ML17298C072
| ML17298C072 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 04/04/1985 |
| From: | Kirsch D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| Shared Package | |
| ML17298C073 | List: |
| References | |
| NUDOCS 8504250540 | |
| Download: ML17298C072 (2) | |
See also: IR 05000529/1985013
Text
Docket Nos. 50-529,
50-530
Arizona Public Service
Company
P. 0.
Box 21666
Phoenix, .Arizona
85036
APR 0 4 )985
Attention:
Mr. E. E. Van Brunt, Jr., Vice President
Nuclear Productions
Gentlemen:
Subject:
NRC Inspection of Palo Verde Vnits 2 and
3
This refers to the inspection
conducted by Mr. W. J.
Wagner of this office on
March 4-8 and 18-22,
1985, of activities authorized by NRC Construction Permit
Nos.
CPPR-142,
and 143,
and to the discussion of our findings held with
members of your staff at the conclusion of the inspection.
Areas
examined during this inspection are described in the enclosed
inspection
report.
Within these
areas,
the inspection consisted of selective
examinations
of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspectors.
No violations of NRC requirements
were identified within the scope of this
inspection.
In accordance
with 10 CFR 2.790 (a),
a copy of this letter and'he
enclosure
will be placed in the
NRC Public Document Room.
Should you have any questions
concerning this inspection,
we will be glad to
discuss
them with you.
D. F. Kirsch, Acting Director
Division Reactor Safety 8 Projects
Enclosure:
Inspection Report Nos. 50-529/85-13,
50-530/85-06
cc w/ enclosure:
J.
Bynum,
S.
R. Frost,
T. D. Shriver,. APS
W. E. Ide,
APS C. N. Russo,
J. Morrison
L. Bernabei,
GAP
A. C. Gehr, Esq., Snell 8
W lmer
Rv:~~~
Wager, az
Young
5 ilier
ate,
4/ oS/85
4/g /85
4/) /85
4/8 /85
Kirsch
4/g /85
8504250540
850404
ADOCK 05000529
4
i