ML023030452
| ML023030452 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 10/11/2002 |
| From: | Public Service Enterprise Group |
| To: | David Pinckney Document Control Desk, Office of Nuclear Security and Incident Response |
| References | |
| Download: ML023030452 (27) | |
Text
Document Transmittal Form TO
- NRC C/O PINCKNEY, DAVID DOCUMENT CONTROL DESK WASHINGTON, DC 20555 ID: EPIP059 Date :
10/11/2002 Please update your controlled set of documents with the following documents:
Document ID PRCINC.EP-EP.ZZ-01021000 PRCIEPIP-TOC-COMMONI000 Revision Status 5
A 27 A
Quantity Format RecNo 1
H 148042 1
H 147987 This acknowledgement receipt must be returned to:
Document Management PSEG Nuclear PO Box 236 Hancocks Bridge, NJ 08038 MC N04 Your signature below verifies that:
(1) the above documents have been filed and superseded documents have been removed and destroyed or clearly marked as obsolete.
(2) the mailing address and copyholder information are correct or corrections have been identified on this transmittal r] Place checkmark here to be removed from controlled distribution Signature:
Date:
AXV46
Sd PSEG NUCLEAR ONSITE IMPLEMENTING PROCEDURES October 11, 2002 CHANGE PAGES FOR REVISION #27 The Table of Contents forms a
general guide to revision of each section of the Onsite EPEPs.
The are made in this TOC Revision #27 are shown below.
that your revision packet is complete and remove material listed below:
ADD the current changes that Please check the outdated REMOVE Description Rev.
Paqe Description TOC 27 NC.EP-EP.ZZ-0102 05 ALL All TOC NC.EP-EP.ZZ-0102 04 EPEP-AIJJ Paoe ALL All Rev.
26 1 of I
EPIP T.O.C.
Pg.
1 of 2 PSEG NUCLEAR LLC EMERGENCY PLAN ONSITE IMPLEMENTING PROCEDURES TABLE OF CONTENTS October 11, 2002 STATION PROCEDURES Revision Number Number Pages Effective Date NC.EP-EP.ZZ-0101 (Q)
NC.EP-EP.ZZ-0102 (Q)
NC.EP-EP.ZZ-0201 (Q)
NC.EP-EP.ZZ-0202 (Q)
NC.EP-EP.ZZ-0203 (Q)
EPIP 204H EPIP 204S HC.EP-EP.ZZ-0205 (Q)
SC.EP-EP.ZZ-0205 (Q)
HC.EP-EP.ZZ-0301 (Q)
SC.EP-EP.ZZ-0301 (Q)
EP I P - TOC-COMMON ACTIONS REQUIRED AT UNAFFECTED STATION EMERGENCY COORDINATOR
RESPONSE
TSC -
INTEGRATED ENGINEERING RESPONSE OPERATIONS SUPPORT CENTER (OSC)
ACTIVATION AND OPERATIONS ADMINISTRATIVE SUPPORT/
COMMUNICATION TEAM RESPONSE -
TSC EMERGENCY RESPONSE CALLOUT/PERSONNEL RECALL EMERGENCY RESPONSE CALLOUT/PERSONNEL RECALL TSC -
POST ACCIDENT CORE DAMAGE ASSESSMENT TSC -
POST ACCIDENT CORE DAMAGE ASSESSMENT SHIFT RADIATION PROTECTION TECHNICIAN
RESPONSE
01 05 05 04 03 15 12/18/2001 22 10/11/2002 23 07/31/2002 28 03/14/2002 15 27 25 39 56 56 03 02 02 03/14/2002 07/31/2002 07/31/2002 02/06/2002 82 02/06/2002 21 05/24/2001 SHIFT RADIATION 03 35 PROTECTION TECHNICIAN
RESPONSE
PS&
S~PSE&G CONTROL COPY #
05/24/2001 Rev.
27 I
EPIP T.O.C.
Pg.
