ML023230069

From kanterella
Jump to navigation Jump to search
Summary of the 10/30/2002 Palisades Public Meeting Re Palisades Excellence Plan Implementation, Equipment Reliability Improvement Initiatives, Human-performance Improvement Initiatives, and Corrective Action Program Implementation
ML023230069
Person / Time
Site: Palisades Entergy icon.png
Issue date: 11/18/2002
From: Grant G
Division Reactor Projects III
To: Cooper D
Nuclear Management Co
References
Download: ML023230069 (6)


Text

November 18, 2002 Mr. Douglas E. Cooper Site Vice President Palisades Nuclear Plant Nuclear Management Company, LLC 27780 Blue Star Memorial Highway Covert, MI 49043-9530

SUBJECT:

SUMMARY

OF THE OCTOBER 30, 2002, PALISADES PUBLIC MEETING

Dear Mr. Cooper:

On October 30, 2002, the Nuclear Regulatory Commission (NRC) held a public meeting at the Region III office in Lisle, Illinois. The meeting was held to discuss performance at the Palisades plant. Discussions were held between you and your staff, and NRC staff and management regarding Palisades Excellence Plan implementation, equipment reliability improvement initiatives, human-performance improvement initiatives, and corrective action program implementation. Enclosure 1 is a list of attendees for the meeting, and Enclosure 2 is a copy of the slides used by your staff during the meeting.

The meeting consisted of detailed presentations by you and your staff on the current performance of Palisades. You started the meeting by presenting an overview of the Palisades Excellence Plan, including a description of performance measures that you are using to assess progress. You stated that Palisades performance has improved but has not yet reached the standards prescribed in the Excellence Plan. Mr. Dan J. Malone, Plant General Manager then provided a summary of current Palisades plant performance including the improving trend in the occurrence of human performance related Licensee Event Reports in the previous 12 months, current equipment challenges, and maintenance and training improvement initiatives. Mr. Paul Harden, Director of Engineering, then described actions being taken to improve performance in engineering, including defining engineering standards and expectations, providing training to engineers on the performance of structured engineering reviews, and initiatives being taken to

D. Cooper improve supervisory performance. During the above presentation, the NRC staff and your staff discussed specific attributes of your improvement initiatives. The meeting closed with a discussion of the current status of security at the Palisades plant, including recent issues, and actions being taken to maintain site security at the appropriate level.

Sincerely,

/RA/

Geoffrey E. Grant, Director Division of Reactor Projects Docket No. 50-255 License No. DPR-20

Enclosures:

1. List of Meeting Attendees
2. Licensees Slide Presentation cc w/encl: R. Fenech, Senior Vice President, Nuclear Fossil and Hydro Operations L. Lahti, Manager, Licensing R. Anderson, Chief Nuclear Officer, NMC A. Udrys, Esquire, Consumers Energy Company S. Wawro, Nuclear Asset Director, Consumers Energy Company W. Rendell, Supervisor, Covert Township Office of the Governor Michigan Department of Environmental Quality Department of Attorney General (MI)

DOCUMENT NAME: C:\ORPCheckout\FileNET\ML023230069.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII E RIII E RIII RIII NAME Lennartz/trn AVegel JCreed GGrant DATE 11/14/02 11/14/02 11/15/02 11/18/02 OFFICIAL RECORD COPY

D. Cooper ADAMS Distribution:

WDR DFT JHE RidsNrrDipmIipb GEG HBC JAL3 C. Ariano (hard copy)

DRPIII DRSIII PLB1 JRK1

Enclosure 1 NRC REGION III MEETING ATTENDANCE LIST Meeting Description A Public Meeting with the Nuclear Management Company, LLC Addressing Palisades Excellence Plan and general licensee activities Date: October 30, 2002 Time: 2:00 p.m. (CDT) Location: Region III, Lisle, IL Name Organization Position/Affiliation 1 Douglas E. Cooper NMC Site Vice President, Palisades 2 Daniel J. Malone NMC Plant General Manager, Palisades 3 Paul Harden NMC Director of Engineering, Palisades 4 Laurie Lahti NMC Licensing Manager, Palisades 5 Geoff Grant NRC Director, Division of Reactor Projects 6 Cindy Pederson NRC Director, Division of Reactor Safety 7 Dave Hills NRC Branch Chief, Mechanical 8 Anton Vegel NRC Branch Chief, Branch 6 9 Jay Lennartz NRC Senior Resident Inspector, Palisades 10 Jim Creed NRC Team Leader - Security 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Enclosure 1 25 26