LR-N09-0075, Summary of Emergency Plan Document Revisions Implemented March 11, 2009

From kanterella
Jump to navigation Jump to search
Summary of Emergency Plan Document Revisions Implemented March 11, 2009
ML091000663
Person / Time
Site: Salem, Hope Creek  PSEG icon.png
Issue date: 04/01/2009
From: Burgin D
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LR-N09-0075
Download: ML091000663 (3)


Text

If PSEG Nuclear LLC P.O. Box 236,, Hancocks Bridge, NJ 08038-0236 APR 012009 0 PSEG NuclearL.L. C.

10 CFR 50.54(q)

LR-N09-0075 U. S. Nuclear Regulatory Commission (NRC)

ATTN: Document Control Desk Washington, D.C. 20555-0001 Salem Nuclear Generating Station, Units 1 and 2 Facility Operating License Nos. DPR-70 and 75 NRC Docket Nos. 50-272 and 50-311 Hope Creek Generating Station Facility Operating License No. NPF-57 NRC Docket No. 50-354

Subject:

Summary of Emergency Plan Document Revisions Implemented March 11, 2009.

Pursuant to 10 CFR 50.54(q) and 10 CFR 50.4(b)(5), PSEG Nuclear LLC hereby submits a summary of Emergency Plan Document revisions implemented March 11, 2009 (attached) associated with the PSEG Nuclear LLC Emergency Plan that did not require prior NRC approval. There are no regulatory commitments contained in this letter.

If you have any questions or require additional information, please contact Lee Marabella, Senior Licensing Engineer, at 856-339-1208 or Craig Banner, Emergency Preparedness, at 856-339-1157.

Sincerely, David B g Manager - Emergency Preparedness Attachment AJ~f 2

Document Control Desk -APR 0.1 2009 LR-N09-0075 Page 2 C Mr. S. Collins, Administrator.- Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 U. S. Nuclear Regulatory Commission Mr. R. Ennis, Project Manager - Salem Unit 1 and Unit 2 and Hope Creek Mail Stop 08C2 Washington, DC 20555-0001 USNRC Senior Resident Inspector - Hope Creek Generating Station USNRC Senior Resident Inspector - Salem Generating Station Mr. P. Mulligan, Manager IV Bureau of Nuclear Engineering P. O. Box 415 Trenton, NJ 08625 Corporate Commitment Tracking Coordinator

,4 ATTACHMENT LR-N09-0075 EMERGENCY PLAN Summary of E-Plan Document Revisions ImplementedMarch 11, 2009 The following Emergency Plan revisions were reviewed in accordance with 10CFR50.54(q) and determined to not require prior NRC approval.

Emergency Plan Summary of Changes:

Editorial Revisions:

  • Section 1 revised to incorporate minor editorial changes to Step 4, Part (4),

changed references from "ENC" to ENC/JIC" in Step 4, Part (15), and to modify Figure 1-1 on Page 1.13to include the Delaware and Pennsylvania border.

  • Section 2 revised to incorporate current PSEG Nuclear titles.
  • Section 3 revised to incorporate current PSEG Nuclear titles, changed references from "ENC" to ENC/JIC", and revised the formatting of the ERO organization figures.
  • Section 7 revised to change the reference from "Nuclear Training Center" to the "Environmental & Energy Resource Center (EERC)" and corrected the note reference in Table 7-1.

" Section 8 revised to change referencesfrom "ENC" to ENC/JIC".

  • Section 9 revised to change the reference from "Nuclear Training Center" to the "Environmental & Energy Resource Center (EERC)" and to change references from "ENC" to ENC/JIC".
  • Section 10 revised to incorporate minor editorial changes and changes to monitors listed in Table 10-1 .based on DCP Nos. 80059610, 80059614, and 80063785.
  • Section 12 revised to clarify the issuance of additional dosimetry and to change procedure references.
  • Section 14 revised to incorporate current PSEG Nuclear titles.
  • Section 16 revised to change references to Training procedure and to incorporate current PSEG Nuclear titles.

Section 17 revised Table 17-1, Page 17.4 to add Site Engineering Director to the "Responsible Manager" column to review Salem 200 series procedures, corrected "RPS" which was a typographical error to "RPM" and added "REM" to the Hope Creek 200 series to make review responsibilities consistent between Salem and Hope Creek.