LR-N23-0079, Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days | 7 December 2023 | Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days | |
LR-N23-0077, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion | 29 November 2023 | Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion | Loop seal |
LR-N23-0072, Core Operating Limits Report Cycle 30 | 1 November 2023 | Core Operating Limits Report Cycle 30 | |
LR-N23-0065, Submittal of 2023 Annual 10 CFR 50.46 Report | 2 October 2023 | Submittal of 2023 Annual 10 CFR 50.46 Report | |
LR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement | 8 September 2023 | and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement | |
LR-N23-0055, Special Report 272/23-01-00, Pursuant to the Requirements of Technical Specification 3.3.3.1, Action 23, for the Vent Noble Gas Rad Monitor Inoperable for Greater than Seven Days | 3 August 2023 | Special Report 272/23-01-00, Pursuant to the Requirements of Technical Specification 3.3.3.1, Action 23, for the Vent Noble Gas Rad Monitor Inoperable for Greater than Seven Days | |
LR-N23-0052, Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers Per Technical Specification 4.6.2.1 | 31 July 2023 | Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers Per Technical Specification 4.6.2.1 | |
LR-N23-0054, In-Service Inspection Activities | 26 July 2023 | In-Service Inspection Activities | |
LR-N23-0042, Spent Fuel Cask Registration | 12 July 2023 | Spent Fuel Cask Registration | |
LR-N23-0046, Emergency Plan Document Revisions Implemented June 28, 2023 | 10 July 2023 | Emergency Plan Document Revisions Implemented June 28, 2023 | Deep Dose Equivalent Power change |
LR-N23-0005, License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies | 23 June 2023 | License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies | Hot Short Safe Shutdown Boric Acid High winds Weld Overlay Internal Flooding Probabilistic Risk Assessment Coatings Emergency Lighting Incorporated by reference FLEX Aging Management Test box Thermoset Local Leak Rate Testing Foreign Material Exclusion Large early release frequency Moisture barrier License Renewal Fuel cladding Power Uprate |
LR-N23-0035, 2022 Annual Radioactive Effluent Release Report (ARERR) | 27 April 2023 | 2022 Annual Radioactive Effluent Release Report (ARERR) | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Annual Radiological Effluent Release Report |
LR-N23-0034, 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station | 27 April 2023 | 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Annual Radiological Effluent Release Report Tritium |
LR-N23-0033, Core Operating Limits Report Cycle 27 | 26 April 2023 | Core Operating Limits Report Cycle 27 | |
LR-N23-0010, License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location | 21 April 2023 | License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location | Offsite Dose Calculation Manual |
LR-N23-0009, License Amendment Request (LAR) to Revise the Hope Creek Trip and Standby Auto-start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning (HVAC) Trains | 18 April 2023 | License Amendment Request (LAR) to Revise the Hope Creek Trip and Standby Auto-start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning (HVAC) Trains | Ultimate heat sink Anticipated operational occurrence GOTHIC |
LR-N23-0024, Submittal of Hope Creek Generating Station Technical Specification Bases Changes | 29 March 2023 | Submittal of Hope Creek Generating Station Technical Specification Bases Changes | Safe Shutdown Shutdown Margin Reactor Vessel Water Level Safety Limit Minimum Critical Power Ratio High Radiation Area Fire Barrier Anticipated operational occurrence Tornado Missile Water Inventory Control Internal Flooding Hydrostatic Missed surveillance Abnormal operational transient Surveillance Frequency Control Program Scram Discharge Volume Feedwater Controller Failure Excess Flow Check Valve Fast acting solenoid valve Spiral reload Overtravel Control of Heavy Loads Power Operated Valves Turbine Missile Fuel cladding Pressure Boundary Leakage Recently irradiated fuel Offsite Circuit Scaffolding Power change Unidentified leakage Failure to Scram |
LR-N23-0006, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations | 24 March 2023 | Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations | Decommissioning Funding Plan Authorized possession limits |
LR-N23-0019, and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums | 21 March 2023 | and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums | |
LR-N23-0016, and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments | 28 February 2023 | and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments | Temporary Modification |
LR-N23-0018, Technical Specification 6.9.1.5.b - 2022 Annual Report of SRV Challenges | 27 February 2023 | Technical Specification 6.9.1.5.b - 2022 Annual Report of SRV Challenges | |
LR-N23-0012, Annual Property Insurance Status Report | 24 February 2023 | Annual Property Insurance Status Report | |
LR-N23-0014, Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.717 | 23 February 2023 | Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.717 | Fitness for Duty |
LR-N23-0003, Response to Requests for Additional Information Salem Unit 2 Relief Request S2-I4R-211 | 1 February 2023 | Response to Requests for Additional Information Salem Unit 2 Relief Request S2-I4R-211 | Nondestructive Examination VT-2 Incorporated by reference Aging Management |
LR-N23-0011, In-Service Inspection Activities - 90 Day Report: Twenty-Fourth Refueling Outage | 19 January 2023 | In-Service Inspection Activities - 90 Day Report: Twenty-Fourth Refueling Outage | |
LR-N22-0096, and Salem Generating Station, Units 1 and 2 - Request for Threshold Determination | 5 January 2023 | and Salem Generating Station, Units 1 and 2 - Request for Threshold Determination | Offsite Dose Calculation Manual |