2 of 2 PSEG NUCLEAR LLC EMERGENCY PLAN ONSITE IMPLEMENTING PROCEDURES TABLE OF CONTENTS October 11, 2002 Revision Number NC.EP-EP.ZZ-0302 (Q)
NC.EP-EP.ZZ-0303 (Q)
NC.EP-EP.ZZ-0304 (Q)
NC.EP-EP.ZZ-0305 (Q)
NC.EP-EP.ZZ-0306 (Q)
NC.EP-EP.ZZ-0307 (Q)
NC.EP-EP.ZZ-0308(Q)
NC.EP-EP.ZZ-0309 (Q)
NC.EP-EP.ZZ-0310 (Q)
NC.EP-EP.ZZ-0311 (Q)
NC.EP-EP.ZZ-0312 (Q)
NC.EP-EP.ZZ-0313(Q)
RADIOLOGICAL ASSESSMENT 05 COORDINATOR RESPONSE CONTROL POINT -
02 RADIATION PROTECTION RESPONSE OPERATIONS SUPPORT CENTER (OSC)
RADIATION PROTECTION RESPONSE POTASSIUM IODIDE (KI)
ADMINISTRATION 06 01 EMERGENCY AIR SAMPLING 00 PLANT VENT SAMPLING 02 PERSONNEL/VEHICLE 00 SURVEY AND DECONTAMINATION DOSE ASSESSMENT (MIDAS)
INSTRUCTIONS 05 Number Pages 19 25 26 Effective Date 07/03/2002 07/03/2002 07/03/2002 10 07/03/2002 12 02/29/2000 13 07/03/2002 16 02/29/2000 40 RADIATION PROTECTION 05 SUPERVISOR -
OFFSITE AND FIELD MONITORING TEAM RESPONSE CONTROL POINT CHEMISTRY RESPONSE 02 CHEMISTRY SUPERVISOR -
03 CP/TSC RESPONSE ADVANCED DOSE ASSESSMENT (MIDAS)
INSTRUCTIONS 02 10/04/2002 43 10/04/2002 17 07/03/2002 25 07/03/2002 34 10/04/2002 EPIP-TOC-COMMON Rev.
2 7
PSEG Internal Use Only PSEG NUCLEAR NC.EP-EP.ZZ-0102(Q)
Rev. 05 EMERGENCY COORDINATOR RESPONSE Page 1 of 1 USE CATEGORY: II REVISION
SUMMARY
Biennial Review Yes_
No X Step numbers removed to allow more than one action to be performed at the same time.
Former step 5.3.2 was changed from EC to ERM. 80037925-0030 Former step 5.3.5 was added for requesting Federal Assistance. 80038743-0040 "TSC is activated and is EC" announcement was added Attachment 8. 80040982-0340 "EOF is activated and is EC" announcement was added Attachment 9. 80040982-0340 Former step 5.3.3 was changed to add HC and Salem OS phone numbers. 80047154-0020 - EPA changed to EPC. 80047308-0450 0 - the UE section was placed in front of the Alert section. 80046594-0010 PSE&G CONTROL COPY #
APPROVED:
EP Mahn"er APPROVED:
Vice Pre dent - Operations IMPLEMENTATION REQUIREMENTS Effective date:
101 Ill CQOta bate'
NC.EP-EP.ZZ-0102(Q)
EMERGENCY COORDINATOR RESPONSE kJTABLE OF CONTENTS Section Title Page 1.0 PU R PO SE...................................................................................................
2 2.0 PREREQUISITES........................................................................................
2 2.1 Prerequisites to be Followed Prior to Implementation:....................... 2 3.0 PRECAUTIONS AND LIMITATIONS..........................................................
2 3.1 Precautions and Limitations to be Followed Prior to Implementation:.... 2 4.0 EQUIPMENT REQUIRED...........................................................................
2 5.0 PR O C EDU R E:.............................................................................................
3 5.1 Initial A ctions:....................................................................................
3 5.2 Emergency Conditions:......................................................................
3 5.3 Subsequent Actions.........................................................................
4 5.4 EC Duties Turnover...........................................................................
4 5.5 Termination/Reduction/Recovery......................................................
4 5.6 R eporting..........................................................................................
4 6.0 R EC O R DS....................................................................................................
5 7.0 R EFER ENCES.............................................................................................
5
7.1 REFERENCES
5 7.2 CROSS REFERENCES.....................................................................
5 8.0 COMMITMENT DOCUMENTS.....................................................................
5 ATTACHMENTS ATTACHMENT 1 REPORTING CHECKLIST............................................................
6 ATTACHMENT 2 EC EMERGENCY STATUS BRIEFING FORM.............................. 7 ATTACHMENT 3 ACCOUNTABILITY ACTIONS AND RESULTS.............................. 9 ATTACHMENT 4 GENERAL EMERGENCY MESSAGE.........................................
11 ATTACHMENT 5 SITE AREA EMERGENCY MESSAGE.........................................
12 ATTACHMENT 6 ALERT MESSAGE.......................................................................
13 ATTACHMENT 7 UNUSUAL EVENT MESSAGE....................................................
14 ATTACHMENT 8 ACTIVATION of the TSC..............................................................
15 ATTACHMENT 9 ACTIVATION of the EOF.............................................................
17 ATTACHMENT 10 SECURITY EMERGENCY GUIDELINE (SEG)...................... 20 Nuclear Common Page l of 22 Rev. 05
NC.EP-EP.ZZ-0102(Q)
)1.0 PURPOSE This procedure provides emergency response instructions to the Emergency Coordinator (EC) after emergency classification.
2.0 PREREQUISITES 2.1 Prerequisites to be Followed Prior to Implementation:
2.1.1 ECG Attachment 1, 2, 3, 4 or 24 was completed.
3.0 PRECAUTIONS AND LIMITATIONS 3.1 Precautions and Limitations to be Followed Prior to Implementation:
3.1.1 Initials should be used in place of keeping sign-offs, instead of checkmarks.
3.1.2 Activation of the Emergency Response Organization (ERO) during an Unusual Event is implemented at the discretion of the Emergency Coordinator (EC). If additional support personnel are needed during an Unusual Event, then limited or full staffing of the TSC may be initiated at the discretion of the EC. Limited staffing may be initiated by contacting selected support personnel on an individual basis in lieu of activating the full ERO.
K 3.1.3 Activation of the ERO Callout system is expected during an Unusual Event that is based on a Security Event as called for in Attachment 10, Security Emergency Guideline, (SEG).
4.0 EQUIPMENT REQUIRED As provided in the Control Room, TSC and EOF.
Nuclear Common Page 2 of 22 Rev. 05
NC.EP-EP.ZZ-0102(Q)
5.0 PROCEDURE
5.1 Initial Actions:
OS IF security based emergency THEN Implement Security Emergency Guideline, JAW:
ERM ACTIVATE the EOF.
Note: Initial each block as applicable UE, A~.'
SAE G
ATT ATT ATT ATT 10 10 10 10 Optional ATT 8 ATT 8 ATT 8 Att 8 Optional Optional ATT 9 ATT 9 Att 9 Att 9 NOTE Since the Rad Alert alarm is located in the Control Room, the OS directs all emergency status announcements EDO or ERM as the Emergency Coordinator ensures OS is notified to direct the emergency announcements.
5.2 Emergency Conditions:
EC DIRECT the OS to generate the announcement of the emergency status and Assembly lAW: For Security based emergency, SEG may require modifications of associated actions/announcements.
OS IF not performed previously, THEN DIRECT the OSC Coordinator to Activate the OSC lAW EPEP 202, OSC Activation and Operations.
OS IF not performed previously, THEN DIRECT the other station OS to Implement EPEP-101, Actions Required at Unaffected Station:
For Securty based emergency, SEG may require modifications of associated actions/announcements.
EC IF desired or WHEN required, THEN DIRECT implementation of Accountability lAW:
For Security based emergency, SEG may require modifications of associated actions/announcements.
EC ENSURE the NRC Data Sheet is completed and CM-1 notifies NRC as soon as possible, but not to exceed one hour from emergency classification lAW:
Nuclear Common NOTE Should the EDO/ERM be unable to fulfill the duties of EC for any reason (sudden illness, accident, etc.) the Technical Support Supervisor (TSS) or Site Support Manager (SSM) may assume the duties and responsibilities of EC until another qualified EDO/ERM arrives.
Note: Initial each block as applicable.
ATT7 ATT6 ATT5 ATT4 Optional (Except security event)
EPEP 101 EPEP 101 EPEP 101 EPEP 101 Unusual ASSEM ASSEM ASSEM Event BLY BLY BLY Att 5 Att 4 Att 4 Att 4 HC OS x3027 Salem OS x5200 NETS x5221 NETS x5122 Optional Optional ATT 3 ATT 3 Att 3 Att 3 ECG ECG ECG ECG ATT5 ATT5 ATT5 ATT5 Page 3 of 22 Rev. 05
NC.EP-EP.ZZ-0102(Q)
Subsequent Actions COORDINATE and PRIORITIZE OSC tasks in conjunction with accident mitigation efforts.
ERM IF radionuclide concentrations exist orcould potentially exist offsite in excess of 10CFR20 Appendix B limits, THEN RECOMMEND to the States of New Jersey and Delaware that the ingestion pathway be monitored.
IF needed, CONTACT unaffected station OS to identify and request available support personnel.
EC ENSURE the NRC is notified of significant changes in emergency plant status, and implementation of 10CFR50.54x lAW:
EC IF needed, CONTACT the NRC for any Federal assistance or Federal resources that are required.
5.4 EC 5.5 EC 5.6 EC EC Duties Turnover IF relief is required, THEN PROVIDE turnover to the EDO/ERM:
(Coordinate with the Communicators.)
Termination/Reduction/Recovery IMPLEMENT NC.EP-EP.ZZ-0405 (Q), Emergency Termination / Reduction/Recovery, as appropriate.
Reporting WHEN the event is terminated, THEN ENSURE appropriate reports are made and paperwork is forwarded to EP.
5.3 OS Nuclear Common Note: Initial each block as applicable UE A
SAE~
E ECG ECG ECG ECG ATT5 ATT5 ATT5 ATT5 Note: Initial each block as applicable.
- ~E~A
~SAEý'
4ý-GEf optional ATT 2 ATT 2 ATT 2 AT-2 Note: Initial each block as applicable.
'UE ~
/EDO
/ERM
/ERM
/ERM Note: Initial each block as applicable.
,UEATT ATT1 SAET AT ATT I ATT I ATTI1 ATT I OSI EDO Rev. 05 Page 4 of 22
NC.EP-EP.ZZ-0102(Q) 6.0 RECORDS Forward all completed ECG Attachments / EPEPs / attachments / forms to EP Manager.
7.0 REFERENCES
7.1 REFERENCES
7.1.1. PSEG Nuclear Emergency Plan 7.1.2. NUREG-0654, Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants.
7.1.3. PSEG Nuclear Business Unit, NC.NA-AP.ZZ-0001(Q), Nuclear Procedure System.
7.1.4. PSEG Nuclear Business Unit, NC.NA-WG.ZZ-0001(Z), Procedure Writer's Guide.
7.1.5. NRC Security Advisory Basis Document, Notification - 20080626 7.2 CROSS REFERENCES 7.2.1 NC.EP-EP.ZZ-0405(Q), Emergency Termination/Reduction/Recovery 7.2.2 Hope Creek/Salem Event Classification Guide (ECG) 8.0 COMMITMENT DOCUMENTS Commitment No. EP96-003, (Item #: LR-N96062)
Nuclear Common Page 5 of 22 Rev. 05
NC.EP-EP.ZZ-0102(Q)
ATTACHMENT I Page 1 of I REPORTING CHECKLIST Initials
- 1. ENSURE a Notification is created.
OS
- 2. FORWARD all completed ECG Attachments, EPEPs, attachments, forms, NRC Data Sheet and any supporting documentation to the EP Manager.
OS
- 3. REVIEW this Attachment, the notification and any other relevant information for correct classification of event and corrective actions taken.
- 4. FORWARD Copies of the documentation to the LER Coordinator (LERC).
- 5. ENSURE this documentation is retained lAW current PSEG Nuclear procedures.
LERC Nuclear Common Page 6 of 22 Rev. 05
NC.EP-EP.ZZ-0102(Q)
ATTACHMENT 2 Page 1 of 2 EC EMERGENCY STATUS BRIEFING FORM
- 1.
EAL that is the basis for the emergency classification:
Unusual Event Alert Site Area Emergency General Emergency
- a.
EAL(s)#
- b.
Time declared
- c.
PAR based on 10 points?
- d.
Accountability?
Results:
Yes NO
__Yes NO
- 2.
Status of important safety systems:
- 3.
Status of fuel cladding, reactor coolant system, and containment integrity:
- 4.
Unusual radiological conditions currently existing:
Nuclear Common NOTE Completion of this Attachment is optional. However, the information listed is useful for providing a thorough turnover to the EC.
Wind dir.
(from)
Time Page 7 of 22 Rev. 05
NC.EP-EP.ZZ-0102(Q)
ATTACHMENT 2 Page 2 of 2
- 5.
OSC activated? (YES NO ) Time Activated In-Plant emergency actions underway (OSC priorities):
- 6.
Identification of "out-of-service" equipment that needs repair: (not on priority list)
- 7.
Offsite emergency actions underway (Did a release occur? Have field-monitoring teams been dispatched? State's PADs, etc.)
- 8.
Prognosis for the situation to improve or worsen:
- 9.
Adequacy of current Control Room staffing (Is an additional person needed to assist with communications?)
- 10.
Emergency Operating Procedures (EOPs) being implemented.
- 11.
Security Event details, were SEG Attachment 10 actions completed?
- 12.
Other Nuclear Common Page 8 of 22 Rev. 05
NC.EP-EP.ZZ-0102(Q)
ATTACHMENT 3 Page 1 of 2 ACCOUNTABILITY ACTIONS AND RESULTS PERFORM
+0 Min Initials I
Time
"* For an UNUSUAL EVENT, direct SECURITY (X2222) TO IMPLEMENT EPEP 902, SECTIONS 5.2, Automated Accountability and 5.3, Accountability Report Generation.
"* For an ALERT or higher, direct SECURITY (X2222) TO IMPLEMENT EPEP 902, SECTIONS 5.2, Automated Accountability, 5.3, Accountability Report Generation and 5.5, Evacuation.
