take a set of seven, one-minute scaler counts.

(2) Mark the approximate location on a blank map (3) Record each background measurement "as read" (in units of cpm) on the background survey map.

Prepared by Date (64(146 FS, angineer Reviewed by , an )_ Date (,0- -- .

SS R diological Engineer Approved by Date ___________

DPF-8856.1 YNSP-FSSP-AUX02-02-00 Page 7 of 7

Attachment I SPA-3 Scan Inputs:

Scan speed: 0.13 m/s MDCR = 1.38*sqrt(b)/sqrt(p)*t Where:

b = background counts in time t p = surveyor efficiency = 0.5 t = time the detector is above localized activity 4.31 s = 0.0718 min Assume:

Localized contam diam = 56 cm MDC(fDCGLEMc) = MDCR> J(f / EAFiDCGLi) (DP-88 53)

AF= Area Factor E1 = Scanning instrument efficiency (YA-REPT-00-015-04) f = radionuclide fraction Cs-1 37 Co-60 Ei 188 379 cpm/pCi/g*

DCGL 3 1.4 f= 0 1 AF= 3.1 2.4 BKG(cpm)IBKG/t IMDCRIMDC(fDCGLemc(8.73))

7000 502.6 609 4.79E-01 8000 574.4 651 5.12E-01 9000 646.2 691 5.43E-01 10000 717.9 728 5.72E-01 11000 789.7 764 6.OOE-01 12000 861.5 798 6.27E-01 13000 933.3 830 6.52E-01 14000 1005.1 862 6.77E-01 15000 1076.9 892 7.01E-01 16000 1148.7 921 7.23E-01 17000 1220.5 950 7.46E-01 18000 1292.3 977 7.67E-01 19000 1364.1 1004 7.88E-01 20000 1435.9 1030 8.09E-01 21000 1507.7 1055 8.29E-01 22000 1579.5 1080 8.48E-01 23000 1651.3 1105 8.67E-01 V 24000 1723.1 1128 8.86E-01

  • Ej values from YA-REPT-00=01 5-04, "Instrument Efficiency Determination for Use in Minimum Detectable Concentration Calculations in Support of Final Status Survey at Yankee Rowe"

YN PS-FSS P-AUX-02-02-00 Attachment 2 DCGL MDC Table Tc-99 5.6E+06 5.OE-01 2.5E+00 HTD 4.7E+00 2.6E+07 Pu-238 2.3E+03 1.2E+00 5.8E+00 HTD 4.9E+00 1.1E+04 Pu-239 2.OE+03 1.1E+00 5.3E+00 HTD 4.9E+00 9.8E+03 Pu-241 1.OE+05 3.4E+01 1.7E+02 HTD 4.9E+00 4.9E+05 Cm-243 2.9E+03 1.1E+00 5.6E+00 HTD 4.7E+00 1.4E+04

TECHNICAL REPORT TITLE PAGE Copy Instrument Efficiency Determination for Use in Minimum Detectable Concentration Calculations in Support of the Final Status Survey at Yankee Rowe Title YA-REPT-00-015-04 REV. 0 Technical Report Number Approvals/, " (Print & Sign Name)

Preparer: Date: 0 - I_- 0,j Review *: Date: (0 -

Approver (Co nizant Manager): - Date: ro /7/0 "

YA-REPT-00-015-04 Rev. 0

/

Page 1 of 26

/

TABLE OF CONTENTS Page 1.0 Executive Summ ary: ........................................................................................... 4 2.0

Introduction:

............................................................................... ............... 4 3.0 Calibration Sources: .................. .. ...... ... ... ...................... 4 4.0 Efficiency Determination: ............................................... 6 4.1 Alpha and Beta Instrument Efficiency (si): ..................................................... 6 4.2 Source to Detector Distance Considerations: ................................................... 7 4.2.1 Methodology ............................................................................... 7 4.3 Source (or Surface) Efficiency (se) Determination: ............................................ 8 5.0 Instrument Conversion Factor (E) (Instrument Efficiency for Scanning): .......................... 9 6.0 Applying Efficiency Corrections Based on the Effects of Field Conditions for Total Efficiency:... 9 7.0

Conclusion:

................................................................................................... 10 8.0 R eferences: .................................................................................................... 11 Tables Table 3.1 Nuclides and Major Radiations: Approximate Energies ....................................... 5 Table 4.1 Instrument Efficiencies (si) .......................................................................... 7 Table 4.2 Source to Detector Distance Effects on Instrument Efficiencies for a- 10 Emitters ........... 8 Table 4.3 Source Efficiencies as listed in ISO 1703-1: ..................................................... 8 Table 5.1 Energy Response and Efficiency for Photon Emitting Isotopes: ............................. 9 Appendix APPENDIX A MicroShield, SPA-3 Soil scan - 28 cm radius lpCi/cm3 Co-60 ..................... 12 APPENDIX B Microsoft Excel Co-60 Calculation Sheet ............................................... 13 APPENDIX C MicroShield, SPA-3 Soil scan - 28 cm radius IpCi/cm3 Nb-94 ................... 14 APPENDIX D Microsoft Excel Nb-94 Calculation Sheet ............................................. 15 YA-REPT-00-0 15-04 Rev. 0 Page 2 of 26

APPENDIX E MicroShield, SPA-3 Soil scan- 28 cm radius lpCi/cm3 Ag-108m ................. 16 APPENDIX F Microsoft Excel Ag-108m Calculation Sheet .......................................... ....... 17 APPENDIX G MicroShield, SPA-3 Soil scan -28 cm radius lpCi/cm3 Sb-125 .................. 18 APPENDIX H Microsoft Excel Sb- 125 Calculation Sheet ............................................. 19 APPENDIX I MicroShield, SPA-3 Soil scan -28 cm radius lpCi/cm3 Cs-134 ................... 20 APPENDIX J Microsoft Excel Cs-134 Calculation Sheet .......................... 21 APPENDIX K MicroShield, SPA-3 Soil scan -28 cm radius lpCi/cm3 Cs-137 ............. ...... 22 APPENDIX L Microsoft Excel Cs-137 Calculation Sheet ............................................. 23 APPENDIX M MicroShield, SPA-3 Soil scan -28 cm radius IpCi/cni3 Cs-137 ............ ý... 24 APPENDIX N Microsoft Excel Cs-137 Calculation Sheet ............................................. 25 APPENDIX 0 Calculated Energy Response ............................................................. 26 YA-REPT-00-015-04 Rev. 0 Page 3 of 26

1.0 Executive Summary:

The minimum detectable concentration (MDC) of the field survey instrumentation is an important factor affecting the quality of the final status survey (FSS). The efficiency of an instrument inversely impacts the MDC value. The objective of this report is to determine the instrument and source efficiency values used to calculate MDC. Several factors were considered when determining these efficiencies and are discussed in the body of this report. Instrument efficiencies (si), and source efficiencies (es), for alpha beta detection equipment under various field conditions, and instrument conversion factors (Ei), for gamma scanning detectors were determined and the results are provided herein.

2.0

Introduction:

Before performing Final Status Surveys of building surfaces and land areas, the minimum detectable concentration (MDC) must be calculated to establish the instrument sensitivity. Table 5.4 of the License Termination Plan (LTP) [8.6] lists the available instrumentation and nominal detection sensitivities; however for the purposes of this basis document, efficiencies for the 100cm 2 gas proportional and the 2"x2" Nal (TI) detectors will be determined. Efficiencies for the other instrumentation listed in the LTP shall be determined on an as needed basis. The 100 cm 2 gas propoitional probe will be used to perform surveys (i.e. fixed point measurements). A 2" x2" Na! (TI) detector will be used to perform gamma surveys (i.e., surface scans) of portions of land areas and possibly supplemental structural scans at the Yankee Rowe site. Although surface scans and fixed point measurements can be performed using the same instrumentation, the calculated MDCs will be quite different. MDC is dependent on many factors and may include but is not limited to:

  • instrument efficiency "background

" integration time

" surface type

" source to detector geometry

" source efficiency A significant factor in determining an instrument MDC is the total efficiency, which is dependent on the instrument efficiency, the source efficiency and the type and energy of the radiation. MDC values are inversely affected by efficiency, as efficiencies increase, MDC values will decrease. Accounting for both the instrument and source components of the total efficiency provides for a more accurate assessment of surface activity.

3.0 Calibration Sources:

For accurate measurement of surface activity it is desirable that the field instrumentation be calibrated with source standards similar to the type and energy of the anticipated contamination. The nuclides listed in Table 3.1 illustrate the nuclides found in soil and building surface area DCGL results that are listed in the LTP.

Instrument response varies with incident radiations and energies; therefore, instrumentation selection for field surveys must be modeled on the expected surface activity. For the purposes of this report, isotopes with max beta energies less than that of C-14 (0.158 MeV) will be considered difficult to detect (reference table 3.1). The detectability of radionuclides with max beta energies less than 0.158 MeV, utilizing gas proportional detectors, will be negligible at typical source to detector distances of approximately 0.5 YA-REPT-00-015-04 Rev. 0 Page 4 of 26

. attached inches. The standoff (DP-8534 source to detector "Operation distance and Source of 1.27 Checks cm (0.5 of Proportional inches) to the detectorTable Friskers")[8.5].

is the distance provides a summary of the LTP radionuclides and their detectability using Radiological Health Handbook

[8.4] data.

3.1 with the Table 3.1 Nuclides and Maor Radiations: Approximate Energies (Reference 8.4)

Nuclide a Energy Ep., (MeV) Average Photon Energy (MeV) a Detectable P3Detectable y (MeV) EF wl Gas . w/ Gas Detectable (MeV) Proportional Proportional w/ Nal 2x2" H-3 0.018 0.005 C-14 0.158 0.049 Fe-55 0.23 (0.004%)

bremsstrahlung Co-60 0.314 0.094 1.173 (100%), 1.332 (100%)

Ni-63 0.066 0.017 Sr-90 0.544 0.200 2.245 (Y-90) 0.931 Nb-94 0.50 0.156 0.702 (100%), 0.871 -q -

(100%) _____

TC-99 0.295 0.085 __

Ag- 1.65. (Ag- 0.624 0.434 (0.45%), 0.511 108m 108) (Ag- (0.56%)

108) 0.615 (0.18%), 0.632 (1.7%)

Sb-125 0.612 0.084 0.6, 0.25, 0.41, 0.46, 0.68, 0.77, 0.92,1.10, 1.34 Cs-134 1.453 0.152 0.57 (23%), 0.605 (98%)

0.796 (99%), 1.038 (1.0%)

1.168 (1.9%), 1.365 (3.4%)

Cs-137 1.167 0.195 0.662 (85%) Ba-137m X- ,

rays Eu-152 1.840 0.288 0.122 (37%), 0.245 (8%) 4 0.344 (27%), 0.779 (14%)

0.965 (15%), 1.087 (12%)

1.113 (14%), 1.408 (22%)

Eu-154 1.850(10%) 0.228 Eu-155 0.247. 0.044 0.087 (32%), 0.105 (20%) 4 Pu-238 5.50 (72%) 0.099 (8E-3%)

5.46 (28%) 0.150 (1E-3%)

0.77 (5E-5%)

Pu-239 5.16 (88%) 0.039 (0.007%), 0.052 5.11 (11%) (0.20%), 0.129 (0.005%)...

Pu-241 4.90 0.021 0.005 0.145 (1.6E-4%)

(0.0019%)

4.85 (0.0003%)

Am-241 5.49 (85%) 0.060 (36%), 0.101 5.44 (13%) (0.04%)...

Cm-243 6.06 (6%) 0.209 (4%), 0.228 (12%), q 5.99 (6%) 0.278 (14%)

5.79 (73%)

5.74

_ _ __ (11.5%) _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _____

YA-REPT-00-015-04 Rev. 0 Page 5 of 26

NUREG-1507 and ISO 7503-1 provide guidance for selecting calibration sources and their use in determining total efficiency. It is common practice to calibrate instrument efficiency for a single beta energy; however the energy of this reference source should not be significantly greater than the beta energy of the lowest energy to be measured.

Tc-99 (0.295 MeV max) and Th-230 (4.68 MeV at 76% and 4.62 MeV at 24%) have been selected as the beta and alpha calibration standards respectively, because their energies conservatively approximate the beta and alpha energies of the plant specific radionuclides.

4.0 Efficiency Determination:

Typically, using the instrument 47r efficiency exclusively provides a good approximation of surface activity. Using these means for calculating the efficiency often results in an under estimate of activity levels in the field. Applying both the instrument 2a efficiency and the surface efficiency components to determine the total efficiency allows for a more accurate measurement due to consideration of the actual characteristics of the source surfaces. ISO 7503-1 [8.2] recommends that the total surface activity be calculated using:

Rs+B - RB where:

A. is the total surface activity in dpm/cm 2, Rs+B is the gross count rate of the measurement in cpm, RB is the background count rate in cpm, q is the instrument or detector 27c efficiency Esis the efficiency of the source W is the area of the detector window (cm2) 4.1 Alpha and Beta Instrument Efficiency (ei):

Instrument efficiency (qi) reflects instrument characteristics and counting geometry, such as source construction, activity distribution, source area, particles incident on the detector per unit time and therefore source to detector geometry. Theoretically the maximum value of 8i is 1.0, assuming all the emissions from the source are 2n and that all emissions from the source are detected. The ISO 7503-1 methodology for determining the instrument efficiency is similar to the historical 47r approach; however the detector response, in cpm, is divided by the 2a surface emission rate of the calibration source. The instrument efficiency is calculated by dividing the net count rate by the 2a surface emission rate (q 2,)

(includes absorption in detector window, source detector geometry). The instrument efficiency is expressed in ISO 7503-1 by:

YA-REPT-00-015-04 Rev. 0 Page 6 of 26

=Rs B -RB q 2, where:

Rs+B is the gross count rate of the measurement in cpm, R1 is the background count rate in cpm, q 2,is the 27c surface emission rate in reciprocal seconds Note that both the 2n surface emission rate and the source activity are usually stated on the certification sheet provided by the calibration source manufacturer and certified as National Institute of Standards and Technology (NIST) traceable. Table 4.1 depicts instrument efficiencies that have been determined during calibration using the 27r surface emission rate of the source.

Table 4.1 Instrument Efficiencies (q)

Source Emission Active Area of Effective Area 100 cm 2 Gas Proportional Source (cm )2 of Detector HP-100 Instrument Efficiency (ci)

(Contact)

Tc-99 15.2 100 cm2 0.4148 Th-230 a 15.2 100 cm 2 0.5545 4.2 Source to Detector Distance Considerations:

A major factor affecting instrument efficiency is source to detector distance. Consideration must be given to this distance when selecting accurate instrument efficiency. The distance from the source to the detector shall to be as close as practicable to geometric conditions that exist in the field. A range of source to detector distances has been chosen, taking into account site specific survey conditions. In an effort to minimize the error associated with geometry, instrument efficiencies have been determined for source to detector distances representative of those survey distances expected in the field. The results shown in Table 4.2 illustrate the imposing reduction in detector response with increased distance from the source. Typically this source to detector distance will be 0.5 inches for fixed point measurements and 0.5 inches for scan surveys on flat surfaces, however they may differ for other surfaces. Table 4.2 makes provisions for the selection of source to detector distances for field survey conditions of up to 2 inches. If surface conditions dictate the placement of the detector at distances greater than 2 inches instrument efficiencies will be determined on an as needed basis.

4.2.1 Methodology

The practical application of choosing the proper instrument efficiency may be determined by averaging the surface variation (peaks and valleys narrower than the length of the detector) and adding 0.5 inches, the spacing that should be maintained between the detector and the highest peaks of the surface. Select the source to detector distance from Table 4.2 that best reflects this pre-determined geometry.

YA-REPT-00-015-04 Rev. 0 Page 7 of 26

Table 4.2 Source to Detector Distance Effects on Instrument Efficiencies for a- f3 Emitters Source to Detector Instrument Efficiency (Ci)

Distance (cm)

Tc-99 Th-230 Distributed Distributed Contact 0.4148 0.5545 1.27 (0.5 in) 0.2413 0.1764 2.54 (1 in) 0.1490 0.0265 5.08 (2 in) 0.0784 0.0002 4.3 Source (or Surface) Efficiency (cs) Determination:

Source efficiency (sQ), reflects the physical characteristics of the surface and any surface coatings. The source efficiency is the ratio between the number of particles emerging from surface and the total number of particles released within the source. The source efficiency accounts for attenuation and backscatter. es is nominally 0.5 (no self-absorption/attenuation, no backscatter)-backscatter increases the value, self-absorption decreases the value. Source efficiencies may either be derived experimentally or simply selected from the guidance contained in ISO 7503-1. ISO 7503-1 takes a conservative approach by recommending the use of factors to correct for alpha and beta self-absorption/attenuation when determining surface activity. However, this approach may prove to be too conservative for radionuclides with max beta energies that are marginally lower than 0.400 MeV, such as Co-60 with a P3max of 0.314 MeV. In this situation, it may be more appropriate to determine the source efficiency by considering the energies of other beta emitting radionuclides. Using this approach it is possible to determine weighted average source efficiency. For example, a source efficiency of 0.375 may be calculated based on a 50/50 mix of Co-60 and Cs-137. The source efficiencies for Co-60 and Cs-137 are 0.25 and 0.5 respectively, since the radionuclide fraction for Co-60 and Cs-137 is 50% for each, the weighted average source efficiency for the mix may be calculated in the following manner:

(0.25Xo.5)+ (0.5Xo.5) = 0.3 75 Table 4.3 lists guidance on source efficiencies from ISO 7503-1.

Table 4.3 Source Efficiencies as listed in ISO 7503-1

> 0.400 MeVrnx < 0.400 MeVmax Beta emitters e,= 0.5 e = 0.25 Alpha emitters e, = 0.25 F, = 0.25 It should be noted that source efficiency is not typically addressed for gamma detectors as the value is effectively unity.

YA-REPT-00-015-04 Rev. 0 Page 8 of 26

5.0 Instrument Conversion Factor (E) ( Instrument Efficiency for Scanning):

W Separate modeling analysis (Microshield TM ) was conducted using the common gamma emitters with a concentration of 1 pCi/g of uniformly distributed contamination throughout the volume. MicroShield is a comprehensive photon/gamma ray shielding and dose assessment program, which is widely used throughout the radiological safety community. An activity concentration of I pCi/g for the nuclides was entered as the source term. The radial dimension of the cylindrical source was 28 cm, the depth was 15 cm, and the dose point above the surface was 10 cm with a soil density of 1.6 g/cm3 . The instrument efficiency when scanning, Ei, is the product of the modeled exposure rate (MicroShieldTM) in mRhr'f/pCi/g for and the energy response factor in cpm/mR/hr as derived from the energy response curve provided by Eberline Instruments (Appendix 0). Table 5.1 demonstrates the derived efficiencies for the major gamma emitting isotopes listed in Table 3.1.

TABLE 5.1 Energy Response and Efficiency for Photon Emitting Isotopes Isotope Calculations for.E Ei See appendix A through L (cpm/pCi/g)

Co-60 See Appendix Aand B 379 Nb-94 See Appendix C and D 416 Ag-108m See Appendix E and F 637 Sb-125 See Appendix G and H 210 Cs-134 See Appendix I and J 506 Cs-137 See Appendix.K and L 188 Eu-152 See Appendix M and N 344 When performing gamma scan measurements on soil surfaces the effective source to detector geometry is as close as is reasonably possible (less than 3 inches).

6.0 Applying Efficiency Corrections Based on the Effects of Field Conditions for Total Efficiency:

The total efficiency for any given condition can now be calculated from the product of the instrument efficiency ei and the source efficiency 8.

stot = ei X es The following example illustrates the process of determining total efficiency. For this example we will assume the following:

- Surface activity readings need to be made in the Primary Auxiliary Building (PAB) on the concrete wall surfaces using the E-600 and C- 100 gas proportional detector.

"Data obtained from characterization results from the PAB indicate the presence of beta emitters with energies greater than 0.400 Mev.

"The source (activity on wall) to detector distance is 1.27 cm-(0.5 in detector stand off). To calculate the total efficiency, tot, refer to Table 4.2 "Source to Detector Distance Effects on Instrument Efficiencies for at- 03Emitters" to obtain the appropriate si value.

"Contamination on all surfaces is distributed relative to the effective detector area.

. YA-REPT-00-0 15-04 Rev. 0 Page 9 of 26

- When performing fixed point measurements with gas proportional instrumentation the effective source to detector geometry is representative of the calibrated geometries listed in Table 4.2 "Source to Detector Distance Effects, on Instrument Efficiencies for a- j3 Emitters".

- Corrections for temperature and pressure are not substantial.

In this example, the value for Pi is 0.2413 as depicted in Table 4.2 "Source to Detector Distance Effects on Instrument Efficiencies for a- 03Emitters". The &svalue of 0.5 is chosen refer to Table 4.3 "Source Efficiencies as listed in ISO 7503-1". Therefore the total efficiency for this condition becomes stot = 8i x E,= 0.2413 x 0.5 = 0.121 or 12.1%.

7.0

Conclusion:

Field conditions may significantly influence the usefulness of a survey instrument. When applying the instrument and source efficiencies in MDC calculations, field conditions must be considered. Tables have been constructed to assist in the selection of appropriate instrument and source efficiencies. Table 4.2 "Source to Detector Distance Effects on Instrument Efficiencies for a-P3 Emitters" lists instrument efficiencies (si) at 'various source to detector distances for alpha and beia emitters. The appropriate si value should be applied, accounting for the field condition, i.e. the relation between the detector and the surface to be measured.

Source efficiencies shall be selected from Table 4.3 "Source Efficiencies as listed in ISO 7503-1 ". This table lists conservative Es values that correct for self-absorption and attenuation of surface activity.

Table 5.1 "Energy Response and Efficiency for Photon Emitting Isotopes" lists Ei values that apply to scanning MDC calculations. The MicroshieldTM model code was used to determine instrument efficiency assuming contamination conditions and detector geometry cited in section 5.6.2.4.4 "MDCs for Gamma Scans of Land Areas" of the License Termination Plan [8.6].

Detector and source conditions equivalent to those modeled herein may directly apply to the results of this report.

. YA-REPT-00-015-04 Rev. 0 Page 10 of 26

8.0 References 8.1 NUREG-1507, "Minimum Dqtectable Concentrations with Typical Radiation Survey Instruments for Various Contaminants and Field Conditions," 1998 8.2 ISO 7503-1, "Evaluation of Surface Contamination - Part I: Beta Emitters and Alpha Emitters," 1988-08-01.

8.3 ISO 8769, "Reference Sources for the Calibration of Surface Contamination Monitors-Beta-emitters (maximum beta energy greater 0.15MeV) and Alpha-emitters," 1988-06-15.

8.4 "Radiological Health Handbook," Revised Edition 1970.

8.5 DP-8534, "Operation and source Checks of Portable Friskers".

8.6 Yankee Nuclear Plant Site License Termination Plan, Rev.0, November 2003.

YA-REPT-00-015-04 Rev. 0 Page 11 of 26

APPENDIX A MicroShield v6.02 (6.02-00253)

Page :1 File Ref DOS File :SPA3-EFF-Co-60.ms6 Date Run Date September 10, 2004 By Run Time 8:56:50 AM Checked Duration 00:00:00 Case

Title:

SPA3-EFF-Co-60

Description:

SPA-3 Soil scan - 28 cm radius lpCi/cm3 Co-60 Geometry: 8 - Cylinder Volume - End Shields Source Dimensions:

Height 15.0 cm (5.9 in)

Radius 28.0 cm (11.0 in)

Dose Points V A X Y z

  1. 1 0 cm 25 cm 0 cm 0.0 in 9.8 in 0.0 in Shields Shield N Dimension Material Density Source 3.69e+04 cm 3 Concrete 1.6 Air Gap Air 0.00122 Source Input: Grouping Method - Actual Photon Energies Nuclide curies becquerels pCi/cm3 Bq/cm 3 Co-60 3.6945e-008 1.3670e+003 1.00OOe-006 3.7000e-002 Buildup : The material reference is - Source Integration Parameters Radial 20 Circumferential 10 Y Direction (axial) 10 Results Fluence 2Rate Fluence Rate Exposure Rate Exposure Rate Energy Activity 2 MeV/cm /sec MeV/cm /sec mR/hr mR/hr MeV Photons/sec No Buildup With Buildup No Buildup With Buildup 0.6938 2.230e-01 9.055e-06 1.590e-05 1.748e-08 3.070e-08 1.1732 1.367e+03 1.098e-01 1.669e-01 1.962e-04 2.982e-04 1.3325 1.367e+03 1.293e-01 1.904e-01 2.244e-04 3.303e-04 Totals 2.734e+03 2.391e-01 3.573e-01 4.205e-04 6.286e-04 YA-REPT-00-015-04 Rev. 0 Page 12 of 26

APPENDIX B YA-REPT-00-0 15-04 Rev. 0 Page 13 of 26

APPENDIX C MicroShield v6.02 (6.02-00253)

Page :1 File Ref DOS File :SPA3-EFF-Nb-94.ms6 Date Run Date September 16, 2004 By Run Time 3:22:38 PM Checked Duration 00:00:00 Case

Title:

SPA3-EFF-Nb-94

Description:

SPA-3 Soil scan - 28 cm radius lpCi/cm3 Nb-94 Geometry: 8 - Cylinder Volume - End Shields Source Dimensions:

Height 15.0 cm (5.9 in)

Radius 28.0 cm (11.0 in)

