PSEG Internal Use Only PSEG NUCLEAR L.L.C.
Page 1 of 1 HOPE CREEK GENERATING STATION HC.OP-AR.ZZ-0016(Q) - Rev. 14 OVERHEAD ANNUNCIATOR WINDOW BOX E3 USE CATEGORY: II
- Packages and Affected Document Numbers incorporated into this revision:
CP No.
CP Rev.
AD No.
Rev No.
None 9
- The following OPEX were incorporated into this revision: None
- The following OTSCs were incorporated into this revision: None REVISION
SUMMARY
Corrects Attachments B2, B3, C2, C3, D2 and D3 to reference the proper PAX breaker numbers. This was recently updated in HC.OP-SO.MF-0001(Z), verified in 70113105 and is editorial. (70113105-0030)
IMPLEMENTATION REQUIREMENTS Effective Date 9/17/10 None
HC.OP-AR.ZZ-0016(Q)
Hope Creek Page 1 of 54 Rev. 14 OVERHEAD ANNUNCIATOR WINDOW BOX E3 TABLE OF ATTACHMENTS 1
2 3
4 5
STA SERVICE 13.8KV BUS 4.16KV 1E STA SERVICE A-TRANSFORMER LOCKOUT INCM BRKR TRANSFORMER 1AX502 TRBL RELAY TRIP EMER TKOVR 1BX502 TRBL Page 2 Page 5 Page 7 Page 8 STA SERVICE CKT BREAKER CKT BREAKER STA SERVICE B-TRANSFORMER (3)52-BS9-0 (3)52-BS1-2 TRANSFORMER 1AX501 TRBL TROUBLE TROUBLE 1BX501 TRBL Page 11 Page 14 Page 16 Page 18 STA SERVICE CKT BREAKER CKT BREAKER STA SERVICE WTR CHILLER C-TRANSFORMER (3)52-BS7-8 (3)52-BS2-3 TRANSFORMER TRANSFORMER 1AX503 TRBL TROUBLE TROUBLE 1BX503 TRBL 1AX104 TRBL Page 21 Page 24 Page 26 Page 28 Page 31 STA SERVICE CKT BREAKER CKT BREAKER STA SERVICE WTR CHILLER D-TRANSFORMER (3)52-BS6-7 (3)52-BS4-5 TRANSFORMER TRANSFORMER 1DX501 TRBL TROUBLE TROUBLE 1CX501 TRBL 1BX104 TRBL Page 33 Page 36 Page 38 Page 40 Page 43 7.2KV SYS 4.16KV SYS USS E-INCOMING INCOMING FEEDER BRKR MALF BRKR MALF BRKR TRBL Page 45 Page 46 Page 49 4.16KV FDR 480V USS H2/O2 F-TO USS XFMR MAIN OR TIE ANALYZER BRKR MALF BRKR MALF TROUBLE Page 51 Page 52 Page 53
HC.OP-AR.ZZ-0016(Q)
Hope Creek Page 2 of 54 Rev. 14 ATTACHMENT A1 STA SERVICE TRANSFORMER Window Location E3-A1 1AX502 TRBL OPERATOR ACTION:
IF 1AX502 Transformer Lockout has occurred, THEN ENSURE 1BX502 supplies the 7.2KV buses.
INPUTS Digital Point/
Indication Nomenclature/Condition Automatic Action N/A 1AX502 Trouble Alarm or Transformer Lockout N/A Loss of power to annunciator panel on transformer.
Alarm only
REFERENCES:
E2-47(4)-10 E-6741-0
HC.OP-AR.ZZ-0016(Q)
Hope Creek Page 3 of 54 Rev. 14 ATTACHMENT A1 CONDITION 1AX502 Transformer Trouble SETPOINT N/A INDICATION N/A ORIGIN 1AX502 AUTOMATIC ACTION:
Alarm or Transformer lockout (on Fault Pressure)
OPERATOR ACTION:
- 1.
IF 1AX502 Transformer Lockout has occurred, THEN ENSURE 1BX502 supplies the 7.2KV buses.
- 2.
IF transfer has not occurred, THEN ATTEMPT (once) to close E(F)-12 FEED BRKR in accordance with HC.OP-SO.NA-0001(Z), 7.2KV System Operation.
- 3.
IF alarm only THEN ENSURE bus voltage is 7.2KV
- 4.
IF tap changer malfunction has occurred AND manual operation is desired, THEN REFER TO HC.OP-SO.MC-0001(Z), for direction on adjusting 13.8Kv to 7.2Kv Transformers 1AX502 (1BX502) Load Tap.
- 5.
REFER TO HC.OP-DL.ZZ-0003(Q), as necessary, to determine allowable bus voltage.
- 6.
IF unable to maintain proper bus voltage THEN REFER TO HC.OP-SO.NA-0001(Z), for direction on shifting 7.2Kv Busses 10A110(E) AND 10A120(F) to Alternate Breaker Alignments CAUSE CORRECTIVE ACTION
- 1. Transformer trouble 1A. DISPATCH NEO to 1AX502 Transformer to determine cause of alarm in accordance with HC.OP-AR.NA-0001(Z).
REFERENCES:
E2-47(4)-10
HC.OP-AR.ZZ-0016(Q)
Hope Creek Page 4 of 54 Rev. 14 ATTACHMENT A1 CONDITION SETPOINT N/A Loss of Power to Annunciator Panel on Transformer INDICATION N/A ORIGIN 1AX502 AUTOMATIC ACTION:
Alarm only OPERATOR ACTION:
None CAUSE/SYMPTOM ACTION
- 1. Loss of panel power 1A. REQUEST NEO to determine cause of panel loss of power.
1B. REQUEST SM/CRS to initiate corrective action.
REFERENCES:
E2-47(4)-10
HC.OP-AR.ZZ-0016(Q)
Hope Creek Page 5 of 54 Rev. 14 ATTACHMENT A2 13.8KV BUS LOCKOUT Window Location E3-A2 RELAY TRIP OPERATOR ACTION:
- 1.
ENSURE Auto Actions have occurred.
- 2.
REFER TO HC.OP-AB.ZZ-0000(Q), Reactor Scram, as necessary.
- 3.
ENSURE Class 1E busses are energized.
- 4.
ENSURE compliance with operability requirements of T/S 3/4.8.1 A.C. Sources.
INPUTS Digital Point/
Indication Nomenclature/Condition Automatic Action 1.
Breaker BS7-8 trips.
D4850 13.8KV BUS 8-9 DIFF LKOUT RLY 2.
Breaker BS9-0 trips.
1.
500KV Breaker BS2-4 trips.
2.
500KV Breaker BS2-6 trips AND is blocked from closing.
3.
13.8KV Breaker BS4-5 trips.
D4851 13.8KV BRKR 6-7 FAIL LKOUT RLY 4.
13.8KV Breaker BS7-8 trips.
1.
Breaker BS6-7 trips.
D4852 13.8KV BRKR 7-8 FAIL LKOUT RLY 2.
Breaker BS9-0 trips.
1.
500KV Breaker BS5-1 trips.
2.
500KV Breaker BS3-1 trips.
3.
13.8KV Breaker BS7-8 trips.
4.
13.8KV Breaker BS1-2 trips.
D4854 13.8KV BRKR 9-0 FAIL LKOUT RLY 5.
IF operating at >30% power, Rx may scram on P/L mismatch.
Continued next page
REFERENCES:
E-0115-0, Sht. A E-3032-0 PSBP 249001-A-1818-4
HC.OP-AR.ZZ-0016(Q)
Hope Creek Page 6 of 54 Rev. 14 ATTACHMENT A2 INPUTS Digital Point/
Indication Nomenclature/Condition Automatic Action 1.
Breaker BS2-3 trips.
D4857 13.8KV BUS 3-4 DIFF LKOUT RLY 2.
Breaker BS4-5 trips.
1.
500KV Breaker BS5-1 trips.
2.
500KV Breaker BS1-3 trips.
3.
13.8KV Breaker BS2-3 trips.
D4858 13.8KV BRKR 1-2 FAIL LKOUT RLY 4.
13.8KV Breaker BS9-0 trips.
1.
Breaker BS1-2 trips.
D4861 13.8KV BRKR 2-3 FAIL LKOUT RLY 2.
Breaker BS4-5 trips.
1.
500KV Breaker BS2-4 trips.
2.
500KV Breaker BS2-6 trips AND is blocked from closing.
3.
13.8KV Breaker BS2-3 trips.
4.
13.8KV Breaker BS6-7 trips.
D4865 13.8KV BRKR 4-5 FAIL LKOUT RLY 5.
IF operating at >30% power, Rx may scram on P/L mismatch.
HC.OP-AR.ZZ-0016(Q)
Hope Creek Page 7 of 54 Rev. 14 ATTACHMENT A3 4.16KV 1E INCM BRKR Window Location E3-A3 EMER TKOVR OPERATOR ACTION:
DISPATCH an NEO to Vital Bus A(B,C,D) to determine reason for EMERGENCY being selected on local breaker.
INPUTS Digital Point/
Indication Nomenclature/Condition Automatic Action D4571 4.16KV BUS A401 INC BRKR ETO Loss of breaker control in Control Room.
D4572 4.16KV BUS A402 INC BRKR ETO Loss of breaker control in Control Room.
D4573 4.16KV BUS A403 INC BRKR ETO Loss of breaker control in Control Room.
D4574 4.16KV BUS A404 INC BRKR ETO Loss of breaker control in Control Room.
REFERENCES:
E-3060-0 E-3400-0, Sht. 2
HC.OP-AR.ZZ-0016(Q)
Hope Creek Page 8 of 54 Rev. 14 ATTACHMENT A4 STA SERVICE TRANSFORMER Window Location E3-A4 1BX502 TRBL OPERATOR ACTION:
IF 1BX502 Transformer Lockout has occurred, ENSURE 1AX502 supplies the 7.2KV buses.
INPUTS Digital Point/
Indication Nomenclature/Condition Automatic Action N/A 1BX502 trouble Alarm or Transformer Lockout N/A Loss of power to annunciator panel on transformer.
Alarm only
REFERENCES:
E2-47 Sht. 4 E-6741-0
HC.OP-AR.ZZ-0016(Q)
Hope Creek Page 9 of 54 Rev. 14 ATTACHMENT A4 CONDITION 1BX502 Transformer Trouble SETPOINT N/A INDICATION N/A ORIGIN 1BX502 AUTOMATIC ACTION:
Alarm or Transformer lockout (on Fault Pressure)
OPERATOR ACTION:
- 1.
IF 1BX502 Transformer Lockout has occurred, ENSURE 1AX502 supplies the 7.2KV buses.
- 2.
IF transfer has not occurred, ATTEMPT once to close E(F)-11 FEED BRKR in accordance with HC.OP-SO.NA-0001(Z) 7.2KV System Operation.
- 3.
IF alarm only, ENSURE bus voltage is 7.2KV.
- 4.
IF tap changer malfunction has occurred AND manual operation is desired, THEN REFER TO HC.OP-SO.MC-0001(Z), for direction on adjusting 13.8Kv to 7.2Kv Transformers 1AX502 (1BX502) Load Tap.
- 5.
REFER TO HC.OP-DL.ZZ-0003(Q), as necessary, to determine allowable bus voltage.
- 6.
IF unable to maintain proper bus voltage THEN REFER TO HC.OP-SO.NA-0001(Z), for direction on shifting 7.2Kv Busses 10A110(E) and 10A120(F) to Alternate Breaker Alignments.
CAUSE CORRE CTIVE ACTION
- 1. Transformer trouble 1A. DISPATCH NEO to 1BX502 Transformer to determine cause of alarm IAW HC.OP-AR.NA-0001(Z).
REFERENCES:
E2-47(4)-10
HC.OP-AR.ZZ-0016(Q)
Hope Creek Page 10 of 54 Rev. 14 ATTACHMENT A4 CONDITION SETPOINT N/A Loss of Power to Annunciator Panel on Transformer INDICATION N/A ORIGIN 1AX502 AUTOMATIC ACTION:
Alarm only OPERATOR ACTION:
RESTORE annunciator panel power.
CAUSE CORRE CTIVE ACTION
- 1. Loss of panel power 1A. REQUEST NEO to determine cause of panel loss of power 1B. REQUEST SM/CRS to initiate corrective action.
REFERENCES:
E2-47(4)-10
HC.OP-AR.ZZ-0016(Q)
Hope Creek Page 11 of 54 Rev. 14 ATTACHMENT B1 STA SERVICE TRANSFORMER Window Location E3-B1 1AX501 TRBL OPERATOR ACTION:
- 1.
IF 1AX501 Transformer Lockout has occurred, THEN ENSURE 1BX501 supplies 4.16KV Class 1E busses, 10A101 AND 10A102.
- 2.
ENSURE compliance with operability requirements of T/S 3/4.8.1. A.C. Sources.
INPUTS Digital Point/
Indication Nomenclature/Condition Automatic Action N/A Transformer 1AX501 trouble Alarm or Transformer Lockout N/A Loss of power to local annunciator panel Alarm only
REFERENCES:
E2-76(4)-8 E-6741-0
HC.OP-AR.ZZ-0016(Q)
Hope Creek Page 12 of 54 Rev. 14 ATTACHMENT B1 CONDITION 1AX501 Transformer Trouble SETPOINT N/A INDICATION N/A ORIGIN 1AX501 AUTOMATIC ACTION:
Alarm or Transformer lockout (on Fault Pressure).
OPERATOR ACTION:
- 1.
IF 1AX501 Transformer Lockout has occurred, ENSURE 1BX501 supplies the 4.16KV Class 1E busses, 10A101 and 10A102.
- 2.
IF transfer has not occurred, ATTEMPT once to close feeder breakers IAW HC.OP-SO.PB-0001(Q),
4.16KV System Operation.
- 3.
ENSURE bus voltage remains within required range.
(REFER TO HC.OP-DL.ZZ-0002(3)(Q), Control Console Log(s))
[70038194]
- 4.
IF tap changer malfunction has occurred and manual operation is desired, THEN REFER TO HC.OP-SO.MC-0001(Z), for direction on adjusting 13.8KV to 4.16KV Transformer 1AX501 Load Tap.
- 5.
IF unable to maintain proper bus voltage THEN REFER TO HC.OP-SO.PB-0001(Z), for direction on shifting 4.16KV Busses to Alternate Breaker Alignments.
CAUSE CORRE CTIVE ACTION
- 1. Transformer trouble 1A. DISPATCH NEO to 1AX501 Transformer to determine cause of alarm IAW HC.OP-AR.NB-0001(Z).
REFERENCES:
E2-76(4)-8
HC.OP-AR.ZZ-0016(Q)
Hope Creek Page 13 of 54 Rev. 14 ATTACHMENT B1 CONDITION SETPOINT N/A Loss of Power to Annunciator Panel on Transformer INDICATION N/A ORIGIN 1AX501 AUTOMATIC ACTION:
Alarm only OPERATOR ACTION:
RESTORE annunciator panel power.
CAUSE CORRE CTIVE ACTION
- 1. Loss of panel power 1A. REQUEST NEO to determine cause of panel loss of power.
1B. REQUEST SM/CRS to initiate corrective action.
REFERENCES:
E2-76(4)-8
HC.OP-AR.ZZ-0016(Q)
Hope Creek Page 14 of 54 Rev. 14 ATTACHMENT B2 CKT BREAKER (3)52-BS9-0 Window Location E3-B2 TROUBLE OPERATOR ACTION:
DISPATCH an NEO to the 13.8KV Switchyard BS9-0 local panel to determine cause of alarm.
INPUTS Digital Point/
Indication Nomenclature/Condition Automatic Action N/A 13.8KV Swyd Breaker BS9-0 Air Pressure Low and Compressor Motor Undervoltage.
Alarm only
REFERENCES:
E-0103-0, Sht. A E-3032-0 E-6740-0 PSBP 249001-A-1818-4 PSBP 249233-A-1828-1
HC.OP-AR.ZZ-0016(Q)
Hope Creek Page 15 of 54 Rev. 14 ATTACHMENT B2 CONDITION SETPOINT 145 psig 13.8KV Bus BS9-0 Breaker Trouble INDICATION N/A ORIGIN N/A AUTOMATIC ACTION:
Alarm only OPERATOR ACTION:
DISPATCH an NEO to 13.8KV Switchyard BS9-0 local panel to determine cause of alarm.
CAUSE CORRE CTIVE ACTION
- 1. Compressor motor trip 1A. CHECK closed the following breakers:
- 1.
208VAC Compressor Motor breaker
- 2.
PAX2 Distribution Panel 208/120VAC Brkr #19 1B. REQUEST SM/CRS initiate corrective action.
- 2. Improper valve lineup 2A. CHECK Air Receiver pressure 145 psig.
2B. CHECK open Air Receiver Outlet Valve 2C. REQUEST SM/CRS initiate corrective action.
REFERENCES:
E-0103-0, Sht. A E-3032-0 E-6740-0 PSBP 249001-A-1818-4 PSBP 249233-A-1828-1
HC.OP-AR.ZZ-0016(Q)
Hope Creek Page 16 of 54 Rev. 14 ATTACHMENT B3 CKT BREAKER (3)52-BS1-2 Window Location E3-B3 TROUBLE OPERATOR ACTION:
DISPATCH an NEO to the 13.8KV Switchyard BS1-2 local panel to determine cause of alarm.
INPUTS Digital Point/
Indication Nomenclature/Condition Automatic Action N/A 13.8KV Swyd Breaker BS1-2 Air Pressure Low and Compressor Motor Undervoltage.
Alarm only
REFERENCES:
E-0103-0, Sht. A E-3032-0 E-6740-0 PSBP 249001-A-1818-4 PSBP 249233-A-1828-1
HC.OP-AR.ZZ-0016(Q)
Hope Creek Page 17 of 54 Rev. 14 ATTACHMENT B3 CONDITION SETPOINT 145 psig 13.8KV Bus BS1-2 Breaker Trouble INDICATION N/A ORIGIN N/A AUTOMATIC ACTION:
Alarm only OPERATOR ACTION:
DISPATCH an EO to 13.8KV Switchyard BS1-2 local panel to determine cause of alarm.
CAUSE CORRE CTIVE ACTION
- 1. Compressor motor trip 1A. CHECK closed the following breakers:
- 1.
208VAC Compressor Motor breaker
- 2.
PAX1 Distribution Panel 208/120VAC Brkr #13 1B. REQUEST SM/CRS to initiate corrective action.
- 2. Improper valve lineup 2A. CHECK Air Receiver pressure 145 psig.
2B. CHECK open Air Receiver Outlet Valve 2C. REQUEST SM/CRS to initiate corrective action.
REFERENCES:
E-0103-0, Sht. A E-3032-0 E-6740-0 PSBP 249001-A-1818-4 PSBP 249233-A-1828-1
HC.OP-AR.ZZ-0016(Q)
Hope Creek Page 18 of 54 Rev. 14 ATTACHMENT B4 STA SERVICE TRANSFORMER Window Location E3-B4 1BX501 TRBL OPERATOR ACTION:
- 1.
IF 1BX501 Transformer Lockout has occurred, ENSURE 1AX501 supplies 4.16KV Class 1E busses, 10A101 and 10A102.
- 2.
ENSURE compliance with operability requirements of T/S 3/4.8.1. A.C. Sources.
INPUTS Digital Point/
Indication Nomenclature/Condition Automatic Action N/A Transformer 1BX501 Trouble Alarm or Transformer Lockout N/A Loss of power to local annunciator panel Alarm only
REFERENCES:
E2-76(4)-8 E-6741-0
HC.OP-AR.ZZ-0016(Q)
Hope Creek Page 19 of 54 Rev. 14 ATTACHMENT B4 CONDITION 1BX501 Transformer Trouble SETPOINT N/A INDICATION N/A ORIGIN 1BX501 AUTOMATIC ACTION:
Alarm or Transformer lockout (on Fault Pressure).
OPERATOR ACTION:
- 1.
IF 1BX501 Transformer Lockout has occurred, ENSURE 1AX501 supplies the 4.16KV Class 1E busses, 10A101 and 10A102.
- 2.
IF transfer has not occurred, ATTEMPT once to close feeder breakers IAW HC.OP-SO.PB-0001(Q) 4.16KV System Operation.
- 3.
ENSURE bus voltage remains within required range.
(REFER TO HC.OP-DL.ZZ-0002(3)(Q), Control Console Log(s))
[70038194]
- 4.
IF tap changer malfunction has occurred and manual operation is desired, THEN REFER TO HC.OP-SO.MC-0001(Z), for direction on adjusting 13.8KV to 4.16KV Transformer 1BX501 Load Tap.
- 5.
IF unable to maintain proper bus voltage THEN REFER TO HC.OP-SO.PB-0001(Z), for direction on shifting 4.16KV Busses to Alternate Breaker Alignments.
CAUSE CORRE CTIVE ACTION
- 1. Transformer trouble 1A. DISPATCH NEO to 1BX501 Transformer to determine cause of alarm IAW HC.OP-AR.NB-0001(Z).
REFERENCES:
E2-76(4)-8
HC.OP-AR.ZZ-0016(Q)
Hope Creek Page 20 of 54 Rev. 14 ATTACHMENT B4 CONDITION SETPOINT N/A Loss of Power to Annunciator Panel on Transformer INDICATION N/A ORIGIN 1BX501 AUTOMATIC ACTION:
Alarm only OPERATOR ACTION:
RESTORE annunciator panel power.
CAUSE CORRE CTIVE ACTION
- 1. Loss of panel power 1A. REQUEST NEO to determine cause of panel loss of power.
1B. REQUEST SM/CRS to initiate corrective action.
REFERENCES:
E2-76(4)-8
HC.OP-AR.ZZ-0016(Q)
Hope Creek Page 21 of 54 Rev. 14 ATTACHMENT C1 STA SERVICE TRANSFORMER Window Location E3-C1 1AX503 TRBL OPERATOR ACTION:
IF 1AX503 Transformer Lockout has occurred, ENSURE 1BX503 supplies 4.16KV busses 10A502 and 10A501.
NOTE This overhead alarm has re-flash capability.
INPUTS Digital Point/
Indication Nomenclature/Condition Automatic Action N/A Transformer 1AX503 Trouble Alarm or Transformer Lockout N/A Loss of power to local annunciator panel Alarm only
REFERENCES:
E2-75(2)-9 E-6741-0
HC.OP-AR.ZZ-0016(Q)
Hope Creek Page 22 of 54 Rev. 14 ATTACHMENT C1 CONDITION 1AX503 Transformer Trouble SETPOINT N/A INDICATION N/A ORIGIN 1AX503 AUTOMATIC ACTION:
Alarm or Transformer lockout (on Fault Pressure).
OPERATOR ACTION:
- 1.
IF 1AX503 Transformer Lockout has occurred, ENSURE 1BX503 supplies the 4.16KV busses 10A502 and 10A501.
- 2.
IF transfer has not occurred, ATTEMPT once to close feeder breakers IAW HC.OP-SO.PB-0001(Q) 4.16KV System Operation.
- 3.
IF alarm only, ENSURE bus voltage is 4.16KV.
- 4.
IF tap changer malfunction has occurred and manual operation is desired, THEN REFER TO HC.OP-SO.MC-0001(Z), for direction on adjusting 13.8KV to 4.16KV Transformer 1AX503 Load Tap.
- 5.
REFER TO HC.OP-DL.ZZ-0003(Q), as necessary, to determine allowable bus voltage.
- 6.
IF unable to maintain proper bus voltage THEN REFER TO HC.OP-SO.PB-0001(Z), for direction on shifting 4.16KV Busses to Alternate Breaker Alignments.
CAUSE CORRE CTIVE ACTION
- 1. Transformer trouble 1A. DISPATCH NEO to 1AX503 Transformer to determine cause of alarm IAW HC.OP-AR.NB-0002(Z).
REFERENCES:
E2-75(2)-9
HC.OP-AR.ZZ-0016(Q)
Hope Creek Page 23 of 54 Rev. 14 ATTACHMENT C1 CONDITION SETPOINT N/A Loss of Power to Annunciator Panel on Transformer INDICATION N/A ORIGIN 1AX503 AUTOMATIC ACTION:
Alarm only OPERATOR ACTION:
RESTORE annunciator panel power.
CAUSE CORRE CTIVE ACTION
- 1. Loss of panel power 1A. REQUEST NEO to determine cause of panel loss of power.
1B. REQUEST SM/CRS to initiate corrective action.
REFERENCES:
E2-75(2)-9
HC.OP-AR.ZZ-0016(Q)
Hope Creek Page 24 of 54 Rev. 14 ATTACHMENT C2 CKT BREAKER (3)52-BS7-8 Window Location E3-C2 TROUBLE OPERATOR ACTION:
DISPATCH an NEO to the 13.8KV Switchyard BS7-8 local panel to determine cause of alarm.
INPUTS Digital Point/
Indication Nomenclature/Condition Automatic Action N/A 13.8KV Swyd Breaker BS7-8 Air Pressure Low and Compressor Motor Undervoltage.
Alarm only
REFERENCES:
E-0103-0, Sht. A E-3032-0 E-6740-0 PSBP 249001-A-1818-4 PSBP 249233-A-1828-1
HC.OP-AR.ZZ-0016(Q)
Hope Creek Page 25 of 54 Rev. 14 ATTACHMENT C2 CONDITION SETPOINT 145 psig 13.8KV Bus BS7-8 Breaker Trouble INDICATION N/A ORIGIN N/A AUTOMATIC ACTION:
Alarm only OPERATOR ACTION:
DISPATCH an NEO to the 13.8KV Switchyard BS7-8 local panel to determine cause of alarm.
CAUSE CORRE CTIVE ACTION
- 1. Compressor motor trip 1A. CHECK closed the following breakers:
- 1.
208VAC Compressor Motor breaker
- 2.
PAX2 Distribution Panel 208/120VAC Brkr #14 1B. REQUEST SM/CRS to initiate corrective action.
- 2. Improper valve lineup 2A. CHECK Air Receiver pressure 145 psig.
2B. CHECK open Air Receiver Outlet Valve 2C. REQUEST SM/CRS to initiate corrective action.
REFERENCES:
E-0103-0, Sht. A E-3032-0 E-6740-0 PSBP 249001-A-1818-4 PSBP 249233-A-1828-1
HC.OP-AR.ZZ-0016(Q)
Hope Creek Page 26 of 54 Rev. 14 ATTACHMENT C3 CKT BREAKER (3)52-BS2-3 Window Location E3-C3 TROUBLE OPERATOR ACTION:
DISPATCH an NEO to the 13.8KV Switchyard BS2-3 local panel to determine cause of alarm.
INPUTS Digital Point/
Indication Nomenclature/Condition Automatic Action N/A 13.8KV Swyd Breaker BS2-3 Air Pressure Low and Compressor Motor Undervoltage.
Alarm only
REFERENCES:
E-0103-0, Sht. A E-3032-0 E-6740-0 PSBP 249001-A-1818-4 PSBP 249233-A-1828-1
HC.OP-AR.ZZ-0016(Q)
Hope Creek Page 27 of 54 Rev. 14 ATTACHMENT C3 CONDITION SETPOINT 145 psig 13.8KV Bus BS2-3 Breaker Trouble INDICATION N/A ORIGIN N/A AUTOMATIC ACTION:
Alarm only OPERATOR ACTION:
DISPATCH an NEO to the 13.8KV Switchyard BS2-3 local panel to determine cause of alarm.
CAUSE CORRE CTIVE ACTION
- 1. Compressor motor trip 1A. CHECK closed the following breakers:
- 1.
208VAC Compressor Motor breaker
- 2.
PAX1 Distribution Panel 208/120VAC Brkr #14 1B. REQUEST SM/CRS to initiate corrective action.
- 2. Improper valve lineup 2A. CHECK Air Receiver pressure 145 psig.
2B. CHECK open Air Receiver Outlet Valve 2C. REQUEST SM/CRS to initiate corrective action.
REFERENCES:
E-0103-0, Sht. A E-3032-0 E-6740-0 PSBP 249001-A-1818-4 PSBP 249233-A-1828-1
HC.OP-AR.ZZ-0016(Q)
Hope Creek Page 28 of 54 Rev. 14 ATTACHMENT C4 STA SERVICE TRANSFORMER Window Location E3-C4 1BX503 TRBL OPERATOR ACTION:
IF 1BX503 Transformer Lockout has occurred, ENSURE 1AX503 supplies 4.16KV busses 10A501 and 10A502.