AND Direct the other station's OS TO IMPLEMENT NC.EP-EP.ZZ-0101 ACCOUNTABILITY Attachment 3 Hope Creek (NETS X5221)
Salem (NETS X5122)
SECTION 5.1.2,
/
EDO/OS Time SOUND RAD ALERT ALARM AND ANNOUNCE TWICE "ATTENTION, ATTENTION, ALL ACCOUNTABILITY STATIONS, IMPLEMENT ACCOUNTABILITY.
i Announcer Time
+20 Min after above announcement was made.
ANNOUNCE TWICE i
Announcer Time Nuclear Common DIRECT DIRECT "ATTENTION, ATTENTION.
ALL ACCOUNTABILITY STATIONS, COMPLETE ACCOUNTABILITY.
Page 9 of 22 Rev. 05
NC.EP-EP.ZZ-0102(Q)
ATTACHMENT 3 Page 2 of 2 Initials
+30 min after implement accountability announcement was made:
NOTE IF the TSC has not yet been manned by the TSC security liaison, THEN Security will report the results of the accountability immediately to the Operations Superintendent (OS) of both stations.
- 1.
OBTAIN from Security a list of unaccounted personnel. IF Security has not supplied results of the accountability within 30 minutes of the first accountability announcement, then contact the affective station's TSC Security Liaison and request accountability results.
EDO/OS Hope Creek Salem NETS X5214 NETS X5117
- 2.
DESIGNATE an individual to attempt to locate unaccounted personnel as follows:
A.
Page individuals over the plant page.
B.
Obtain feedback from unaccounted person's co-workers/supervisors on last known locationfjob assignment.
C.
Call individual's home to verify work schedule.
D.
Request Security's assistance in locating unaccounted personnel.
EDO/OS
- 3.
UPDATE Security as missing personnel are located.
EDO/OS
- 4.
INITIATE search and rescue operations in accordance with EPEP 202, OSC Activation and Operations, as appropriate.
EDO/OS
- 5.
As the situation dictates and/or as radiological conditions permit:
IF all onsite Emergency Response Facilities are completely staffed, THEN release/evacuate extra-personnel who reported to the OSC, TSC, CP or Maintenance Shop for accountability.
EDO/OS Nuclear Common Page 10 of 22 Rev. 05
NC.EP-EP.ZZ-0102(Q)
ATTACHMENT 4 Page 1 of 1 GENERAL EMERGENCY MESSAGE Initials SOUND RAD ALERT ALARM AND ANNOUNCE TWICE Announcer RADIO REPEAT EMERGENCY ANNOUCEMENT MESSAGE Announcer IF NOT PERFORMED PREVIOUSLY, DIRECT Security (x2222)
"* IMPLEMENT both EPEP 901, Onsite Security Response, and EPEP 903, Opening of Emergency Operations Facility (EOF).
"* IMPLEMENT EPEP 0902, section 5.1 Assembly, DUE TO:
(read "Due TO:" from above)
Announcer Nuclear Common "ATTENTION ALL PERSONNEL. ATTENTION ALL PERSONNEL.
(HOPE CREEK - SALEM Unit lIUnit 2) IS IN A General Emergency Circle one - cross out the others DUE TO:
ALL PSEG PERSONNEL REPORT TO YOUR ASSIGNED ASSEMBLY AREA. ALL CONTRACTORS LEAVE THE SITE IMMEDIATELY.
Rev. 05 Page 11 of 22
NC.EP-EP.ZZ-0102(Q)
ATTACHMENT 5 Page 1 of I SITE AREA EMERGENCY MESSAGE Initials SOUND RAD ALERT ALARM AND ANNOUNCE TWICE "ATTENTION ALL PERSONNEL. ATTENTION ALL PERSONNEL.
(HOPE CREEK - SALEM Unit lIUnit 2) IS IN A Site Area Emergency Circle one - cross out the others DUE TO:
ALL PSEG PERSONNEL REPORT TO YOUR ASSIGNED ASSEMBLY AREA. ALL CONTRACTORS LEAVE THE SITE IMMEDIATELY.
Announcer RADIO REPEAT EMERGENCY ANNOUCEMENT MESSAGE Announcer IF NOT PERFORMED PREVIOUSLY, DIRECT Security (x2222)
" IMPLEMENT both EPEP 901, Onsite Security Response, and EPEP 903, Opening of Emergency Operations Facility (EOF).
" IMPLEMENT EPEP 0902, section 5.1 Assembly, DUE TO:
(read "DUE TO:" from above).
