IE Insp Repts 50-546/80-18 & 50-547/80-18 on 800507-08.No Noncompliance Noted.Major Areas Inspected:Licensee Action Relative to Physical Insp & Verification of in-place Safety Category 1 Piping & Hangers
ML19318B852
Person / Time
Site: Marble Hill
Issue date: 05/19/1980
From: Cordero Z, Danielson D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19318B850 List:
References
50-546-80-18, 50-547-80-18, NUDOCS 8006300182
Download: ML19318B852 (3)


Text

.

E'

'

U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT

REGION III

Report No. 50-546/80-18; 50-547/80-18 Docket No. 50-546; 50-547 License No. CPPR-170; CPPR-171 Licensee: Public Service of Indiana 1000 East Main Street Plainfield, IN 46168 Facility Name: Marble Hill Nuclear Generating Station, Units 1 and 2 Inspection At: Marble Hill Site, Jefferson County, Indiana Inspection Conducted: May 7-8, 1980 l9l[6

Inspector:

Z. C.

r ero

-

Approved By:

D. H. Danielson, Chief

$ /f ["o Engineering Support Section 2

/

'

Inspection Summary Inspection on May 7 and 8, 1980 (Report No. 50-546/80-18; 50-547/80-18)

Areas Inspected:

Licensee's actions relative to the physical inspection and verification of in place safety Category I piping and hangers. This inspection involved a total of 16 inspector-hours by one NRC inspector. 1 Results: No items of noncompliance or deviations were identified.

seO6see \\W

.

.

DETAILS Persons Contacted L. Ramsett, QA Manager J. Norris, Acting QA Manager J. Roberts, Superintendent Inspection R. Ubaudi, Project Contractor R. Latronica, Area Manager F. Rubio, QA Inspector R. Schmidt, Construction Engineer I. Lefman, Audit Coordinator R. Beech, Material Management

  • R. Minnich, QA Inspector
  • F. Starr, QA Inspector
  • G. Weston, Superintendent Mechanical Q.E.
  • W. Rice, ANI/ PSI Other Personnel J. Harrison, NRC - Resident Inspector The inspector also contacted other licensee and contractor personnel.
  • Denotes those not attending the exit meeting.

Functional or Program Areas Inspected

,

1.

Licensee's Physical Inspection and Verification of In-Place rafety Category I Pipings and Hangers A 100% review of 101 completely installed hanger packages was com-pieted.

Installed configuration was verified consistent with the design drawings and all spring type were temporarily locked com-pressed. S&L hanger drawings were used for the verification program.

Twenty-four (24) additional completely installed hangers not on the list were found and subsequent package review is scheduled at a later date. A total of 719 hangers were noted. Fifty-seven (57) random

,

samples of selected hanger field welds were inspected to establish an overall 95% reliability with 95% confidence factor.

The piping verification is still not complete. The Physical Survey Team has reviewed approximately 19% of Cherne traveler packages for the in place pipe.

l Part of the program for piping weld procedure verification requires the Physical Survey Team to examine the S&L piping design tables and S&L pipin and instrumentation diagrams and to document the findings o

as to the correctness of the piping design table used, pipe class and weld procedure for the type of material welded. The inspector i

-2-J l

-. -

. _.

__

.__ __

__

_ _ _. _

_ _ _. _ _ _ _ _

_.

'

.:

.

,

'

noted that this procedure is apparently not followed in that the

'

Physical Survey Team uses a WPS natrix written by S&L to document

the basis of their findings. The licensen agreed to revise the procedure to incorporate the S&L issuance of WPS matrix.for use by the team for weld procedure verification. This item'is con-

,!

sidered unresolved pending licensee's issuance of an approved revision to the SPP-4 procedure incorporating the above comments.

(546/80-18-01)

No items of noncompliance or deviations were identified.

2.

Observation of Safety Related Componeet Installation The inspector noted on May 7, 1980 three (3) component cooling heat

exchangers on elevation 364, NB-1031 through NB-1033, not having

'

inert gas blankets as required by the manufacturer during storage.

Review of the contractor's (Cherne) Nonconformance Report No. 01360

-

indicates that the inert gas was removed on or before March 31, 1979;

}

prior to grinding activities on the pipe spools. On January 29, 1980, PSI issued a DCR No. C-014-80, but no resolution was recommended until March 7, 1980, when Westinghouse, in a letter to Mr. L. Peterson, PSI, recommended the use of desiccants. The inspector noted that the nonconformance was not promptly identified, nor was the Westinghouse recommendation promptly followed to correct the problem. This is considered an unresolved item and will be examined on subsequent inspection to determine licensee's action to prevent recurrence.

(546/80-18-02)

Unresolved Items

Unresolved items are matters about which more information is required in i

order to ascertain whether they are acceptable items, items of noncompli-ance, or deviations. Unresolved items disclosed during the inspection are discussed in Paragraph I and 2.

F Exit Meeting i

The' inspector met with site staff representatives sdenoted under Persons Contacted) at the conclusion of the inspection on May 8, 1980, and sum-marized the scope and findings of the inspection. The licensee acknow-

.ledged the findings reported herein.

a f-3-

,

a

,