Dose Points V A X*. y z

  1. 1 0 cm 25 cm 0 cm 0.0 in 9.8 in 0.0 in Shields Shield N Dimension Material Density 3

Source 3.69e+04 cm Concrete 1.6 Air Gap Air 0.00122 Source Input: Grouping Method - Actual Photon Energies Nuclide curies becquerels pCI/cm-3 Bq/cm 3 Nb-94 3.6945e-008 1.3670e+003 1.00OOe-006 3.7000e-002 Buildup : The material reference is - Source Integration Parameters Radial 20 Circumferential 10 Y Direction (axial) 10 Results Fluence Rate Fluence Rate Exposure Rate Exposure Rate Energy Activity MeV/cM2 /sec MeV/cm 2 /sec mR/hr mR/hr MeV Photons/sec No Buildup With Buildup No Buildup With Buildup 0.0023 9.067e-02 1.391e-10 1.430e-10 1.86le-10 1.913e-10 0.0174 4.834e-01 8.762e-09 9.129e-09 4.729e-10 4.927e-10 0.0175 9.260e-01 1.719e-08 1.792e-08 9.104e-10 9.491e-10 0.0196 2.720e-01 7.924e-09 8.356e-09 2.925e-10 3.085e-10 0.7026 1.367e+03 5.643e-02 9.872e-02 1.088e-04 1.904e-04 0.8711 1.367e+03 7.464e-02 1.228e-01 1.405e-04 2.312e-04 Totals 2.736e+03 1.311e-01 2.216e-01 2.493e-04 4.216e-04 YA-REPT-00-015-04 Rev. 0 Page 14 of 26

APPENDIX D YA-REPT-00-015-04 Rev. 0 Page 15 of 26

APPENDIX E MicroShield v6.02 (6.02-00253)

Page :1 File Ref DOS File :SPA3-EFF-Ag-108m.ms6 Date Run Date September 16, 2004 By Run Time 3:30:40 PM Checked Duration 00:00:00 Case

Title:

SPA3-EFF-Ag-108m

Description:

SPA-3 Soil scan - 28 cm radius lpCi/cm3 Ag-108m Geometry: 8 - Cylinder Volume - End Shields Source Dimensions:

Height 15.0 cm (5.9 in)

Radius 28.0 cm (11.0 In)

Dose Points A X Y z

  1. 1 0 cm 25 cm 0 cm 0.0 in 9.8 in 0.0 in Shields Shield N Dimension Material Density 3

Source 3.69e+04 cm Concrete 001.6 Air Gap Air 0.00122 Source Input: Grouping Method - Actual Photon Energies Bq/cm3 3

Nuclide curies becquerels pCi/cm Ag-108m 3.6945e-008 1.3670e+003 1.00OOe-006 3.7000e-002 Buildup : The material reference is - Source Integration Parameters Radial 20 Circumferential 10 Y Direction (axial) 10 Results Fluence 2Rate Fluence Rate Exposure Rate Exposure Rate Energy Activity MeV/cm2/sec mR/hr mR/hr MeV/cm /sec MeV Photons/sec With Buildup No Buildup With Buildup No Buildup 0.0028 6.580e+01 1.252e-07 1.287e-07 1.351e-07 1.388e-07 0.003 7.853e+00 1.568e-08 1.612e-08 1.612e-08 1.657e-08 0.021 2.491e+02 9.534e-06 1.015e-05 2.824e-07 3.007e-07 0.0212 4.727e+02 1.862e-05 1.985e-05 5.389e-07 5.744e-07 0.022 7.024e+00 3.202e-07 3.434e-07 8.233e-09 8.83le-09 0.0222 1.330e+01 6.251e-07 6.714e-07 1.568e-08 1.685e-08 0.0238 1.501e+02 9.273e-06 1.010e-05 1.863e-07 2.029e-07 0.0249 4.289e+00 3.145e-07 3.464e-07 5.492e-09 6.050e-09 0.0304 2.902e-04 4.431e-11 5.248e-11 4.230e-13 5.010e-13 0.0792 9.687e+01 2.008e-04 4.802e-04 3.190e-07 7.629e-07 0.4339 1.229e+03 2.705e-02 5.514e-02 5.294e-05 1.079e-04 0.6144 1.236e+03 4.282e-02 7.808e-02 8.347e-05 1.522e-04 0.7229 1.237e+03 5.300e-02 9. 194e-02 1.019e-04 1.768e-04 Totals 4.768e+03 1.231e-01 2.257e-01 2.398e-04 4.389e-04 YA-REPT-00-015-04 Rev. 0 Page 16 of 26

APPENDIX F YA-REPT-00-015-04 Rev. 0 Page 17 of 26

APPENDIX G q

MicroShield v6.02 (6.02-00253)

Page :1 File Ref DOS File :SPA3-EFF-Sb-I 25.ms6 Date Run Date September 16. 2004 By Run Time 3:34:07 PM Checked Duration 00:00:00 Case

Title:

SPA3-EFF-Sb-125

Description:

SPA-3 Soil scan - 28 cm radius IpCi/cm3 Sb-125 Geometry: 8 - Cylinder Volume - End Shields Source Dimensions:

Height 15.0cm (5.9 in)

Radius 28.0 cm (1lO in)

V DosePoints A x Y z MlI Oco 25 Ma 0 Me 0.0 in 9.8 in 0.0in Shields Shield N Dimension Material Density Source 3.69c+04 cnP CoAcrele 1.6 Air Gap Air 0.00122 Source Input : Grouping Method - Actual Photon Energies Nuclide curies Bccquereh liCi/cm, EL1/cm' 9

Sb-125 3.6 45e-008 1.3670e+003 10000e-006 3.7000e-002 Buildup: The materialreterence is- source Integration Paramneters Radial 20 CircuJmferential I0 Y Direction iaxial) I0 Results Fluence Rate Fluence Rate Exposure Rate Exposure Rate Energy Activity MeV/cmI/sec MeV/cmlsec mR/hr mR/hr MeV Photons/sec No Buildup With Buildup No Buildup With Buildup 0.0038 6.762e+0 I 1.708e-07 1.756e-07 1.388e-07 1.427e-07 0.0272 1.748e+02 I. 785e-05 2.020e-05 2.376e-07 2.689e-07 0.0275 3.262e+02 3.453e-05 3.922e.05 4.461 e-07 5.067e-07 0.03 I 1.132e+02 1.857e-05 2.221 e-05 1.670e-07 1.997e-07 0.0355 5.693e+01 1.492e-05 1.91 Be-05 9.090e-08 I. 169c-07 0.117 3.568e+00 1.380e-05 3.715e-05 2.146e-08 5.778e-08 0.159 9.53 le-Ol 5.634e-06 1.499e-05 9.416e-09 2.505e-08 0.1726 2.47"c+0 1.634e-05 4.295e-05 2.787e-08 7.326e-08 0.1763 9.422e+01 6.392e-04 1.674e-03 1.096e-06 2.870e-06 0.2041 4.4 1Oe+00 3,630c-05 9.230e-05 6.435e-08 1.636e-07 0.208 I 3.324e+t00 2.805e-05 7. 103e-05 4.994e-08 1.264c-07 0.2279 1.796e+00 1.708e-05 4.229e-05 3.098e-08 7.670e.08 0.32 I 5.70 1Ie+00 8.474e-05 1.899e-04 1.620e-07 3.632e-07 0.3804 2,045e+0 I 3.792e-04 8,052e-04 7.364e-07 1.564e-06 0.408 2.486e+00 5.05 1e-05 1.049e-04 9.853e-08 2.047e-07 0.4279 4.009e+02 8.668e-03 1.774e-02 1.695e-05 3.470e-05 0.4435 4.130&400 9.356e-05 1.894e-04 1.832e-07 3.709c-07 0.4634 1.415ec+02 3.395e-03 6.78] e-03 6.658e-06 1.330e-05 0.6006 2.430e+02 8.1 74e-03 1.501e-02 1.595e-05 2.930e-05 0.6066 6.864e+01I 2.340e-03 4.283e-03 4.564e-06 8.355e-06 0.6359 1.549e+02 5.609e-03 1.012e-02 1.091e-05 1.967e-05 0.6714 2.478e+01 9.640e-04 1.710e-03 1.867e-06 3.31 le-06 Totals 1.916e+03 3.060e-02 5.901e-02 6.046e-05 I.158e-04 YA-REPT-00-015-04 Rev. 0 Page 18 of 26

APPENDIX H YA-REPT-00-015-04 Rev. 0 Page 19 of 26

APPENDIX I MicroShield v6.02 (6.02-00253)

Page :1 File Ref DOS File :SPA3-EFF-Cs-134.ms6 Date Run Date September 16, 2004 By Run Time 3:39:09 PM Checked Duration 00:00:00 Case

Title:

SPA3-EFF-Cs-134

Description:

SPA-3 Soil scan - 28 cm radius lpCi/cm3 Cs-134 Geometry: 8 - Cylinder Volume - End Shields Source Dimensions:

Height 15.0 cm (5.9 in)

Radius 28.0 cm (11.0 in)

Dose Points V A X Y z

  1. 1 0 cm 25 cm 0 cm 0.0 in 9.8 in 0.0 in Shields Shield N Dimension Material Density 3

Source 3.69e+04 cm Concrete 1.6 Air Gap Air 0.00122 Source Input: Grouping Method - Actual Photon Energies Nuclide curies becquerels Pid/cm 3 Bq/cm3 Cs-134 3.6945e-008 1.3670e+003 1.00OOe-006 3.7000e-002 Buildup : The material reference is - Source Integration Parameters Radial 20 Circumferential 10 Y Direction (axial) 10 Results Fluence Rate Fluence Rate Exposure Rate Exposure Rate Energy Activity MeV/cm 2 /sec MeV/cm 2 /sec mR/hr mR/hr MeV Photons/sec No Buildup With Buildup No Buildup With Buildup 0.0045 1.222e+00 3.658e-09 3.760e-09 2.507e-09 2.577e-09 0.0318 2.931e+00 5.271e-07 6.386e-07 4.391e-09 5.320e-09 0.0322 5.407e+00 1.014e-06 1.236e-06 8.157e-09 9.943e-09 0.0364 1.968e+00 5.611e-07 7.32le-07 3.188e-09 4.160e-09 0.2769 4.839e-01 5.931e-06 1.391e-05 1.113e-08 2.610e-08 0.4753 1.996e+01 4.950e-04 9.808e-04 9.712e-07 1.924e-06 0.5632 1.146e+02 3.545e-03 6.648e-03 6.940e-06 1.302e-05 0.5693 2.109e+02 6.619e-03 1.237e-02 1.295e-05 2.421e-05 0.6047 1.334e+03 4.529e-02 8.300e-02 8.836e-05 1.619e-04 0.7958 1.167e+03 5.668e-02 9.564e-02 1.079e-04 1.820e-04 0.8019 1.193e+02 5.852e-03 9.853e-03 1.113e-05 1.874e-05 1.0386 1.367e+01 9.377e-04 1.472e-03 1.717e-06 2.696e-06 1.1679 2.461e+01 1.964e-03 2.990e-03 3.514e-06 5.349e-06 1.3652 4.156e+01 4.055e-03 5.936e-03 6.993e-06 1.024e-05 Totals 3.058e+03 1.2S4e-01 2.189e-01 2.405e-04 4.202e-04 YA-REPT-00-015-04 Rev. 0 Page 20 of 26

APPENDIX .

YA-REPT-00-015-04 Rev. 0 Page 21 of 26

APPENDIX K MicroShief*l"v6.02 (6.02-00253)

Page :1 File Ref DOS File :SPA3-EFF-Cs- 137.ms6 Date Run Date September 10, 2004 By Run Time 8:52:18 AM Checked Duration 00:00:00 Case

Title:

SPA3-EFF-Cs-137

Description:

SPA-3 Soil scan - 28 cm radius lpCi/cm3 Cs-137 and Daughters Geometry: 8 - Cylinder Volume - End Shields Source Dimensions:

Height 15.0 cm (5.9 in)

Radius 28.0 cm (11.0 in)

Dose Points A X Y z

  1. 1 0 cm 25 cm 0 cm 0.0 in 9.8 in 0.0 in X

Shields Shield N Dimension Material Density 3

Source 3.69e+04 cm Concrete 1.6 Air Gap Air 0.00122 Source Input: Grouping Method - Actual Photon Energies Nuclide curies becquerels PCi/cmS Bq/cm3 Ba-137m 3.4950e-008 1.2932e+003 9.4600e-007 3.5002e-002 Cs-137 3.6945e-008 1.3670e+003 1.0000e-006 3.7000e-002 Buildup : The material reference is - Source Integration Parameters Radial 20 Circumferential 10 Y Direction (axial) 10 Results Fluence Rate Fluence Rate Exposure Rate Exposure Rate Energy Activity MeV/cmz/sec MeV/cm 2/sec mR/hr mR/hr MeV Photons/sec No Buildup With Buildup No Buildup With Buildup 0.0045 1.342e+01 4.020e-08 4.133e-08 2.755e-08 2.833e-08 0.0318 2.677e+01 4.815e-06 5.834e-06 4.011e-08 4.860e-08 0.0322 4.939e+01 9.260e-06 1.129e-05 7.452e-08 9.084e-08 0.0364 1.797e+01 5.126e-06 6.688e-06 2.912e-08 3.800e-08 0.6616 1.164e+03 4.442e-02 7.913e-02 8.61le-05 1.534e-04 Totals 1.271e+03 4.444e-02 7.915e-02 8.628e-05 1.536e-04 YA-REPT-00-015-04 Rev. 0 Page 22 of 26

APPENDIX L YA-REPT-00-015-04 Rev. 0 Page 23 of 26

APPENDIX M MicroShield v6.02 (6.02-00253)

Page :1 ..:.. e.. .. ........ ... ......