Announcer Nuclear Common Page 12 of 22 Rev. 05
NC.EP-EP.ZZ-0102(Q)
ATTACHMENT 6 Page 1 of 1 ALERT MESSAGE Initials SOUND RAD ALERT ALARM AND ANNOUNCE TWICE Announcer RADIO REPEAT EMERGENCY ANNOUCEMENT MESSAGE Announcer IF NOT PERFORMED PREVIOUSLY, DIRECT Security (x2222)
"IMPLEMENT both EPEP 901, Onsite Security Response, and EPEP 903, Opening of Emergency Operations Facility (EOF).
" IMPLEMENT EPEP 0902, section 5.1 Assembly, DUE TO:
(read "DUE TO:" from above).
Announcer Nuclear Common "ATTENTION ALL PERSONNEL. ATTENTION ALL PERSONNEL.
(HOPE CREEK - SALEM Unit llUnit 2) IS IN AN Alert Circle one - cross out the others DUE TO:
ALL PSEG PERSONNEL REPORT TO YOUR ASSIGNED ASSEMBLY AREA. ALL CONTRACTORS LEAVE THE SITE IMMEDIATELY.
Page 13 of 22 Rev. 05
NC.EP-EP.ZZ-0102(Q)
ATTACHMENT 7 Page 1 of I UNUSUAL EVENT MESSAGE Initials SOUND RAD ALERT ALARM AND ANNOUNCE TWICE Announcer RADIO REPEAT UNUSUAL EVENT ANNOUCEMENT MESSAGE Announcer Notify Security (x2222) of Unusual Event Announcer Nuclear Common "ATTENTION ALL PERSONNEL. ATTENTION ALL PERSONNEL.
(HOPE CREEK - SALEM Unit 1/Unit 2) IS IN AN UNUSUAL EVENT DUE TO:
Circle one - cross out the other Page 14 of 22 Rev. 05
NC.EP-EP.ZZ-0102(Q)
ATTACHMENT 8 Page 1 of 2 ACTIVATION of the TSC 1.0 Prior To TSC Activation (i.e., Before Assuming Emergency Coordinator Duties):
"* ESTABLISH and MAINTAIN a chronological log of activity and events.
OBTAIN a briefing on the status of the emergency from the Operations Superintendent (OS). Refer to Attachment 2, EC Emergency Status Briefing Form for turnover points of discussion.
ENSURE that TSC section leads are making preparations to assume emergency response functions while ensuring adequate staffing:
"* Radiological Assessment Coordinator (RAC)
"* Technical Support Supervisor (TSS)
"* Administrative Support supervisor
"* EPA or CM-1
"* Security
"* PERFORM initial briefing to the TSC staff on emergency conditions and the following issues:
"* Plant conditions
"* Introduce section leads
"* Noise control
"* Administrative services
"* Synchronize all TSC clock and personnel watches with SPDS time.
"* PREPARE to activate the TSC and ASSUME the duties and responsibilities of the Emergency Coordinator as follows:
ENSURE each functional group at the TSC has received a detailed briefing from their counterpart in the Control Room and are ready to support TSC activation. (i.e., EDO/OS, TSS/STA, RAC/SRPT).
"* ENSURE TSC communicators are ready to assume communications and notification responsibilities from the TSC. This includes coordination of requirement for the "Station Status Checklist", and NRC Updates.
"* VERIFY which EPEP is currently being implemented by the OS, which steps are completed and which steps will be turned over for completion.
Nuclear Common Page 15 of 22 Rev. 05
NC.EP-EP.ZZ-0102(Q)
ATTACHMENT 8 Page 2 of 2
- ACTIVATE the TSC by contacting the OS, and with his concurrence, assume the EC's function.
- Ensure TSC Communicators assume communications and notification responsibilities coincident with the EC turnover.
2.0 Upon Assuming Emergency Coordinator Duties, the EDO Should:
o ANNOUNCE (over the page) "THE TSC IS ACTIVATED AND
_IS THE EMERGENCY COORDINATOR" NOTE Since the Rad Alert alarm is located in the Control Room, the OS directs all emergency status announcements.
EDO or ERM as the Emergency Coordinator ensures OS is notified to direct the emergency announcements
"* ANNOUNCE to the staff that the TSC is activated, the effective time and that you are the Emergency Coordinator.
"* NOTIFY ERM of TSC activation and provide a brief status update.
"* REVIEW the ECG for conditions that may require Event Classification escalation.
"* ENSURE the Station Status Checklist is reviewed and approved for transmission to the states every 30 minutes.
"* IMPLEMENT NC.EP-EP.ZZ-0404(Q), Protective Action Recommendations Upgrades, after an initial PAR for a General Emergency has been made.
" GIVE a status briefing and coordinate the integration of NRC team members within functional areas of the TSC upon arrival of an NRC emergency response team.
"* PROVIDE periodic status briefing to the unaffected station's OS and EDO.
