Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date: June 3, 2004 Time: 1400 Preparer: John Olvera U I R 28 NOTE: Refer to baseprocedureNP 10.3.6for safety assessment checklist KSF definitions.

NOTE: Wheneverfuel has been removedfrom the reactorvessel a!d refuieling cavity, all key safetyfunctions are GREEN except spentfuelpoot cooling.

KEY SAFETY FUNCTION CRITERIA: No/False = 0, Yes/True = 1 through 4 REACTIVITY Subtotal Condition

1. RCS Boron concentration 3271 ppm a.) For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) >2200 ppm b.) For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C (0-1) 1 0-1 RED
2. Number of boration paths (0-2) 2 2 ORANGE
3. No fuel motion (0-1) 1 3-4
4. SR instrumentation operable (0-1) 1 5 dV Subtotal = 5 CORE COOLING Subtotal Condition
1. Number of SG available for DHR (0-2) 2 0-1 RED
2. Refueling cavity filled (0-1) 0 2 . ORANGE
3. Number of trains RHR available (0-2) 2 3
4. RCS level above REDUCED INVENTORY (0-1) 1 4-5 RE RCS Temperature = 343SF; 61 days shutdown S/G tubes filled; Pressurizer Level = 31 % Subtotal = 5 RCS Time to Boil N/A (Applicable at Cold or Refueling Shutdown)

POWER AVAILABILITY Subtotal Condition

1. Independent off-site power sources I RED available to A-05 and A-06 (totally 2 ORANGE independent at the 4160 V, 13.8 kV, 3 and 345 kV levels) (0-2) 2 4-5
2. G-01 or G-02/A-05/B-03 available (0-1) 1 G-03 or G-04/A-06/B-04 available (0-1) 1
3. G-05 available, Reactor Cavity filled to 2 23 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. (0-1) 0 Subtotal = 4 INVENTORY Subtotal Condition 0-1 RED
1. Pressurizer level 290 percent w/head on. (0-1) 1 2 ORANGE
2. Refueling Cavity filled (see definition) (0-3) 0 3 _

3.

4.

RCS level above REDUCED INVENTORY Makeup from VCT/BLENDER (0-1) 1 4 Q ED and/or RWST available (0-2) 2 Subtotal = 4 i 77man in Ms recora was 1edelte inaccordance wvthefreedom of infLrma Act exem bn _ -

PBF-1S62

References:

NP 10.3.6 Revision 2 10/30102 FCfi31ag_ I of 9 NP 10.2.1

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT Subtotal Condition

1. Containment integrity (TS 15.1.D) (Containment 0 RED Operable ) (ITS TS 3.6.1) set (Oor 4) 4 1 ORANGE
2. Containment Closure CL-IE maintained 2-3 and closure < time to boil (O or 2) 0 4-5-6

<M5

3. No fuel motion (0-1) 1
4. DHR Capability:

- cavity flooded and internals out OR

- at least one SG available OR

- one fan cooler with Equip hatch installed and personnel hatches capable of being shut (0-1) 1 Subtotal = 6 SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)

NOTE: Take creditfor only one P-12 independent offsite power source duringperiods ofsingle X.03 or X-04 availability (*).

Subtotal Condition

1. "A" SFP cooling pump available 0-1 RED with power available from: 2 ORANGE

- G-02 or G-0I via 2B-32 (0-1) NA 3 YELLOW

-(*) an independent off-site power 4-5 GREEN source different than that for Train B below (0-1) NA

2. "B" SFP cooling pump available with power available from:

- G-03 or G-04 via I B42 (0-1) NA

-(*) an independent off-site power source different than that for Train A above (0-1) NA

3. Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. (0-1) NA SFP Temperatures: Subtotal = NA NW NA OF SE NA OF SFP Average Temp NA 0F SFP Time to Boil NA GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:
  • Core Cooling returned to GREEN since RHR is re-aligned for Low Head Safety Injection.
  • Fire Protection Condition I was entered as RCS temperature exceeded 200'F.
  • G-02 to be removed from service for Heat exchanger cleaning.
  • Containment integrity established and credited for Containment Safety Function.

PBF-1562

References:

NP 10.3.6 Revision 2 10/30102 Page 2 of 9 NP 10.2.1

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT: 1 DATE: June 3, 2004 TIME: 1400 KEY SAFETY FUNCTIONS:

REACTIVITY: GREEN CORE COOLING: GREEN POWER AVAILABLE: GREEN INVENTORY: GREEN CONTAINMENT: GREEN SFP COOLING: NA PROTECTED EOUIPMENT:

0 Core Cooling returned to GREEN since RHR is re-aligned for Low Head Safety Injection.

0 Fire Protection Condition I was entered as RCS temperature exceeded 200'F. Appendix R requirements in effect per OM 3.27.

0 G-02 to be removed from service for heat exchanger cleaning.

S Containment integrity established and credited for Containment Safety Function.

PBF-1562

References:

NP 10.3.6 Revision 2 10/30/02 Page 5 of 9 NP 10.2.1