File Ref

............ ........... . . . . ... . ... ....?

DOS File :SPA3-EFF-Eu-152.ms6

.Date Run Date October 7, 2004 :By Run Time 11:25:11 AM Checked Duration 00:00:00 Case

Title:

SPA-3-EFF-Eu-152

Description:

SPA-3 Soil scan - 28cm radius 1 pCl/cm3 Eu-152 Geometry: 8 - Cylinder Volume - End Shields Source Dimensions:

Height 15.0 cm (5.9 In)

Radius 28.0 cm (11.0 In)

.... .. . .. .i o......

Y A X Y z

  1. 1 0 cm 25 cm 0 cm 0.0 In 9.8 In 0.0 In Shields Shield N Dimension Material Density 3

Source 3.69e+04 cm Concrete 1.6 Air Gap Air 0.00122 Source Input: Grouping Method - Standard Indices Number of Groups :25 Lower Energy Cutoff : 0.015 Photons < 0.015 : Included Library i Grove Nuclide curies becquerels PzCl/cm3 Bq/cma Eu-152 3.6945e-008 1.3670e+003 1.0000e-006 3.7000e-002 Buildup : The material reference is - Source Integration Parameters Radial 20 C*rcumferential 10 Y Direction (axial) 10 Results Exposure Energy Activity Fluence 2Rate MeV/cm /sec Fluence Rate 2

Rate Exposure Rate MeV/cm /sec mR/hr mR/hr MeV Photons/sec No Buildup With Buildup No With Buildup Buildup 0.015 2.077e+02 2.087e-06 2.146e-06 1.790e-07 1.841e-07 0.04 8.088e+02 3. 13le-04 4.331e-04 1.385e-06 1.916e-06 0.05 2.022e+02 1.507e-04 2.467e-04 4.014e-07 6.572e-07 0.1 3.887e+02 1.189e-03 3.118e-03 1.819e-06 4.770e-06 0.2 1.024e+02 8.207e-04 2.097e-03 1.448e-06 3.700e-06 0.3 3.696e+02 5.029e-03 1.151e-02 9.540e-06 2.184e-05 0.4 8.590e+01 1.70le-03 3.555e-03 3.314e-06 6.926e-06 0.5 7.711e+00 2.043e-04 3.984e-04 4.010e-07 7.819e-07 0.6 5.797e+01 1.948e-03 3.579e-03 3.802e-06 6.985e-06 0.8 2.434e+02 1.190e-02 2.005e-02 2.263e-05 3.813e-05 1.0 5.849e+02 3.820e-02 6.058e-02 7.042e-05 1.117e-04 1.5 3.171le+02 3.490e-02 4.999e-02 5.871e-05 8.41le-05 Totals 3.376e+03 9.635e-02 1.556e-01 1.740e-04 2.817e-04 YA-REPT-00-015-04 Rev. 0 Page 24 of 26

APPENDIX N YA-REPT-00-015-04 Rev. 0 Page 25 of 26

APPENDIX 0

.Calculated Energy Response (Eberline ..Instruments)

CPM/mR/h 100000000: II I I

. Y--.

If ..

. iI

1, 1 I

ý!

I

.!! ffm I

I

~IIiIl j 1 10000000.

I - I A I!ý N1 I - -- _-

E

.4 - - - I F

1000000: I N

- Y - t ~C~-t~

- I -i* -..

100000 10 I00 1000 IO00 ENERGY (key)

YA-REPT-00-015-04 Rev. 0 Page 26 of 26

Generic ALARA Evaluation Comparison Worksheet Survey Area: AUX-02 Survey Unit: 01 02- "C/Io(

Reference Generic ALARA Evaluation No.:

Applicable Generic ALARA AL:

Radionuclide Average Concentration DCGL fraction DCGL 1 Co-60 0.0335 7200 4.65E-06 2

3 4

E(fraction DCGL): 4.65E-06 If the Z(fraction DCGL) < the generic ALARA AL, then the generic ALARA evaluation is applicable to the survey unit.

,k 7c.

eck, e ý7 x X ric ALA Generic ALARA AL L fie IS ssatisfied.

-- *------eBMnUAt*RA-At Date: 6/16/2006 Reviewed by: Martin Erickson , .- Date: 6/16/2006 FSS Project Manager/Radiation P(otection Manager rDPF-8867. 1

ALARA Action Levels Calculation of ALARA Action Level (AL)

1. Removable fraction for remediation action being evaluated 1
2. Monetary discount rate 0.07 y-1
3. Number of years over which the collective dose is calculated 70 y
4. Population density for the critical group 0.09 people/m 2 2
5. Survey unit area 1 m Radionuclide AL H-3 <MDA C-14 <MDA Fe-55 <MDA Co-60 1.21 E+02 Ni-63 <MDA Sr-90 <MDA Nb-94 <MDA Tc-99 <MDA Ag-1 08m <MDA Sb-125 <MDA Cs-I 34 <MDA Cs-137 2.35E+01 Eu-1 52 <MDA Eu-1 54 <MDA Eu-155 <MDA Pu-238 <MDA Pu-239/240 <MDA Pu-241 <MDA Am-241 <MDA Cm-243/244 <MDA

((Sum of Als 1.45E+021

,IDCGL Fraction < ALARA AL? IIYES

Survey Area: AUX02 Survey Unit: 01 10-

1. Cost of performing remediation work (CostR) $3,840
2. Cost of waste disposal (CostwD)= (2.a) * (2.b) $810
a. estimated waste volume i m3 3
b. cost of waste disposal 810 $/m 1 1
3. Cost of workplace accident (CostAcc) = $3,000,000 person- *4.2 x 10-8 h (3.a) $4
a. time to perform remediation action 32 person-hours
4. Cost of traffic fatality (CostTF) =

{$3,000,000

  • 3.8 x 10" km1 " (2.a) * (4.a)}/(4.b) $12
a. total distance traveled per shipment 1481 km 3
b. waste volume per shipment 13.6 mi3 , if unknown, use 13.6m as a default value
5. Cost of worker dose (CostwDOS.) = $2,000 per person-rem * (5.a) * (5.b) $0
a. worker TEDE 0.00001 rem/h
b. remediation exposure time _2 person-hour CostT $4,666

ATTACHMENT A COStR Equipment rental' 2 jackhammers for a day $200

$1,920 air compressor for a day $60 2 construction specialists 2 $1,120 2X8hrsX$70/hr 3

1 RP Support $400 lX8hrsX$50/hr 1 Rad Waste Shipper4 $400 lX8hrsX$50 Total $3,840 1Based on interview of Al Stevens of Cianbro 2 Based on interview of Al Stevens of Cianbro 3 Based on Duratek supplying RP Personnel 4 Based on Duratek supplying Rad Waste Shipper

DCGL Fractions Radionuclide jAve. Conc pci/gm IDCGL pci/gm Relative Fraction DCGL Fraction H-3 0.OOE+00 0 #DIV/0!

C-14 0.OOE+00 0.OOE+00 #DIV/0!

Fe-55 0.OOE+00 0.00E+00 #DIV/0!

Co-60 3.45E+03 3450 7.04E-01 1.0000 Ni-63 O.00E+00 0.OOE+00 #DIV/0!

Sr-90 0.OOE+00 0.00E+00 #DIV/0!

Nb-94 0.OOE+00 0.OOE+00 #DIV/0!

Tc-99 0.OOE+00 0.OOE+00 #DIV/0!

Ag-1 08m 0.OOE+00 0.00E+00 #DIV/0!

Sb-125 0.00E+00 0.00E+00 #DIV/0!

Cs-134 0.OOE+00 0.OOE+00 #DIV/0!

Cs-137 1.45E+03 1450 2.96E-01 1.0000 Eu-152 0.OOE+00 0.OOE+00 #DIV/0!

Eu-1 54 0.OOE+00 0.OOE+00 #DIV/0!

Eu-1 55 0.00E+00 0.00E+00 #DIV/0!

Pu-238 0.00E+00 0.OOE+00 #DIV/0!

Pu-239 0.O0E+00 0.OOE+00 #DIV/0i Pu-241 0.OOE+00 0.00E+00 #DIV/0!

Am-241 0.00E+00 0.00E+00 #DIV/0!

Cm-243 0.OOE+00 0.OOE+00 #DIV/0!

Total Concentration 4.90E+03 IITotal DCGL Fraction 1 2.001

  • Co-60 and Cs-1 37 concentrations assumed to be at the worst case (I.e. at their DCGL values). Concentrations at or above these levels automatically warrant remediation.

Generic ALARA Evaluation Comparison Worksheet Survey Area: AUX-02 Survey Unit: 01 j 02- -

Reference Generic ALARA Evaluation No.:

Applicable Generic ALARA AL:

Radionuclide Average Concentration DCGL fraction DCGL 1 Co-60 0.0335 7200 4.65E-06 2

3 4

Z(fraction DCGL): 4.65E-06 If the Z(fraction DCGL) < the generic ALARA AL, then the generic ALARA evaluation is applicable to the survey unit.

_ _ Generic ALARA AL IS satisfied.

Prepared by: L. Dockins Date: 6/16/2006 FSS Radiological Engineer Reviewed by: Martin Erickson '1 \A _ Date: 6/16/2006 FSS Project Manager/Radiation P(otection Manager DPF-8867.1

ALARA Action Levels Calculation of ALARA Action Level (AL)

1. Removable fraction for remediation action being evaluated 1
2. Monetary discount rate 0.07 y-1
3. Number of years over which the collective dose is calculated2 70 y
4. Population density for the critical group 0.09 people/M 2
5. Survey unit area 1 m Radionuclide AL H-3 <MDA C-14 <MDA Fe-55 <MDA Co-60 1.21 E+02 Ni-63 <MDA Sr-90 <MDA Nb-94 <MDA Tc-99 <MDA Agl-108m <MDA Sb-125 <MDA Cs-134 <MDA Cs-137 2.35E+01 Eu-1 52 <MDA Eu-154 <MDA Eu-1 55 <MDA Pu-238 <MDA Pu-239/240 <MDA Pu-241 <MDA Am-241 <MDA Cm-243/244 <MDA

((Sum of Als I .45E+O2 IIDCGL Fraction < ALARA AL? YES

Survey Area: AUX02 Survey Unit: 01 4: 0

1. Cost of performing remediation work (COstR) $3,840
2. Cost of waste disposal (COStwD)= (2.a) * (2.b) $810 3
a. estimated waste volume Im 3
b. cost of waste disposal 810 $/M 1
3. Cost of workplace accident (CostAcc)'= $3,000,000 person"
  • 4.2 x 10.8 h (3.a) $4
a. time to perform remediation action a32 person-hours
4. Cost of traffic fatality (CostTF) =

{$3,000,000

  • 3.8 x 10"Tkm" * (2.a) * (4.a)}/(4.b) $12
a. total distance traveled per shipment 1481 km 3
b. waste volume per shipment 13.6 mi3, if unknown, use 13.6m as a default value
5. Cost of worker dose (Costwoo.) = $2,000 per person-rem * (5.a) * (5.b) $0
a. worker TEDE 0.00001 rem/h
b. remediation exposure time 32 person-hour CostT $4,666

ATTACHMENT A COStR Equipment rental1 2 jackhammers for a day $200

...... _ $1,920 air compressor for a day $60 2 construction specialists 2 $1,120 2X8hrsX$70/hr 1 RP Support 3 $400 1X8hrsX$50/hr 1 Rad Waste Shipper4 $400 1X8hrsX$50 Total $3,840_

1Based on interview of Al Stevens of Cianbro 2 Based on interview of Al Stevens of Cianbro 3 Based on Duratek supplying RP Personnel 4 Based on Duratek supplying Rad Waste Shipper

0 DCGL Fractions Radionuclide jAve. Conc pcilgm IDCGL pci/gm IRelative Fraction jDCGL Fraction H-3 0.00E+00 0 #DIV/0!

C-14 0.OOE+00 0.OOE+00 #DIV/0!