LR-N22-0095, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2022 | 20 December 2022 | Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2022 | Loop seal |
LR-N22-0094, Emergency Plan Document Revisions Implemented November 21, 2022 | 14 December 2022 | Emergency Plan Document Revisions Implemented November 21, 2022 | Fire Watch |
LR-N22-0092, Response to Final Iolb Request for Additional Information for Salem LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG | 9 December 2022 | Response to Final Iolb Request for Additional Information for Salem LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG | Probabilistic Risk Assessment FLEX |
LR-N22-0091, Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments | 2 December 2022 | Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments | |
LR-N22-0084, Response to Final Request for Additional Information for Salem LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG (EPID L- 2022-LLA-0095) | 17 November 2022 | Response to Final Request for Additional Information for Salem LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG (EPID L- 2022-LLA-0095) | Probabilistic Risk Assessment Fukushima Dai-Ichi Large early release frequency |
LR-N22-0090, Supplement to Submittal of Salem Generating Station Updated FSAR, Revision 33, 10 CFR 71.106 Review Results and 10 CFR 54.37(b) Review Results for Salem | 10 November 2022 | Supplement to Submittal of Salem Generating Station Updated FSAR, Revision 33, 10 CFR 71.106 Review Results and 10 CFR 54.37(b) Review Results for Salem | Open Phase Condition Open Phase Initiative |
LR-N22-0075, 2022 Annual 10 CFR 50.46 Report | 30 September 2022 | 2022 Annual 10 CFR 50.46 Report | |
LR-N22-0065, Submittal of Relief Request Associated with the Fourth Inservice Inspection (ISI) Interval Limited Examinations | 27 September 2022 | Submittal of Relief Request Associated with the Fourth Inservice Inspection (ISI) Interval Limited Examinations | VT-2 Large early release frequency Liquid penetrant Pressure Boundary Leakage |
LR-N22-0074, Emergency Plan Evacuation Time Estimate | 15 September 2022 | Emergency Plan Evacuation Time Estimate | Pandemic Coronavirus |
LR-N22-0066, License Amendment Request (LAR) to Relocate Technical Specifications (TS) Requirements for Reactor Head Vents to the Technical Requirements Manual (TRM) | 31 August 2022 | License Amendment Request (LAR) to Relocate Technical Specifications (TS) Requirements for Reactor Head Vents to the Technical Requirements Manual (TRM) | Safe Shutdown Surveillance Frequency Control Program |
LR-N22-0063, Spent Fuel Cask Registration | 10 August 2022 | Spent Fuel Cask Registration | |
LR-N22-0068, In-Service Inspection Activities - 90-Day Report | 10 August 2022 | In-Service Inspection Activities - 90-Day Report | |
LR-N22-0012, License Amendment Request to Amend the Technical Specifications to Revise and Relocate the Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to a Pressure and Temperature | 7 August 2022 | License Amendment Request to Amend the Technical Specifications to Revise and Relocate the Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to a Pressure and Temperature | Shutdown Margin High Radiation Area Offsite Dose Calculation Manual Anticipated operational occurrence Hydrostatic Incorporated by reference Pressure and Temperature Limits Report Surveillance Frequency Control Program Process Control Program Exemption Request Pressure Boundary Leakage |
LR-N22-0062, Spent Fuel Cask Registration | 21 July 2022 | Spent Fuel Cask Registration | |
LR-N22-0006, License Amendment Request (LAR) to Amend Salem Unit 1 and Unit 2 Technical Specifications (TS) to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator from 72 Hours to 14 Days | 29 June 2022 | License Amendment Request (LAR) to Amend Salem Unit 1 and Unit 2 Technical Specifications (TS) to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator from 72 Hours to 14 Days | |
LR-N22-0051, License Amendment Request to Relocate Technical Specification Facility/Unit Staff Qualification Requirements to Quality Assurance Topical Report | 22 June 2022 | License Amendment Request to Relocate Technical Specification Facility/Unit Staff Qualification Requirements to Quality Assurance Topical Report | |
LR-N22-0044, Emergency Plan Document Revisions Implemented November, 2021 | 19 May 2022 | Emergency Plan Document Revisions Implemented November, 2021 | |
LR-N22-0043, Core Operating Limits Report - Cycle 29 | 9 May 2022 | Core Operating Limits Report - Cycle 29 | |
LR-N22-0041, 2021 Annual Radioactive Effluent Release Report (Rerr) | 28 April 2022 | 2021 Annual Radioactive Effluent Release Report (Rerr) | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Annual Radiological Effluent Release Report Backfit |
LR-N22-0040, 2021 Annual Radiological Environmental Operating Report | 28 April 2022 | 2021 Annual Radiological Environmental Operating Report | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Annual Radiological Effluent Release Report Tritium |
LR-N22-0039, Emergency Plan Document Revisions Implemented March 24, 2022 | 21 April 2022 | Emergency Plan Document Revisions Implemented March 24, 2022 | High winds Earthquake Pressure Boundary Leakage |
LR-N21-0052, Request for Relief from ASME Code Defect Removal for Service Water Buried Piping | 7 April 2022 | Request for Relief from ASME Code Defect Removal for Service Water Buried Piping | Ultimate heat sink VT-2 Finite Element Analysis |
LR-N22-0023, Guarantees of Payment of Deferred Premiums | 21 March 2022 | Guarantees of Payment of Deferred Premiums | |
LR-N22-0022, Response to Request for Additional Information Relief Request S1-14R-210, Alternative Examination of Welds | 21 March 2022 | Response to Request for Additional Information Relief Request S1-14R-210, Alternative Examination of Welds | |