INPUTS Digital Point/
Indication Nomenclature/Condition Automatic Action N/A Transformer 1BX503 Trouble Alarm or Transformer Lockout N/A Loss of power to local annunciator panel Alarm only
REFERENCES:
E2-75(2)-9 E-6741-0
HC.OP-AR.ZZ-0016(Q)
Hope Creek Page 29 of 54 Rev. 14 ATTACHMENT C4 CONDITION 1BX503 Transformer Trouble SETPOINT N/A INDICATION N/A ORIGIN 1BX503 AUTOMATIC ACTION:
Alarm or Transformer lockout (on Fault Pressure).
OPERATOR ACTION:
- 1.
IF 1BX503 Transformer Lockout has occurred, ENSURE 1AX503 supplies the 4.16KV busses 10A501 and 10A502.
- 2.
IF transfer has not occurred, ATTEMPT once to close feeder breakers IAW HC.OP-SO.PB-0001(Q) 4.16KV System Operation.
- 3.
IF alarm only, ENSURE bus voltage is 4.16KV.
- 4.
IF tap changer malfunction has occurred and manual operation is desired, THEN REFER TO HC.OP-SO.MC-0001(Z), for direction on adjusting 13.8KV to 4.16KV Transformer 1BX503 Load Tap.
- 5.
REFER TO HC.OP-DL.ZZ-0003(Q), as necessary, to determine allowable bus voltage.
- 6.
IF unable to maintain proper bus voltage THEN REFER TO HC.OP-SO.PB-0001(Z), for direction on shifting 4.16KV Busses to Alternate Breaker Alignments.
CAUSE CORRE CTIVE ACTION
- 1. Transformer trouble 1A. DISPATCH NEO to 1BX503 Transformer to determine cause of alarm IAW HC.OP-AR.NB-0002(Z).
REFERENCES:
E2-75(2)-9
HC.OP-AR.ZZ-0016(Q)
Hope Creek Page 30 of 54 Rev. 14 ATTACHMENT C4 CONDITION SETPOINT N/A Loss of Power to Annunciator Panel on Transformer INDICATION N/A ORIGIN 1BX503 AUTOMATIC ACTION:
Alarm only OPERATOR ACTION:
RESTORE annunciator panel power.
CAUSE CORRE CTIVE ACTION
- 1. Loss of panel power 1A. REQUEST NEO to determine cause of panel loss of power.
1B. REQUEST SM/CRS to initiate corrective action.
REFERENCES:
E2-75(2)-9
HC.OP-AR.ZZ-0016(Q)
Hope Creek Page 31 of 54 Rev. 14 ATTACHMENT C5 WTR CHILLER TRANSFORMER Window Location E3-C5 1AX104 TRBL OPERATOR ACTION:
DISPATCH NEO to 1AX104 Turbine Building Transformer for Water Chiller to check hot spot temperature indication.
INPUTS Digital Point/
Indication Nomenclature/Condition Automatic Action N/A Water Chiller Transformer 1AX104 Trouble Alarm only
REFERENCES:
E-6741-0 10855-E7-8, (1)-3
HC.OP-AR.ZZ-0016(Q)
Hope Creek Page 32 of 54 Rev. 14 ATTACHMENT C5 CONDITION SETPOINT 200°C/210°C/220°C Water Chiller Transformer 1AX104 Trouble INDICATION N/A ORIGIN 1AX104 AUTOMATIC ACTION:
Alarm only OPERATOR ACTION:
DISPATCH NEO to 1AX104 Turbine Building Transformer for Water Chiller to check hot spot temperature indication.
CAUSE CORRE CTIVE ACTION
- 1. Transformer excessive load or fault 1A. START standby Chiller IAW HC.OP-SO.GB-0001(Q) Chilled Water System Operation.
1B. STOP AK111 Chiller IAW HC.OP-SO.GB-0001(Q) Chilled Water System Operation.
1C. REQUEST SM/CRS to initiate corrective action.
- 2. Inadequate transformer ventilation 2A. CHECK transformer ventilation openings for blockage.
2B. CHECK Turbine Bldg. Vent operation IAW HC.OP-SO.GE-0001(Z) Turbine Building Ventilation Operation.
2C. REQUEST SM/CRS to initiate corrective action.
REFERENCES:
E-6741-0 10855-E7-8, (1)-3
HC.OP-AR.ZZ-0016(Q)
Hope Creek Page 33 of 54 Rev. 14 ATTACHMENT D1 STA SERVICE TRANSFORMER Window Location E3-D1 1DX501 TRBL OPERATOR ACTION:
IF 1DX501 Transformer Lockout has occurred, ENSURE 1CX501 supplies 4.16KV busses 10A103 and 10A104.
INPUTS Digital Point/
Indication Nomenclature/Condition Automatic Action N/A Transformer 1DX501 Trouble Alarm or Transformer lockout N/A Loss of power to local annunciator panel Alarm only
REFERENCES:
E-6741-0 E2-76(4)-8
HC.OP-AR.ZZ-0016(Q)
Hope Creek Page 34 of 54 Rev. 14 ATTACHMENT D1 CONDITION Transformer 1DX501 Trouble SETPOINT N/A INDICATION N/A ORIGIN 1DX501 AUTOMATIC ACTION:
Alarm or Transformer lockout (on Fault Pressure).
OPERATOR ACTION:
- 1.
IF 1DX501 Transformer Lockout has occurred, ENSURE 1CX501 supplies 4.16KV busses 10A103 and 10A104.
- 2.
IF the transfer has not occurred, ATTEMPT once to close feeder breakers IAW HC.OP-SO.PB-0001(Q) 4.16KV System Operation.
- 3.
IF alarm only, ENSURE bus voltage is 4.16KV.
- 4.
IF tap changer malfunction has occurred and manual operation is desired, THEN REFER TO HC.OP-SO.MC-0001(Z), for direction on adjusting 13.8KV to 4.16KV Transformer 1DX501 Load Tap.
- 5.
REFER TO HC.OP-DL.ZZ-0003(Q), as necessary, to determine allowable bus voltage.
- 6.
IF unable to maintain proper bus voltage THEN REFER TO HC.OP-SO.PB-0001(Z), for direction on shifting 4.16KV Busses to Alternate Breaker Alignments.
CAUSE CORRE CTIVE ACTION
- 1. Transformer trouble 1A. DISPATCH NEO to 1DX501 Transformer to determine cause of alarm IAW HC.OP-AR.NB-0001(Z).
REFERENCES:
E2-76(4)-8
HC.OP-AR.ZZ-0016(Q)
Hope Creek Page 35 of 54 Rev. 14 ATTACHMENT D1 CONDITION SETPOINT N/A Loss of power to Annunciator Panel on Transformer INDICATION N/A ORIGIN 1DX501 AUTOMATIC ACTION:
Alarm only OPERATOR ACTION:
RESTORE annunciator panel power.
CAUSE CORRE CTIVE ACTION
- 1. Loss of panel power 1A. REQUEST NEO to determine cause of panel loss of power.
1B. REQUEST SM/CRS to initiate corrective action.
