L-2009-517, Diablo Canyon - Receiving Water Monitoring Program 2008 Annual Report

From kanterella
Jump to navigation Jump to search
Diablo Canyon - Receiving Water Monitoring Program 2008 Annual Report
ML091330371
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 04/30/2009
From: Peters K J
Pacific Gas & Electric Co
To: Briggs R
Office of Nuclear Reactor Regulation, State of CA, Central Coast Regional Water Quality Control Bd
References
DCL-2009-517
Download: ML091330371 (2)


Text

Pacific Gas and Electric Company Diablo Canyon Power Plant P0. Box 56 Avila Beach, CA 93424 805.545.6000 PG&E Letter DCL-2009-517 Electronic Submission PDF Formatted File April 30, 2009 Mr. Roger Briggs, Executive Officer Central Coast Regional Water Quality Control Board 895 Aerovista Place, Suite 101 San Luis Obispo, CA 93401-7906 Re: PG&E Diablo Canyon Power Plant (DCPP)Receiving Water Monitoring Program 2008 Annual Report

Dear Mr. Briggs:

Enclosed is a copy of the Receiving Water Monitoring Program (RWMP) 2008 Annual Report for DCPP. This report presents the physical and biological data collected in the RWMP during 2008. Per prior agreement, no analysis or interpretation of the data were performed. Tables in the appendices, provide summary statistics for each task.

I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to ensure that qualified personnel properly gather and' evaluate the information submitted.

Based on my inquiry of the person or persons who manage the. system, or those persons directly responsible for gathering the information, I certify that the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.

I am aware that there are significant penalties for-submitting false information, including the possibility of fine and imprisonment for knowing violations.

If you have any questions or concerns regarding the enclosed report, please, contact Bryan Cunningham of my staff at (805) 545-4439.Sttion ector -Diablo Canyon Power Plant Ecou jlk/b(kc Enclosure (1)

PG&E Letter DCL-2009-517 Mr. Roger Briggs, Executive Officer Central Coast Regional Water Quality Control Board April 30, 2009 Page 2 cc w/enclosure:

PDF Formatted Electronic File Copy: Regional Administrator, Region 9 U. S. Environmental Protection Agency 75 Hawthorne Street San Francisco, CA 94105 Attention:

Carey Houk (W-5-3)

Regional Administrator U.S. Nuclear Regulatory Commission Region IV 612 E. Lamar Blvd., Suite 400 Arlington, TX 76011-4125 California Department of Fish and Game 20 Lower Ragsdale, Suite 100 Monterey, CA 93490 Hardcopy Format: U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001 Resident Inspector, Michael S. Peck U.S. Nuclear Regulatory Commission Diablo Canyon Power Plant 104/5 cc w/o enclosure:

Robyn StuberUS EPA, Region 9 CWA Standards

& Permits Office (Water Division)75 Hawthorne Street San Francisco, CA 94105-3901 Jennifer Soloway SWRCBOffice of the Chief Counsel 901 P Street Sacramento, CA 95812-0100John Steinbeck Tenera Environmental 141 Suburban Road, Suite A2 San Luis Obispo, CA 93401