Fe-55 0.OOE+00 0.00E+00 #DIV/0!

Co-60 3.45E+03 3450 7.04E-01 1.0000 Ni-63 0.OOE+00 0.OOE+00 #DIV/0!

Sr-90 O.OOE+00 O.OOE+00 #DIV/0!

Nb-94 0.OOE+00 0.00E+00 #DIV/0!

Tc-99 0.OOE+00 0.OOE+00 #DIV/0!

Ag-108m 0.OOE+00 0.OOE+00 #DIV/01 Sb-125 0.OOE+00 O.OOE+00 #DIV/0!

Cs-1 34 0.OOE+00 0.00E+00 #DIV/0!

Cs-1 37 1.45E+03 1450 2.96E-01 1.0000 Eu-1 52 0.OOE+00 0.00E+00 #DIVI/0 Eu-1i54 0.00E+00 0.OOE+00 #DIVIO!

Eu-1 55 0.OOE+00 0.OOE+00 #DIV/0!

Pu-238 0.OOE+00 0.OOE+00 #DIV/0!

Pu-239 0.OOE+00 0.OOE+00 #DIV/0!

Pu-241 0.OOE+00 0.OOE+00 #DIV/0!

Am-241 0.OOE+00_ 0.OOE+00 #DIV/0!

Cm-243 0.OOE+00_ 0.OOE+00 #DIV/0!

ITotal Concentration -1 4.90E+03 Total DCGL Fraction 1 2.001

  • Co-60 and Cs-1 37 concentrations assumed to be at the worst case (I.e. at their DCGL values). Concentrations at or above these levels automatically warrant remediation.

Use Of In-Situ Gamma Spectrum Analysis To Perform Elevated Measurement Comparisons In Support Of Final Status Surveys YA-REPT-00-018-05 Approvals (Print & Sign Name)

Preparer: Greg Astrauckas/ 9! 1 L Date: Yw Preparer: Gordon Madison, C Date:/O2SS-9 Reviewer: Jim Hummer, ClP/!

Approver (FSS Manager): Date:

Dann Smith, CLIP/

Rev. 0

YA-REPT-00-018-05 Rev. 0 Technical Report YA-REPT-00-018-05, Rev. 0 Use Of In-Situ Gamma Spectrum Analysis To Perform Elevated Measurement Comparisons In Support Of Final Status Surveys TABLE OF CONTENTS 1.0 Report ............................................................................................................ 2 1.1 Introduction ........................................................................................... 2 1.2 Discussion .............................................................................................. 2 1.2.1 Detector Description .................................................................... 2 1.2.2 Traditional Approach ................................................................. 3 1.2.3 Innovative Approach ................................................................... 4 1.2.4 Investigation Level ...................................................................... 4 1.2.5 Detector Sensitivity ................................................................... 8 1.2.6 Area Coverage ............................................................................ 8 1.2.7 Moisture Content in the Soil M atrix ........................................... 9 1.2.8 Discrete Particles in the Soil M atrix ........................................ 10 1.2.9 Procedures and Guidance Documents ..................................... 10 1.2.10 Environmental Background ....................................................... 11 1.2.11 Quality Control .............................................................................. 11 1.2.12 Data Collection ........................................................................ 12 1.2.13 Efficiency Calibration .............................................................. 13 1.2.14 Data Management ..................................................................... 13 1.3 Conclusions/Recommendations ............................................................ 14 1.4 References .............................................................................................. 14 Attachments Attachment 1, ISOCS Detector System Photos ..................................................... 15 Attachment 2, Field-Of-View Characterization ..................................................... 16 Attachment 3, Typical Grid Pattern For In-Situ Gamma Spectroscopy ................. 18

-1I-

YA-REPT-00-018-05 Rev. 0 1.0 REPORT 1.1 Introduction The ISOCS In-Situ Gamma Spectrum detector system manufactured by Canberra Industries is being employed to perform elevated measurement comparison (EMC) surveys in support of the Final Status Surveys at Yankee Atomic's Yankee Rowe facility. This system uses an HPGe detector and specialized efficiency calibration software designed to perform in-situ gamma-spectroscopy assays. The ISOCS system will primarily be employed to evaluate survey units for elevated measurement comparisons. The ISOCS system can obtain a static measurement at a fixed distance from a pre-determined location. Count times can be tailored to achieve required detection sensitivities. Gamma spectroscopy readily distinguishes background activity from plant-related licensed radioactivity. This attribute is particularly beneficial where natural radioactivity introduces significant investigation survey efforts. Additionally, background subtraction or collimation can be employed where background influences are problematic due to the presence of stored spent fuel (ISFSI).

This technical report is intended to outline the technical approach associated with the use of ISOCS for implementing a MARSSIM-based Final Status Survey with respect to scanning surveys for elevated measurement comparisons for both open land areas and building surfaces. While the examples and discussions in this report primarily address open land areas, the same approach and methodology will be applied when deriving investigation levels, grid spacing and measurement spacing for evaluating building surfaces.

Validation of the ISOCS software is beyond the scope of this technical report.

Canberra Industries has performed extensive testing and validation on both the MCNP-based detector characterization process and the ISOCS calibration algorithms associated with the calibration software. The full MCNP method has been shown to be accurate to within 5% typically. ISOCS results have been compared to both full MCNP and to 119 different radioactive calibration sources. In general, ISOCS is accurate to within 4-5% at high energies and 7-11% at 1 standard deviation for low energies. Additionally, the ISOCS technology has been previously qualified in Yankee Atomic Technical Report YA-REPT-00-022-04, "Use Of Gamma Spectrum Analysis To Evaluate Bulk Materials For Compliance With License Termination Criteria."

1.2 Discussion 1.2.1 Detector Description Two ISOCS-characterized HPGe detectors manufactured by Canberra Industries have been procured. Each detector is a reverse-electrode HPGe YA-REPT-00-018-05 Rev. 0 detector rated at 50% efficiency (relative to a Nal detector). Resolution for these detectors is 2.2 keV @ 1332 keV. As the project progresses, other ISOCS detectors (e.g. standard electrode coaxial), if available, may be used to increase productivity. The key element regarding the use of other types of ISOCS detectors is that specific efficiency calibrations will be developed to account for each detector's unique characteristics.

The HPGe detector is mounted on a bracket designed to hold the detector!

cryostat assembly and associated collimators. This bracket may be mounted in a wheeled cart or in a cage-like frame. Both the wheeled cart and frame permit the detector to be oriented (pointed) over a full range from a horizontal to vertical position. The frame's design allows the detector to be suspended above the ground. Photographs of the frame-mounted system are presented in Attachment 1. During evaluations of Classl areas for elevated radioactivity, the detector will generally be outfitted with the 90-degree collimator. Suspending the detector at 2 meters above the target surface yields a nominal field-of-view of 12.6 m 2 .

The InSpector (MCA) unit that drives the signal chain and the laptop computer that runs the acquisition software (Genie-2000) are mounted either in the frame or on the wheeled cart. These components are battery powered.

Back-up power supplies (inverter or UPS) are available to support the duty cycle. A wireless network has been installed at the site so that the laptop computers used to run the systems can be completely controlled from any workstation at the facility. This configuration also enables the saving of data files directly to a centralized file server. Radio communication will be used to coordinate system operation.

1.2.2 Traditional Approach With respect to Class 1 Survey Units, small areas of elevated activity are evaluated via the performance of scan surveys. The size of the potential area of elevated activity affects the DCGLEMc and is typically determined by that area bounded by the grid points used for fixed measurements. This area in turn dictates the area factor(s) used for deriving the associated DCGLEMC.

These scan surveys are traditionally conducted with hand-held field instruments that have a detection sensitivity sufficiently low to identify areas of localized activity above the DCGLEMc. Occasionally, the detection sensitivity of these instruments is greater than the DCGLEMC. In order to increase the DCGLEMc to the point where hand-held instrumentation can be reasonably employed, the survey design is augmented to require additional fixed-point measurements. The effect of these additional measurement points is to tighten the fixed measurement grid spacing, thus reducing the area applied to deriving the DCGLEMc and increasing the detection sensitivity criteria.

YA-REPT-00-018-05 Rev. 0 Background influences (from the ISFSI) and natural terrestrial sources further impact the sensitivity of these instruments. To address these impacts, the fixed-point grid spacing would again need to be reduced (requiring even more samples) in order to increase the DCGLEMc to the point where hand-held instrumentation can be used. Generally, the collection of additional fixed measurements (i.e. samples) increases project costs.

Survey designs for Class 2 and Class 3 survey units are not driven by the elevated measurement comparison because areas of elevated activity are not expected. In Class 2 areas, any indication of activity above the DCGLw requires further investigation. Similarly, in Class 3 areas, any positive indication of licensed radioactivity also requires further investigation.

Because the DCGLEMc is not applicable to Class 2 or Class 3 areas, adjustments to grid spacing do not occur. However, the increased field-of-view associated with the in-situ gamma spectroscopy system improves the efficiency of the survey's implementation.

1.2.3 Innovative Approach In-situ assays allow fixed-point grid spacing to be uncoupled from the derivation of applicable investigation levels. In contrast to the traditional approach where the DCGLEMc (based on grid size) determines both investigation levels and detection sensitivities, the use of this technology provides two independent dynamics as follows:

  • Detection sensitivity is determined by the DCGLEMc associated with the (optimal) fixed-point grid spacing.

e Investigation levels are based on the detector's field-of-view and adjusted 2).

for the smallest area of concern (i.e. 1 mi 1.2.4 Investigation Level Development of the investigation (action) levels applied to in-situ assay results is a departure from the traditional approach for implementing a MARSSIM survey. Examples are provided for both open land areas (i.e. soil) and for building surfaces, however the approach for both is identical.

To support the use of in-situ spectroscopy to evaluate areas of elevated activity the HPGe detector's field-of-view was characterized. Attachment 2 presents data from the field-of-view characterization for a detector configured with a 90-degree collimator positioned 2 meters from the target surface.

Alternate configurations will be evaluated in a similar manner before being employed. As exhibited in Attachment 2, when the detector is positioned at 2

  • meters above the target surface the field-of-view has a radius of at least 2.3 YA-REPT-00-018-05 Rev. 0.

meters. This value was rounded down to 2.0 meters for implementation purposes, introducing a conservative bias (approximately 9%) in reported results. The example provided in this technical report assumes a 2-meter source-to-detector distance, yielding a nominal field-of-view surface area of 12.6 in 2 .

Occasionally, alternate source-to-detector distances (using the 90-degree collimator) may be employed, particularly in a characterization or investigation capacity. In such cases, the detector's field-of-view will be calculated by setting the radius equal to the source-to-detector distance, thereby maintaining the conservative attribute previously described. If alternative collimator configurations are used to perform elevated measurement comparisons, then specific evaluations will be documented in the form of a technical evaluation or similar. Associated investigation levels will be derived using the same approach and methodology outlined below in this section.

After the detector's field-of-view is determined, an appropriate investigation level is developed to account for a potential one-meter square area of elevated activity. DCGLEMC values for a one-square meter area are presented in Table 1.

TABLE 1, SOIL DCGLEMc FOR 1 m2 Soil Soil DCGLEMc DCGLw DCGLw Area Factor for I m2 (pCitg) (pCitg) for 1 m2 (pCiig)

(NOTE 1) (NOTE 2) (NOTE 3) (NOTE 4)

Co-60 3.8 1.4 11 15 Ag-108m 6.9 2.5 9.2 23 Cs-134 4.7 1.7 16 28 Cs-137 8.2 3.0 22 66 NOTE 1 - LTP Table 6-1 NOTE 2 - Adjusted to 8.73 mRerm/yr NOTE 3 - LTP Appendix 6Q NOTE 4 - Soil DCGLw (adjusted to 8.73 mRem/yr) for a I m' area The I2DCGLEMc values listed in Table 1 do not account for a source positioned at the edge of the field-of-view. Therefore, the lm2DCGLEMc values are adjusted via a correction factor. To develop this correction factor, a spectrum free of plant-related radioactivity was analyzed using two different efficiency calibrations (i.e. geometries). The first scenario assumes radioactivity uniformly distributed over the detector's 12.6 in 2 field-of-view.

