ML051920078

From kanterella
Jump to navigation Jump to search
Pbnp Shutdown Safety Assessment and Fire Condition Checklist
ML051920078
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 04/15/2004
From: Branam T
Nuclear Management Co
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2004-0282
Download: ML051920078 (3)


Text

AJl, C2767 Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date: April 15, 2004 Time: 0200 Preparer: T. R. Branam U I R 28 NOTE: Refer to base procedureJNP 10.3.6for safet assessment checklist KSF definitions.

NOTE: Wiheneverfitel hasbeen reniovedfrom the reactorvessel and refueling cavity, all key safety functions are GREEN except spent fuelpool cooling.

KEY SAFETY FUNCTION CRITERIA: No/False = 0, Yes/True = I through 4 REACTIVITY Subtotal Condition

1. RCS Boron concentration = 2892 ppm a.) For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM2.1) >2200 ppin b.) For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C (0-1) 1 0-1 RED
2. Number of boration paths (0-2) 2 2 ORANGE
3. No fuel motion (0-1) 1 3-4
4. SR instrumentation operable (0-1) I 5 <:E>

Subtotal = 5 CORE COOLING Subtotal Condition

1. Number of SG available for DHR (0-2) 0 0-1 RED
2. Refueling cavity filled (0-1) 0 2
3. Number of trains RHR available (0-2) 2 3
4. RCS level above REDUCED INVENTORY (0-1) 1 4-5
  • RCSTEMP - 97 0F; 12 unys shutdown; RCS 68% Subtotal = 3 RCS Time to Boil 51 min (Applicable at Cold or Refueling Shutdown)

POWER AVAILABILITY Subtotal Condition

1. Independent off-site power sources 1 RED available to A-05 and A-06 (totally 2 ORANGE independent at the 4160 V, 13.8 kV, 3 and 345 kV levels) (0-2) 2 4-5
2. G-01 or G-02/A-05/B-03 available (0-1) 1 G-03 or G-041A-06/B-04 available (0-1) 1
3. G-05 available, Reactor Cavity filled to 2 23 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. (0-1) 0 Subtotal = 4 INVENTORY Subtotal Condition
1. Pressurizer level 220 percent w/head on 0-1 RED (0-1) 0 2
2. Refueling Cavity filled (see definition) (0-3) 0 3 LYELLOW'
3. RCS level above REDUCED INVENTORY (0-1) 1 4 < 2 D
4. Makeup from VCT/BLENDER and/or RWST available (0-2) 2 Subtotal = 3 Information in this rer,,r was deleted in accordance with the Fieedonm of Information PBF-1562 Act0e Page1nofi

References:

NP 10.3.6 Revision 210/30/02 1701 Y -g - b yOol Page I of 9 NP 10.2.1

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT Subtotal Condition

1. Containment integrity (TS 15.1.D) (Containment 0 RED Operable) {ITS TS 3.6. 1) set ( or 4) 0 ORANGE
2. Containment Closure CL-I E maintained 2-3 Cs and closure < time to boil (Oor 2) 2 4-5-6
3. No fuel motion (0-1) 1
4. DHR Capability:

- cavity flooded and internals out OR

- at least one SG available OR

- one fan cooler with Equip hatch installed and personnel hatches capable of being shut (0-1) 1 Subtotal - 4 SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)

NOTE: Take creditforonly one P-12 Independent offslte power source duringperiodsof single X-03 orX-04 availability(*).

Subtotal Condition

1. "A" SFP cooling pump available 0-1 RED with power available from: 2 ORANGE

- G-02 orG-0I via2B-32 (0-1) n/a 3 . YELLOW

(*) an independent off-site power 4-5 GREEN source different than that for Train B below (0-1) n/a

2. "B" SFP cooling pump available with power available from:

- G-03 or G-04 via IB42 (0- I) n/a an independent off-site power source different than that for Train A above (0.1) n/a

3. Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. (0-1) n/a SFP Temperatures: Subtotal - n/a NW n/a OF SE n/a OF SFP Average Temp n/a SFP Time to Boil n/a GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:

No chlige from previous shift.

PB3F-1562 Rcerences: NP 10.3.6 Revision 2 10/30/02 Page 2 of 9 NP 10.2.1

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT: 1 DATE: April 15, 2004 TIME: 0200 KEY SAFETY FUNCTIONS:

REACTIVITY: GREEN CORE COOLING: YELLOW POWER AVAILABLE: GREEN INVENTORY: YELLOW CONTAINMENT: GREEN

  • SFP COOLING: NA PROTECTED EQUIPMENT:

i COMMENTS:

Fire Protection Condition III: Crediting existing fire rounds as fire prevention contingency RCS Time to Boil is 5I minutes RCS is at 68% Reactor Vessel Level Hot Leg Vent Path is the Pressurizer Manway PBF-1562 Rererences: NP 10.3.6 Revision2 10/30/02 Page 5 of 9 NP 10.2.1