Text
~.
.
..
.
.
-
.
..
-h
'
.
ff U.S. NUCLEAR REGULATORY COMMISSION
'*
OFFICE OF INSPECTION AND ENFORCEMENT
' REGION III i
,
Report Nos.
50.-546/80-37; 50-547/80-37
.
!,
Docket Nos.
50-546;.50-547 License Nos. CPPR-170; CPPR-171 Licensee: Public Service of Indiana Post Office Box 190 New washington, IN 47162
<
Facility Name: Marble Hill ~ Generating Station, Units 1 and 2 Inspection At: Marble Ilill Site, Jefferson County, IN Inspection Conducted: September 1-30, 1980
$ ? d. Q i kA bd'sL #./f, e
'
l Inspector:
J. J. Ilarrison
/ 0 ~ )I
~h h (f [ 'Lt/ /s[? w
,.
Approved By:
C. C. Williams, Chief Projects Section 2
/ 6 -;2 7 -d 0
-
,
Inspection Summary
'
Inspection during the period of September 1-30, 1980 (Report Nos. 50-546/80-37; 50-547/80-37)
Areas Inspected: Inspection by the IE Regional Resident Inspector of the Auxiliary Building, Fuel Handling Building, Unit.1 and 2 Containments with miscellaneous areas to verify that activities in progress complied with the
.
stop work order of August ',1979.
This inspection also included a' review of the storage and maintenance activities. for safety related items, an over-view of the Construction and Material Verification Program, and a review ofL
'
the licensee program for receiving. inspection. This inspection involved a total of 210 inspector-hours on site-by one NRC inspector, i
Results: No items of noncompliance or deviations were identified.
.
i e
,8012080 M
~
,
.
,
.
-
-.. -.
.
.,,
. - - -.
. - -. - -
-.. -
,
F b
g DETAILS
s-Principal Person's Contacted Public Service'of Indiana (PSI)
- S. Shie' Ids Sr..Vice. President Nuclear Division
- B.
Petro,' Project Director
- J. Kime, Construction Manager:
,
- C. Beckham, Manager Quality Engineering
'
- V. McMahon, Special Project Consultant
- J. Norris, QA Manager (Verification Program Only)-
- L'. Ramsett, QA Manager D. Janecki, Superintendent Quality Systems
- 'J. Roberts, Superintendent ~ Inspection N. Reichel, Area Construction Manager, Reactor Building
- T. Burns, Project Engineering Manager
- D. Ingmire, Project Engineering Staff - Special Projects
- R. Keele, Superintendent - Quality Administration
'
- R. Beech, Material Manager G. Weston,. Superintendent - Mechanical Quality Engineering R. Hand, ' Superintendent - Electrical Quality Engineerir.g
.
J. Parks, Superintendent - Electrical Quality Engineering
G. Warner, Superintendent - Civil Quality Engineering.
.
B. Morrison, Superintendent - Civil' Quality Engineering 1. Sullivan, Materials Supervisor
. Storage and Maintenance and Materials Information Systems
.'
'M. Juvick, QA Consultant S. Brewer, Nuclear Safety and Licensing Manager M. Evarts,. Environmental Licensing Supervisor
'
R. Simmons, Supervisor Operation QA
>
'cherne Construction Company
J. Mortell, Project Manager i
A. Dolgaard,.QC Manager T.' Francis, Principal Engineer
Newberg - Marble Hill
,
D. Stegemoller, Vice President - Power Construction N. Henry, Project.QA Manager D. Maxwell, Project QC Manager
'
westinghouse Electric Corporation
!
I C. Markham, site Manager
,
N. Skorick, Site, Mechanical Engineer
..
t-2-
- -
J
,
,
, ~,,.
..,,-
,,,.
.
.n
.
.
.
-
.
-
-
--.
.-
--
T
'\\,
,
- -
Authorized Nuclear Inspector-( ANI)
A. Clark, Hartford S+ eam Boiler ( ANI-PSI) '
B. Braden, Hartford. Steam Boiler (ANI-Cherne)
,
- Denotes those present at.the exit meetings.