The second scenario assumes radioactivity localized over a 1 M 2 situated at the edge of the detector's field-of-view. The resultant MDC values were compared to characterize the difference in detection efficiencies between the two scenarios. As expected, the condition with localized (1 in 2) radioactivity at the edge of the detector's field-of-view yielded higher MDC values. The ratio between the reported MDC values for the two scenarios is used as a correction factor. This correction factor is referred to as the offset geometry YA-REPT-00-018-05 Rev. 0 adjustment factor. The investigation levels for soils presented in Table 2 were calculated as follows:

Nuclide Investigation Level (pCi/g) = (DCGLEMc)

  • CF Where: DCGLEMC = (DCGLw or DCGLsuRR)
  • AF(1 in), and CF = Mean offset geometry adjustment factor TABLE 2, SOIL INVESTIGATION LEVEL DERIVATION INVESTIGATION MDC DCGLEMC LEVEL pCi/g MDC pCi/g RATIO for 1 m2 pCi/g (NOTE 1) (NOTE 2) (NOTE 3) (NOTE 5) (NOTE 6)

Co-60 0.121 1.86 0.0651 15 1.0 Ag-108m 0.184 2.82 0.0652 23 1.5 Cs-134 0.189 2.90 0.0652 28 1.8 Cs-137 0.182 2.78 0.0655 66 4.3 Offset Geometry Adjustment Factor 0.0653 (NOTE 4)

NOTE 1 - Assumed activity distributed over the 12.6 m' field-of-view.

NOTE 2 - Efficiency calibration modeled for a I mnl area situated (off-set) at the edge of the detector's field-of-view. The model assumes that all activity is distributed within the I in 2 .

NOTE 3 - Ratio = (12.6 ml MDC + 1 mnMDC).

NOTE 4 - The mean value of the ratios is applied as the off-set geometry adjustment factor.

NOTE 5 - DCGLEMc values for I m? (from Table 1)

NOTE 6 - Investigation levels derived by applying of the off-set geometry adjustment factor (e.g. 0.0653) to the DCGLEMc for a I in 2 area for each radionuclide.

With respect to building surfaces, the development of the investigation level is identical to that for soil surfaces. The one-meter square DCGLEMc for building surfaces are presented in Table 3.

TABLE 3, BUILDING SURFACE DCGLEMc FOR I m2 DCGLEMC 2

Bldg DCGLw Bldg DCGLw Area Factor For I mn (dpm/100m2) (dpm/100cmn ) 2 For 1 m2 (dpm/100cmz)

(NOTE 1) (NOTE 2) (NOTE 3) (NOTE 4)

Co-60 18,000 6,300 7.3 46,000 Ag-108m 25,000 8,700 7.2 62,600 Cs-134 29,000 10,000 7.4 74,000 Cs-137 63,000 22,000 7.6 167,000 NOTE I - LTP Table 6-1 NOTE 2 - Adjusted to 8.73 mnRermyr NOTE 3 - LTP Appendix 6S NOTE 4 - Building DCGLw (adjusted to 8.73 mRem/yr) for a 1 m2 area Using the same approach described for soils, a correction factor to account for efficiency differences due to geometry considerations is developed the one-meter square DCGLEMc. ISOCS efficiency calibrations for activity distributed over the detector's field-of-view and for activity within one-square meter located at the edge of the detector's field-of-view were developed. The MDC values for these two geometries were compared to characterize the difference in detection efficiencies. As expected, the condition with localized (1 m')

YA-REPT-00-018-05 Rev. 0 radioactivity at the edge of the detector's field-of-view yielded higher MDC values. The ratio between the reported MDC values for the two scenarios is used as the offset geometry adjustment factor. The MDC values, the associated ratios, and the derived investigation level for building surfaces are presented in Table 4.

TABLE 4, BUILDING SURFACE INVESTIGATION LEVEL DERIVATION BUILDING SURFACE 2

12.6 in' 1 m DCGLEMC INVESTIGATION MDC MDC For 1 mi LEVEL (dpm/100cmr) (dpm/100cm0) RATIO (dpm/100cm') (dpmf100cm')

(NOTE 1) (NOTE 2) (NOTE 3) (NOTE 5) (NOTE 6)

Co-60 785 12,400 0.0633 46,000 2,900 Ag-108m 839 13,000 0.0645 62,600 3,900 Cs-134 900 14,200 0.0634 74,000 4,700 Cs-137 922 14,600 0.0632 167,000 10,600 Offset Geometry Adjustment Factor 0.0636 (NOTE 4)

NOTE I - Assumed activity distributed over the 12.6 mr field-of-view.

NOTE 2 - Efficiency calibration modeled for a I m' area situated (off-set) at the edge of the detector's field-of-view. The model assumes that all activity is distributed within the I m2.

NOTE 3 - Ratio = (12.6 m' MDC +1 i MDC).

NOTE 4 - The mean value of the ratios is applied as the off-set geometry adjustment factor.

NOTE 5 - DCGL-Mc values for I m2 (from Table 3)

NOTE 6 - Investigation levels derived by applying of the off-set geometry adjustment factor (e.g. 0.0636) to the one-square meter DCGLEMc.

In summary, effective investigation levels for both open land areas (i.e. soils) and for building surfaces can be derived and applied to in-situ gamma spectroscopy results. Note the MDC values associated with the detector's field-of-view were well below the derived investigation levels.

The investigation levels presented in Table 2 and Table 4 do not address the use of surrogate DCGLs. Use of surrogate DCGLs will be addressed in Final Status Survey Plans, particularly where it is necessary to evaluate non-gamma emitting radionuclides on building surfaces. When surrogate DCGLs are employed, investigation levels will be developed on a case-by-case basis using the approach outlined in this document. Similarly, the offset geometry adjustment factor presented in Table 2 and Table 4 will vary for different geometries. Although unlikely, if different geometries are employed, this value will be determined on a case-by-case basis using the methodology reflected in Table 2 and will be documented in the applicable Final Status Survey Plan.

For both open land areas and for building surfaces, when an investigation level is encountered, investigatory protocols will be initiated to evaluate the presence of elevated activity and bound the region as necessary. Such evaluations may include both hand-held field instrumentation as well as the in-situ HPGe detector system. After investigation activities are completed, YA-REPT-00-018-05 Rev. 0 subsequent (follow-up) scanning evaluations will most likely be conducted using the in-situ gamma spectroscopy system.

1.2.5 Detector Sensitivity For Class I scan surveys, the minimum detectable concentration is governed by the DCGLEMc associated with the grid area used to locate fixed-point measurements. The system's count time can be controlled to achieve the required detection sensitivity. Therefore, the grid spacing for the fixed-point measurements can be optimized thus eliminating unnecessary increases to the number of fixed-point measurements while ensuring that elevated areas between fixed measurement locations can be identified and evaluated.

Based on preliminary work, it has been determined that a count time of 900 seconds will yield an acceptable sensitivity for many areas on the site. This count time provides MDC values well below the investigation levels presented in Table 2 and Table 4. Count times will be adjusted as necessary as survey unit-specific investigation levels are derived or where background conditions warrant to ensure that detection sensitivities are below the applicable investigation level. Since each assay report includes a report of the MDC values achieved during the assay, this information is considered technical support that required MDC values were met.

1.2.6 Area Coverage Based on the nominal 12.6 m 2 field-of-view, a 3-meter spacing between each survey point will result in well over 100% of the survey unit to be evaluated for elevated activity. This spacing convention typically employs a grid pattern that is completely independent from the grid used to locate fixed-point measurements. An example of the grid pattern and spacing is presented in Attachment 3.

Alternate spacing conventions may be applied on a case-by-case basis. For instance, spacing may be decreased when problematic topographies are encountered. Note that decreased grid spacing in this context is not associated to the fixed-point measurements. Occasionally it may be necessary to position the detector at one meter or less from the target surface to evaluate unusual (e.g. curved) surfaces or to assist in bounding areas of elevated activity. In cases where it may be desirable to increase the field-of-view via collimator or source-to-detector distances, grid-spacing conventions (and applicable investigation levels) will be determined using the approach described in this document.

YA-REPT-00-018-05 Rev.0 \0 1.2.7 Moisture Content in the Soil Matrix In-situ gamma spectroscopy of open land areas is inherently subject to various environmental variables not present in laboratory analyses. Most notably is the impact that water saturation has on assay results. This impact has two components. First, the total activity result for the assay is assigned over a larger, possibly non-radioactive mass introduced by the presence of water.

Secondly, water introduces a self-absorption factor.

The increase in sample mass due to the presence of water is addressed by the application of a massimetric efficiency developed by Canberra Industries.

Massimetric efficiency units are defined as [counts per second]/[gammas per second per gram of sample]. Mathematically, this is the product of traditional efficiency and the mass of the sample. When the efficiency is expressed this way, the efficiency asymptotically approaches a constant value as the sample becomes very large (e.g. infinite). Under these conditions changes in sample size, including mass variations from excess moisture, have little impact on the counting efficiency. However, the massimetric efficiency does not completely address attenuation characteristics associated with water in the soil matrix.

To evaluate the extent of self-absorption, (traditional) counting efficiencies were compared for two densities. Based on empirical data associated with the monitoring wells, typical nominally dry in-situ soil is assigned a density of 1.7 g/cc. A density of 2.08 g/cc, obtained from a technical reference publication by Thomas J. Glover, represents saturated soil. A density of 2.08 g/cc accounts for a possible water content of 20%. A summary of this comparison is presented in Table 5.

TABLE 5, COUNTING EFFICIENCY COMPARISONS Efficiencies Deviation due to density keV 1.7 g/cc 2.08 g/cc increase (excess moisture) 434 3.3 E-6 2.7 E-6 -18.7%

661.65 2.9 E-6 2.4 E-6 -17.5%

1173.22 2.5 E-6 2.1 E-6 -15.4%

1332.49 2.4 E-6 2.1 E-6 -14.8%

In cases when the soil is observed to contain more than "typical" amounts of water, potential under-reporting can be addressed in one of two manners. One way is to adjust the investigation level down by 20%. The second way is to reduce the sample mass by 20%. Either approach achieves the same objective: to introduce a conservative mechanism for triggering the investigation level where the presence of water may inhibit counting efficiency. The specific mechanism to be applied will be prescribed in implementing procedures.

YA-REPT-00-018-05 Rev. 0 The presence of standing water (or ice or snow) on the surface of the soil being assayed will be accounted for in customized efficiency calibrations applied during data analysis activities.

1.2.8 Discrete Particles in the Soil Matrix Discrete particles are not specifically addressed in the License Termination Plan. However, an evaluation was performed assuming all the activity in the detector's field-of-view, to a depth of 15 cm, was situated in a discrete point-source configuration. A concentration of 1.0 pCi/g (Co-60), corresponding to the investigation level presented in Table 2, correlates to a discrete point-source of approximately 3.2 gCi. This activity value is considered as the discrete particle of concern. Since the presence of any discrete particles will most likely be accompanied by distributed activity, the investigation level may provide an opportunity to detect discrete particles below 3.2 gCi.

Discrete particles exceeding this magnitude would readily be detected during characterization or investigation surveys. The MDCs associated with hand-held field instruments used for scan surveys are capable of detecting very small areas of elevated radioactivity that could be present in the form of discrete point sources. The minimum detectable particle activity for these scanning instruments and methods correspond to a small fraction of the TEDE limit provided in 10CFR20 subpart E. Note that the MDC values presented in Table 2 are significantly lower than those published in Table 5-4 of the License Termination Plan.

When the investigation level in a Class 1 area is observed, subsequent investigation surveys will be performed to include the use of hand-held detectors. The detection sensitivities of instruments used for these surveys have been previously addressed in the LTP. Furthermore, discrete point sources do not contribute to the uniformly distributed activity of the survey unit. It is not expected that such sources at this magnitude would impact a survey unit's ability to satisfy the applicable acceptance criteria.

Noting that Class 2 or Class 3 area survey designs do not employ elevated measurement comparisons, associated investigation levels are based on positive indications of licensed radioactivity above the DCGLw or above background. Because such areas are minimally impacted or disturbed, potential discrete particles would most likely be situated near the soil surface where detection efficiencies are highest.

1.2.9 Procedures And Guidance Documents General use of the portable ISOCS system is administrated by departmental implementing procedures that address the calibration and operation activities A__ as well as analysis of the data. These procedures are listed as follows:

YA-REPT-00-018-05 Rev. 0

  • DP-8869, "In-Situ (ISOCS) Gamma Spectrum Assay System 1Calibration Procedure."
  • DP-8871, "Operation Of The Canberra Portable ISOCS Assay System."
  • DP-8872, "ISOCS Post Acquisition Processing And Data Review."

Where the portable ISOCS system is used for Final Status Surveys, the applicable FSS Plan will address detector and collimator configurations, applicable (surrogated) investigation levels, MDC requirements, and appropriate Data Quality Objectives, as applicable.

A secondary application of the portable ISOCS system is to assay surfaces or bulk materials for characterization or unconditional release evaluations. Use of the portable ISOCSsystem for miscellaneous evaluations will be administrated under a specific guidance document (e.g. Sample Plan, etc.).

Operating parameters such as physical configuration, efficiency calibrations, count times, and MDCs will be applied so as to meet the criteria in the associated controlling documents. Such documents will also address any unique technical issues associated with the application and may provide guidance beyond that of procedure AP-0052, "Radiation Protection Release of Materials, Equipment and Vehicles."

