L-09-001, Independent Spent Fuel Storage Installation, Notification in Accordance with 10 CFR 72.80, Other Records and Reports, Prior to First Storage of Spent Fuel

From kanterella
Jump to navigation Jump to search
Independent Spent Fuel Storage Installation, Notification in Accordance with 10 CFR 72.80, Other Records and Reports, Prior to First Storage of Spent Fuel
ML090500045
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 01/30/2009
From: Becker J
Pacific Gas & Electric Co
To:
Document Control Desk, NRC/NMSS/SFPO
References
DIL-09-001
Download: ML090500045 (1)


Text

PacificGas and Electric Company James R.Becker Diablo Canyon Power Plant Site Vice President Mail Code 104/5/601 P 0. Box 56 Avila Beach, CA 93424 805.545.3462 January 30, 2009 Internal: 691.3462 Fax: 805.545.6445 PG&E Letter DIL-09-001 ATTN: Document Control Desk Director, Spent Fuel Project Office Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Materials License No. SNM-251 1, Docket No. 72-26 Diablo Canyon Independent Spent Fuel Storage Installation Notification in Accordance With 10 CFR 72.80, "Other Records and Reports," Prior to First Storaqe of Spent Fuel

Dear Commissioners and Staff:

In accordance with 10 CFR 72.80 (g), Pacific Gas and Electric Company is notifying the Nuclear Regulatory Commission of its intent to begin the loading of Diablo Canyon Power Plant spent fuel into a storage cask under the Diablo Canyon Independent Spent Fuel Storage Installation Materials License No. SNM-251 1.

Loading activities are scheduled to commence on June 1, 2009.

There are no new or revised regulatory commitments in this report.

If you have any questions concerning this notification, please contact Mr. L. Jearl Strickland at (805) 545-6080.

Sinc rely, James R. B cker gwh2/50033729 cc: Elmo E. Collins, NRC Region IV Shana R. Helton, NRC Division of Spent Fuel Storage and Transportation Ray L. Kellar, NRC Region IV Michael S. Peck, NRC Senior Resident Inspector Alan B. Wang, NRR Project Manager Diablo Distribution A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway