IR 05000546/1980027

From kanterella
Jump to navigation Jump to search
IE Insp Repts 50-546/80-27 & 50-547/80-27 on 800717-18.No Noncompliance Noted.Major Areas Inspected:Technical Adequacy of Util Action Re Marble Hill Concrete Issue
ML19337A494
Person / Time
Site: Marble Hill
Issue date: 08/18/1980
From: Hawkins F, Hayes D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19337A493 List:
References
50-546-80-27, 50-547-80-27, NUDOCS 8009290107
Download: ML19337A494 (3)


Text

{{#Wiki_filter:_ _ _ _ _ _ - - _

lb

U.S. NUCLEAR REGULATORY COMMISSION ' OFFICE OF INSPECTION AND ENFORCEMENT ,

REGION III

Report No. 50-546/80-27; 50-547/80-27 Docket No. 50-546; 50-547 License No. CPPR-170; CPPR-171 Licensee: Public Service of Indiana Post Office Box 190 New Vashington, IN 47162 Facility Name: Marble Hill Nuclear Generating Station, Units 1 and 2 Meetings At: Marble Hill Site, Jefferson County, IN Meetings Conducted: July 17 and 18, 1980 I - h 5N Inspector: F.

. Hawkins 6ll8lBO , , Accompanying Perso 1: D. W. Hayes Approved By: D.

.H ' [[/9[8D , Engineering Suppo t Section 1 / ' Meetings Summary Meetings on July 17 and 18, 1980 (Reports No. 50-546/80-27; 50-547/80-27) Topics Discussed: This report identifies topics discussed during two meetings held with the independent concrete consultant team, relative to the Marble Hill concrete issue. The meetings involved a total of 32 inspector-hours by two Region III NRC inspectors.

, 8809290107 ........ - -..

!

DETAILS Attendees Public Service of Indiana (PSI)

  • S. W. Shields, Senior Vice President - Nuclear Division
  • L. O. Ramsett, Quality Assurance Manager
  • R. J. Kime, Assistant Construction Manager
  • T. R. Burns, Project Engineering Manager
  • C.

S. Togni, Chief Civil Engineer

  • E.

Schlinger, Engineering Staff

  • D. B. Ingmire, Construction Verification Program Coordinator Other Personnel

+*R. E. Shewmaker, Senior Structural Engineer, NRC Headquarters

  • J.

J. Harrison, RIII Resident Inspector +R. A. Lofy, Parameter Inc.

+*A. L. Pa rme, Independent Consultant +*R. C. Hamm, Independent Consultant +*M. A. Cassaro, Public Interest Group Consultant

  • Denotes those personnel attending the July 18, 1980 meeting.

+ Denotes those personnel attending the July 17, 1980 meeting.

1.

July 17, 1980 Meeting A meeting was held in the NRC Region III offices to discuss the upcoming independent consultant team's effort to review the technical adequacy of PSI's actions with regard to the concrete issue at Marble Hill. The meet-ing was divided into two sections: The first portion dealt with contractual considerations with Messrs. Lofy, Hamm, Parme and Shewmaker in attendance.

The second portion dealt with the technical aspects of the Marble Hill concrete issue and the expected scope of the consultant team's effort in accordance with NEC Task Order #1, with Messrs. Lofy, Hamm, Parme, Shewmaker, and Cassaro in attendance.

2.

July 18, 1980 Meeting A meeting was held at the Marble Hill site, with those people denoted in the Detai.. section of this report in attendance. The purpose of the meeting was to make the necessary introductions, establish key contact personnel within PSI's site organization, and to familiarize PSI personnel of the intended scope of the consultant team's effort. As an aid to the consultant team, copies of NRC inspection reports and various PSI documents were supplied to Messrs. Lofy, H: mm, Parme, and Cassaro. Attachment I to this report specifically lists thost iocuments which were made available. Following the close of the meeting, a brief orientation of the site was given the consultant team, followed by a tour of the plant.

Attachment 1: List of Documents Supplied to Concrete Consultant Team - . .- -. -, -. _,.

. ' ATTACHMENT 1 DOCUMENTS SUPPLIED TO THE CONCRETE CONSULTANT TEAM (Messrs. Lofy, Hamm, Parme, Cassaro) A.

NRC Documents IE Marble Hill Inspection Report Nos. 79-03, 79-04, 79-05, 79-07, 79-09, 79-19, 80-02, 80-06, 80-08 B.

PSI Documents 1.

Volume I and II of the S&L report, entitled, Evaluation of In-Place Concrete 2.

Special Process Procedure No. SPP-5, Revision 4 3.

S&L Design Drawings: S-471, Revision C S-472, Revision C

S-473, Revision C S-474, Revision B S-475, Revision B S-477, Revision K S-654, Revision E S-679, Revision W S-785, Revision C 4.

S&L Concrete Beam Reinforcing List No. 3AB, Revision A, pages 1 of 35, 2 of 35, 6 of 35, and 13 of 35.

l

- - - -- . }}