ML032810477
ML032810477 | |
Person / Time | |
---|---|
Site: | Hope Creek ![]() |
Issue date: | 10/01/2003 |
From: | Public Service Enterprise Group |
To: | David Pinckney Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
Download: ML032810477 (10) | |
Text
Document Transmittal Form TO
- NRC C/O PINCKNEY, DAVID DOCUMENT CONTROL DESK WASHINGTON, DC 20555 ID: HECGO065 Date:
10/11/03 Please update your controlled set of documents with the following documents:
Document ID PRCIHECG-HECG-TOC-BASISIOOO PRCIHECG-SECT.1 1.5 (BASIS)1000 Revision Status 20 A
2 A
Quantity Format 1
H I
H RecNo 177184 177226 ALL PAGES of this acknowledgement receipt must be returned to:
Document Management PSEG Nuclear PO Box 236 Hancocks Bridge, NJ 08038 MC N04 Your signature below verifies that (1) the above documents have been filed and superseded documents have been removed and destroyed or clearly marked as obsolete.
(2) the mailing address and copyholder information are correct or corrections have been identified on this transmittal.
J] Place checkmark here to be removed from controlled distribution Signature:
Date:
Signature:
Date:
. sit) W5
HOPE CREEK GENERATING STATION EVENT CLASSIFICATION GUIDE TECHNICAL BASIS October 1, 2003 CHANGE PAGES FOR REVISION #20 The Table of Contents forms a general guide to the current revision of each section and attachment of the Hope Creek ECG Technical Basis.
The changes that are made in this TOC Revision
- 20 are shown below.
- 1. Check that your revision packet is complete.
- 2. Add the revised documents.
- 3. Remove and recycle the outdated material listed below.
ADD REMOVE Pages ALL Description Rev.
Paces Description TOC Rev.
TOC 20 All 19 All Section 11.5 02 All Section 11.5 01 HC-ECG TB 1 of 1
PSEG Internal Use Only HOPE CREEK ECG TECHNICAL BASIS TABLE OF CONTENTS/SIGNATURE PAGE HC EAL Technical Basis T.O.C.
Pg. 1 of 4 PAGES DATE SECTION TITLE REV #
T.O.C.
ii 1.0 2.0 3.0 4.0 5.0 6.0 Table of Contents/Signature Page Introduction and Usage Glossary of Acronyms & Abbreviations Fuel Clad Challenge RCS Challenge Fission Product Barriers (Table) 3.1 Fuel Clad Barrier 3.2 RCS Barrier 3.3 Containment Barrier EC Discretion Failure to SCRAM Radiological Releases/Occurrences 6.1 Gaseous Effluent Release 6.2 Liquid Effluent Release 6.3 In - Plant Radiation Occurrences 6.4 Irradiated Fuel Event 20 00 00 01 00 4
3 5
9
-8 10/01/03 01/21/97 01/21/97 06/14/01 01/21/97 02/01/02 02/01/02 11/11/02 01/21/97 01/21/97 03 02 04 00 00 13 18 16 8
10 00 00 00 01 44 01/21/97 4
01/21/97 6
01/21/97 8
11/15/01 7.0 8.0 Electrical Power 7.1 Loss of AC Power Capabilities 7.2 Loss of DC Power Capabilities System Malfunctions 8.1 Loss of Heat Removal Capability 8.2 Loss of Overhead Annunciators 8.3 Loss of Communications Capability 8.4 Control Room Evacuation 8.5 Technical Specifications 9.0 Hazards -
9.1 9.2 9.3 9.4 9.5 9.6 9.7 9.8 Internal/External Security Threats Fire Explosion Toxic/Flammable Gases Seismic Event High Winds Flooding Turbine Failure/Vehicle Crash/
Missile Impact River Levps E&G 01 00 02 00 00 00 00 02 01 01 02 02 01 01 01 00 18 05/12/97 5
01/21/97 8
04/30/03 8
01/21/97 4
01/21197 4
01/21/97 2
01/21/97 9
02/01/02 6
02/01/01 5
02/01/01 13 11/11/02 4
11/11/02 7
02/01/01 5
02/01/01 7
02/01/01 4
01/21/97 9.9 HCGS CONTROL COPY #z&
Rev. 20
PSEG Internal Use Only HOPE CREEK ECG TECHNICAL BASIS TABLE OF CONTENTS/SIGNATURE PAGE HC EAL Technical Basis T.O.C.
