1 Point Beach Nuclear Plant Excellence Plan June 24, 2003

2 Agenda Agenda Fred Cayia Excellence Plan Execution Mano Nazar Closing Remarks Dan Fadel/ Joe Jensen Progress to Date Mano Nazar Purpose/Objective Doug Johnson Excellence Plan Development Fred Cayia Path to Excellence Fred Cayia Auxiliary Feedwater Issue

3 Purpose and Objective Purpose and Objective

 Describe Actions Taken to Improve Auxiliary Feedwater System Reliability

 Describe Development of the Point Beach Excellence Plan

 Present Focus Areas of the Point Beach Excellence Plan for Sustained Performance Improvement

 Present Progress Made on Key Focus Areas

 Discuss Point Beach Preparation for IP95003 Inspection

4 Auxiliary Auxiliary Feedwater Feedwater Issue Issue Description Description

 Air Operator Recirculation Valve

 Self-Identified During Probabilistic Risk Analysis Upgrade

 Potential For Loss of Instrument Air Event During Which the AFW Recirculation Valves Fail Closed in Steam Generator Overfill or Overcooling Conditions Coincident with Procedurally-Directed Operator Action To Secure AFW Forward Flow

 Recirculation Line Orifice Issue

 NMC Identified Potential For Blockage From Service Water Following Loss of Normal AFW Supply

 Potential For Fouling of Recirculation Line Orifice Coincident With Procedurally-Directed Operator Action To Secure AFW Forward Flow

5 Auxiliary Auxiliary Feedwater Feedwater Issue Issue Corrective Actions Corrective Actions

 Operator Procedures Revised / Operators Trained

 Open Function of Recirculation Valve Made Safety Related

 Installed Back-up Pneumatics on Air Operated Recirculation Valves

 Integrated Probabilistic Safety Assessment into Emergency Operating Procedure Revision

 Replaced Recirculation Line OrificesMarch 2003

 Modifications for AFW System Power Supply Issues Completed by July 21, 2003

6 Auxiliary Auxiliary Feedwater Feedwater Issue Issue Independent Assessment Independent Assessment

 Performed Independent Licensing and Design Basis Review for Auxiliary Feedwater System

 Performed by Industry Experts

 Oversight by Expert Panel

 Validation Team Independent at Point Beach

 Developed a Derived License and Design Basis

 System Review Concluded AFW Could Perform Design and License Basis Functions

7 Path To Excellence Path To Excellence

 Leadership Turning Point

 Orifice Issue - October 2002

 Reflected Organizational and Process Weaknesses

 Impetus for Fundamental Course Change

8 Path To Excellence Path To Excellence

 Leadership Team Focus and Alignment

 December Offsite Leadership Team Retreats

 Management Recognized The Need to Address Known and Unknown Issues

 Outcome - Alignment on 3 Focus Areas

 Corrective Action Program

 Emergency Planning Infrastructure

 Design Modification Process

9 Path To Excellence Path To Excellence

 Revitalized Leadership

 Reorganization Announced Early January

 Strengthened Plant Managers Team

 Operations Leaders (SROs) to Strengthen Other Organizations

 The Right People for the Right Jobs

10 Path To Excellence Path To Excellence

 Nuclear Management Company Focus on Point Beach

 NMC Organizational Effectiveness Assessment

 December 2002 - January 2003

 Assessment and Stream Analysis to Identify Drivers and Barriers to Performance Improvement

 Independent AFW Assessment

 Senior Vice President Assumed Responsibility for Point Beach Oversight February 2003

11 Path To Excellence Path To Excellence Leadership Vision and Mission Vision:

Continuous Pursuit of Enduring Excellence Mission:

Working Together to Achieve Sustained, Safe, Reliable, and Economic Generation of Electricity Using Nuclear Power

12 Path To Excellence Path To Excellence

 Point Beach Picture of Excellence

 Sustainable Improvement Driven By The Excellence Plan

 Focus on Four Pillars of Excellence

 Organizational

 Operational

 Equipment

 Training

 Focus on Long Term Improvements

13 Path To Excellence Path To Excellence

 Vision for Point Beachs Future

 An Organization That Is Viewed by All Stakeholders As Having a Self Improving Culture and Being a Learning Organization