Nuclear Common Page 16 of 22 Rev. 05
NC.EP-EP.ZZ-0102(Q)
ATTACHMENT 9 Page 1 of 3 ACTIVATION of the EOF 1.0 Prior To EOF Activation (i.e., Before Assuming Emergency Coordinator Duties):
"* THEN ESTABLISH and MAINTAIN a chronological log of activity and events.
"* IF the EPC is available:
DIRECT Emergency Preparedness Coordinator (EPC) to implement EPEP 401, EPC Response.
"* OBTAIN a briefing on the status of the emergency from the Emergency Duty Officer (EDO). Refer to Attachment 2, Emergency Status Briefing Form for turnover points of discussion.
" ENSURE that EOF section leads are making preparations to assume emergency response functions while ensuring adequate staffing:
A. Radiological Support Manager (RSM)
B. Site Support Manager (SSM)
C. Technical Support Manager (TSM)
D. Administrative Support Manager (ASM)
ENSURE the Public Information Liaison (PIL) is provided with plant and emergency status information.
PERFORM initial briefing to the EOF staff on emergency conditions and the following issues:
"* Plant conditions
"* Introduce section leads
"* Noise control
"* ASM provides administrative services
"* Synchronize all EOF clock and personnel watches with SPDS time.
" PERFORM periodic EOF leads briefings to exchange information as outlined lAW, "EOF Briefing Checklist."
"* PERFORM briefings for the entire EOF staff regarding current emergency events/status changes.
Nuclear Common Page 17 of 22 Rev. 05
NC.EP-EP.ZZ-0102(Q)
ATTACHMENT 9 Page 2 of 3
" GIVE a status briefing and coordinate the integration of NRC team members within functional areas of the EOF upon arrival of an NRC emergency response team.
" GIVE and OBTAIN status updates from the EDO to include the status of unaffected units/station, Onsite Protective actions implemented, and Corrective Actions in progress and their priorities.
" DIRECT ASM to request assistance from federal, state, local, and private support agencies as required.
"* DIRECT ASM to assure continuity of personnel and resources for 24-hour operation of all emergency response facilities.
"* PREPARE to activate the EOF and ASSUME the duties and responsibilities of the Emergency Coordinator as follows:
A. ENSURE each functional group at the EOF has received a detailed briefing from their counterpart in the TSC and are ready to support EOF activation. (i.e., ERM/EDO, SSM/TSS, RSM/ RAC, TSM/TSTL, ASM/AS-SUP, EPC EOF/EPA TSC).
B. ENSURE EOF communicators are ready to assume communications and notification responsibilities from the TSC. This includes coordination of requirement for the "Station Status Checklist", NRC Updates, and Offsite Dose Assessment.
" ACTIVATE the EOF by contacting the EDO, and with his concurrence, assume the Emergency Coordinator's function.
- Ensure EOF Communicators assume communications and notification responsibilities coincident with the EC turnover.
2.0 Upon Assuming Emergency Coordinator Duties, the ERM Should:
_IS THE EMERGENCY COORDINATOR" Nuclear Common Page 18 of 22 Rev. 05
NC.EP-EP.ZZ-0102(Q)
ATTACHMENT 9 Page 3 of 3
" ANNOUNCE to the staff that the EOF is activated, the effective time and that you are the Emergency Coordinator.
" NOTIFY State Directors of EOF activation and provide a brief status update.
(NJ Director-NETS x5410; DE Director-NETS x5412)
" REVIEW the ECG for conditions that may require Event Classification escalation.
"* ENSURE the Station Status Checklist is reviewed and approved for transmission to the states every 30 minutes.
"* IMPLEMENT NC.EP-EP.ZZ-0404(Q), Protective Action Recommendations Upgrades, after an initial PAR for a General Emergency has been made.
"* NOTIFY corporate management periodically regarding emergency status.
" NOTIFY both State Directors regularly to provide status updates, ensure data flow is satisfactory, obtain information concerning any Protective Actions implemented by the States. (NJ Director-NETS x5410; DE Director-NETS x5412)
- OBTAIN Ingestion Pathway Actions implemented by all four States from both State Directors. (NJ Director-NETS x5410; DE Director-NETS x5412)
Nuclear Common NOTE Since the Rad Alert alarm is located in the Control Room, the OS directs all emergency status announcements. EDO or ERM as the Emergency Coordinator ensures OS is notified to direct the emergency announcements.
NOTE:
New Jersey has responsibility for notification and communications with the contiguous (ingestion pathway)
States of Pennsylvania and Maryland.
Page 19 of 22 Rev. 05
NC.EP-EP.ZZ-0102(Q)
ATTACHMENT 10 Page 1 of 3 SECURITY EMERGENCY GUIDELINE (SEG)
ENTRY CONDITIONS:
Security based emergency is occurring or imminent. (Continue these actions until the security threat is averted or other specific direction is provided in response to the event).
II.
PROMPT ACTIONS
- 1. IF entry into this guideline was based on a Security Event classified at an UNUSUAL EVENT level (9.1.1),
THEN:
- Call-out the Emergency Response Organization (ERO) by locating the confidential envelope marked "Emergency Callout" in the Operations Superintendent's (OS) copy of the ECG. Follow the directions.
- 2. IF entry into this guideline was based on a Security Event classified at an ALERT or higher level, ( EAL 9.1.2 or 9.1.3 or 9.1.4 ) AND, the Security Event/Threat is
- ongoing, OR, IF Operation's Superintendent (OS) judgment is that a credible threat to plant structures/equipment is imminent by a security event in progress, THEN:
"* SCRAM/TRIP the reactor. If time allows, ensure scramming/tripping the reactor is coordinated with the other unit to prevent tripping all three units concurrently. (HC.OP-AB.ZZ-0000 & SI(2)-EOP-TRIP-001)
"* COMMENCE plant cool down to cold shutdown. (HC.OP.IO.ZZ-0004 &
S1 (2).OP-IO.ZZ-0006)
START Emergency Diesel Generators. Do not load. (HC.OP-SO.KJ-0001 &
S1(2).OP-SO.DG-001, 002, 003)
(SALEM ONLY) PLACE the Control Room Ventilation in the Fire Outside Control Room Mode lAW SI (2).OP-SO.CAV-0001.
"* (HOPE CREEK ONLY) PLACE the Control Room Ventilation in the Recirculation Mode lAW HC.OP-SO.GK-0001.
Nuclear Common Page 20 of 22 Rev. 05
NC.EP-EP.ZZ-0102(Q)
ATTACHMENT 10 - SEG Page 2 of 3
- 3. IFIWHEN, Assembly bir Accountability and Evacuation is required by this EPEP, THEN consider delaying or modifying associated page announcements or actions based on the type of security event that is in progress.
"* CONSULT with Security to determine if Assembly, Accountability, or Evacuation can be safely implemented.
"* CONSIDER use of alternate assembly locations (e.g., Hope Creek Unit 2 Reactor Building, Material Center, "B" Building, etc.).
"* CONSIDER leaving personnel in their current office / shop areas.
"* CONSIDER potential alternate evacuation routes for EXITING SITE:
"o Via the Material Center "o Via the South Sally Port "o Via water/aircraft
"* MODIFY plant page announcements for both stations as needed to maximize the safety of the plant and plant personnel.
"o Assembly announcement is directed in step 5.2.1.
"o Accountability/Evacuations announcement is directed in step 5.2.4.
- 4. IF in the EC's judgment (based on discussion with 'Security) it is not safe to have ERO responders report to the site, THEN
" DIRECT security to request LAC Police block off the Access Road at the LAC traffic light and direct all Emergency Responders to report to the EOF.
" DIRECT PSEG Access checkpoint security personnel to relocate to the LAC traffic light to assist.
I1l.
SUBSEQUENT ACTIONS 1
IF in an outage condition, THEN:
- TERMINATE fuel movement. Place any currently loaded fuel bundles in a safe location (preferably either the original location or destination location).
TERMINATE Containment Purge ESTABLISH Containment Integrity Nuclear Common Page 21 of 22 Rev. 05
NC.EP-EP.ZZ-0102(Q)
ATTACHMENT 10 - SEG Page 3 of 3 SUBSEQUENT ACTIONS (cont'd)
- 3. TERMINATE planned releases that are in-progress.
- 4. (Salem Only) START Unit 3 if needed to provide additional backup power capability.
- 5. (HOPE CREEK ONLY) WHEN the OSC is staffed, DIRECT the OSCC to have the Hope Creek TSC ventilation system place in Recirculation Mode.
- 6. (SALEM ONLY) WHEN the OSC is staffed, DIRECT the OSCC to have the Salem TSC ventilation placed in the "Operations During Toxic or Chemical Release" lineup.
(SC.OP-SO.TSC-0051)
- 7. ENSURE the availability of injection systems by performing the following:
Terminate surveillance activities and restore systems to a normal standby alignment.
Ensure the Condensate Storage Tank is filled to the upper end of the normal operating band.
Ensure the Demineralized Water Storage Tanks are filled to the upper end of the normal operating band.
Ensure RAP tanks (RWST, AFWST, & PWST) at Salem 1 & 2 are filled to the upper end of the normal operating band.
Ensure the potable and firewater storage tanks are at normal capacity.
Verify firewater header pressure is normal.
Nuclear Common Page 22 of 22 Rev. 05