Pg. 2 of 4 PAGES DATE SECTION TITLE REV #
10.0 11.0 Reserved for future use Reportable Action Levels (RALs) 11.1 Technical Specifications 11.2 Degraded or Unanalyzed Condition 11.3 System Actuation 11.4 Personnel Safety/Overexposure 11.5 Environmental/State Notifications 11.6 After-the-Fact 11.7 Security/Emergency Response Capabilities 11.8 Public Interest 11.9 Accidental Criticality/
Rad Material Shipments - Releases 11.10 Voluntary Notifications 02 03 05 01 02 02 04 01 02 01 7
01/23/01 4
02/28/02 7
04/19/02 8
01/23/01 4
10/01/03 1
02/28/02 5
02/28/02 3
01/23/01 8
01/23/01 2
01/23/01 HCGS Rev. 20
PSEG Internal Use Only HC EAL Technical Basis T.O.C.
Pg. 3 of4 REVISION
SUMMARY
Biennial Review Performed: Yes No X
Updated RAL 1 1.5.2.c in Tech Basis to conform to the approved changes to RAL 1 1.5.2.c.
HCGS Rev. 20
PSEG Internal Use Only HC EAL Technical Basis T.O.C.
Pg. 4 of 4 SIGNATURE PAGE Prepared By:
W.L. Detwiler 09/03/03 Date Section/Attachments Revised Reviewed By:
N/A (List Non-Editorial Only - Section/Attachments)
N/A 10CFR50.54q Effectiveness Reviewer Date Date Reviewed By:
N/A Department Manager Date Reviewed By:
Reviewed By:
Affi n--x J-
,C.
Manager icensing
)
(Reportable Action Level, Section 11)
Em ency Preparedness Manager l10, Xe Dte
'Date Reviewed By:
N/A Manager - Quality Assessment - NBU (If Applicable)
Date SORC Review and Station Approvals N/A Mtg. No.
Hope Creek Chairman Date Effective Date of this Revision:
N/A Vice President - Nuclear Operations Date De
~'
HCGS Rev. 20
HCGS EAL/RALTechnical Basis 11.0 Reportable Action Levels 11.5 Environmental REPORTABLE ACTION LEVEL - 11.5.2.a IC SPILL/DISCHARGE OF ANY NON-RADIOACTIVE HAZARDOUS SUBSTANCE
[1 OCFR50.72(b)(2)(xi); N.J.A.C. 7:1 E]
RAL Spill/discharge of an industrial chemical or petroleum product outside of a plant structure within the Owner Controlled Area (OCA) that results in EITHER one of the following:
Spill / discharge that has passed through the engineered fill and into the ground water as confirmed by Licensing Spill / discharge that CANNOT be cleaned up within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and no contact with groundwater is suspected NOTE:
This event MAY require IMMEDIATE (15 minute) notifications. DO NOT delay implementation of Attachment 16.
OPERATIONAL CONDITION - All BASIS This RAL addresses the conditions requiring reports IAW PSEG Nuclear's DPCC/DCR Plan.
The intent of this RAL is to direct IMMEDIATE implementation of ECG Attachment 16, which will provide further direction on reportability based upon the nature of the Spill/Discharge as well as the expertise of Environmental Licensing personnel concerning requirements.
