ML052430071

From kanterella
Jump to navigation Jump to search
Midcycle 2005 Performance Review and Inspection Plan - Grand Gulf Nuclear Station
ML052430071
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 08/30/2005
From: Webb Patricia Walker
NRC/RGN-IV/DRP/RPB-C
To: Gerald Williams
Entergy Operations
References
Download: ML052430071 (7)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION R E G I O N IV 611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 76011-4005 August 30,2005 George A. Williams, Site Vice President Grand Gulf Nuclear Station Entergy Operations, Inc.

P.O. Box 756 Port Gibson, MS 39150

SUBJECT:

MIDCYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

GRAND GULF NUCLEAR STATION

Dear Mr. Williams:

On August 4, 2005, the NRC staff completed its performance review of the Grand Gulf Nuclear Station for the first half of the calendar year 2005 assessment cycle. Our technical staff reviewed performance indicators (PIS) for the most recent quarter and inspection results over the previous 12 months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility in order for you to inform us of any planned inspection that may conflict with your plant activities.

This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Exempt from Public Disclosure in Accordance with 10 CFR 2.390 will include the physical protection review and a resultant inspection plan.

Plant performance for the most recent quarter at Grand Gulf Nuclear Station was within the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIS indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process baseline inspections at your facility through March 31, 2007.

The enclosed inspection plan details the inspections, except those related to physical protection, scheduled through March 31, 2007. The inspection plan is provided to minimize the resource impact on your staff and to allow for the early resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last 9 months of the inspection plan are tentative and may be revised at the end-of-cycle review meeting.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs

Entergy Operations, Inc. document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.aov/readina-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact YOU to discuss the change as soon as possible. Please contact me at (817) 276-6523 with any questions you may have regarding this letter or the inspection plan.

Sincerely, Wayne C. Walker, Chief Project Branch C Division of Reactor Projects Docket: 50-416 License: NPF-29

Enclosure:

Grand Gulf Inspection/Activity Plan cc w/enclosure:

Senior Vice President and Chief Operating Officer Entergy Operations, Inc.

P.O. Box 31995 Jackson, MS 39286-1995 Wise, Carter, Child & Caraway P.O. Box 651 Jackson, MS 39205 Winston & Strawn LLP 1700 K Street, N.W.

Washington, DC 20006-3817 Jay Barkley, Chief Energy & Transportation Branch Environmental Compliance and Enforcement Division Mississippi Department of Environmental Quality P.O. Box 10385 Jackson, MS 39289-0385

Entergy Operations, Inc. President, District 1 Claiborne County Board of Supervisors P.O. Box 339 Port Gibson, MS 39150 General Manager Grand Gulf Nuclear Station Entergy Operations, Inc.

P.O. Box 756 Port Gibson, MS 39150 The Honorable Charles C. Foti, Jr.

Attorney General Department of Justice State of Louisiana P.O. Box 94005 Baton Rouge, LA 70804-9005 Governor Haley Barbour Office of the Governor State of Mississippi Jackson, MS 39201 Jim Hood, Attorney General State of Mississippi P.O. Box 22947 Jackson, MS 39225 Dr. Brian W. Amy State Health Officer State Board of Health P.O. Box 1700 Jackson, MS 39215 Robert W. Goff, Program Director Division of Radiological Health Mississippi Dept. of Health P.O. Box 1700 Jackson, MS 39215-1700 Director Nuclear Safety & Licensing Entergy Operations, Inc.

1340 Echelon Parkway Jackson, MS 39213-8298

Entergy Operations, Inc. Director, Nuclear Safety and Regulatory Affairs Entergy Operations, Inc.

P.O. Box 756 Port Gibson, MS 39150 institute of Nuclear Power Operations (INPO)

Records Center 700 Galleria Parkway SE, Suite 100 Atlanta, GA 30339

07 v ) v ) v ) v ) v) v) v) W v ) v ) u ) v ) v ) v ) v) v ) v ) v) v)

K C K K K C K C K K C K K K K K K K c

0 0

.g .g .g .g .g .o c .g .g .g c .g .g .g .g

.o .g .g .g .-

c c a, a, 8 8 8 8 8 8 8 8 8 $ 8 8 8 8 8 8 8 8 8 a, zj 2 $ $ $ $ ,a $ 5: $ 3 $ $ $ $ $ $ $ $ 3 $

8 E c + c + E 5 c c c E E E + + 5 + E 5 .-

(1 a, a,a,a,a, a, a, a, aa, a,a,a,a,a, a, ala, a, a, -

a c .E .E .E .E -

.E 2 -

.E - .E

.E - .c

.E .E .E .E -

.E .E .E .E -

.E 8

B 3 Im aI mI a% I I I 1 1 "3 8m 8m 2m % m I f f  ;

I c z m m m m m 2 2 2 2 2 m m m m m i moa m 2 2

Entergy Operations, Inc. Electronic distribution by RIV:

Regional Administrator (BSMl )

DRP Director (ATH)

DRS Director (DDC)

DRS Deputy Director (KMK)

Senior Resident Inspector (GBM)

Branch Chief, DRP/C (WCW)

Project Engineer, DRPIC (RVA)

Team Leader, DRP/TSS (RLNl)

RITS Coordinator (KEG)

V. Dricks, PA0 (VLD)

W. Maier, RSLO (WAM)

C. Gordon (CJG)

DRS Branch Chiefs (LJS, MPSl, REL, NFO)

S. Richards, Chief, NRWDIPM/IIPB (SAR)

M. Case, Deputy Dir. for Inspection and Programs (MJC)

B. Sheron, Associate Dir. for Project Licensing and Technical Analysis (BWS)

T. Bergman, Chief, TRPWOEDO (TAB)

H. Berkow, Director, LPD4, NRWDLPM (HNB)

D.Terao, Chief, PDIV-I , NRWDLPM (DXT)

8. Vaidya, NRR Project Manager (BKV)

SlSP Review Completed: -wcw- ADAMS: ezl Yes 0 No Initials: -wcw-ezl Publicly Available Non-Publicly Available 0 Sensitive ezl Non-Sensitive 1 8117/05 I 811 7/05 18/25/05 I8/ &05 1 81 2-4105 I1 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax