L-96-002, Forwards Revised Monthly Operating Repts for Point Beach Nuclear Plant Units 1 & 2 for Jul,Dec & Mar 1995

From kanterella
(Redirected from L-96-002)
Jump to navigation Jump to search
Forwards Revised Monthly Operating Repts for Point Beach Nuclear Plant Units 1 & 2 for Jul,Dec & Mar 1995
ML20097D835
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 02/07/1996
From: Maxfield G
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20097D578 List:
References
PBL-96-0024, PBL-96-24, NUDOCS 9602130198
Download: ML20097D835 (1)


Text

.

r Wisconsin

' Electnc POWER COMPANY Point Beach Nuclear Plant .

6610 Nuclear Rd., Two RNm WI 54241 (414) 755-2321 PBL 96-0024 February 7, 1996 Document Control Desk U. S. NUCLEAR REGULATORY COMMISSION Mail Station P1-137 Washington, DC 20555 Gentlemen:

DOCKETS 50-266 AND 50-301 MONTHLY OPERATING REPORTS POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 )

1 Attached are revised monthly operating reports for Units 1 and 2 of the Point ,

Beach Nuclear Plant. The change incorporates the forced outage rate applied for a trip of each unit. Prior reports identified the trips, but did not account for the forced outage rates. l Sincerely,

/

G. J. Maxfield PBNP Manager blz Attachments cc: L. L. Smith, PSCW NRC Regional Administrator, Region III NRC Resident Inspector l

R A subsWwvofMInns Ewqw Capvauw