LR-N10-0355, Salem and Hope Creek - Submittal of Emergency Action Level Changes

From kanterella
Jump to navigation Jump to search
Salem and Hope Creek - Submittal of Emergency Action Level Changes
ML110050376
Person / Time
Site: Salem, Hope Creek  PSEG icon.png
Issue date: 10/14/2010
From: Joyce T P
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LR-N10-0355
Download: ML110050376 (3)


Text

Thomas P. Joyce President

& Chief Nuclear Officer President

& Chief Nuclear Officer P. 0. Box 236, Hancocks Bridge, NJ 08038 tel: 856.339.1100 fax: 856.339.1104 email: Thomas.Joyce@pseg.com PSEG OCT 14 2010 10 CFR 50, Appendix E LR-N 10-0355 Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Hope Creek Generating Station Facility Operating License No. NPF-57 NRC Docket No. 50-354 Salem Nuclear Generating Station, Units 1 and 2 Facility Operating License Nos. DPR-70 and 75 NRC Dockets Nos. 50-272 and 50-311

SUBJECT:

Emergency Action Level Changes PSEG Nuclear LLC requests Nuclear Regulatory Commission (NRC) approval for the adoption of revised Emergency Action Levels (EALs) for use at the Hope Creek Generating Station (HCGS) and Salem Nuclear Generating Station (SGS) in accordance with 10 CFR 50, Appendix E, Section IV(B)(1) and 10 CFR 50.4(b)(5).

The revised EALs are based on Nuclear Energy Institute 99-01, Revision 5, "Methodology for Development of Emergency Action Levels," dated February 22, 2008 (ADAMS Accession No. ML080450149).

Current HCGS and SGS EALs are based on NUMARC/NESP-007.

NRC approval is requested by October 1, 2011, with the EAL changes being implemented within 180 days after approval.

The implementation time was selected to allow operator and Emergency Response Organization familiarization prior to the May, 2012 NRC Graded Exercise.Emergency Preparedness representatives in the States of New Jersey (NJ Bureau of Nuclear Engineering

-NJBNE) and Delaware (Delaware Emergency Management Agency -DEMA) have reviewed and are in agreement with the proposed EAL changes.4 fI Document Control Desk OCT 14 2010 LR-N10-0355 Hope Creek Attachments:

Attachment I provides the HCGS EAL Technical Bases (strike-out version).Attachment 2 provides the HCGS EAL Technical Bases (clean version).

The Technical Bases document provides an explanation and rationale for each EAL included in the HCGS EAL Upgrade Project.Attachment 3 provides the HCGS EAL Comparison Matrix, which provides a line-by-line comparison of the EALs contained in NEI 99-01, Revision 5, to the proposed HCGS EALs.Attachment 4 is a compact disk (CD) containing HCGS EAL supporting documentation.

Salem Attachments:

Attachment 5 provides the SGS EAL Technical Bases (strike-out version).Attachment 6 provides the SGS EAL Technical Bases (clean version).

The Technical Bases document provides an explanation and rationale for each EAL included in the SGS EAL Upgrade Project.Attachment 7 provides the SGS EAL Comparison Matrix, which provides a line-by-line comparison of the EALs contained in NEI 99-01, Revision 5, to the proposed SGS EALs.Attachment 8 is a compact disk (CD) containing SGS EAL supporting documentation.

This letter contains no new commitments and no revisions to existing commitments.

Should you have any questions concerning this letter, or require additional information, please contact Lee Marabella at (856) 339-1208 or Craig Banner at (856) 339-1157.I declare under penalty of perjury that the foregoing is true and correct.Executed on_________

Sincerely, Thomas P. Joyce President

& CNO -PSEG Nuclear, LLC 2 Document Control Desk LR-N10-0355 OCT 14 2010 Attachments (8)Attachment 1: Attachment 2: Attachment 3: Attachment 4: Attachment 5: Attachment 6: Attachment 7: Attachment 8: HCGS Emergency Action Level Technical Bases (strike-out version)HCGS Emergency Action Level Technical Bases (clean version)HCGS EAL Comparison Matrix HCGS -CD of Supporting Documentation SGS Emergency Action Level Technical Bases (strike-out version)SGS Emergency Action Level Technical Bases (clean version)SGS EAL Comparison Matrix SGS -CD of Supporting Documentation C (with enclosures

-2 copies)Project Manager, Hope Creek Generating Station, Salem Units 1 and 2 and Hope Creek, USNRC C (without enclosures)

Regional Administrator, Region I, USNRC NRC Resident Inspector, Hope Creek, USNRC NRC Resident Inspector, Salem Units 1 & 2, USNRC Corporate Commitment Tracking Coordinator Manager, NJ Bureau of Nuclear Engineering Manager, Delaware Emergency Management Agency 3