r
[
OPERATING DATA REPORT i
DOCKET NO. 50-266 t
2"U4 O(b 2o DATE:
01/23/96
[
g COMPLETED BY:
M.
B.
Koudelka l
00 O CD
- K N TELEPHONE:
414 755-6480 o,o OPERATING STATUS OM
- 1. UNIT NAME:
POINT BEACH NUCLEAR PLANT - UNIT 1
. NOTES
~D 00 cNN
- 2. REPORTING PERIOD: July - 1995
]
- 3. LICENSED THERMAL POWER (MWT) :
1518.5
- 4. NAMEPLATE RATING (GROSS MWE):
523.8
- 5. DESIGN ELECTRICAL RATING (NET MWE):
497.0 l
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE) :
509.0.
- 7. MAXIMJM DEPENDABLE CAPACITY (NET MWE) :
485.0 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NA 9.
POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NA
- 10. REASONS FOR RESTRICTIONS, (IF ANY) :
NA THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 744.0 5,087.0 216,815.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 676.8 4,141.8 180,981.4
[
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 667.3 l
- 14. HOURS GENERATOR ON LINE 644.1 4,096.0 177,808.4
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 846.9
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 951835.0 6104460.0 251649457.0
[
I
- 17. GROSS ELECTRICAL ENERGY GENERATED 323400.0 2080460.0 85019110.0
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 308186.0 1986778.0 81047429.0
- 19. UNIT SERVICE FACTOR 86.6%
80.5%
82.0%
- 20. UNIT AVAILABILITY FACTOR 86.6%
80.5%
82.4%
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 85.4%
80.5%
76.7%
- 22. UNIT CAPACITY FACTOR (USING DER NET) 83.3%
78.6%
75.2%
l
- 23. UNIT FORCED OUTAGE RATE 13.4%
2.4%
1.5%
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
NONE l
- 25. IF SHUTDOWN AT END OF PEPORT PERIOD, ESTIMATED DATE OF STARTUP:
NA DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977 l
. 'o POINT BEACH NUCLEAR PLANT OPERATING
SUMMARY
REPORT UNIT 1 - JGLY 1995 ELECTRICAL MONTH YEAR TO DATE GROSS GENERATION MWH 323400.0 2080460.0 85019310.0 TOTAL STATION SERVICE MWH 15214.O 93682.0 3971681.O NET OUTPUT MWH 308186.0 1986778.0 81047429.0 AVG. GROSS GENERATION FOR MONTH MWH 434.7 409.0 392.1 AVG. GROSS GENERATION RUNNING MWH 502.1 507.9 478.2 TOTAL STATION SEVICE/ GROSS GEN.
4.7%
4.5%
4.7%
HOURS OF GENERATION HRS 644.1 4,096.0 177,808.4 PLANT PERFORMANCE MONTH YEAR TO DATE NET PLANT EFFICIENCY 32.38%
32.55%
32.21%
WET PLANT HEAT RATE BTU /KWH 10,540 10,486 10,596 WUMBER OF DAYS OF OPERATION DAYS 28 171 8,248 UMIT NET CAPACITY FACTOR 85.4%
80.5%
76.7%
UNIT SERVICE FACTOR 86.6%
80.5%
82.0%
SCHEDULED GUTAGES 0
2 120 FORCED OUTAGES 1
1 66 FORCED OUTAGE HOURS HRS 99.9 99.9 2,778.0 UMIT FORCED OUTAGE RATE 13.4%
2.4%
1.5%
NUCLEAR MONTH YEAR TO DATE HOURS CRITICAL HRS 676.8 4,141.8 180,981.4 TOTAL HOURS POSSIBLE HRS 744.O 5,087.0 216,815.O INADVERTANT REACTOR TRIPS 1
1 56 DURATION OF REACTOR DOWN TIME HRS 67.2 945.2 35,917.6 REACTOR CAPACITY FACTOR 84.3%
79.0%
76.4%
REACTOR SERVICE FACTOR 91.0%
81.4%
83.5%
THERMAL POWER GENERATED MWTHR 951,835 6,104,460 251,649,457 THERMAL POWER GENERATED THIS FUEL CYCLE MWTHR 3,624,427
- -