'O U.S. NUCLEAR REGULATORY COMMISSION
OFFICE OF INSPECTION AND ENFORCEMENT PIGION III
.
Report No. 50-546/80-20; 50-547/80-20
.
,
Docket No.-50-546; 50-547 License No. CPPR-170; CPPR-171 Licensee: Public Service of Indiana 1000 East Main Street Plainfield, IN 46168 Facility Name: Marble Hill Generating Station, Units 1 and 2 Inspection At: Marble Hill Site, Jefferson County, IN Inspection Conducted: April 1-30, 1980 SuWE(dcwf4E Inspector:
J. J. Harrison b
/
c-
/
0V WAh' L Approved By:
C. C. Williams, Chief
2/[
'
Projects Section 2 Inspection Summary Inspection during the period of April 1-30, 1980 (Report No. 50-546/80-20; 50-547/80-20)
Areas Inspected:
Inspection by the IE Regional Resident Inspector of the Auxiliary Building, Fuel Handling Building, Unit I and 2 containments and miscellaneous areas to verify that activities in progress complied with the stop work order of August 7,1979. This inspection also included a review of the storage and maintenance activities for safety related items and an overview of the Construction Verification Program (concrete and reinforcing steel visual inspection) in progress. This inspection in-volved a total of 176 inspector-hours on site by one NRC inspector.
Results: No items of noncompliance or deviations were identified.
_
'
800625017 0
_
_
__
_
_
_ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _
.
,
DETAILS Principal Persons Contacted Public Service of Indiana (PSI)
- S. Shields, Vice President Electrical Systems
- G. Brown, Project Director
.
- J. Brewer,' Construction Manager
- V. McMahon, Special Project Consultant
- J. Norris, QA Manager
- L. Ramsett, QA Manager E. Shows, Consultant J. Kime, Assistant Construction Manager C. Beckham, Manager Quality Engineering C. Chmielewski, Superintendent Quality Systems J. Roberts, Superintendent Inspection N. Reichel, Area Construction Manager, Reactor Buildings T. Burns, Project Engineering Manager
.
- R. Ubaudi, Project Controls Manager M. Morris, Project Controls Manager R.. Beech, Materials Manager G. Weston, Superintendent - Mechanical Quality Engineering R. Hand, Superintendent - Electrical Quality Engineering G. Davis, Superintendent - Welding /NDE Engineering G. Warner, Superintendent - Civil Quality Engineering K. Seeber, Project Staff Engineer (S&L)
C. Togni, Project Staff Engineer (S&L)
J. Frederick, Materials - Supervisor Storage and Maintenance Cherne J. Mortell, Project Manager '
A. Dolgard, QC Manager R. Horine, QC Supervisor Westinghouse Electric Corporation C. Markham, Site Manager N. Skorich, Site Mechanical Engineer Authorized Nuclear Inspector (ANI)
B. Rice, Hartford Steam Boiler (ANI-PSI)
B._ Braden, Hartford Steam Boiler (ANI-Cherne)
- Denotes those present at exit meetings.
S&L - Sargent & Lundy Engineers The inspector also contacted and interviewed other licensee and contractor personnel.
-2-
_
.
Functional or Program Areas Inspected
1.
Construction Activities Inspection of construction activities indicated that work in all Category I areas, i.e.,
safety-related work, remains terminated in accordance with NRC confirmatory order dated August 15, 1979, except for material receiving, storage, and maintenance. Two inspections were also conducted during off shift periods.
No items of noncompliance or deviations were identified.
2.
Storage and Preservation of Material and Equipment The Resident Inspector observed the storage conditions and mainten-ance activities in laydown areas, warehouses, and interim storage in the Auxiliary and Fuel Handling Buildings and other storage areas of material and equipment. These inspections were performed to as-sure complaince with the requirements of ANSI N45.2.2 - Packaging, Shipping, Receiving, Storage, and other requirements of the Nuclear Steam System Supplier (Westinghouse) and The Public Service of Indiana's Project Management Manual.
No items of noncompliance or deviations were identified.
3.
The Resident Inspector observed, the activities in progress related to the Construction Verification Program. These activities speci-fically involved the inspection of:
Category I Reinforcing Steel to Procedure SPP-2
.
Category I Structural Steel to Procedure SPP-3
.
Physical Inspection and Verification of In-Place Safety Category
.
I Piping and Hangers to Procedure SPP-4 Category I Concrete Surface Irregularities to Procedure SPP-5
.
No items of noncompliance or deviations were identified.
4.
The Resident Inspector met with Congressman L. H. Hamilton, State of Indiana, on April 8, 1980 to discuss inspection results at Marble Hill.
5.
The Resident Inspector met with the American Society of Mechanical Engineers (ASME) Team Leader, Mr. R. E. Tolton, on April 15, 1980
-
to discuss the findings of the survey conducted on Cherne Contract-ing Corporation (Mechanical Erection Contractor to PSI).
Mr. Tilton stated that the team would recommend "N" stamp authorization for the Cherne Corporation Marble Hill installation activities.
6.
The Resident Inspector participated in the regional inspection effort during the week of April 21, 1980. This inspection consisted of-3-
_ -
-
__
__ _ _ _
_ _ - _ _ _ - _ _ _ _ - _ _ _ _ _ _.
_
.
.
Project Quality Assurance Manual review, personnel staffing quali-fication, reviews, and review of PSI preparation for receiving inspection. Details will be forthcoming in a separate report.
Exit Meetings The' Resident Inspector attended the exit meetings conducted by Region III inspectors as follows:
Z. Cordero on April 3, 1980
.
J. Konklin and Z. Cordero on April 14, 1980
.
K. Naidu on April 24, 1980
.
C. Williams, D. Hayes, J. Konklin, E. Schweibinz, J. Harris (RII), and
.
F. Hawkins on April 25, 1980 The Resident Inspector met with licensee representatives (denoted under Persons Contacted) periodically throughout this reporting period col-lectively and individually. The inspector summarized the scope and findings for each part of this activity.
I
.
_
.
-4-