REFERENCES:
E2-76(4)-8
HC.OP-AR.ZZ-0016(Q)
Hope Creek Page 36 of 54 Rev. 14 ATTACHMENT D2 CKT BREAKER (3)52-BS6-7 Window Location E3-D2 TROUBLE OPERATOR ACTION:
DISPATCH an NEO to 13.8KV Switchyard BS6-7 local panel to determine cause of alarm.
INPUTS Digital Point/
Indication Nomenclature/Condition Automatic Action N/A 13.8KV Swyd Breaker BS6-7 Air Pressure Low and Compressor Motor Undervoltage Alarm only
REFERENCES:
E-0103-0, Sht. A E-3032-0 E-6740-0 PSBP 249001-A-1818-4 PSBP 249233-A-1828-1
HC.OP-AR.ZZ-0016(Q)
Hope Creek Page 37 of 54 Rev. 14 ATTACHMENT D2 CONDITION SETPOINT 145 psig 13.8KV Bus BS6-7 Breaker Trouble INDICATION N/A ORIGIN N/A AUTOMATIC ACTION:
Alarm only OPERATOR ACTION:
DISPATCH an NEO to 13.8KV Switchyard BS6-7 local panel to determine cause of alarm.
CAUSE CORRE CTIVE ACTION
- 1. Compressor Motor trip 1A. CHECK closed the following breakers:
- 1.
208VAC Compressors Motor breaker.
- 2.
PAX 2 Distribution Panel 208/108VAC Brkr #13.
1B. REQUEST SM/CRS to initiate corrective action.
- 2. Improper valve lineup 2A CHECK Air Receiver pressure < 145 psig.
2B. CHECK open Air Receiver Outlet Valve.
2C. REQUEST SM/CRS to initiate corrective action.
REFERENCES:
E-0103-0, Sht. A E-3032-0 E-6740-0 PSBP 249001-A-1818-4 PSBP 249233-A-1828-1
HC.OP-AR.ZZ-0016(Q)
Hope Creek Page 38 of 54 Rev. 14 ATTACHMENT D3 CKT BREAKER (3)52-BS4-5 Window Location E3-D3 TROUBLE OPERATOR ACTION:
DISPATCH an NEO to 13.8KV Switchyard BS4-5 local panel to determine cause of alarm.
INPUTS Digital Point/
Indication Nomenclature/Condition Automatic Action N/A 13.8KV Swyd Breaker BS4-5 Air Pressure Low and Compressor Motor Undervoltage Alarm only
REFERENCES:
E-0103-0, Sht. A E-3032-0 E-6740-0 PSBP 249001-A-1818-4 PSBP 249233-A-1828-1
HC.OP-AR.ZZ-0016(Q)
Hope Creek Page 39 of 54 Rev. 14 ATTACHMENT D3 CONDITION 13.8KV Bus BS4-5 Breaker SETPOINT 145 psig INDICATION N/A ORIGIN N/A AUTOMATIC ACTION:
Alarm only OPERATOR ACTION:
DISPATCH an NEO to 13.8KV Switchyard BS4-5 local panel to determine cause of alarm.
CAUSE CORRE CTIVE ACTION
- 1. Compressor Motor trip 1A. CHECK closed the following breakers:
- 1.
208VAC Compressors Motor breaker.
- 2.
PAX1 Distribution Panel³208/120VAC Brkr #19.
1B. REQUEST SM/CRS to initiate corrective action.
- 2. Improper valve lineup 2A. CHECK air receiver pressure < 145 psig.
2B. CHECK open Air Receiver Outlet Valve.
2C. REQUEST SM/CRS to initiate corrective action.
REFERENCES:
E-0103-0, Sht. A E-3032-0 E-6740-0 PSBP 249001-A-1818-4 PSBP 249233-A-1828-1
HC.OP-AR.ZZ-0016(Q)
Hope Creek Page 40 of 54 Rev. 14 ATTACHMENT D4 STA SERVICE TRANSFORMER Window Location E3-D4 1CX501 TRBL OPERATOR ACTION:
IF 1CX501 Transformer Lockout has occurred, ENSURE 1DX501 supplies 4.16KV busses 10A103 and 10A104.
INPUTS Digital Point/
Indication Nomenclature/Condition Automatic Action N/A Transformer 1CX501 Trouble Alarm or Transformer lockout N/A Loss of power to local annunciator panel Alarm only
REFERENCES:
E-6741-0 E2-76(4)-8
HC.OP-AR.ZZ-0016(Q)
Hope Creek Page 41 of 54 Rev. 14 ATTACHMENT D4 CONDITION Transformer 1CX501 Trouble SETPOINT N/A INDICATION N/A ORIGIN 1CX501 AUTOMATIC ACTION:
Alarm or Transformer lockout (on Fault Pressure).
OPERATOR ACTION:
- 1.
IF 1CX501 Transformer Lockout has occurred, ENSURE 1DX501 supplies 4.16KV busses 10A103 and 10A104.
- 2.
IF the transfer has not occurred, ATTEMPT once to close feeder breakers IAW HC.OP-SO.PB-0001(Q) 4.16KV System Operation.
- 3.
IF alarm only, ENSURE bus voltage is 4.16KV.
- 4.
IF tap changer malfunction has occurred and manual operation is desired, THEN REFER TO HC.OP-SO.MC-0001(Z), for direction on adjusting 13.8KV to 4.16KV Transformer 1CX501 Load Tap.
- 5.
REFER TO HC.OP-DL.ZZ-0003(Q), as necessary, to determine allowable bus voltage.
- 6.
IF unable to maintain proper bus voltage THEN REFER TO HC.OP-SO.PB-0001(Z), for direction on shifting 4.16KV Busses to Alternate Breaker Alignments.
CAUSE CORRE CTIVE ACTION
- 1. Transformer trouble 1A. DISPATCH NEO to 1CX501 Transformer to determine cause of alarm IAW HC.OP-AR.NB-0001(Z).
REFERENCES:
E-6741-0 E2-76(4)-8
HC.OP-AR.ZZ-0016(Q)
Hope Creek Page 42 of 54 Rev. 14 ATTACHMENT D4 CONDITION SETPOINT N/A Loss of power to Annunciator Panel on Transformer INDICATION N/A ORIGIN 1CX501 AUTOMATIC ACTION:
Alarm only OPERATOR ACTION:
RESTORE annunciator panel power.
CAUSE CORRE CTIVE ACTION
- 1. Loss of panel power 1A. REQUEST NEO to determine cause of panel loss of power.
1B. REQUEST SM/CRS to initiate corrective action.
REFERENCES:
E-6741-0 E2-76(4)-8
HC.OP-AR.ZZ-0016(Q)
Hope Creek Page 43 of 54 Rev. 14 ATTACHMENT D5 WTR CHILLER TRANSFORMER Window Location E3-D5 1BX104 TRBL OPERATOR ACTION:
DISPATCH NEO to 1BX104 Turbine Building Transformer for Water Chiller to determine cause of alarm.