1.2.10 Environmental Backgrounds If background subtraction is used, an appropriate background spectrum will be collected and saved. Count times for environmental backgrounds should exceed the count time associated with the assay. In areas where the background radioactivity is particularly problematic (e.g. ISFSI), the background will be characterized to the point of identifying gradient(s) such that background subtractions are either appropriate or conservative.

Documentation regarding the collection and application of environmental backgrounds will be provided as a component of the final survey plan.

1.2.11 Quality Control Quality Control (QC) activities for the ISOCS system ensure that the energy calibration is valid and detector resolution is within specifications. A QC file will be set up for each detector system to track centroid position, FWHM, and activity. Quality Control counts will be performed on a shifily basis prior to the system's use to verify that the system's energy calibration is valid. The Na-22 has a 1274.5 keV photon which will be the primary mechanism used for performance monitoring. If the energy calibration is found to be out of an acceptable tolerance (e.g. greater than +/-4 channels), then the amplifier gain may be adjusted and a follow-up QC count performed. If the detector's

__ resolution is found to be above the factory specification, then an evaluation YA-REPT-00-018-05 Rev. 0 will be performed to determine if the detector should be removed from service and/or if the data is impacted. Evaluations associated with QC counts shall be documented. Such documentation may be limited to a remark directly on the applicable QC report or in a logbook if the resolution does not render the system out of service. Otherwise the evaluation should be separately documented (e.g. Condition Report, etc.) so as to address the impact of any assay results obtained since the last acceptable QC surveillance.

Where it is determined that background subtraction is necessary, a baseline QC background will be determined specific to that area or region. When background subtraction is required, a QC background surveillance will be performed before a set of measurements are made to verify the applicability of the background to be subtracted. Due to the prevailing variability of the background levels across the site, the nature and extent of such surveillances will be on a case-by-case basis and should be addressed in the documentation associated with the applicable survey plan(s).

In addition to the routine QC counts, each assay report is routinely reviewed with respect to K-40 to provide indications where amplifier drift impacts nuclide identification routines. This review precludes the necessity for specific (i.e. required) after-shift QC surveillances. It also minimizes investigations of previously collected data should the system fail a before-use QC surveillance on the next day of use.

1.2.12 Data Collection Data collection to support FSS activities will be administered by a specific Survey Plan. Survey Plans may include an index of measurement locations with associated spectrum filenames to ensure that all the required measurements are made and results appropriately managed. Personnel specifically trained to operate the system will perform data collection activities.

Data collection activities will address environmental conditions that may impact soil moisture content. Logs shall be maintained so as to provide a mechanism to annotate such conditions to ensure that efficiency calibration files address the in-situ condition(s). In extreme cases (e.g. standing water, etc.) specific conditions will be addressed to ensure that analysis results reflect the conditions. As previously discussed with respect to water, when unique environmental conditions exist that may impact analysis results, conservative compensatory factors will be applied to the analysis of the data.

YA-REPT-00-018-05 Rev.O0 1.2.13 Efficiency Calibration The central feature of the portable ISOCS technology is to support in-situ gamma spectroscopy via the application of mathematically derived efficiency calibrations. Due to the nature of the environment and surfaces being evaluated (assayed), input parameters for the ISOCS efficiency calibrations will be reviewed on a case-by-case basis to ensure the applicability of the resultant efficiency. Material densities applied to efficiency calibrations will be documented. In practice, a single efficiency calibration file may be applied to the majority of the measurements.

The geometry most generally employed will be a circular plane assuming uniformly distributed activity. Efficiency calibrations will address a depth of 15 cm for soil and a depth up to 5 cm for concrete surfaces to account for activity embedded in cracks, etc. Other geometries (e.g. exponential circular plane, rectangular plane, etc.) will be applied if warranted by the physical attributes of the area or surface being evaluated. Efficiency calibrations are developed by radiological engineers who have received training with respect to the ISOCS software. Efficiency calibrations will be documented in accordance with procedure DP-8869, "In-Situ (ISOCS) Gamma Spectrum Assay System Calibration Procedure."

1.2.14 Data Management Data management will be implemented in various stages as follows:

" An index or log will be maintained to account for each location where evaluations for elevated activity are performed. Raw spectrum files will be written directly or copied to a central file server.

" Data Analysis - After the spectrum is collected and analyzed, a qualified Radiological Engineer will review the results. The data review process includes application of appropriate background, nuclide libraries, and efficiency calibrations. Data reviews also verify assay results with respect to the applicable investigation levels and the MDCs achieved. Data reviews may include monitoring system performance utilizing K-40. When the data analysis is completed, the analyzed data file will be archived to a unique directory located on a central file server.

" Data Reporting - The results of data files whose reviews have been completed and are deemed to be acceptable may be uploaded to a central database for subsequent reporting and statistical analysis.

YA-REPT-00-018-05 Rev. 0

  • Data Archiving - Routinely (daily) the centralized file server(s) where the raw and analyzed data files are maintained will be backed up to tape.

1.3 Conclusions/Recommendations The in-situ gamma spectroscopy system is a cost-effective technology well-suited to replace traditional scanning survey techniques to evaluate areas for elevated radioactivity. The static manner in which this system is operated eliminates many variables and limitations inherent to hand-held detectors moving over a surface. This system provides a demonstrably lower detection sensitivity than those offered by hand-held field instruments. This attribute qualifies this system as an alternative technology in lieu of hand-held NaI field instruments in areas where background radiation levels would prohibit the use of such detectors to evaluate for elevated gross activity. The MDC to which this system will be operated satisfies (or exceeds) criteria applied to traditional scan surveys using hand-held field instruments.

Effective investigation levels for both open land areas (i.e. soils) and for building surfaces can be derived and applied to in-situ gamma spectroscopy results. Where surrogate DCGLs are employed, investigation levels will developed on a case-by-case basis using the approach outlined in this document.

The manner in which investigation levels are derived employs several conservative decisions and assumptions. Additionally, adequate spacing applied to scanning survey locations yields an overlap in surface coverage providing 100-percent coverage of Class 1 areas and redundant opportunities in a significant portion of the survey area to detect localized elevated activity.

1.4 References

1. YNPS License Termination Plan, Revision 1
2. Multi-Agency Radiation Survey And Site Investigation Manual (MARSSIM)

Revision 1, 2000

3. Canberra User's Manual Model S573 ISOCS Calibration Software, 2002
4. Decommissioning Health Physics - A Handbook for MARSSIM Users, E.W.

Abelquist, 2001

5. Canberra's Genie 2000 V3.0 Operations Manual, 2004
6. In-Situ (ISOCS) Gamma Spectrum Assay System Calibration Procedure DP-8869, Revision 0
7. Operation of the Canberra Portable ISOCS Assay System DP-8871 Revision 0
8. Technical Ref., by Thomas J. Glover.

YA-REPT-00-018-05 tI0 Rev. 0 Attachment 1 Portable ISOCS Detector System Photos YA-REPT-00-018-05 A Rev. 0 Attachment 2 Field-Of-View Characterization Generally, the HPGe detector will be outfitted with a 90-degree collimator situated at 2 meters perpendicular to the surface being evaluated. Note that characterizing the detector's field-of-view could be performed without a source by comparing ISOCS-generated efficiencies for various geometries. If a different collimator configuration is to be employed, a similar field-of-view characterization will be performed.

To qualify the field-of-view for this configuration, a series of measurements were made at various off-sets relative to the center of the reference plane. The source used for these measurements was a 1.2 ý Ci Co-60 point-source with a physical size of approximately 1 cm 3 . Each spectrum was analyzed as a point source both with and without background subtract. It was observed that the detector responded quite well to the point source.

Figure 1 presents the results with background subtraction applied. Note that there is a good correlation with the expected nominal activity and that outside the 2-meter radius of the "working" field-of-view (i.e. at 90 inches) some detector response occurs. This validates that the correct attenuation factors are applied to the algorithms used to compute the efficiency calibration.

FIGURE 1 POINT SOURCE TEST (background subtracted) 2

. 1.5 U

9 0.5 0

0 18 48 60 66 72 78 84 90 Offset (inches)

Figure 2 shows the effect of plant-derived materials present in the reference background, which indicates an increasing over-response the further the point source is moved off center. Detector response outside the assumed (i.e. 2-meter) field-of-view would yield conservative results.

Normally, source term adjacent to the survey units should be reduced to eliminate background interference.

YA-REPT-00-018-05 Rev. 0 FIGURE 2 POINT SOURCE TEST (background NOT subtracted) 5-0 18 48 60 66 72 78 84 90 Offset (inches)

YA-REPT-00-01R8-05 Rev.O0 Attachment 3 Typical Grid Pattern For In-Situ Gamma Spectroscopy Typical Scan Grid Pattern (For 2m scan height using 90' collimator.)

=Scan Point Location O =Scan Area Footprint (4mdIJor *2mw h1h AUX-02 Attachment A Maps Attachment A - Maps and Posting Plots List of Figures Fi rnirre Paee Fioure FIGURE 1AUX-02 RELATIVE TO STRUCTURES............................ ................ .............................. 2 FIGURE 2 A U X 01 POSTING PLOT ........................................................................................................................... 3 FIGURE 3 A U X 02 POSTING PLOT ......................................................................................................................... 4 I

AUX-02 Attachment A Maps Figure 1 AUX-02 Relative to Structures 2

AUX-02 Attachmont A Maps Figure 2 AUX-02-01 Posting Plot 0I meters 5 East Wall (16 square meters)

  • Results shown are net dpmf~lOOcm2.

M* *""KfW~fW~ -i ~v*~ptR"%~j11ftsyrmOMO Us" "MQ"*,, MUWAM&W Alit pW M M. Prepoed by: LDooldns AK **-W~fMui*W M- ~ I mIU iNW ft" Ifnv

~7"K

=,=,_.,__ Dte: Aug. 3, 2006 3

S U

0 mft r-0 04 04 sir3m 5w SW 974*

0 ei 00t 1

O1i D i07 Goo1 or*

US I

010 742" Tr 141*

~r

  • ~ *1.

013 01td 01:5 017 018 DID 3W or~ 1w owi Rmmft - - we not Soto W9111 msgmýwww bmdLLGONM Dead L*mMnwft AMCMý- - -:r-FM O-who N*M momouuemui koefto n direAlIct &us Visual Samfple Pla tsiu~ rlruier teslm IVm~ a tundom lWt peat).

Loverm Aftp ouInumya'of & tk* AUX-02-M akeAucPm mw y No offmb 2 kf POSTING PLOT

AUX-02 Attachment B Data Quality Assessment Plots and Curves Attachment B Data Quality Assessment Plots and Curves List of Figures Figure Page FIGURE 1 AUIX-02-01 PROSPECTIVE POWER CURVE ........................................................................................ 2 FIGURE 2 ALUX-02-01 RETROSPECTIVE POWER CURVE ..................................................................................... 2 FIGURE 3 A U X 01 SCATTER PLOT ................................................................................................................. 3 FIGURE 4 A U X 01 QUANTILE PLOT ............................................................................................................... 4 FIGURE 5 AUX-02-01 FREQUENCY PLOT ......................................... .......................................................... 5 FIGURE 6 AUX-02-01 REPLICATE DQA ..................................................................................................... 5 FIGURE 7 AUX-02-02 PROSPECTIVE POWER CURVE ........................................................................................ 6 FIGURE 8 AUX-02-02 RETROSPECTIVE POWER CURVE ................................................................................. 6 FIGURE 9 A JX-02-02 SCATrER PL OT ................................................................................................................. 7 FIGURE 10 A U X 02 Q UANTILE PLOT ............................................................................................................. 8 FIGURE 11 ALX-02-02 FREQUENCY PLOT .................................................................................................. 9 FIGURE 12 AUX-02-02 REPLICATE DQA ................................................................................................... 9 The LBGR on the Power Curves have been adjusted to demonstrate the actual power of the survey.

