Revised Monthly Operating Rept for Mar 1995 for Point Beach Nuclear Plant Unit 2
ML20097D979
Person / Time
Site: Point Beach  
Issue date: 03/31/1995
From: Koudelka M
WISCONSIN ELECTRIC POWER CO.
To:
Shared Package
ML20097D578 List:
References
NUDOCS 9602130258
Download: ML20097D979 (1)


Text

- _ _ _ _ _ - - _ _ _ _ _ _ _. _ _.

s OPERATING DATA REPOkT DOCKET NO. 50-301 2

DATE:

01/23/96 20 h

COMPLETED BY:

M.

B.

Koudelka 3P O CO ON TELEPHONE:

414 755-6480 N

OPERATING STATUS o.

01 0'

1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 2

. NOTES OO ON 2.

REPORTING PERIOD: March - 1995 TOO 3.

LICENSED THERMAL POWER (MWT):

1518.5 g y 22 0'

4. NAMEPLATE RATING (GROSS MWE).

523.8

5. DESIGN ELECTRICAL RATING (NET MWE) :

497.0 6.

MAXIMUM DEPENDABLE CAPACITY (GROSS MWE) :

509.0.

7.

MAXIMUM DEPENDABLE CAPACITY (NET MWE) :

485.0 8.

IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

NA 9.

POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NA

10. REASONS FOR RESTRICTIONS, (IF ANY) :

NA THIS MONTH YEAR TO DATE CUMULATIVE i

11. HOURS IN REPORTING PERIOD 744.0 2,160.0 198,673.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 683.4 2,014.4 174,066.0
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 233.9
14. HOURS GENERATOR ON LINE 607.0 1,933.3 171,628.0
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 302.2
16. GROSS THERMAL ENERGY GENERATED (MWH) 909449.0 2895326.0 246877251.0
17. GROSS ELECTRICAL ENERGY GENERATED 305910.0 976380.0 83927490.0
18. NET ELECTRICAL ENERGY GENERATED (MWH) 290627.0 931075.0 B0011590.0
19. UNIT SERVICE FACTOR 81.6%

89.5%

86.4%

20. UNIT AVAILABILITY FACTOR 81.6%

89.5%

86.5%

21. UNIT CAPACITY FACTOR (USING MDC NET) 80.5%

88.9%

82.5%

22. UNIT CAPACITY FACTOR (USING DER NET) 78.6%

86.7%

81.0%

23. UNIT FORCED OUTAGE RATE 2.3%

0.7%

1.0%

24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

Refueling, 09/30/95, 38 days

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

NA DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977

.