REFERENCES 1 OCFR50.72(b)(2)(xi)
N.J.A.C. 7:1E DPCC/DCR Plan, Part III PSE&G CONTROL COPY #
LriLLS Page 1 of 1 RAL-11.5.2.a Rev. 02
HCGS EAL/RALTechnical Basis 11.0 Reportable Action Levels 11.5-Environmental REPORTABLE ACTION LEVEL - 11.5.2.b IC SPILL/DISCHARGE OF ANY NON-RADIOACTIVE HAZARDOUS SUBSTANCE INTO OR UPON THE RIVER [OCFR50.72(b)(2)(xi); N.J.A.C.7:1E]
RAL EITHER one of the following events occur:
Observation of a spill/discharge of an industrial chemical or petroleum product from on-site into the Delaware River or into a storm drain Observation of an oil slick on the Delaware River from any source.
NOTE:
This event MAY require IMMEDIATE (15 minute) notifications. DO NOT delay implementation of Attachment 16.
OPERATIONAL CONDITION - All BASIS This RAL addresses the conditions requiring reports IAW PSEG Nuclear's DPCC/DCR Plan.
The intent of this RAL is to direct IMMEDIATE implementation of ECG Attachment 16, which will provide further direction on reportability based upon the nature of the Spill/Discharge as well as the expertise of Environmental Licensing personnel concerning requirements.
REFERENCES 1 OCFR50.72(b)(2)(xi)
N.J.A.C.7: 1 E DPCC/DCR Plan, Part III Page 1 of 1 RAL-1.5.2.b Rev. 02
HCGS EAL/RALTechnical Basis 11.0 Reportable Action Levels 11.5 Environmental REPORTABLE ACTION LEVEL - 11.5.2.c IC UNUSUAL OR IMPORTANT ENVIRONMENTAL EVENTS
[ENVIRONMENTAL PROTECTION PLAN SECTION 4.1]
RAL As judged by the OS/EDO, in concurrence with Environmental Licensing, ANY one of the following events has occurred:
Unusually large fish kill Protected aquatic species impinge on Circulating or Service Water intake screens (e.g., sea turtle, sturgeon) as reported by Site personnel Any occurrence of an unusual or important event that indicates or could result in significant environmental impact casually related to plant operation; such as the following:
Onsite plant or animal disease outbreaks Mortality or unusual occurrence of any species protected by the Endangered Species Act of 1973 Increase in nuisance organisms or conditions Excessive bird impactation Major NJPDES Permit violations Excessive opacity (smoke)
I OPERATIONAL CONDITION - All BASIS This RAL addresses those conditions requiring reports in accordance with the Environmental Protection Plan. Final determination or reportability will be made by Environmental Licensing as a result of implementing Attachment 15.
REFERENCES HCGS Technical Specifications, ENVIRONMENTAL PROTECTION PLAN Page 1 of 1 RAL - 11.5.2.c Rev. 02
HCGS EAL/RALTechnical Basis 11.0 Reportable Action Levels 11.5 Environmental / State Notifications REPORTABLE ACTION LEVEL - 11.5.3 IC BOILER OR PRESSURE VESSEL EXPLOSION OR PERSONAL INJURY
[10CFR50.72(b)(2)(xi), N.J.A.C. 5:11-3.11]
RAL EITHER one of the following events occur:
Personal injury due to an occurrence to a boiler or pressure vessel A boiler or pressure vessel explosion MODE - All BASIS This RAL addresses the conditions requiring notifications following occurrences to boilers and pressure vessels.
An occurrence means any event which reduces the pressure containing capability of, or requires immediate repair to, a boiler or pressure vessel, exclusive of normal wear on the equipment. Per NC.NA-AP.ZZ-0026(Q), this is understood to mean through wall leakage conditions, permanent deformation to a boiler or pressure vessel resulting from transient conditions or service degradation and/or rupture conditions.
An explosion is a catastrophic failure of a boiler or pressure vessel that imparts energy of sufficient force to damage or potentially damage permanent plant structures, systems or components.
Immediate notification is required in the event of an explosion or a personal injury due to an occurrence.
REFERENCES 1 OCFR50.72(b)(2)(xi)
N.J.A.C.5:11-3.11 Hope Creek ECG 9.3, Explosion NC.NA-AP.ZZ-0026(Q), NEIL / Jurisdictional Boiler and Machinery Inspection Program Page 1 of 1 RAL - 11.5.3 Rev. 02