I

AUX-02 Attacbmnnt B Data Quality Assessment Plots and Curves Figure 1 Al JX-02-O1 Prospective Power Curve EnterValues DCGL. 17200 P 17 LBGR: ism 0.7 - -

015 Auha: F~FR7 Urnts pDPM/100cm2 0.4 Calculations *'02 +

Ala,: ______

0.1 S10.97725 N:F-i- SWIM 6000 620 640 060 6600 7000 7200 7400 7600 CatciAate Sample Size/Update PRoupective Powel Cuire I - Praqpecfte POW - OMg 1----- Il I

- WOGR m 1-bet Figure 2 AUX-02-01 Retrospective Power Curve

,- EnterValues Tes~t o*,-9 1,- J . N DCGL 0.009 V LBGR: 15M28 Sigma:

$ignmc i0+o50 -. o- - -420 --- - -

Am lo om --. o-0.- -

B 0.5 ,0 UAK IDFMA00Ocm2 &4-Calculations- "--

A/C: 1 3.03 - -- - -

N; r -13 04 SN 8103 e 6400 am0 -O 7000 M2007400 76O DPWI~=

Calcuiate Sample Size/Update C, owe C-urve-- Io - L

- LOGI m 14meta 2

AUX-02 Attachment B Data Quality Assessment Plots and Curves Figure 3 AUX-02-01 Scatter Plot AUX-02-01 Sample Results Scatter Plot DCGLw = 7200 dpmll00cm2 Co-60 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 2500 2000 1881 1500 1000 0

- - - p620 500 00 0 0-*

-500

-640

-1000 0 Activity - Average-- "+3StDev"-- "-3StDev" 3

AUX-02 Attachment B Data Quality Assassment Plots and Curves Figure 4 AUX-02-O1 Quantile Plot 2.1 Sample Results Qua.le Plot 1400 1"a 100D0- r "

an__

,S I an I

  • **m

-2800 600-1 0-an 0 10 20 30 40 50 60 70) D 90 100 0 E~red Masuerreil - rredan - - - 75th Pemr*- --. 5Mt Pemtenrile l

  • e4

AUX-02 Attachmcnt B Data Quality Assessmcnt Plots and Curves Figure 5 AUX-02-01 Frequency Plot PL42R1

.F m2. PIk 4.5 4

3.5 3 -_ _

2.5 2-

"1.5 0.5 0,

-121 45 211 377 543 708 874 1040 1206 1372 L44w Erd Value 2

3 Maximum Value 1739 4 Minimum Value -121 5 Mean 822 6 Median 851 7 Estimated Stdev 420 8 Number of Samples 20 9

10 11 lmm Vwui 12 13 14 MOD 00 15 5W.00D 16 17 18 aOD.00*

19 20 21 22 23___z~zzIIIl 24[_

_ __ _ _ _ _ _ _ _ _ 80I tO, I I I 5

ALUX-02 Attacunent B Data Quality Assessment Plots and Curves Figure 7 AUX-02-02 Prospective Power Curve rEntferValues Test: ~g i0.7 _

DBGte ffa-7 Sigm IG3/6Ir

  • 05 OA 0.4 I

CalcuIlaions - - - jo.

a/c fi 2 SigrP. j 0.97-725 N: 1 5800 600 6200O 64 60 1 710 72M0 74W0 16O

- Prec Pow" --- DCG I- a -epat

- Mt 1-4e*

Figure 8 AUX-02-02 Retrospective Power Curve Enter Values Test Sg I0 O.7 '

0.5

~0.4 - - - ---

Beter

  • 0.5 Uni IDPMR00ern2 Clcultions ,,02 Ng: r:1 03 5800 6ooo 1-6200 6400 8600 6800 7000 7200 7400 j ý ml ize/Update pro pectn/ Power Cursve -- Prolqict Pow. - XOL

- LDGm n 1-ete 6

AUX-02 Attachment B Data Quality Assessment Plots and Curves Figure 9 AUX-02-02 Scatter Plot AUX-02-02 Sample Results Scatter Plot DCGLw = 7200 dpm/l00cm2 Co-60 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 1600 1400 --------------------------------------------------------------- 1406 1200 1000 0 800 0 00 600 1.=. . . . . . .- , =1==. 574 400 200 5

-200

-258

-200 f ----------------------------------------------------------------------------.

-400 I 0 Activity .- , Averacle - - "+3StDev" - - "-3StDeV'l 7

AUX-02 Attachment B Data Quality Assessment Plots and Curves Figure 10 AUX-02-02 Quantile Plot

@000 200 0 10 2) 30 410 50 e) 70 so 90 100)

DrOed Nbaaaeerts -n-edan - - - 75th Perterte ----- M0tPamtere 8

AUX-02 Attachment B Data Quality Assessment Plots and Curves Figure 11 AUX-02-02 Frequency Plot ALM-02-02 Fequsnay PIRo 4.5 4-3.5-3-

1 ,,m 32.5-0.5-0-

62 163 265 366 467 569 670 771 873 974 Upper Ed Vaie 2

3 Maximum Value 1524 4 Minimum Value -268 5 Mean 660 6 Median 642 7 Estimated Stdev 277 8 Number of Samples 20 9

10 11 True Vwlmic 12 13 14 10D0.00 15 16 17 18 1000.00 19 20 21 22 23 24 I I I I I I 0.00 25 I l I I*

26 I 9

>x Data -- - Sample Mean -- Investigate ----- Action X Off Scale 6 1.1 2

6 4

A 1.05 __

C t

i V

i 1 *<

t y

0.95 1

2 7

4 0.9 6/15/06 6116/06 6/17/06 6118/06 6/19106 6/20)06 6121/06 Measurement Date/Time QA Filename S:\2RedRover (6264)\Archived QC Files\6264.QAF Parameter Description 6264 Activity @ 1274 keV (uCi)

Selection Dates 6/1510612:00:00AM- 6/2110612:00:00AM Sample Mean +/-Std Dev: 1.013+/-0.017

AUX-02 ISOCS DETECTOR 6264 FWHM @1461 KeV (as obtained from assay results) 2.4 2.2 2

1.8 4) 1,6 ONLY ONE DATA POINT: FWHM = 2.21 KeV I 1.4+

1.2 1

Centroid @1461 KeV (as obtained from assay results) 5863 5858 5853 5848

5) 5843 5838 5833 5828 5823

I > Data - - - Sample Mean - Investigate ----- Action K Off Scale 6 1.3-2 7

9 1.2------------------------------------------------------------------------------------------

A C

t i

V t

y 0.9_

1 0.8 2

7 4 n7 ____ ____ ____

6/15106 6/16/06 6/17/06 6/18/06 6/19106 6U20/06 6/21/06 6/22/06 6/23/06 Measurement DataeTime QA Filename, S:\1 BlueRover (6279)Wchived QC Files\6279.QAF Parameter Description 6279 Activity @ 1274 keV (uCi)

Selection Dates  : 6/15/06 12:00:00 AM - 6/23/06 12:00:00 AM Sample Mean +/-Std Dev: 1.023 +/- 0.056

AUX-02 ISOCS DETECTOR 6279 FWHM @1461 KeV (as obtained from assay results) 22 2

1.8 S 1.6 1.4 1.2 Centroid @1461 KeV (as obtained from assay results) 5863 5858 --------------------------------------------------------------

5853 --------------------------------------------------------------

5848

>= 5843 5838 5833 5828 --------------------------------------------------------------

5823

Daily Survey Journal Page I of I Survey Area Unit No.: AUX-02-01 Survey Date: 06/21/06 Survey Plan #: YNPS-FSSP-AUX-02-01-00 Supervisor: Neel / Sprucinski Crew: Pen-mock / J. White Instruments:

.Model: ISOCS (Blue) ISOCS (NA) zrjuv"-

7*So-K Serial #: 6279 Cal. Due. 03/07 Pre-op source check: Sat. o Sat. o Sat. 0 Pre-op source check : Sat. o Date: Sat. 0 Date: Sat. [I Date:

TIME NOTES FOR SURVEY DATE 0700 Conducted daily safety briefing and plan for today's FSS activities.

0800 Background survey being conducted lAW FSSP direction.

0830 Direct measurement survey being conducted IAW FSSP direction, DP-8534, and DP-8535 by FSS technician James White.

1300 Direct measurements are complete in this survey unit.

1615 Blue rover set up with 90 degree collimator at 2 meters from surface of concrete wall. Starting scans LAW DP-8871. FSS technician James White positioning rovers and FSS technician Gary Jennings controlling counts from truck monitor.

1700 ISOCS scans completed. Field work for survey unit complete.

Completed by AL.W,FSS0Fieldýr-wSupervisor Date 06-21-2006 6

f4.-TO4 Reviewed by Date tehoR 10t DPF-8856.2 Page 1 of 2

CON-MTRO ON PORTABLE fIB Thm1 ACCOM-MAMMZTT OR Instrument TIPS Batt. Cal ISro Location and/or Date =nd

~

!eoh Dataan.so a MhEC or DESS P Due'O V,Reaon.rox V

~ ie Tile zn ,

se IM ct N~e ad s 1( o-ut i_ _ _ _ __ _ _ _

__ _ _ _ _ __I VW(e m,

to eaJ]'

OP 1- 5L0L Xt ~-

'cnI, - -

__4 -ZST -er ,V*~- A ft~i%

C 3-ýr A J ~~~ v ______ _____ ____

_-rW VA(

7 5%

6~~~~f0/T04716q

  • ale RP Supervisor Review

"*) If any post-use source check failures occur, ensure that the condition is documented by a Condition Report.

Azsrc- 14dad ~~eL~lq~, /,to- -

DPF-8504 .1 Rev. 17 COPY

pOdTAV&/G~MA . .-... Uu CHECK FOES t

COPY-- Net...

Meter Detector Detector Source Net Type Type Number ID Acceptance Criteria Acceptance Criteria

- 20% + 20%

PRE USE CHECKS ' POST UE CHECKS Date Time Audible Alarm BKG SRC Net Int Date Time Audible Alarm BKG SRC Net Int Check Check Counts Counts Counts Check Check Counts Counts Counts d1 .$-* o9 To

  • " 5 '- O Zo*25: t. ** f- L't' Qv o

.3 P -28714,

  • 01 o*. 14(& ,,- 1 238161 _,_ * $:*

Pft ... A 4i A- I AV 17o Aa.i ;A,7(o 01o~ K /65! 'gO-VC ac O-ph.

OW

,nf-r*, *(- _*, 72*-o * ) t* *-. *_ , ./S&, .* *,3 ZSO-D ZZIW?

As-& 1353 25ooo* Z M-7 -

= ""A

____ 'kA / 'x' 2Z', c M"' 4 Ac-f

__ ___ 2 a

Y,-!I ~ JAt i- aZZ& SLr V3c6; 2.%e 2'c2.. din-L I RP Supervisor Review: a4a--f,_- Ii' (1) If any post-use source check failures occur, 1 Condition Report.

ensure that the condition is documented by a DPF-8504.5 Rev. 17

Daffy Survey Journal Page 1 of I Survey Area Unit No.: AUX-02-02 Survey Date: 06/21/06 Survey Plan #: YNPS-FSSP-AUX-02-02-00 Supervisor: Neel / Sprucinski Crew: Pennock / J. White Instruments:

Model: ISOCS (Blue) ISOCS (NA) $ 66 Serial #: 6279 Cal. Due. 03/07 Pre-op source check: Sat. 0 Sat. C1 Sat. 0 Pre-op source check: Sat. 11 Date: Sat. 0] Date: Sat. 0: Date:

TIME NOTES FOR SURVEY DATE 0700 Conducted daily safety briefing and plan for today's FSS activities.

0800 Background survey being conducted IAW FSSP direction.

0830 Direct measurement survey being conducted LAW FSSP direction, DP-8534, and DP-8535 by FSS technician James White.

1040 Blue rover set up with 90 degree collimator at 2 meters from surface of concrete wall. Starting scans IAW DP-8871. FSS technician Steve Pennock positioning rovers and FSS technician Gary Jennings controlling counts from truck monitor.

1300 Direct measurements are complete in this survey unit.

1310 FSS technician James White is taking over positioning of ISOCS rovers.

1700 Turnover of ISOCS scans given to nightshift with two scans remaining to be done.

4,!. _* .,I / "

Completed by Date 06-21-2006

" 1- Field Supervisor Reviewed by Date 9 -

FV Ra -ologicalEngineer DPF-8856.2 Page 1 of 2

cOcNagoL F-ozz PORMEAM 3 RTRATMN!! AC~1NTWhZTLT W RP Supervisor Review If any post-use source check failures occur, ensure the condition is documented by a Condition Report.

DPF-8504.1 Rev. 17

~~Drfl~~1 uS Iftk~.AR,~

EYOUMEWOL

~

er ý-_. _% gy-bLADAts EYAN&

COPY Meter Detector Detector Source Ne t Net Type Type Number ID Acceptance Acceptance Criteria Criteria A, - 20% + 20%

PRE USE CHECKS POST UPE CHECKS Date Time Audible Alarm BKG SRC Net Int Date Time Audible Alarm BKG SRC Net Int Check Check Counts Counts Counts Check Check Counts Counts Counts

-.. pv- bI3 f.,A /4/ o O I ;2r I -pZ*o 1 _

________f(O ___

w-

_9L,_ _ Z,91 VA.

.50. .01A-

, 020 , '*0' 1_- An 5**f1 1 K /6--

15400OIbo 5-f,~ I&, I-,- CAT2~ DA ~1O~z I.£o

____ ____ 5&-f' 04 2Z900 29IV4 A I(2 _____

~ b __

36-ýZýo2ýi4-dr I guk 22A~ M& SW Pis, Ile__

_____ ______ 22q-__

Z 7-c. PC q Lr Si'L... 17-- 2.Z ZCI* 2 Zo Oe..X.

X 7-- J&.

I RP Supervisor Review: (1) i I C* If any post-use source check failures occur, ensure that the condition is documented by a Condition Report.

DPF-8504.5 Rev. 17