ML052030133

From kanterella
Jump to navigation Jump to search
Pbnp Shutdown Safety Assessment and Fire Condition Checklist
ML052030133
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 05/26/2004
From: Leiker J
Nuclear Management Co
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2004-0282
Download: ML052030133 (3)


Text

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date: Mlav 26. 2004 Time: 1300 Preparer: Jon Leiker U I R 28 NOTTE: Refer to baseprocedure NP 10.3. 6for safety assessment checklist KSF definitions.

NOTE: Wheneverfuel has been removedfrom the reactorvessel and refueling cavity, all key safetfunctions are GREEN except spent fuel pool cooling.

KEY SAFETY FUNCTION CRITERIA: No/False = 0, Yes/True = I through 4 REACTIVITY Subtotal Condition

1. RCS Boron concentration = 3015 ppm a.) For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) >2200 ppm b.) For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C (0-1) 1 0-1 RED
2. Number of boration paths (0-2) 2 2 ORANGE
3. No fuel motion (0-1) 1
4. SR instrumentation operable (0-1) 1 c65 CGREENJ0M Subtotal = 5 CORE COOLING Subtotal Condition
1. Number of SG available for DHR (0-2) 0 0-1 RED
2. Refueling cavity filled ' (0-1) 0 2
3. Number of trains RHR available (0-2) 2 2 E
4. RCS level above REDUCED INVENTORY (0-1) 1 4-5 RCS Temperature = 94-F; 53 days shutdown RCS Level = 69% Subtotal = 3 RCS Time to Boil 98 min. (Applicable at Cold or Refueling Shutdown)

POWER AVAILABILITY Subtotal Condition I. Independent off-site power sources I RED available to A-05 and A-06 (totally 2 ORANGE independent at the 4160 V, 13.8 kV, 3 and 345 kV levels) (0-2) .2 (j)5

2. G-01 or G-02/A-05/B-03 available (0-1) 1 G-03 or G-04/A-06/B-04 available (0-1) 1
3. G-05 available, Reactor Cavity filled to 2 23 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. (0-1) 0 Subtotal = 4 INVENTORY Subtotal Condition 0-1 RED
1. Pressurizer level 220 percent wlhead on (0-1) 0 2 M
2. Refueling Cavity filled (see definition) (0-3) 0 )
3. RCS level above REDUCED INVENTORY (0-1) 1 4
4. Makeup from VCT/BLENDER and/or RWST available (0-2) 2 Subtotal = 3 Inmabo inttAs record was d Wd inaccordance wth theFre do of lor PBF-1562 Act exem +

References:

NP 10.3.6 Revision 2 10/30102 Page 1 of 9 NP 10.2.1

r .

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT Subtotal Condition

1. Containment integrity (TS 15.1.D) (Containment 0 RED Operable) (ITS TS 3.6.11 set ( or 4) 0 1 ORANGE
2. Containment Closure CLIE maintained 2-3 -AWEW&I and closure < time to boil (Oor2) 2 &3-6 .
3. No fuel motion (0-1) 1
4. DHR Capability:

- cavity flooded and internals out OR

- at least one SG available OR

- one fan cooler with Equip hatch I/

installed and personnel hatches capable of being shut (0-1) 1 Subtotal = 4 SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)

NOTE: Take creditfor only one P-12 independent offsite power source duringperiods of single X-03 or X-04 availability(*).

Subtotal Condition

1. "A" SFP cooling pump available 0-1 RED with power available from: 2 ORANGE

- G-02 or G-0 I via 2B-32 (0-1) NA 3 YELLOW

-(*) an independent off-site power 4-5 GREEN source different than that for Train B below (0-1) NA

2. "B" SFP cooling pump available with power available from:

- G-03 or G-04 via IB-42 (0-1) NA

-(*) an independent off-site power source different than that for Train A above (0-1) NA

3. Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. (0-1) NA SFP Temperatures: Subtotal = NA 0

NW NA F 0

SE NA F 0

SFP Average Temp NA F SFP Time to Boil NA GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:

  • TTB was calculated from SEP-i with vessel level at %pipe and the 1.3 multiplier for being refueled. Note that TTB curve based on 50 days post shutdown was conservatively used (CAP056964).

PBF-1562

References:

NP 10.3.6 Revision 2 10/30/02 Page 2 of 9 NP 10.2.1

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT: I DATE: May 26, 2004 TIME: 1300 KEY SAFETY FUNCTIONS:

REACTIVITY: GREEN CORE COOLING: YELLOW POWER AVAILABLE: GREEN INVENTORY: YELLOW CONTAINMENT: GREEN SFP COOLING: NA PROTECTED EOUIPMENT: ,

CONMIMENTS:

  • Fire Protection Condition III: Credit is taken for fire rounds as fire prevention contingency PBF-1562

References:

NP 10.3.6 Revision 2 10/30/02 Page 5 of 9 NP 10.2.1