INPUTS Digital Point/
Indication Nomenclature/Condition Automatic Action N/A Water Chiller Transformer 1BX104 Trouble Alarm only
REFERENCES:
E-6741-0 10855-E7-8, (1)-3
HC.OP-AR.ZZ-0016(Q)
Hope Creek Page 44 of 54 Rev. 14 ATTACHMENT D5 CONDITION Water Chiller Transformer SETPOINT 200°C/210°C/220°C 1BX104 Trouble INDICATION N/A ORIGIN 1BX104 AUTOMATIC ACTION:
Alarm only OPERATOR ACTION:
DISPATCH NEO to 1BX104 Turbine Building Transformer for Water Chiller to determine cause of alarm.
CAUSE CORRE CTIVE ACTION
- 1. Transformer excessive load or fault.
1A. START standby Chiller IAW HC.OP-SO.GB-0001(Q) Chilled Water System Operation.
1B. STOP BK111 Chiller IAW HC.OP-SO.GB-0001(Q).
1C. REQUEST SM/CRS to initiate corrective action.
- 2. Inadequate transformer ventilation 2A. CHECK transformer ventilation openings for blockage.
2B. CHECK Turbine Bldg. Vent operation IAW HC.OP-SO.GE-0001(Z)
Turbine Bldg Ventilation Operation.
2C. REQUEST SM/CRS to initiate corrective action.
REFERENCES:
E-6741-0 10855-E7-8, (1)-3
HC.OP-AR.ZZ-0016(Q)
Hope Creek Page 45 of 54 Rev. 14 ATTACHMENT E1 7.2KV SYS INCOMING Window Location E3-E1 BRKR MALF OPERATOR ACTION:
- 1.
ENSURE Auto Transfer to Alternate Feeder breaker has occurred.
- 2.
ENSURE compliance with the operability requirements of T/S 3/4.4.1 Recirculation System.
INPUTS Digital Point/
Indication Nomenclature/Condition Automatic Action D4553 7.2KV CKT BUS A110 BRKR Possible breaker trip D4554 7.2KV CKT BUS A120 BRKR Possible Breaker trip
REFERENCES:
E-6747-0 E-3400-0, Sht. 1 E-3040-0
HC.OP-AR.ZZ-0016(Q)
Hope Creek Page 46 of 54 Rev. 14 ATTACHMENT E2 4.16KV SYS INCOMING Window Location E3-E2 BRKR MALF OPERATOR ACTION:
IF a 4.16KV Feeder Breaker has tripped, ENSURE Alternate Feeder Breaker automatically closes.
INPUTS Digital Point/
Indication Nomenclature/Condition Automatic Action D4555 4.16KV CKT A102/103/501 BRKR Alarm or Breaker Trip D4556 4.16KV CKT A101/104/502 BRKR Alarm or Breaker Trip D4557 4.16KV CKT A401 BRKR Alarm only D4558 4.16KV A402 CKT BRKR Alarm or Breaker Trip D4559 4.16KV BUS A403 CKT BRKR Alarm or Breaker Trip D4560 4.16KV BUS A404 CKT BRKR Alarm or Breaker Trip
REFERENCES:
E-3050-0, Sht. 1, Sht. 2, E-3400-0, Sht. 1, E-3060-0, Sht. 1,
HC.OP-AR.ZZ-0016(Q)
Hope Creek Page 47 of 54 Rev. 14 ATTACHMENT E2 TABLE 001
- 1.
NO LOP and/or LOCA exists IF the following conditions exist:
A. Standby Diesel is NOT running AND B. 4.16 KV Bus Power is available AND C. Alternate Feed Breaker is closed AND D. ELS (Emergency Load Sequencer) Initiated AND E. Previously running loads stripped.
- 2.
As a result of a slow transfer, a PSIS signal will be generated, therefore manually start the following loads from the Control Room as required by SM/CRS.
A. Service Water Pump B. SACS Pump C. RACS Pump (IF applicable)
D. TSC Chillers and Chilled Water Circ. Pumps (IF applicable)
E. Control Room Chillers and Chilled Water Circ. Pumps (IF applicable)
F. Applicable Drywell Coolers G. CRD pump (IF applicable) (NOTE 1)
H. Emergency Instrument Air Compressor (IF applicable)(NOTE 1)
I.
Radwaste Supply and Exhaust Fans (IF applicable)(NOTE 1)
- 3.
RESET Initiated ELS (Emergency Load Sequencer) either manually (key),
OR by Powering Down and Up ( El. 130').
- 4.
Following a slow transfer, REQUEST Maintenance to reset the ELS IAW Attachment E2-1.
- 5.
The following loads will restart automatically upon resetting ELS, IF process signals (e.g. flows), are satisfied.
A. RBVS Supply and Exhaust Fans B. SWGR Room Coolers C. D.G. Room Recirc Fans D. D.G. Panel Room Supply Fans E. Control Room Supply Fans F. Control Equip Room Supply Fans G. CREF Fan H. Control Area Battery Exhaust Fan I.
Control Room Return Air Fan
- 6.
FRVS will trip on Undervoltage & will restart on process signal.
- 7.
Class 1E unit substation Bkrs & MCC's fed from the 4.16 KV Class 1E busses will not trip.
Class 1E powered non-1E loads which trip during this transfer are addressed in Step 2 above.
- 8.
Should a LOCA signal initiate concurrent with this transfer, all automatic equipment operations, through the ELS, will occur as per design, without operator action.
NOTE Trips on undervoltage, manual action is required to restore. NO PSIS for this.
HC.OP-AR.ZZ-0016(Q)
Hope Creek Page 48 of 54 Rev. 14 ATTACHMENT E2-1 Page 1 of 1 EMERGENCY LOAD SEQUENCER RESET
- 1.
OBTAIN the keys required to operate the following switches:
- SEQUENCER TEST SWITCH
- DG BREAKER CLOSED SIMULATE SWITCH
- SEQUENCER RESET SWITCH
- 2.
UNLOCK and OPEN the cabinet door on Panel 1A(B,C,D)C428 to gain access to the MTP.
- 3.
INSERT the key into the SEQUENCER TEST SWITCH AND PLACE in the LOCA TEST position.
- 4.
When the SEQUENCING COMPLETE light on the MTP illuminates, PLACE the SEQUENCER TEST SWITCH in the OFF position.
- 5.
INSERT the key into the SEQUNCER RESET SWITCH and momentarily PLACE switch to RESET.
- 6.
PLACE the SEQUENCER TEST SWITCH in the LOP TEST position.
- 7.
INSERT the key into the DG BREAKER CLOSED SIMULATE SWITCH AND PLACE in the SIMULATE position.
- 8.
When the SEQUENCING COMPLETE light on the MTP illuminates, PLACE the SEQUENCER TEST SWITCH in the OFF position.
- 9.
PLACE the DG BREAKER CLOSED SIMULATE SWITCH to OFF.
- 10. Momentarily PLACE the SEQUNCER RESET SWITCH to RESET.
- 11. VERIFY all white lights on the MTP are extinguished.
- 12. REMOVE all keys.
- 13. CLOSE and LOCK the cabinet door on Panel 1A(B,C,D)C428.
HC.OP-AR.ZZ-0016(Q)
Hope Creek Page 49 of 54 Rev. 14 ATTACHMENT E3 USS FEEDER Window Location E3-E3 BRKR TRBL OPERATOR ACTION:
- 1.
DISPATCH NEO to affected USS to determine cause of alarm.
- 2.