 Improvement Driven by an Industry Leading Corrective Action Program

 Sustainable Improvement Driven by a Culture Characterized by Organizational and Individual Accountability

14 Path To Excellence Path To Excellence

 Excellence Team

 A Strong Cross-Functional Team Formed to Improve Organizational Focus and Create Infrastructure

 Experienced Industry Expertise Providing Oversight and External Perspective

 Capable NMC Leader with Multi-Site Experience

15 EXCELLENCE PLAN EXCELLENCE PLAN

 Multi-Disciplined Excellence Team Formed to Support Stations Goal of Sustainable Performance Improvement

 Primary Focus of Excellence Team:

 Aid in Independently Identifying & Understanding Performance Issues

 Aid in Understanding Causes of Performance Issues

 Aid Organization in Preparing and Implementing the Excellence Plan

 Aid in Resolution of Issues and Common Causes

 Monitor Execution of the Excellence Plan and Facilitate Adjustments as Required

16 EXCELLENCE PLAN EXCELLENCE PLAN

 Revision 0 of the Excellence Plan Issued on May 30

 Developed Using Formal, Structured Process

 Attributes of Excellence Plan

 Sufficient Scope to Address Station Performance Issues

 Addresses Common Causes and Drivers of Performance Issues

 Risked Informed Prioritization of Actions

 Integrated Departmental Initiatives

 Effectiveness Reviews and Performance Indicators Will Determine if Desired Results Achieved

 Rigorous Monitoring and Closeout Processes

17 EXCELLENCE PLAN Excellence Plan Integration Action Plan Alignment Point Beach Excellence Plan Improvement Initiative Business Initiative Pillar of Excellence Focus Area Action Plan Problem Statement Action Plan Causal Factors ACTION PLANS Action Plan Objectives Action Plan Steps Performance Measures/

Indicators Effectiveness Reviews HIERARCHY PLAN Pillar of Excellence (Senior Manager)

Focus Area (Dept Manager)

Specific Action Plan (Group Head)

Specific Action Steps (Individual)

Pillar of Excellence Focus Area

18 EXCELLENCE PLAN EXCELLENCE PLAN

 Identification of Performance Issues

 Database Created Which Captured Observations & Findings From Recent Assessments, Inspections and Audits

 Sorted Data by Department, Focus Areas, and Trend Codes to Look for Performance Trends and Long-standing Issues

 Identified Trends and Issues Compared Against Action Plans Contained in Revision 0 of the Excellence Plan for Gaps

 Database Analysis Demonstrated That the Excellence Plan Addresses Major Issues

 Currently Assessing Approximately 20 Issues/Areas Which May Require a Revision to an Existing Action Plan or the Creation of a New Action Plan

19 EXCELLENCE PLAN EXCELLENCE PLAN

 Inspection Procedure 95003 Mapping Analysis

 Mapped Recently Completed Site Assessments Against the Requirements in NRC Inspection Procedure 95003

 Purpose Was to Determine Which 95003 Inspection Areas Have Not Been Recently And/Or Sufficiently Self-assessed

 Excellence Team Recommended That PBNP Conduct Approximately 25 Focused Assessments

 Focused Assessments Are in Progress

 Applicable Assessment Findings Will be Built Into the Excellence Plan

20 EXCELLENCE PLAN EXCELLENCE PLAN

 Identification of Common Causal Factors

 Streaming Analysis of Findings From Organizational Effectiveness Assessment Completed

  • Identified 5 Primary Drivers/Causes of Organizational Performance Issues

 Common Factors Assessment of Root Cause Evaluations Completed

  • Identified 3 Primary Common Causes

 Validation That the Excellence Plan Addresses These Common Drivers / Causes in Progress

21 EXCELLENCE PLAN EXCELLENCE PLAN

 Revision 1 of Excellence Plan Will Be Issued by July 11

 Ongoing Work on Revision 1 is Focused on:

 Prioritization and Resource Loading

 Action Plan Integration

 Refinement of Objective Statements and Alignment of Performance Indicators and Effectiveness Reviews

 Addition of New Plans or Plan Revisions Based Upon Ongoing Analysis Work

22 EXCELLENCE PLAN EXCELLENCE PLAN

 Excellence Plan Built Upon 4 Pillars of Excellence

 Organizational Excellence

 Operational Excellence

 Equipment Excellence

 Training Excellence

 Pillars Supported by 19 Focus Areas

 Focus Areas Supported by Over 100 Action Plans

23 Excellence Plan Excellence Plan Focus Areas Focus Areas

 Human Performance

 Oversight and Assessment

 Culture Survey

 Communications

 Management Effectiveness

 Engineering Organizational Effectiveness

 Engineering Programs

 Configuration Management

 Emergency Preparedness

 Corrective Action Program

24 Excellence Plan Excellence Plan Focus Areas Focus Areas

 Significant Operating Event Report 02-04, Reactor Pressure Vessel Head Degradation at Davis-Besse Nuclear Power Station

 Work Management

 Business Initiatives

 Technical Procedure Quality

 Operationally Focused

 Security

 Equipment Reliability

 Training Programs

 Training Organizational Effectiveness

25 Excellence Plan Excellence Plan

 Our Excellence Plan Is a Roadmap to Create and Sustain Improvements

 The Objective Statements Associated with Each Excellence Plan Action Plan are Forward Looking and Define What We Want to Achieve

 Performance Indicators and Effectiveness Reviews Assure Progress Is Being Made and Desired Objectives Are Accomplished

 Site Leadership Team Rigorously Monitor Execution of The Excellence Plan

26 Excellence Plan Excellence Plan Corrective Action Program Corrective Action Program Focus Area Focus Area

 Problem Statement

 Corrective Action Program was not used as a Management Tool for Continuously Improving Performance

 Causal Factors

 Management Oversight of the Program Was Ineffective

 Issue ownership was not reinforced to Ensure Timely and Effective Resolution of Issues

 Roles, Responsibilities, and Expectations for Supporting the Corrective Action Program Were Not Understood

 Corrective Action Screening Process Was Not Effective at Prioritizing Significant Issues

27 Excellence Plan Excellence Plan Corrective Action Program Corrective Action Program Focus Area Focus Area

 Objective:

Excellent Corrective Action Program Used By Management to Drive Continuously Improving Performance

 Corrective Action Program Roles, Responsibilities, and Expectations Understood

 Improved Screening Process that Focuses on Prioritization of Significant Issues

 Site Culture that Promotes Timely Actions to Resolve Identified Issues

 Program Oversight that Monitors and Provides Feedback to Management on the Effectiveness of the Corrective Action Program

28 Excellent Corrective Excellent Corrective Action Program Action Program Effective Effective Operability Operability Identification Identification Based On Low Based On Low Threshold Threshold Low Low Backlog Backlog Feedback Feedback To Initiator To Initiator Assignments Assignments Based on Based on Knowledge Skills Knowledge Skills Resolutions Resolutions Effectively Address Effectively Address Problems Problems Effective Effective Monitoring Monitoring Formal Formal Trending Trending Completion Completion Prior to Due Dates Prior to Due Dates Effective Effective Screening Screening Effectiveness Effectiveness Review Review Prioritization Prioritization Based on Based on Significance Level Significance Level Effective Effective Root Cause Root Cause Evaluations Evaluations EXCELLENT CORRECTIVE ACTION PROGRAM Effective Effective Operability Operability Identification Identification Based On Low Based On Low Threshold Threshold Low Low Backlog Backlog Feedback Feedback To Initiator To Initiator Assignments Assignments Based on Based on Knowledge Skills Knowledge Skills Resolutions Resolutions Effectively Address Effectively Address Problems Problems Effective Effective Monitoring Monitoring Formal Formal Trending Trending Completion Completion Prior to Due Dates Prior to Due Dates Effective Effective Screening Screening Effectiveness Effectiveness Review Review Prioritization Prioritization Based on Based on Significance Level Significance Level Effective Effective Root Cause Root Cause Evaluations Evaluations Corrective Action Program Corrective Action Program Picture of Excellence Picture of Excellence

