Category:INSPECTION REPORT
MONTHYEARIR 05000498/19990161999-10-0707 October 1999 Insp Repts 50-498/99-16 & 50-499/99-16 on 990808-0918.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000498/19990151999-09-29029 September 1999 Insp Repts 50-498/99-15 & 50-499/99-15 on 990920-24.No Violations Noted.Major Areas Inspected:Licensed Operators Requalification Program IR 05000199/19990121999-09-14014 September 1999 Insp Repts 50-498/99-12 & 50-199/99-12 on 990816-19.Three Violations Noted & Being Treated as Ncvs.Major Areas Inspected:Access Authorization,Assessment Aids,Security Event Logs & Security Program Audits IR 05000499/19990141999-09-0303 September 1999 Insp Repts 50-499/99-14 & 50-499/99-14 on 990627-0807.NCVs Noted.Major Areas Inspected:Aspects of Licensee Operation, Maint,Engineering & Plant Support IR 05000498/19990081999-08-16016 August 1999 Insp Repts 50-498/99-08 & 50-499/99-08 on 990517-21 & 0607- 10.No Violation Noted.Major Areas Inspected:Corrective Action Program Implementation at Plant IR 05000498/19990131999-07-21021 July 1999 Insp Repts 50-498/99-13 & 50-499/99-13 on 990516-0626. Noncited Violations Noted Re Failure to Follow Procedures by Shift Supervisor Authorizing Deviation from Procedure Used to vacuum-fill RHR Sys & to Follow Plant Startup Procedure IR 05000498/19990111999-06-10010 June 1999 Insp Repts 50-498/99-11 & 50-499/99-11 on 990404-0515.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19990091999-05-25025 May 1999 Insp Repts 50-498/99-09 & 50-499/99-09 on 990503-06.No Violations Noted.Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program ML20206H6361999-05-0505 May 1999 Insp Repts 50-498/99-06 & 50-499/99-06 on 990221-0403. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000498/19990101999-04-22022 April 1999 Insp Repts 50-498/99-10 & 50-499/99-10 on 990405-09.No Violations Noted.Major Areas Inspected:Review of Licensee Inservice Exam Program Plan & Schedule & Implementation of Program Plan for Facilities IR 05000498/19990071999-04-22022 April 1999 Insp Repts 50-498/99-07 & 50-499/99-07 on 990405-09. Violations Noted.Major Areas Inspected:Radiation Protection Program Focusing on Unit 1 Refueling Outage Activities IR 05000498/19990051999-03-29029 March 1999 Insp Repts 50-498/99-05 & 50-499/99-05 on 990301-05.No Violations Noted.Major Areas Inspected:Engineering IR 05000498/19980191999-03-26026 March 1999 Insp Repts 50-498/98-19 & 50-499/98-19 on 990125-0317. Violations Noted.Major Areas Inspected:Operations & Engineering IR 05000498/19990041999-03-24024 March 1999 Insp Repts 50-498/99-04 & 50-499/99-04 on 990222-25. Violations Noted.Major Areas Inspected:Maint ML20205A1601999-03-24024 March 1999 Insp Repts 50-498/99-04 & 50-499/99-04 on 990222-25. Violations Noted.Major Areas Inspected:Maint IR 05000498/19980171999-03-23023 March 1999 Cancellation of Insp Repts 50-498/98-17 & 50-499/98-17.No Insp Rept Will Be Issued for Util with Listed Number IR 05000498/19990021999-03-16016 March 1999 Insp Repts 50-498/99-02 & 50-499/99-02 on 990110-0220. No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000498/19990031999-03-0404 March 1999 Insp Repts 50-498/99-03 & 50-499/99-03 on 990222-25.No Violations Noted.Major Areas Inspected:Plant Support ML20203D5711999-02-10010 February 1999 Insp Repts 50-498/98-15 & 50-499/98-15 on 990614-1123. Violations Noted.Major Areas Inspected:Review of Circumstances Surrounding 980614 Fire in Potential Transformer & Subsequent Deenergization of Switchgear E1B IR 05000498/19980111999-02-0404 February 1999 Insp Repts 50-498/98-11 & 50-499/98-11 on 981129-990109.