e U.S. NUCLEAR REGULATORY COMMISSION
.
OFFICE OF INSPECTION AND ENFORCEMENT
REGION III
.
Report Nos. 50-546/80-13; 50-547/80-13 Docket Nos. 50-546; 50-547 License Nos. CPPR-170; CPPR-171 Licensee: Public Service of Indiana 1000 East Main Street Plainfield, IN 46168 Facility Name: Marble Hill Generating Station, Units 1 and 2
-
,
Inspection At: Marble Hill Site, Jefferson County, IN Inspection Conducted: March 1-31, 1980
!nspector:
. IINs 0 JD
'
/
/
Appro^ved By:
.C 1 Ili L
Projects Section 2
/
Inspection Summary Inspection during the period of March 1-31, 1980 (Report Nos. 50-546/80-131 50-547/80-13)
Areas Inspected:
Inspection by the IE Regional Resident Inspector of the Auxiliary Building, Fuel Handling Building, Unit I and 2 containments and miscellaneous areas to verify that activities in progress complied with the stop work order of August 7, 1979. This inspection also included a review of the storage and maintenance activities for safety related items and an overview of the Construction Verification Program (concrete and reinforcing steel visual inspection) in progress. This inspection in-volved a total of 184 inspector-hours on site by one NRC inspector.
Results: No items of noncompliance or deviations were identified.
.
WQ 8 0052 T6
'
-
<,..n.-
.. 7 9
_y--.
-. - -
,- -. - -
- -, -.,..
.r-
- ~ ~ - ' '
_
-
.
DETAILS
.
Principal Persons Contacted
.
Public Service of Indiana (PSI)
- S. Shields, Vice President Electrical Systems L. Crews, Vice President Construction
- G. Brown, Project Director
- J. Brewer, Construction Manager
-
- V. Mahan, QA Technical Support
J. Kime, Assistant Construction Manager C. Beckham, Manager Quality Engineering C. Chmielewski, Superintendent Quality Systems J. Roberts, Superintendent Inspection N. Reichel, Area Construction Manager, Reactor Buildings
.. Burns, Project Engineering Manager
- R. Ubaudi, Project Controls Manager M. Morris, Project Controls Manager J. Sullivan, Materials Manager D. Ingmire, Superintendent - Civil Quality Engineering G. Weston, Superintendent - Mechanical Quality Engineering R. Hand, Superintendent - Electrical Quality Engineering G. Davis, Superintendent - Welding /NDE Engineering G. Watner, Civil Quality Engineer K. Seeber, Project Staff Engineer (S&L)
C. Togni, Project Staff Engineer (S&L)
M. John, Reactor Buildings Mechanical Construction Supervisor J. Frederick, Materials - Supervisor Storage and Maintenance J. Byer, Systems Turnover Manager J. Mattinoe, Receiving Inspection Supervisor Cherne J. Mortell, Project Manager A. Dolgard, QC Manager R. Horine, QC Supervisor C. Jurgens, QC Engineer Westinghouse Electric Corporation C. Markham, Site Manager N. Skorick, Site Mechanical Engineer
.
-2-
.
_ _ _.
,,,.,.
~ - - - -
-
-
.
l Authorized Nuclear Inspector (ANI)
.
B. Rice, Hartford, Steam Boiler (ANI-PSI)
B. Braden, Hartford Steam Boiler (ANI-Cherne)
.
- Denotes those present at exit meetings.
MAC - Management Analysis Company S&L - Sargent & Lundy Engineers The inspector also contacted and interviewed other licensee and contractor personnel.
-
Functional or Program Areas Inspected 1.
Construction Activities Inspection of construction activities indicated that work in all Category I areas, i.e.,
safety-related work, remains terminated in accordance with NRC confirmatory order dated August 15, 1979, except for material receiving, storage, and maintenance. Three inspections were also conducted during the off shift including one to assure those activities were also being maintained in a stop work condition.
No items of noncompliance or deviations were identified.
2.
Storage and Preservation of Material and Equipment The Resident Inspector observed the storage conditions and mainte-nance activities in laydown areas, warehouses, and in interim storage (installed or to be installed) in the Auxiliary and Fuel Handling Buildings and miscellaneous areas of material and equipment. These inspections were performed to assure compliance with the require-ments of ANSI N45.2.2 - Packaging, Shipping, Receiving, Storage, and Handling of Items for Nuclear Power Plants the Nuclear Steam System Supplier (Westinghouse) and Public Service of Indiana's Management Manual for Construction Procedures.
Several isolated cases of end caps not installed, end caps not properly sealed, and items not properly stored on cribbing (dunnage)
were noted on various equipment during this reporting period. These conditions were promptly corrected.
No items of noncompliance or deviations were identified.
3.
The Resident Irspector observed, during the reporting period, the activities in progress related to the Construction Verification Program. These activities specifically were in the inspection of
" Category I Concrete Surface Irregularities" to Special Projects
'
Procedure SPP-5 and " Category I Reinforcing Steel" to Special Pro-ject Procedure SPP-2.
-3-
.
.
. _. - _
_ _
._
,
_ _, _ _ _ _.
_....
._
_
_
_
__
. _ _. _
. _ _ _ _
..
_.
. _
.
.
... _ _ _.
. -.-
-
.
'
No items of noncompliance or deviations were identified.
4.
A contingent of Nuclear Regulatory Commission personnel visited the Marble Hill site on March 25, 1980. This visit was followed by participation in the Public Meeting conducted at Madison Jr.'High
'
,
!,
School, Madison, Indiana. The following is a list of those NRC
personnel who attended:
Nuclear Reactor Regulation Office D. Vassalo
'
J. Wilson W. Haass J. Gilray Executive Legal Office S. Burns Inspection and Enforcement Office, Headquarters V. Stello H. Thornburg Inspection and Enforcement, Region III J. Keppler G. Fiore11i D. Hayes F. Hawkins E. Schweibinz 5.
The Resident Inspector conducted an audit of the Nuclear Regulatory Commission files contents in the Public Document Room in the Madison, Indiana Public Library. This audit was conducted on March 26, 1980, e
the NRC documents were found to be up-to-date, in order and in good condition. This audit was conducted because of complaints by the news media and general public that the lastest information was not available.
Exit Meetings The Resident Inspector attended the exit meetings conducted by Region III inspectors J. Neisler and F. Hawkins together with J. Harrison (Region III) on March 7, and March 21, 1980 respectively.
The Resident Inspector met with licensee representatives (denoted under Persons Contacted) collectively and individually on March 6, 19, and 20, 1980. The inspector at those times summarized the scope and findings of the inspection effort to date.