U.S. NUCLEAR REGULATORY COMMISSION
j OFFICE OF INSPECTION AND ENFORCEMENT
REGION III
Reports No. 50-546/80-33; 50-547/80-33 Docket Nos. 50-546; 50-547 Licenses No. CPPR-170; CPPR-171
,
Licensee:
Public Service of: Indiana
,
.1000 East Main Street
Plainfield, IN 46168 Facility Name: Marble Hill Nuclear Generating Station, Units 1 and 2
!-
Inspection At: Marble Hill Site, Jefferson County, IN Inspection Conducted: September 10-12, 1980 M4/l'
f-M - TO Inspector:
J. H. Neisler
-
([ n' sas -
Approved By:
C. C.-Villiams, C ief f-J A - J c Projects Section 2
Inspection Summary Inspection on September 10-12, 1980 (Reports No. 50-546/80-33; 50-547/80-33)
Areas Inspected: Followup of unresolved items from previous inspection; review quality assurance, quality control, and work procedures involving receipt storage handling and installation of electrical components and materials. The inspection involved a total of 22 inspector-hours onsite by one NRC inspector.
Results: No items of noncompliance or deviations were identified during this inspection.
i i
!
B()11260 373 L
. _ _ _ _.
_
.
_ _,._.
--
-
-
_
-
r.
'
.
DETAILS-
.
Persons Contacted Principal Licensee Employees
- L.
D.' Ramsett, Quality Assurance Manager
- N.
C. Farr, Chief Electric Engineer
- R. J. Kime, Manager Construction
- W.
Petro, Project Director
- C. Beckham, Manager Quality Engineering
- H.
Curry, Superintendent Electrical Quality Engineering
- T. R. Burns, Project Engineering Manager
- R. Hand, Electrical QA Superintendent R. Crouch, Document Control Supervisor Contractor and Other Personnel
- J. Hindson, Acting Site QA Manager, Commonwealth-Lord
- R. -Wise, Quality Assurance Manager, Commonwealth-Lord
- D. Kuiper, Project Engineer, Commonwealth-Lord W. Benkert, Site QA Manager Designate, Commonwealth-Lord
- Denotes those persons attending the exit interview.
Licensee Accion
. Previously Reported Items (Closed) Unresolved Item (50-546/80-10-03; 50-547/80-10-03) - Basis for cer-tifying a Level III electrical inspector: The individual in question is no longer working as an electrical inspector.
PSI Procedure PMP 3.01 Revision 4 dated July-7, 1980, " Qualification and Certification of QA Personnel",
provides specific requirements for the qualification and certification of inspection personnel at all levels. This item is considered resolved.
(Closed) Unresolved ~ Item (50-546/80-10-04; 50-547/80-10-04) - Incomplete documentation packages for Conax containment electrical penetrations:
Licenree has reassembled the documentation package for the penetrations.
Documentation now includes test data for qualification of the penetrations in accordance with IEEE 317 and IEEE 323. This item is considered resolved.
Functional or Program Areas Inspected 1.
Procedures The inspector reviewed quality assurance procedures, quality control procedures and work procedures relating to the receipt storage handling and installation of electrical materials and equipment; training and qualification of personnel; and-document control.
Specific procedures reviewed during this inspection were:
-2-
s o
e
--
,-
,
.,.
.
-
a.
Commonwealth-Lord Procedure QAP-C1, Revision 1, dated February 11, 1980, " Procedure Preparation"
.
b.
Commcnwealth-Lord Procedure QAP-C2, Revision 2, dated July 23, 1980, " Training and Qualification of Personnel" c.
Commonwealth-Lord Procedure QAP-C4, Revision 2, dated July 30, 1980, " Drawing Specification and Procedure Control" d.
Commonwealth-Lord Procedure QAP-C8, Revision 2, dated May 8, 1980, " Receiving Inspection" e.
