Revised Monthly Operating Repts for Dec 1995 for Point Beach Nuclear Plant,Units 1 & 2
ML20097D871
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 12/31/1995
From: Koudelka M
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20097D578 List:
References
NUDOCS 9602130217
Download: ML20097D871 (2)


Text

.'.

OPERATIEG DATA REPORT DOCKET NO. 50-266 237 4

@h DATE:

01/23/96 M

[o COMPLETED BY:

M.

B.

Koudelka co OM Or TELEPHONE:

414 755-6480 OPERATING STATUS 04 OO

1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 1

. NOTES o

2. REPORTING PERIOD: December - 1995

$[

3.

LICENSED THERMAL POWER (MWT):

1518.5 Ch 4.

NAMEPLATE RATING (GROSS MWE):

523.8

5. DESIGN ELECTRICAL RATING (NET MWE):

497.0 6.

MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):

509.0.

7.

MAXIMUM DEPENDABLE CAPACITY (NET MWE):

485.0 8.

IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

NA 9.

POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NA

10. REASONS FOR RESTRICTIONS, (IF ANY) :

NA THIS MONTH YEAR TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 744.0 8,760.0 220,488.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 7,814.8 184,654.4
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 667.3
14. HOURS GENERATOR ON LINE 744.0 7,769.0 181,481.4
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 846.9
16. GROSS THERMAL ENERGY GENERATED (MWH) 1129726.0 11671152.0 257216149.0
17. GROSS ELECTRICAL ENERGY GENERATED 385190.0 3967720.0 86906370.0
18. NET ELECTRICAL ENERGY GENERATED (MWH) 369205.0 3792433.5 82853084.5
19. UNIT SERVICE FACTOR 100.0%

88.7%

82.3%

20. UNIT AVAILABILITY FACTOR 100.0%

88.7%

82.7%

21. UNIT CAPACITY FACTOR (USING MDC NET) 102.3%

89.3%

77.1%

22. UNIT CAPACITY FACTOR (USING DER NET) 99.8%

87.1%

75.6%

23. UNIT FORCED OUTAGE RATE 0.0%

1.3%

1.5%

24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH) :

Refueling, 03/30/96, 24 days

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

NA DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977

  • o OPERATING DATA REPORT UDCKET NO. 50-301 i

DATE:

01/23/96 E

COMPLETED BY:

M. B.

Koudelka i

TELEPHONE: 414 755-6480 OPERATING STATUS

1. UNIT NAME:

POINT BEACH NUCLEAR PLANT - UNIT 2

. NOTES

2. REPORTING PERIOD: December - 1995 3.

LICENSED THERMAL POWER (MWT) :

1518.5

4. NAMEPLATE RATING (GROSS MWE):

523.8 I

5. DESIGN ELECTRICAL RATING (NET MWE):

497.0

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE) :

509.0.

i

7. MAXIMUM DEPENDABLE CAPACITY (NET MWE) :

485.0 I

8.

IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

i NA

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): power 901
10. REASONS FOR RESTRICTIONS, (IF ANY) :

Self-imposed restriction because of SG tube plugging, pending further evaluation.

THIS MONTH YEAR TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 744.0 8,760.0 205,273.0
12. NUMBER OP HOURS REACTOR WAS CRITICAL 722.9 7,275.5 179,327.1
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 233.9 I
14. HOURS GENERATOR ON LINE 688.9 7,159.7 176,854.4

[

15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 302.2
16. GROSS THERMAL ENERGY GENERATED (MWH) 887934.0 10550228.0 254532153.0
17. GROSS ELECTRICAL ENERGY GENERATED 298870.0 3552150.0 86503260.0
18. NET ELECTRICAL ENERGY GENERATED (MWH) 283626.0 3384134.5 82464649.5
19. UNIT SERVICE FACTOR 92.6%

81.7%

86.2%

20. UNIT AVAILABILITY FACTOR 92.6%

81.7%

86.3%

l

21. UNIT CAPACITY FACTOR (USING MDC NET) 78.6%

79.7%

82.3%

22. UNIT CAPACITY FACTOR (USING DER NET) 76.7%

77.7%

80.8%

l

23. UNIT FORCED OUTAGE RATE 0.0%

0.2%

0.9%

24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH) :

NONE

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

NA 3

DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977 i

r r

. ~

.