29 Corrective Action Program Corrective Action Program Progress-to-Date Progress-to-Date

 Implemented a Formal, Rigorous Process for Screening Corrective Actions

 Lowered the Threshold for Reporting Problems and Improved Initiator Feedback

 Improved the Quality of Resolutions to Corrective Actions

 Strengthened Monitoring the Corrective Action Program Performance

 Strengthening Accountability in the Timeliness of Corrective Actions

30 Corrective Action Program Corrective Action Program Progress-to-Date Progress-to-Date 0

100 200 300 400 500 600 700 Jan-02 Feb-02 Mar-02 Apr-02 May-02 Jun-02 Jul-02 Aug-02 Sep-02 Oct-02 Nov-02 Dec-02 Jan-03 Feb-03 Mar-03 Apr-03 May-03 Jun-03 Jul-03 Aug-03 Sep-03 Oct-03 Nov-03 Dec-03 CAP Number CAP Generation by Month CAP Generation by Month

31 Corrective Action Program Corrective Action Program Progress-to-Date Progress-to-Date 70%

80%

90%

100%

Jan-03 Feb-03 Mar-03 Apr-03 May-03 Jun-03 Jul-03 Aug-03 Sep-03 Oct-03 Nov-03 Dec-03 Corrective Actions Due Date Corrective Actions Due Date Extensions Extensions Corrective Actions Closed Corrective Actions Closed on Time on Time 0%

10%

20%

30%

40%

50%

60%

Jan-03 Feb-03 Mar-03 Apr-03 May-03 Jun-03 Jul-03 Aug-03 Sep-03 Oct-03 Nov-03 Dec-03 G

o

32 Corrective Action Program Corrective Action Program Progress-to-Date Progress-to-Date

Quality Check Acceptance

 Percentage of Actions Accepted During Quality Check /

Technical Review Panel 80%

90%

100%

Jan-03 Feb-03 Mar-03 Apr-03 May-03 Jun-03 Jul-03 Aug-03 Sep-03 Oct-03 Nov-03 Dec-03

33 Excellence Plan Excellence Plan Emergency Planning Infrastructure Emergency Planning Infrastructure Focus Area Focus Area

 Problem Statement

 Emergency Planning Infrastructure Was Not Consistently Maintained

 Causal Factors

 Processes and Facility Information Were Not Captured in Procedures or Guidelines

 Lack of Formal Drill/Exercise Development Procedures.

 Evaluations of Emergency Plan Changes Sometimes Inconsistent with Regulation

 Emergency Planning Program Personnel Were Not Effective at Maintaining the Program Infrastructure

34 Excellence Plan Excellence Plan Emergency Planning Infrastructure Emergency Planning Infrastructure Focus Area Focus Area

 Objectives A Robust Infrastructure Exists That Supports The Emergency Planning Program at Point Beach

 Line Ownership of Emergency Preparedness Program to Maximize Program Oversight

 Procedures and Guidelines In Place That Formalize Emergency Preparedness Processes and Requirements

 Formal Drill and Exercise Procedures

 Emergency Plan and Supporting Procedures Are Aligned With Regulation

35 Emergency Planning Emergency Planning Picture of Excellence Picture of Excellence Drill/Exercise Capability Robust EP Infrastructure Qualified EP Staff Effective Emergency Plan Facilities ERO Capability Regulatory Relationship ERO Notification Capability Effective Training Program EXCELLENT EMERGENCY PLANNING Offsite Relationships Public Notification

36 Emergency Planning Emergency Planning Progress-to-Date Progress-to-Date Organization & Staff Proficiency Organization & Staff Proficiency

 EP Manager Assigned Specific to Point Beach

 Hired Personnel With Previous EP Experience (EP Manager and EP Senior Coordinator)

