OPERATIEG DATA REPORT DOCKET NO. 50-266 237 4
@h DATE:
01/23/96 M
[o COMPLETED BY:
M.
B.
Koudelka co OM Or TELEPHONE:
414 755-6480 OPERATING STATUS 04 OO
- 1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 1
. NOTES o
- 2. REPORTING PERIOD: December - 1995
$[
3.
LICENSED THERMAL POWER (MWT):
1518.5 Ch 4.
NAMEPLATE RATING (GROSS MWE):
523.8
- 5. DESIGN ELECTRICAL RATING (NET MWE):
497.0 6.
MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
509.0.
7.
MAXIMUM DEPENDABLE CAPACITY (NET MWE):
485.0 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NA 9.
POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NA
- 10. REASONS FOR RESTRICTIONS, (IF ANY) :
NA THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 744.0 8,760.0 220,488.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 7,814.8 184,654.4
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 667.3
- 14. HOURS GENERATOR ON LINE 744.0 7,769.0 181,481.4
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 846.9
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1129726.0 11671152.0 257216149.0
- 17. GROSS ELECTRICAL ENERGY GENERATED 385190.0 3967720.0 86906370.0
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 369205.0 3792433.5 82853084.5
- 19. UNIT SERVICE FACTOR 100.0%
88.7%
82.3%
- 20. UNIT AVAILABILITY FACTOR 100.0%
88.7%
82.7%
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 102.3%
89.3%
77.1%
- 22. UNIT CAPACITY FACTOR (USING DER NET) 99.8%
87.1%
75.6%
- 23. UNIT FORCED OUTAGE RATE 0.0%
1.3%
1.5%
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH) :
Refueling, 03/30/96, 24 days
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
NA DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977
- o OPERATING DATA REPORT UDCKET NO. 50-301 i
DATE:
01/23/96 E
COMPLETED BY:
M. B.
Koudelka i
TELEPHONE: 414 755-6480 OPERATING STATUS
- 1. UNIT NAME:
POINT BEACH NUCLEAR PLANT - UNIT 2
. NOTES
- 2. REPORTING PERIOD: December - 1995 3.
LICENSED THERMAL POWER (MWT) :
1518.5
- 4. NAMEPLATE RATING (GROSS MWE):
523.8 I
- 5. DESIGN ELECTRICAL RATING (NET MWE):
497.0
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE) :
509.0.
i
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE) :
485.0 I
8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
i NA
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): power 901
- 10. REASONS FOR RESTRICTIONS, (IF ANY) :
Self-imposed restriction because of SG tube plugging, pending further evaluation.
THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 744.0 8,760.0 205,273.0
- 12. NUMBER OP HOURS REACTOR WAS CRITICAL 722.9 7,275.5 179,327.1
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 233.9 I
- 14. HOURS GENERATOR ON LINE 688.9 7,159.7 176,854.4
[
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 302.2
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 887934.0 10550228.0 254532153.0
- 17. GROSS ELECTRICAL ENERGY GENERATED 298870.0 3552150.0 86503260.0
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 283626.0 3384134.5 82464649.5
- 19. UNIT SERVICE FACTOR 92.6%
81.7%
86.2%
- 20. UNIT AVAILABILITY FACTOR 92.6%
81.7%
86.3%
l
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 78.6%
79.7%
82.3%
- 22. UNIT CAPACITY FACTOR (USING DER NET) 76.7%
77.7%
80.8%
l
- 23. UNIT FORCED OUTAGE RATE 0.0%
0.2%
0.9%
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH) :
NONE
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
NA 3
DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977 i