LD-92-076, Forwards Draft Dctr 10, Sys 80+ Shutdown Risk Evaluation Rept, in Fulfillment of Commitment from .Final Version of Shutdown Risk Rept Will Be Provided by 920731. W/Eight Oversize Drawings

From kanterella
(Redirected from LD-92-076)
Jump to navigation Jump to search
Forwards Draft Dctr 10, Sys 80+ Shutdown Risk Evaluation Rept, in Fulfillment of Commitment from .Final Version of Shutdown Risk Rept Will Be Provided by 920731. W/Eight Oversize Drawings
ML20101G520
Person / Time
Site: 05200002
Issue date: 06/16/1992
From: Brinkman C
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY, ASEA BROWN BOVERI, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20101G523 List:
References
LD-92-076, LD-92-76, NUDOCS 9206260094
Download: ML20101G520 (1)


Text

__

ABB ASE A BAOWN BOVERI June 16, 1992 LD-92-076 Docket No.52-002 Attn: Document Control Dask U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

System 80+" Shutdown Fisk Report, Revision 1

Reference:

ABB-CE Letter LD-92-038, Submittal Schedule, March 25, 1992

Dear Sirs:

Enclosed with this letter is the first revision of the Shutdown Risk Report. This submittal fulfills a commitment from the refuence letter, The final version of the Shutdown Risk Report will be provided by July 31, 1992.

If you have any questions, please call me or Mr. Stan Ritterbusch at (203) 285-5206.

Very.truly yours, COMBUSTION ENGINEERING, INC.

y A ., '

C.-B. Brinkman Actir3 Director Nuclear Systems Licen*ing CBB/ser cc: J. Tv / er (EPRI)

T. '..+ tach (NRC)

C200d7 ABB Combustion Engineering Nuclear Power c__ <,_ _

===2e- e;g = r $pi r

gg6228oJRolSogga
  • ~ '"*" """ ** "' " "" ** "

h  !