Commonwealth-Lord Procedure QAP-CIO, Revision 2, dated July 7, 1980, "Nonconformance Control and Corrective Action" f,
Commonwealth-Lord Procedure QAP-Cll, Revision 1, dated July 30, 1980, " Surveillance Inspection and Monitoring" g.
Commonwealth-Lord. Procedure QAP-C12, Revision 1, dated July 28, 1980, " Audits" h.
Commonwealth-Lord Procedure QAP-C13, Revision 1, dated July 30, 1980, " Inspection and Test Control" t
Commonwealth-Lord Procedure CWP-C6A, Revision 1, dated May 8, 1980, " Receiving, Storing, Handling, and Issuing of Permanent Wire and Cable" j.
Commonwealth-Lord Pro CWP-C6C, Revision 0, dated April 30, 1980, " Cable Installam _
k.
Commonwealth-Lord Procedure CWP-C9, Revision 2, dated May 8, 1980, " Material Control (General)"
1.
Commonwealth-Lord Procedure CWP-C3A, Revision 1, dated June 4, 1980, " Receiving, Storing, Handling, and Issuing of Cable Tray and Cable Tray Supports" m.
Commonwealth-Lord Procedure CWP-C3B, Revision-1, dated June 2, 1980, " Cable Tray System Installation"
,.
No items of noncompliance or deviations were identified in this area.
l 2.
Onsite Design Activities
%
The inspector questioned whether any safety related design activities were to be performed by the electrical contractor and if adequate pro-cedural controls to assure that design controls, reviews, organization, 4-responsibilities, and interfaces had been established and implemented.
-
-3-
-
-
-
-.
,
.
-
.__
!
$
-
The licensee and contractor personnel indicated that no safety related
design activities had been performed to date but they anticipated some onsite cable tray hanger detailing and similar activities would be per-formed by the electrical contractor's engineering group. The electrical contractor's quality control manager stated that in-house procedures were in use in their engineering group, but that these procedures had yet to be reviewed and approved. The licensee representative at the exit interview stated that procedural requirements for electrical onsite design activities would be determined and the necessary procedures established to control these activities. This matter will be examined during future inspections.
(50-546/80-33-01; 50-547/80-33-01).
No items of noncompliance or deviations were identified in this area.
3.
Welding The inspector examined the electrical contractor's welding procedures.
It was not clear from the procedures which code editions applied to
welding performed at Marble Hill.
Procedure CWP-C8A, " Welding Procedure (General)", states that American Welding Society (AWS) Code D.1.1 latest edition will be used. Procedure CWP-C8B, " Welder Qualifications", re-ferences AWS D.1.1-1977.
Procedures CVP-C8D, " Welding Procedure (CS-1)"
and CWP-C8H, " Welding Procedure (CS-2)" both reference the AWS D.1.1-1979 as being applicable.
Licensee representatives at the exit interview stated that procedures would be changed to reflect code commitments in the facility Safety Analysis Report. This matter is unresolved (50-546/80-33-02; 50-547/80-33-02).
No items of noncompliance or deviations were identified in this area.
4.
Quality Assurance Program The inspectors observations and reviews of procedural controls established by the licensee and his electrical contractor, except for the unresolved items mentioned in this report, indicate that the electrical quality assurance program is now adequate in the areas of receipt inspection; storage handling and issuing materials, training and qualification of inspection personnel, and installation and inspection of Class IE electrical systems at Marble Hill.
Unresolved Items Unresolved items are matters about which more information is required in order to ascertain whether they are acceptable items, items of noncompliance,
'
or deviatior.s. Unresolved items disclosed during this inspection are dis-cussed in Paragraphs 2 and 3.
i f-4-i
-.
-
-
_ _
_ - -. _ _
.
_
..
-
-
.
.
Exit Interview
.
The inspector met with licensee representatives (denoted under Persons Contacted) and the NRC Resident Inspector at the conclusion of the inspection on September 12, 1980. The inspector summarized the scope and findings of the inspection. The licensee acknowledged the findings as stated.