Text
"U O
U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT
REGION III
-
Reports No. 50-546/80-25; 50-547/80-25 Docket Nos. 50-546; 50-547 Licenses No. CPPR-170; CPPR-171 Licensee: Public Service of Indiana 1000 East Main Street Plainfield, IN 46168 Facility Name:
Marble Hill Generating Station, Units 1 and 2
.
Inspection At: Marble Hill Site, Jefferson County, IN Inspection Conducted: June 1 - 30, 1980 h b, Y Y W f W.
Inspector:
J. J. Harrison
- 2( /f[S
,
$0W) en Approved By:
C. C. Williams, Chief fd,;7C /980 Projects Section 2
[/ (/
'
Inspection Summary Inspection during the period of June 1 - 30, 1980 (Reports No. 50-546/80-25; 50-547/80-25)
Areas Inspected:
Inspection by the IE Regional Resident Inspector of the Auxiliary Building, Fuel Handling Building, Unit 1 and 2 Containments with miscellaneous areas to verify that activities in progress complied with the stop work order of August 7, 1979. This inspection also included a review of the storage and maintenance activities for safety related items, an overview of the Construction Verification Program, and a review of the licensee program for receiving inspection. This inspection involved a total of 114 inspector-hours on site by one NRC inspector.
Results: No items of noncompliance or deviations were identified.
J scosm j77
f.
..
.
D DETAILS
Principal Persons Contar:ted
-
Public Service of Indiana (PSI)
A. Barker, Chairman and Chief Executive Officer D. Menscer, President and Chief Operating Officer
- S.
Shields, Sr. Vice President Nuclear Division
- G.
Brown, Project Director
- J. Brewer, Construction Manager
- V. McMahon, Special Project Consultant
- J. Norris, QA Manager
- L. Ramsett, QA Manager E. Shows, Consultant J. Kime, Assistant Construction Manager C. Beckham, Manager Quality Engineering C. Chmielewski, Superintendent Quality Systems J. Roberts, Superintendent Inspection N. Reichel, Area Construction Manager, Reactor Buildings T. Burns, Project Engineering Manager
- R. Ubaudi, Project Controls Manager R. Keeley, Superintendent - Quality Administration R. Beech, Material Manager G. Weston, Superintendent - Mechanical Quality Engineering R. Hand, Superintendent - Electrical Quality Engineering G. Davis, Superintendent - Welding /NDE Engineering G.-Warner, Superintendent.- Civil Quality Engineering B. Morrison, Superintendent - Civil Quality Engineering J. Frederick, Materials Supervisor - Materials Receiving and Warehousing J. Sullivan, Materials Supervisor - Storage and Maintenance and Materials Information Systems Cherne Construction Company J. Mortells, Project Manager A. Dolgard, QC Manager R. Horine, QC Supervisor Westinghouse Electric Corporation C. Markham, Site Manager N. Skorick, Site Mechanical Engineer Authorized Nuclear Inspector (ANI)
B. Rice, Hartford Steam Boiler (ANI-PSI)
B. Braden, Hartford Steam Boiler (ANI-Cherne)
-2-
.
.
b a
a
_W mnm
' __
d'r%
w J, R4 m'q-
'a&
, 9 w.AR
ff?
,
- Denotes those present at exit meetings.
The inspector also contacted and interviewed other licensee and contractor personnel.
-
Functional or: Program Areas Inspected 1.
Construction Activities Inspection of construction activities indicated that work in all Category 1 areas, i.e., safety-related work, remains tenminated in accordance with NRC confirmatory order dated August 15, 1979, except for material receiving, storage, and maintenance. Three inspections were also conducted during off shift periods.
No items of noncompliance or deviations were identified.
2.
Storage and Preservation of Material and Equipment The Resident Inspector observed the storage conditions and maintenance activities in laydown areas, warehouses,_and interim storage in the Auxiliary and Fuel Handling Buildings and other storage areas of material and equipment. These inspections were performed to assure compliance-with the requirements of ANSI N45.2.2 - Packaging, Shipping, Receiving, Storage, and other requirements of the Nuclear Steam System Supplier (Westinghouse) and the Public Service of Indiana's Project Management Manual.
No items of noncompliance or deviations were identified.
3.
Construction Verification Program i
The Resident Inspector observed the activities in progress related to the Construction Verification Program. These activities specifically involved the inspection of:
Category I Reinforcing Steel to Procedure SPP-2
.
Category I Structural Steel to Procedure SPP-3
.
Physical Inspection and Verification of In-Place Safety Category
.
I Piping and Hangers to Procedure SPP-4 Mechanical ~ Splices - Cadwelds to Procedure SPP-6
.
i Material verification or previously accepted purchased items to
.
Procedure SPP-7 No items of noncompliance or deviations we're identified.
-3-
~
h
.
.
'*
4.
Receiving Inspection Program The Resident Inspector participated in the inspection effort with Region III personnel the week of June 23-27, 1980.
Inspection results
- will be detailed in a subsequent report.
At the conclusion of this inspection on June 27, 1980, a meeting was conducted at the site between NRC Region III Management (Messrs. Keppler, Fiorelli, Williams, Hayes, and Harrison) and PSI Management (Messrs. Barker, Menscer, and Shields) to discuss restart activities, plans, and policy.
5.
Meetings On June 6,.1980, NRC Region III staff (Messrs, Strasma, Menczer, Williams, and Harrison) conducted a meeting in Madison, Indiana with local officials to discuss:
NRC Regulatory Program
.
Resident Inspector Introduction and Responsibilities
.
Public Information - Channels of Communication
.
Marble Hill Status
.
Exit Meetings The Resident Inspector participated in the exit meeting conducted on June 27, 1980.
'The Resident Inspector also met with licensee representatives (denoted.under Persons Contacted) periodically throughout this reporting period collectively and' individually. The inspector summarized the scope and findings for each part of this activity.
.
-4-
_
.J 1.
-
.