Text
. _ - - _.
..
_
- = _ _ ~.
.
. _ -.
-
_ -
O i
.
'
U.S. NUCLEAR REGULATORY COND!ISSION
'
OFFICE OF INSPECTION AND ENFORCEMENT
REGION III
Reports Nos.
50-546/80-38; 50-547/80-38 no Docket Nos.
50-546; 50-547 Licenses No. CPPR-170; CPPR-171 Licensee: Public Service of Indiana P.O. Box 190 New Washington, IN 47162 Facility Name: Marble Hill Nuclear Generating Station, Units 1 and 2 Inspection At: Marble Hill Site, Jefferson County, IN Inspection Conducted: October 8-10, 17 and 27, 1980 Inspectors: $J l}
j$
t on c R J2A.212._
E. R. Schweibinz
//'/ b 8 O (October 9, 1Q, and 17, 1980)
@WS ~
@C.~C. Williams, Chief Approved By:
Projects Section 2
- ~ #7 ~ b
,
__
Inspection Summary Inspection on October 8-10, 17 and 27, 1980 (Reports Nos. 50-546/80-38; j
50-547/80-38)
Areas Inspected: A special inspection of the completely revised Document Control system was conducted to assure procedural and system adequacy i
and implementation of that system. This inspection involved a total of
!'
80 inspector-hours on site by two NRC inspectors.
Results: No items of noncompliance or deviations were identified.
- i i
l
- 80122400 2-
--
. -
.-.
-
-
..
..
..-
,. - -
-.,.
.
- _ _.
_
-
_ _.
_
_
. _ - - _.
. - -. - -
.
<
<
f
DETAILS
Principal Persons Contacted Public Service of Indiana (PSI)
- S.
W. Shields, Senior Vice President Nuclear Division
- W. M. Petro, Project Director
,
- L. O. Ramsett, Quality Assurance Manager
- T. R. Burns, Project Engineering Manager
- R. B. Hanson, Document Control Task Force Leader
- H. H. Eller, Document Control Task Force
- C. W. Janecke, Quality System Superintendent M. Sturdivant, Document Control Task Force L. Zorbas, Document Control Task Force
.
E. Bonnett, Document Control Supervisor
!
W. Mahoney, Document Control Supervisor K. Hinkle, Assistant Construction Manager S. J. Brewer, Nuclear Safety and Licensing Manager C. T. Ligon, Document Control Task Force
- M.
L. Juvik, QA Administrative Assistant
- J. L. Keys, QA Administrative Assistant
'
L. A. Nicodemus, QA Supervisor Audits W. Kropp, QA Engineer, Audits W. Abrams, QA, Quality Programs Supervisor
- Denotes those present at the exit meeting on October 28, 1980.
The inspectors also contacted other licensee personnel during the inspection.
Functional or Program Areas Inspected Document Control 1.
Procedure l
The inspectors reviewed document control procedure PMP 5.02, Revision 7, dated 10/6/80 for content and being adequate to control this i
activity to the requirements of the Project Quality Assurance Manual l
(specifically sections 5 and 6) this procedure as reviewed was found to be acceptable.
i
[
2.
Training The inspectors reviewed the training for document control personnel to assure the requirements of procedures PMP 1.04, Revision 3, Training,were met; also that the specific requirements of PMP 5.02 Revision 7 were included in the training. Attendance records and l
reading lists were also reviewed to assure all personnel currently engaged in this activity pere so trained. This review was acceptable.
,
l
-2-
_ _ ___.,_ _____ _,,
_,
,
_,.
. _..., _ - -, _
_.. _
. _ _,
_
_ _ _ _ _ _ _ _
- _ _.-_-__-__ _ - - _____________
- ___ - - ____ - ____
_______________ - __ - __ _ _ _ _ - _ - _ _
d
"
.
't
!
3.
Implementation The inspectors also reviewed the actual implementation of the Document Control System to procedure PMP 5.02, Revision 7.
This review was limited to only two control stations. Site Document i
Control Center (SDCC) and Control Station No. 1 (the construction I
reference library). Numerous other control stations were planned j
for implementation in the near future but were not functioning
'
during this inspection.
This inspection concentrated on the following document control
.
activities (drawing and documents):
.
Receipt Control
'
Stamping and Logging i
Transmittal Control
]
Distribution Control; PSI and Contractor
!
File Maintenance Control Use Control l
Control of Indices Document Control Records i
The inspection included both drawings and documents of the following j
types:
l a.
Drawings:
.
!
General Arrangement Drawings Piping and Instrumentation Diagrams Electrical Single Line Diagrams
.
'
Vendor and Contractor Drawings Control and Instrumention Diagrams
,
l b.
Documents:
h
'
Classification Criteria of Structures / Systems / Components Design Criteria Documents ASME Design Specifications ASME Piping System Design Reports Procurement Specifications
'
i Erection Specifications Specification Addenda Specification Amendments Engineering Change Notices Field Change Request Project Management Procedures Special Process Procedures
,
l Storage and Maintenance Instructions Contractor Work Procedures-3J
!
,
..
.
.
.
l This part of the inspection revealed some problem areas that required additional action by PSI for resolution:
1.
A large number of "un-status"/" uncontrolled" drawings / documents were found to be not properly controlled. These items were located primarily in construction trailers. Additional action by PSI in the form of stamping, collection and destroying these items proved to be acceptable.
2.
Several Project Management Manual's were found not to be current or had " controlled" copies identified " uncontrolled". All manuals were recalled, reverified, corrected and reissued, this was found to be acceptable.
The problems noted above were primarily related to the userh. Additional training was conducted by the licensee.
The corrective action noted above took place during the course of this inspection, was reviewed, and found acceptable by the NRC.
Results:
The Document Control system, together with corrective action taken during this inspection was found to be acceptable to the NRC.
No items of noncompliance or deviations were identified in this area.
Exit Meeting The inspectors met with the staff representatives (denoted under Persons Contacted) at the conclusion of the inspection on October 28, 1980. The inspector summarl ed the scope and finding of the inspection.
Interim exit debriefings were also conducted on October 10 and 17, 1980 l
due to the on-going inspection.
,
a
'i
,
!