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000498/19990011999-01-27027 January 1999 Insp Repts 50-498/99-01 & 50-499/99-01 on 990104-07.No Violations Noted.Major Areas Inspected:Insp Reviewed Implementation of Solid Radwaste Mgt & Radioactive Matl Transportation Programs & Plant Support IR 05000498/19980161998-12-24024 December 1998 Insp Repts 50-498/98-16 & 50-499/98-16 on 981207-10.No Violations Noted.Major Areas Inspected:Plant Support, Including Alarm Stations,Security Equipment,Vital Area Barriers & Detection Aids & Security Event Logs IR 05000498/19980101998-12-22022 December 1998 Insp Repts 50-498/98-10 & 50-499/98-10 on 981018-1125.No Violations Noted.Major Areas Inspected:License Operations, Maint,Engineering & Plant Support IR 05000498/19980201998-12-0202 December 1998 Insp Repts 50-498/98-20 & 50-499/98-20 on 981102-05. Violation Noted.Major Areas Inspected:Radiological Controlled Area Access Controls,Radiation Work Permits, Radiological Surveys & pre-job Health Physics Briefings IR 05000498/19980091998-11-12012 November 1998 Insp Repts 50-498/98-09 & 50-499/98-09 on 980906-1017. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19980181998-10-21021 October 1998 Insp Repts 50-498/98-18 & 50-499/98-18 Has Been Canceled.No Insp Rept Will Be Issued IR 05000498/19980081998-09-28028 September 1998 Insp Repts 50-498/98-08 & 50-499/98-08 on 980726-0905.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000498/19980141998-08-31031 August 1998 Insp Repts 50-498/98-14 & 50-499/98-14 on 980706-23.No Violations Noted.Major Areas Inspected:Engineering IR 05000498/19980131998-08-14014 August 1998 Insp Repts 50-498/98-13 & 50-499/98-13 on 980804-07.No Violations Noted.Major Areas Inspected:Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures IR 05000498/19980071998-08-11011 August 1998 Insp Repts 50-498/98-07 & 50-499/98-07 on 980614-0725.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19983011998-07-14014 July 1998 Insp Repts 50-498/98-301 & 50-499/98-301 on 980601-04.No Violations Noted.Major Areas Inspected:Examiners Evaluated Competency of 6 Senior Operator Applicants for Issuance of Operating Licenses at Plant,Units 1 & 2 & Operations IR 05000498/19980061998-07-0808 July 1998 Insp Repts 50-498/98-06 & 50-499/98-06 on 980503-0613. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19980051998-05-18018 May 1998 Insp Repts 50-498/98-05 & 50-499/98-05 on 980322-0502. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19980041998-04-20020 April 1998 Insp Repts 50-498/98-04 & 50-499/98-04 on 980214-0321. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support IR 05000498/19980031998-03-24024 March 1998 Insp Repts 50-498/98-03 & 50-499/98-03 on 980104-0214. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Emergency Facilities IR 05000498/19980121998-03-24024 March 1998 Insp Repts 50-498/98-12 & 50-499/98-12 on 980223-27.No Violations Noted.Major Areas Inspected:Licensee Physical Security Program,Including Review of Access Authorization Program,Testing & Maint & Security Program Plans ML20202D7781998-02-12012 February 1998 Insp Repts 50-498/98-02 & 50-499/98-02 on 980112-15. Violations Noted.Major Areas Inspected:Operations & Plant Support Re Radiation Protection IR 05000498/19970081998-01-23023 January 1998 Insp Repts 50-498/97-08 & 50-499/97-08 on 971116-980103.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000498/19973011997-12-18018 December 1997 Insp Repts 50-498/97-301 & 50-499/97-301 on 971020-1205. Violations Noted.Major Areas Inspected:Competency of 6 RO & 8 SROs for Issuance of Operating Licenses at South Texas Project Facility IR 05000498/19970071997-12-10010 December 1997 Insp Repts 50-498/97-07 & 50-499/97-07 on 971005-1115.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19970061997-12-0808 December 1997 Insp Repts 50-498/97-06 & 50-499/97-06 on 970810-1004. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19970251997-11-28028 November 1997 Partially Withheld Insp Repts 50-498/97-25 & 50-499/97-25 on 971103-07 (Ref 10CFR73.21).Major Areas Inspected:Physical Security Program,Maint,Audits,Protected Area Barriers, Testing of Intrusion Detection Sys & Control Equipment IR 05000498/19970261997-11-28028 November 1997 Insp Repts 50-498/97-26 & 50-499/97-26 Has Been Cancelled. No Insp Rept Will Be Issued ML20199J5591997-11-21021 November 1997 Insp Repts 50-498/97-24 & 50-499/97-24 on 970915-1112.No Violations Noted.Major Areas Inspected:Electrical,Mechanical & Instrumentation & Control Calculations to Assess Scope of Design Control Weakness ML20199E1971997-11-14014 November 1997 Rev 1 to Insp Repts 50-498/97-05 & 50-499/97-05 on 970629-0809,correcting Errors in Numbering of Insp Followup Sys Open Items & Some Items Identified in Executive Summary IR 05000498/19970231997-11-12012 November 1997 Insp Repts 50-498/97-23 & 50-499/97-23 on 970811-15,25-29 & 0903-04.No Violations Noted.Major Areas Inspected: Operations,Maint & Engineering IR 05000498/19970211997-10-0101 October 1997 Partially Withheld Insp Repts 50-498/97-21 & 50-499/97-21 on 970902-05 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Physical Security Program,Including Access Authorization.Mgt Support & Security Program Audits IR 05000498/19970191997-09-26026 September 1997 Insp Repts 50-498/97-19 & 50-499/97-19 on 970825-28.No Violations Noted.Major Areas Inspected:Implementation of Liquid & Gaseous Radwaste Effluent Mgt Program IR 05000498/19970131997-09-26026 September 1997 Insp Repts 50-498/97-13 & 50-499/97-13 on 970902-04.No Violations Noted.Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000498/19970201997-09-16016 September 1997 Insp Repts 50-498/97-20 & 50-499/97-20 on 970811-14.No Violations Noted.Major Areas Inspected:Operations Re Annual Operating Requalification Exams 1999-09-03
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000498/19990161999-10-0707 October 1999 Insp Repts 50-498/99-16 & 50-499/99-16 on 990808-0918.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000498/19990151999-09-29029 September 1999 Insp Repts 50-498/99-15 & 50-499/99-15 on 990920-24.No Violations Noted.Major Areas Inspected:Licensed Operators Requalification Program IR 05000199/19990121999-09-14014 September 1999 Insp Repts 50-498/99-12 & 50-199/99-12 on 990816-19.Three Violations Noted & Being Treated as Ncvs.Major Areas Inspected:Access Authorization,Assessment Aids,Security Event Logs & Security Program Audits IR 05000499/19990141999-09-0303 September 1999 Insp Repts 50-499/99-14 & 50-499/99-14 on 990627-0807.NCVs Noted.Major Areas Inspected:Aspects of Licensee Operation, Maint,Engineering & Plant Support IR 05000498/19990081999-08-16016 August 1999 Insp Repts 50-498/99-08 & 50-499/99-08 on 990517-21 & 0607- 10.No Violation Noted.Major Areas Inspected:Corrective Action Program Implementation at Plant IR 05000498/19990131999-07-21021 July 1999 Insp Repts 50-498/99-13 & 50-499/99-13 on 990516-0626. Noncited Violations Noted Re Failure to Follow Procedures by Shift Supervisor Authorizing Deviation from Procedure Used to vacuum-fill RHR Sys & to Follow Plant Startup Procedure IR 05000498/19990111999-06-10010 June 1999 Insp Repts 50-498/99-11 & 50-499/99-11 on 990404-0515.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19990091999-05-25025 May 1999 Insp Repts 50-498/99-09 & 50-499/99-09 on 990503-06.No Violations Noted.Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program ML20206H6361999-05-0505 May 1999 Insp Repts 50-498/99-06 & 50-499/99-06 on 990221-0403. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000498/19990101999-04-22022 April 1999 Insp Repts 50-498/99-10 & 50-499/99-10 on 990405-09.No Violations Noted.Major Areas Inspected:Review of Licensee Inservice Exam Program Plan & Schedule & Implementation of Program Plan for Facilities IR 05000498/19990071999-04-22022 April 1999 Insp Repts 50-498/99-07 & 50-499/99-07 on 990405-09. Violations Noted.Major Areas Inspected:Radiation Protection Program Focusing on Unit 1 Refueling Outage Activities IR 05000498/19990051999-03-29029 March 1999 Insp Repts 50-498/99-05 & 50-499/99-05 on 990301-05.No Violations Noted.Major Areas Inspected:Engineering IR 05000498/19980191999-03-26026 March 1999 Insp Repts 50-498/98-19 & 50-499/98-19 on 990125-0317. Violations Noted.Major Areas Inspected:Operations & Engineering IR 05000498/19990041999-03-24024 March 1999 Insp Repts 50-498/99-04 & 50-499/99-04 on 990222-25. Violations Noted.Major Areas Inspected:Maint ML20205A1601999-03-24024 March 1999 Insp Repts 50-498/99-04 & 50-499/99-04 on 990222-25. Violations Noted.Major Areas Inspected:Maint IR 05000498/19980171999-03-23023 March 1999 Cancellation of Insp Repts 50-498/98-17 & 50-499/98-17.No Insp Rept Will Be Issued for Util with Listed Number IR 05000498/19990021999-03-16016 March 1999 Insp Repts 50-498/99-02 & 50-499/99-02 on 990110-0220. No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000498/19990031999-03-0404 March 1999 Insp Repts 50-498/99-03 & 50-499/99-03 on 990222-25.No Violations Noted.Major Areas Inspected:Plant Support ML20203D5711999-02-10010 February 1999 Insp Repts 50-498/98-15 & 50-499/98-15 on 990614-1123. Violations Noted.Major Areas Inspected:Review of Circumstances Surrounding 980614 Fire in Potential Transformer & Subsequent Deenergization of Switchgear E1B IR 05000498/19980111999-02-0404 February 1999 Insp Repts 50-498/98-11 & 50-499/98-11 on 981129-990109.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000498/19990011999-01-27027 January 1999 Insp Repts 50-498/99-01 & 50-499/99-01 on 990104-07.No Violations Noted.Major Areas Inspected:Insp Reviewed Implementation of Solid Radwaste Mgt & Radioactive Matl Transportation Programs & Plant Support IR 05000498/19980161998-12-24024 December 1998 Insp Repts 50-498/98-16 & 50-499/98-16 on 981207-10.No Violations Noted.Major Areas Inspected:Plant Support, Including Alarm Stations,Security Equipment,Vital Area Barriers & Detection Aids & Security Event Logs IR 05000498/19980101998-12-22022 December 1998 Insp Repts 50-498/98-10 & 50-499/98-10 on 981018-1125.No Violations Noted.Major Areas Inspected:License Operations, Maint,Engineering & Plant Support IR 05000498/19980201998-12-0202 December 1998 Insp Repts 50-498/98-20 & 50-499/98-20 on 981102-05. Violation Noted.Major Areas Inspected:Radiological Controlled Area Access Controls,Radiation Work Permits, Radiological Surveys & pre-job Health Physics Briefings IR 05000498/19980091998-11-12012 November 1998 Insp Repts 50-498/98-09 & 50-499/98-09 on 980906-1017. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19980181998-10-21021 October 1998 Insp Repts 50-498/98-18 & 50-499/98-18 Has Been Canceled.No Insp Rept Will Be Issued IR 05000498/19980081998-09-28028 September 1998 Insp Repts 50-498/98-08 & 50-499/98-08 on 980726-0905.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000498/19980141998-08-31031 August 1998 Insp Repts 50-498/98-14 & 50-499/98-14 on 980706-23.No Violations Noted.Major Areas Inspected:Engineering IR 05000498/19980131998-08-14014 August 1998 Insp Repts 50-498/98-13 & 50-499/98-13 on 980804-07.No Violations Noted.Major Areas Inspected:Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures IR 05000498/19980071998-08-11011 August 1998 Insp Repts 50-498/98-07 & 50-499/98-07 on 980614-0725.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19983011998-07-14014 July 1998 Insp Repts 50-498/98-301 & 50-499/98-301 on 980601-04.No Violations Noted.Major Areas Inspected:Examiners Evaluated Competency of 6 Senior Operator Applicants for Issuance of Operating Licenses at Plant,Units 1 & 2 & Operations IR 05000498/19980061998-07-0808 July 1998 Insp Repts 50-498/98-06 & 50-499/98-06 on 980503-0613. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19980051998-05-18018 May 1998 Insp Repts 50-498/98-05 & 50-499/98-05 on 980322-0502. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19980041998-04-20020 April 1998 Insp Repts 50-498/98-04 & 50-499/98-04 on 980214-0321. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support IR 05000498/19980031998-03-24024 March 1998 Insp Repts 50-498/98-03 & 50-499/98-03 on 980104-0214. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Emergency Facilities IR 05000498/19980121998-03-24024 March 1998 Insp Repts 50-498/98-12 & 50-499/98-12 on 980223-27.No Violations Noted.Major Areas Inspected:Licensee Physical Security Program,Including Review of Access Authorization Program,Testing & Maint & Security Program Plans ML20202D7781998-02-12012 February 1998 Insp Repts 50-498/98-02 & 50-499/98-02 on 980112-15. Violations Noted.Major Areas Inspected:Operations & Plant Support Re Radiation Protection IR 05000498/19970081998-01-23023 January 1998 Insp Repts 50-498/97-08 & 50-499/97-08 on 971116-980103.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000498/19973011997-12-18018 December 1997 Insp Repts 50-498/97-301 & 50-499/97-301 on 971020-1205. Violations Noted.Major Areas Inspected:Competency of 6 RO & 8 SROs for Issuance of Operating Licenses at South Texas Project Facility IR 05000498/19970071997-12-10010 December 1997 Insp Repts 50-498/97-07 & 50-499/97-07 on 971005-1115.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19970061997-12-0808 December 1997 Insp Repts 50-498/97-06 & 50-499/97-06 on 970810-1004. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19970251997-11-28028 November 1997 Partially Withheld Insp Repts 50-498/97-25 & 50-499/97-25 on 971103-07 (Ref 10CFR73.21).Major Areas Inspected:Physical Security Program,Maint,Audits,Protected Area Barriers, Testing of Intrusion Detection Sys & Control Equipment IR 05000498/19970261997-11-28028 November 1997 Insp Repts 50-498/97-26 & 50-499/97-26 Has Been Cancelled. No Insp Rept Will Be Issued ML20199J5591997-11-21021 November 1997 Insp Repts 50-498/97-24 & 50-499/97-24 on 970915-1112.No Violations Noted.Major Areas Inspected:Electrical,Mechanical & Instrumentation & Control Calculations to Assess Scope of Design Control Weakness ML20199E1971997-11-14014 November 1997 Rev 1 to Insp Repts 50-498/97-05 & 50-499/97-05 on 970629-0809,correcting Errors in Numbering of Insp Followup Sys Open Items & Some Items Identified in Executive Summary IR 05000498/19970231997-11-12012 November 1997 Insp Repts 50-498/97-23 & 50-499/97-23 on 970811-15,25-29 & 0903-04.No Violations Noted.Major Areas Inspected: Operations,Maint & Engineering IR 05000498/19970211997-10-0101 October 1997 Partially Withheld Insp Repts 50-498/97-21 & 50-499/97-21 on 970902-05 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Physical Security Program,Including Access Authorization.Mgt Support & Security Program Audits IR 05000498/19970191997-09-26026 September 1997 Insp Repts 50-498/97-19 & 50-499/97-19 on 970825-28.No Violations Noted.Major Areas Inspected:Implementation of Liquid & Gaseous Radwaste Effluent Mgt Program IR 05000498/19970131997-09-26026 September 1997 Insp Repts 50-498/97-13 & 50-499/97-13 on 970902-04.No Violations Noted.Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000498/19970201997-09-16016 September 1997 Insp Repts 50-498/97-20 & 50-499/97-20 on 970811-14.No Violations Noted.Major Areas Inspected:Operations Re Annual Operating Requalification Exams 1999-09-03
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000498/19990161999-10-0707 October 1999 Insp Repts 50-498/99-16 & 50-499/99-16 on 990808-0918.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000498/19990151999-09-29029 September 1999 Insp Repts 50-498/99-15 & 50-499/99-15 on 990920-24.No Violations Noted.Major Areas Inspected:Licensed Operators Requalification Program IR 05000199/19990121999-09-14014 September 1999 Insp Repts 50-498/99-12 & 50-199/99-12 on 990816-19.Three Violations Noted & Being Treated as Ncvs.Major Areas Inspected:Access Authorization,Assessment Aids,Security Event Logs & Security Program Audits IR 05000499/19990141999-09-0303 September 1999 Insp Repts 50-499/99-14 & 50-499/99-14 on 990627-0807.NCVs Noted.Major Areas Inspected:Aspects of Licensee Operation, Maint,Engineering & Plant Support IR 05000498/19990081999-08-16016 August 1999 Insp Repts 50-498/99-08 & 50-499/99-08 on 990517-21 & 0607- 10.No Violation Noted.Major Areas Inspected:Corrective Action Program Implementation at Plant IR 05000498/19990131999-07-21021 July 1999 Insp Repts 50-498/99-13 & 50-499/99-13 on 990516-0626. Noncited Violations Noted Re Failure to Follow Procedures by Shift Supervisor Authorizing Deviation from Procedure Used to vacuum-fill RHR Sys & to Follow Plant Startup Procedure IR 05000498/19990111999-06-10010 June 1999 Insp Repts 50-498/99-11 & 50-499/99-11 on 990404-0515.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19990091999-05-25025 May 1999 Insp Repts 50-498/99-09 & 50-499/99-09 on 990503-06.No Violations Noted.Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program ML20206H6361999-05-0505 May 1999 Insp Repts 50-498/99-06 & 50-499/99-06 on 990221-0403. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000498/19990101999-04-22022 April 1999 Insp Repts 50-498/99-10 & 50-499/99-10 on 990405-09.No Violations Noted.Major Areas Inspected:Review of Licensee Inservice Exam Program Plan & Schedule & Implementation of Program Plan for Facilities IR 05000498/19990071999-04-22022 April 1999 Insp Repts 50-498/99-07 & 50-499/99-07 on 990405-09. Violations Noted.Major Areas Inspected:Radiation Protection Program Focusing on Unit 1 Refueling Outage Activities IR 05000498/19990051999-03-29029 March 1999 Insp Repts 50-498/99-05 & 50-499/99-05 on 990301-05.No Violations Noted.Major Areas Inspected:Engineering IR 05000498/19980191999-03-26026 March 1999 Insp Repts 50-498/98-19 & 50-499/98-19 on 990125-0317. Violations Noted.Major Areas Inspected:Operations & Engineering IR 05000498/19990041999-03-24024 March 1999 Insp Repts 50-498/99-04 & 50-499/99-04 on 990222-25. Violations Noted.Major Areas Inspected:Maint ML20205A1601999-03-24024 March 1999 Insp Repts 50-498/99-04 & 50-499/99-04 on 990222-25. Violations Noted.Major Areas Inspected:Maint IR 05000498/19980171999-03-23023 March 1999 Cancellation of Insp Repts 50-498/98-17 & 50-499/98-17.No Insp Rept Will Be Issued for Util with Listed Number IR 05000498/19990021999-03-16016 March 1999 Insp Repts 50-498/99-02 & 50-499/99-02 on 990110-0220. No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000498/19990031999-03-0404 March 1999 Insp Repts 50-498/99-03 & 50-499/99-03 on 990222-25.No Violations Noted.Major Areas Inspected:Plant Support ML20203D5711999-02-10010 February 1999 Insp Repts 50-498/98-15 & 50-499/98-15 on 990614-1123. Violations Noted.Major Areas Inspected:Review of Circumstances Surrounding 980614 Fire in Potential Transformer & Subsequent Deenergization of Switchgear E1B IR 05000498/19980111999-02-0404 February 1999 Insp Repts 50-498/98-11 & 50-499/98-11 on 981129-990109.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000498/19990011999-01-27027 January 1999 Insp Repts 50-498/99-01 & 50-499/99-01 on 990104-07.No Violations Noted.Major Areas Inspected:Insp Reviewed Implementation of Solid Radwaste Mgt & Radioactive Matl Transportation Programs & Plant Support IR 05000498/19980161998-12-24024 December 1998 Insp Repts 50-498/98-16 & 50-499/98-16 on 981207-10.No Violations Noted.Major Areas Inspected:Plant Support, Including Alarm Stations,Security Equipment,Vital Area Barriers & Detection Aids & Security Event Logs IR 05000498/19980101998-12-22022 December 1998 Insp Repts 50-498/98-10 & 50-499/98-10 on 981018-1125.No Violations Noted.Major Areas Inspected:License Operations, Maint,Engineering & Plant Support IR 05000498/19980201998-12-0202 December 1998 Insp Repts 50-498/98-20 & 50-499/98-20 on 981102-05. Violation Noted.Major Areas Inspected:Radiological Controlled Area Access Controls,Radiation Work Permits, Radiological Surveys & pre-job Health Physics Briefings IR 05000498/19980091998-11-12012 November 1998 Insp Repts 50-498/98-09 & 50-499/98-09 on 980906-1017. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19980181998-10-21021 October 1998 Insp Repts 50-498/98-18 & 50-499/98-18 Has Been Canceled.No Insp Rept Will Be Issued IR 05000498/19980081998-09-28028 September 1998 Insp Repts 50-498/98-08 & 50-499/98-08 on 980726-0905.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000498/19980141998-08-31031 August 1998 Insp Repts 50-498/98-14 & 50-499/98-14 on 980706-23.No Violations Noted.Major Areas Inspected:Engineering IR 05000498/19980131998-08-14014 August 1998 Insp Repts 50-498/98-13 & 50-499/98-13 on 980804-07.No Violations Noted.Major Areas Inspected:Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures IR 05000498/19980071998-08-11011 August 1998 Insp Repts 50-498/98-07 & 50-499/98-07 on 980614-0725.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19983011998-07-14014 July 1998 Insp Repts 50-498/98-301 & 50-499/98-301 on 980601-04.No Violations Noted.Major Areas Inspected:Examiners Evaluated Competency of 6 Senior Operator Applicants for Issuance of Operating Licenses at Plant,Units 1 & 2 & Operations IR 05000498/19980061998-07-0808 July 1998 Insp Repts 50-498/98-06 & 50-499/98-06 on 980503-0613. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19980051998-05-18018 May 1998 Insp Repts 50-498/98-05 & 50-499/98-05 on 980322-0502. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19980041998-04-20020 April 1998 Insp Repts 50-498/98-04 & 50-499/98-04 on 980214-0321. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support IR 05000498/19980031998-03-24024 March 1998 Insp Repts 50-498/98-03 & 50-499/98-03 on 980104-0214. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Emergency Facilities IR 05000498/19980121998-03-24024 March 1998 Insp Repts 50-498/98-12 & 50-499/98-12 on 980223-27.No Violations Noted.Major Areas Inspected:Licensee Physical Security Program,Including Review of Access Authorization Program,Testing & Maint & Security Program Plans ML20202D7781998-02-12012 February 1998 Insp Repts 50-498/98-02 & 50-499/98-02 on 980112-15. Violations Noted.Major Areas Inspected:Operations & Plant Support Re Radiation Protection IR 05000498/19970081998-01-23023 January 1998 Insp Repts 50-498/97-08 & 50-499/97-08 on 971116-980103.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000498/19973011997-12-18018 December 1997 Insp Repts 50-498/97-301 & 50-499/97-301 on 971020-1205. Violations Noted.Major Areas Inspected:Competency of 6 RO & 8 SROs for Issuance of Operating Licenses at South Texas Project Facility IR 05000498/19970071997-12-10010 December 1997 Insp Repts 50-498/97-07 & 50-499/97-07 on 971005-1115.