Che inspector als'o contacted and interviewed other licensee and contractor persennel.
.
l Functional or Program Areas Inspected 1.
Construction Activities
.
.!
Inspection of construction activities indicated that work in all Categcry 1-areas,'i.e., safety-related' work, remains cerminated in accordance with NRC confirmatory order dated August 15, 1979, except for material receiving,. storage, and maintenance and receiving-inspection activities. Two inspections were also conducted during off shift periods.
'
No items of noncompliance or deviations were identified.
- 2.
Storage and Preservation of Material and Equipment The Resident Inspector observed the storage conditions and maintenance activities.in laydown areas, warehouses, and interim storage in the
. Auxiliary and' Fuel Handling Buildings and other storage. areas of
- -
material _and equipment..These inspections were performed to assure compliance with the requirements of ANSI-N45.2.2 - Packaging, Shipping, l
Receiving, Storage and other requirementslof the Nuclear Steam System Supplier (Westinghouse) and the Public Service of Indiana's Project
.
i Management Manual.
No items of noncompliance or deviations were. identified.
!
3.
Construction and Materials Verification Program-The Resident Inspector began a review of the " Construction and Material J
Verification Program,. Final Report" dated September 12,1980.
This review is generic for content and will continue into the next reporting
~
period.
The review for technical adequacy is being accomplished by the i
NRC Region III Staff.
I No Litems of noncompliance or deviations were identified'.
4.
Receiving' Inspection Program 1:
The Resident Inspector _ observed the ongoing receiving insp'ction-e activities being. performed in. accordance.with Project Management Manual -Procedure PMP-3.07,{ Revision 4, dated June 26, 1980..
No items of noncompliance or ' deviations 'were identified,
'
.
--3
_-
,
-- -
- -
.
,
,
.-,
_-
-
.
.-
.
-
.
.
-
.-.-
.
.
-.
.
.
. -
\\
]f
-
5.
1 Project Quality Assurance Manual (PQAM)
The Resident Inspector. reviewed Revision 4, dated September 23, 1980,
'
- to'Section 6 of the PQAM.on Document' Control. This was a major revision to :this section of. the' PQAM and 'was deemed by this review to be -adequate.
- i^
No items of, noncompliance or deviations were identified.
'
,
6.
Review of Previously ' Reviewed Nonconformanccs and Corrective Action Reports The Resident Inspector reviewed Special Process Procedure SPP-23, titled
" Verification of the NCR Review Committee's Review Documentation and Curren: NCR Status" Revision i dated September 12, 1980. The review also consisted of the " Final Report of Special Process Procedure 23" dated: September 23, 1980. Based on this review and a sampling of supporting quality records, this procedure and resulting report are
<
considered adequate and responsive to commitments made to the NRC and
~
are acceptable pending Region III Management review.
p No items of noncompliance or deviations were identified.
,
7.
Meeting / Site Visits
>
,
During this reporting period the Resident' Inspector participated in the following:
On September 17, 1980 Mr. W. E. Thixton, State of Indiana - District Building Offical, Administrative Building Council met ~with the Resident Inspector to discuss the responsibilities of the NRC andithe State of Indiana in their respective regulatory roles. Messrs. Brewer and'Evarts of PSI. also attended.
8.
Media Contacts The Resident Inspector was interviewed on September 9, 1980 by Jane
,
Anderson WHAS radio, Louisville, Kentucky. The interview subject was construction restart dates-and constraints in place by the NRC order of August 15, 1979.
'
Exit Meetings-
'The Resident Inspector participated in the exit meetings conducted on:
September 10, 1980, E. Schweibinz September 12,'1980, J. Neisler September 18,'1980,' J. Konklin September ~25, 1980, C. Erb and Z. Cordero The1 esident Inspector also met with licensee representatives (denoted
!
R
under Persons Contacted) periodically throughout this reporting period
.
. collectively and individually. The inspector summarized the scope and
~
findings for each part of-this activity.