 Hired a Supervisor With Strong Radiation Protection/Chemistry/Operations Background

 All Current Staff Has Attended NEI Training on EP

 Defining Roles and Responsibilities for all EP Staff

 Creating Procedures and Job Aids for Major Responsibilities, then Cross-Training Staff

37 Emergency Planning Emergency Planning Progress-to-Date Progress-to-Date Plan/Procedures & ERO Proficiency Plan/Procedures & ERO Proficiency

 Utilizing A Multi-Discipline Team to:

 Excellent Support and Ownership by the Line Organizations

 Review and Upgrade Plan and Procedures

 Retrain ERO On Changes As Required

 As Part of the Upgrade, We Are Developing ERO Proficiency by:

 Implemented On-Call Rosters for Key Duty Positions

 Implementing a More Comprehensive Drill Schedule That Allows More Training Time for ERO Members Each Year

 ERO Drill Participation Improved

 Alert and Notification System Reliability Improved

38 Emergency Planning Emergency Planning Progress-to-Date Progress-to-Date Infrastructure Infrastructure

 Implemented an EP Advisory Committee of Senior Station Management

 Implemented an EP Training Advisory Committee

 Revised Critique Process to Ensure Consistency and Review of all Pertinent Data

 Developed and Communicated an EP Vision And Mission for the Station

 Improved Implementation of the Corrective Action Program Within EP

 Utilizing a Multi-Discipline Team for Scenario Development

 Upgrading Document Control and Records Retention Practices for EP

39 Excellence Plan Excellence Plan Design Change Process Design Change Process Focus Area Focus Area

 Problem Statement

 Auxiliary Feedwater Modification Issues Raised Questions Regarding Modification Quality

 Causal Factors

 Expectations for Design Change Process Development Were Not Effectively Communicated

 Quality Review Teams Were Not In-Place

 Ineffective Management Oversight and Reviews of Modifications

40 Excellence Plan Excellence Plan Design Change Process Design Change Process Focus Area Focus Area

 Objectives Modification Process That Consistently Evaluates Impact of Proposed Changes to Plant System, Structures, and Components and Effectively Resolves Identified Issues

 Engineering Personnel Understand Roles, Responsibilities and Expectations

 Modifications Are Reviewed by the Design Engineering Review Board

 Selected Design Modifications Are Reviewed by the Quality Review Team for Quality and Completeness

 Proceduralized Modification Process Being Implemented to Ensure Technically Accurate Modifications

41 Excellence Plan Excellence Plan Design Engineering Design Engineering Managed Modification Backlog EXCELLENT DESIGN ENGINEERING PROGRAM Effective Modifications Strong Design Basis Ownership

42 Engineering Engineering Progress-to-Date Progress-to-Date Design Change Process Design Change Process

 Improvement In All Aspects of Engineering Support Program Training

 Initiate the Design Engineering Review Board

 DERB Is Established and Functioning

 Utilize the Quality Review Team

 QRT Is Implemented

 Formalize Backlog Reduction Methodology

 Methodology Established for Modification Prioritization

 Fleet-wide Plant Modification Process Being Implemented

 Conducted Training

43 Engineering Engineering Progress-to-Date Progress-to-Date

Engineering Excellence Plan Activities

 Proposed Workdown Curve for All Actions Assigned to Engineering 367 508 397 508 389 340 328 309 286 253 241 231 231 196 184 0

100 200 300 400 500 600

44 Closing Remarks Closing Remarks

 NMC and WE Energies Are Supportive of Point Beach Improvement Initiatives

 Point Beach Continues to Operate Safely

 Risk Significant Auxiliary Feedwater Issues Have Been Resolved

 We Looked Hard and Are Confident We Are Identifying Our Issues

 As a Learning Organization We Will Continue to Look Objectively to Identify and Resolve Issues

 Robust Plan for Sustainable Performance Improvement

 Progress Has Already Been Made In Key Areas

 We Are Prepared to Support Your Inspection Efforts