ENSURE compliance with operability requirements of T/S 3/4.8.2 DC Sources AND 3/4.8.3 Onsite Power Distribution Systems.
INPUTS Digital Point/
Indication Nomenclature/Condition Automatic Action D4600 UNIT SUBSTA 00B300 FDR CKT BRKR Alarm only D4607 UNIT SUBSTA 00B310 FDR CKT BRKR Alarm only D4609 UNIT SUBSTA 10B410 FDR CKT BRKR Alarm only D4610 UNIT SUBSTA 10B420 FDR CKT BRKR Alarm only D4611 UNIT SUBSTA 10B430 FDR CKT BRKR Alarm only D4612 UNIT SUBSTA 10B450 FDR CKT BRKR Alarm only D4613 UNIT SUBSTA 10B460 FDR CKT BRKR Alarm only D4614 UNIT SUBSTA 10B470 FDR CKT BRKR Alarm only D4615 UNIT SUBSTA 10B480 FDR CKT BRKR Alarm only
REFERENCES:
E-3132-0 E-3133-0; Sht. 1 E-3134-0
HC.OP-AR.ZZ-0016(Q)
Hope Creek Page 50 of 54 Rev. 14 ATTACHMENT E3 INPUTS Digital Point/
Indication Nomenclature/Condition Automatic Action D4616 UNIT SUBSTA 10B440 FDR CKT BRKR Alarm only D4617 UNIT SUBSTA 10B490 FDR CKT BRKR Alarm only D4618 UNIT SUBSTA 10B120 FDR CKT BRKR Alarm only D4619 UNIT SUBSTA 10B130 FDR CKT BRKR Alarm only D4620 UNIT SUBSTA 10B140 FDR CKT BRKR Alarm only D4621 UNIT SUBSTA 10B250 FDR CKT BRKR Alarm only D4622 UNIT SUBSTA 10B260 FDR CKT BRKR Alarm only D4623 UNIT SUBSTA 10B110 FDR CKT BRKR Alarm only D4624 UNIT SUBSTA 00B170 FDR CKT BRKR Alarm only D4625 UNIT SUBSTA 00B180 FDR CKT BRKR Alarm only D4626 UNIT SUBSTA 00B500 FDR CKT BRKR Alarm only D4627 UNIT SUBSTA 00B590 FDR CKT BRKR Alarm only
REFERENCES:
E-3132-0 E-3133-0; Sht. 1 E-3134-0
HC.OP-AR.ZZ-0016(Q)
Hope Creek Page 51 of 54 Rev. 14 ATTACHMENT F2 4.16KV FDR TO USS XFMR Window Location E3-F2 BRKR MALF OPERATOR ACTION:
- 1.
DISPATCH NEO to affected 4.16KV Feeder Circuit Breaker to determine cause of alarm.
- 2.
IF applicable, ENSURE compliance with operability requirements of T/S 3/4.8.3 Onsite Electrical Power Distribution Systems AND 3/4.8.2 D.C. Sources.
INPUTS Digital Point/
Indication Nomenclature/Condition Automatic Action D4561 4.16KV FDR CKT 102/3/4 BRKR Alarm or breaker trip D4562 4.16KV FDR CKT 101/501/502 BRKR Alarm or breaker trip D4563 4.16KV BUS A401 FDR CKT BRKR Alarm or breaker trip D4564 4.16KV BUS A402 FDR CKT BRKR Alarm or breaker trip D4565 4.16KV BUS A403 FDR CKT BRKR Alarm or breaker trip D4566 4.16KV BUS A404 FDR CKT BRKR Alarm or breaker trip
REFERENCES:
E-0001-0 E-3051-0, Sht. 1, Sht. 2 E-3061-0 E-3400-0, Sht. 1
HC.OP-AR.ZZ-0016(Q)
Hope Creek Page 52 of 54 Rev. 14 ATTACHMENT F3 480V USS MAIN OR TIE Window Location E3-F3 BRKR MALF OPERATOR ACTION:
DISPATCH an NEO to affected 480V to determine cause of alarm.
INPUTS Digital Point/
Indication Nomenclature/Condition Automatic Action D4575 480V MAIN CKT BRKR B170/B180 Alarm or breaker trip D4576 480V MAIN CKT BRKR B500/B590 Alarm or breaker trip D4577 480V MAIN CKT BRKR B300/B310 Alarm or breaker trip
REFERENCES:
E-0001-0 E-0013-0; Sht. 1 E-3030-0; Sht. 1 E-3031-0 E-3400-0; Sht. 2 E-6747-0
HC.OP-AR.ZZ-0016(Q)
Hope Creek Page 53 of 54 Rev. 14 ATTACHMENT F5 H2/O2 ANALYZER Window Location E3-F5 TROUBLE OPERATOR ACTION:
- 1.
CHECK Containment Atmosphere Pnl on 10C650E to determine cause of alarm.
- 2.
ENSURE compliance with operability requirements of T/S 3.6.3 Primary Containment Isolation Valves, 3.3.7.5 Accident Monitoring Instrumentation and 3.6.6.2 Drywell and Suppression Chamber Oxygen Concentration.
INPUTS Digital Point/
Indication Nomenclature/Condition Automatic Action D4203 CONT ATM ANALYZER A H2 Alarm only D4204 CONT ATM ANALYZER A O2 Alarm only D4205 CONT ATM H2/O2 ANALYZER A UNIT Alarm only D4212 CONT ATM ANALYZER B H2 Alarm only D4213 CONT ATM ANALYZER B O2 Alarm only D4214 CONT ATM H2/O2 ANALYZER B UNIT Alarm only D4234 H2/O2 ANALYZER A HV-4955A OPF Alarm only D4235 H2/O2 ANALYZER A HV-5019A OPF Alarm only D4236 H2/O2 ANALYZER A HV-4959A OPF Alarm only D4237 H2/O2 ANALYZER A HV-4966A OPF Alarm only
REFERENCES:
J-57-0; Sht. 10; Sht. 18
HC.OP-AR.ZZ-0016(Q)
Hope Creek Page 54 of 54 Rev. 14 ATTACHMENT F5 INPUTS Digital Point/
Indication Nomenclature/Condition Automatic Action D4238 H2/O2 ANALYZER A H2 SPLY OPF Alarm only D4243 H2/O2 ANALYZER B HV-4955B OPF Alarm only D4244 H2/O2 ANALYZER B HV-5019B OPF Alarm only D4245 H2/O2 ANALYZER B HV-4959B OPF Alarm only D4246 H2/O2 ANALYZER B HV-4966B OPF Alarm only D4247 H2/O2 ANALYZER H2 SPLY OPF Alarm only D4248 H2/O2 ANALYZER A HV-4983A OPF Alarm only D4249 H2/O2 ANALYZER A HV-4984A OPF Alarm only D4250 H2/O2 ANALYZER A HV-4965A OPF Alarm only D4251 H2/O2 ANALYZER A HV-5022A OPF Alarm only D4252 H2/O2 ANALYZER B HV-4983B OPF Alarm only D4253 H2/O2 ANALYZER B HV-4984B OPF Alarm only D4254 H2/O2 ANALYZER B HV-4965B OPF Alarm only D4255 H2/O2 ANALYZER B HV-5022B OPF Alarm only