ML042430414

From kanterella
Jump to navigation Jump to search
Submittal of Registration Information for the Storage of Spent Fuel from Unit 1 at the ISFSI
ML042430414
Person / Time
Site: San Onofre, 07201029  Southern California Edison icon.png
Issue date: 08/24/2004
From: Nunn D
Southern California Edison Co
To:
Document Control Desk, NRC/NMSS/SFPO
References
-RFPFR
Download: ML042430414 (2)


Text

SOUTHERN CALIFORNIA Dwight E. Nunn EDISON Vice President An EDISON 1,'TERNIATIONAIY' Company August 24, 2004 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk, Director, Spent Fuel Project Office Office of Nuclear Material Safety and Safeguards Washington, D.C. 20555-0001

Subject:

Docket Nos. 50-206, 50-361, 50-362 and 72-41 San Onofre Nuclear Generating Station, Units 1, 2 and 3 Gentlemen:

In accordance with the registration requirements given in 10 CFR § 72.212(b)(1)(ii),

Southern California Edison (SCE) hereby submits the following registration information for the storage of spent fuel from Unit 1 at the Independent Spent Fuel Storage Installation (ISFSI) of the San Onofre Nuclear Generating Station (SONGS).

Licensees' Names: Southern California Edison Company San Diego Gas & Electric Company City of Anaheim, California City of Riverside, California Licensee's Address: 5000 Pacific Coast Highway San Clemente, CA 92672 Reactor License Number: DPR-13 (SONGS-1)

NPF-10 (SONGS-2)

NPF-15 (SONGS-3)

Docket Numbers: 50-206 (SONGS-1) 50-361 (SONGS-2) 50-362 (SONGS-3) 72-41 (SONGS ISFSI)

Cask Certificate Number: CoC 1029, Amendment 0, February 5, 2003 Cask Model Number: Standardized Advanced NUHOMSO System Cask Identification Nos: Canister Number: S12208MVDSCO13 Module Number: S1232208AHSM012 P.O. Box 128 San Clemente, CA 92674-0128 949-368-1480 Fax 949-368-1490 Uvfvm

Document Control Desk August 24, 2004 For additional information concerning the storage of spent fuel under this general license, please contact Mr. D. F. Pilmer, Licensing Manager, at 949-368-1486.

Sincerely, cc: B. S. Mallett, NRC Regional Administrator, Region IV B. M. Pham, NRC Project Manager, San Onofre Units 2 and 3 W. C. Huffman, NRC Project Manager, San Onofre Unit I S. C. O'Connor, NRC Project Manager, San Onofre ISFSI C. C. Osterholtz, NRC Senior Resident Inspector, San Onofre Units 2 and 3