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19970061997-12-0808 December 1997 Insp Repts 50-498/97-06 & 50-499/97-06 on 970810-1004. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19970251997-11-28028 November 1997 Partially Withheld Insp Repts 50-498/97-25 & 50-499/97-25 on 971103-07 (Ref 10CFR73.21).Major Areas Inspected:Physical Security Program,Maint,Audits,Protected Area Barriers, Testing of Intrusion Detection Sys & Control Equipment IR 05000498/19970261997-11-28028 November 1997 Insp Repts 50-498/97-26 & 50-499/97-26 Has Been Cancelled. No Insp Rept Will Be Issued ML20199J5591997-11-21021 November 1997 Insp Repts 50-498/97-24 & 50-499/97-24 on 970915-1112.No Violations Noted.Major Areas Inspected:Electrical,Mechanical & Instrumentation & Control Calculations to Assess Scope of Design Control Weakness ML20199E1971997-11-14014 November 1997 Rev 1 to Insp Repts 50-498/97-05 & 50-499/97-05 on 970629-0809,correcting Errors in Numbering of Insp Followup Sys Open Items & Some Items Identified in Executive Summary IR 05000498/19970231997-11-12012 November 1997 Insp Repts 50-498/97-23 & 50-499/97-23 on 970811-15,25-29 & 0903-04.No Violations Noted.Major Areas Inspected: Operations,Maint & Engineering IR 05000498/19970211997-10-0101 October 1997 Partially Withheld Insp Repts 50-498/97-21 & 50-499/97-21 on 970902-05 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Physical Security Program,Including Access Authorization.Mgt Support & Security Program Audits IR 05000498/19970191997-09-26026 September 1997 Insp Repts 50-498/97-19 & 50-499/97-19 on 970825-28.No Violations Noted.Major Areas Inspected:Implementation of Liquid & Gaseous Radwaste Effluent Mgt Program IR 05000498/19970131997-09-26026 September 1997 Insp Repts 50-498/97-13 & 50-499/97-13 on 970902-04.No Violations Noted.Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000498/19970201997-09-16016 September 1997 Insp Repts 50-498/97-20 & 50-499/97-20 on 970811-14.No Violations Noted.Major Areas Inspected:Operations Re Annual Operating Requalification Exams 1999-09-03
[Table view] Category:UTILITY
MONTHYEARIR 05000498/19900271990-09-20020 September 1990 Insp Repts 50-498/90-27 & 50-499/90-27 on 900813-17.No Violations or Deviations Noted.Major Areas Inspected: Radiation Protection Program ML20059K9431990-09-18018 September 1990 Insp Repts 50-498/90-28 & 50-499/90-28 on 900730-0808. Violations Noted.Major Areas Inspected:Onsite Followup of Two Events IR 05000498/19900241990-08-17017 August 1990 Insp Repts 50-498/90-24 & 50-499/90-24 on 900701-0801.No Violations Noted.Major Areas Inspected:Plant Status,Onsite Followup of Events at Operating Power Reactors & Licensee Action on Previous Findings IR 05000498/19900231990-07-19019 July 1990 Insp Repts 50-498/90-23 & 50-499/90-23 on 900601-30.No Violations or Deviations Noted.Major Areas Inspected:Plant Status,Onsite Followup of Events,Licensee Actions on Previous Insp Findings IR 05000498/19890211989-09-29029 September 1989 Informs That Insp Repts 50-498/89-21 & 50-499/89-21 Canceled & That No Insp Rept Will Be Issued IR 05000498/19890311989-09-28028 September 1989 Insp Repts 50-498/89-31 & 50-499/89-31 on 890814-25.No Violations or Deviations Noted.Major Areas Inspected: Radiation Protection Activities Associated W/Current Refueling Outage IR 05000498/19890301989-09-26026 September 1989 Insp Repts 50-498/89-30 & 50-499/89-30 on 890801-31.No Violations Noted.Major Areas Inspected:Plant Status,Onsite Followup of Plant Events,Licensee Action on Previous Insp Findings & Preparation for Refueling IR 05000498/19890351989-09-26026 September 1989 Insp Repts 50-498/89-35 & 50-499/89-35 on 890814-18. Violation Noted.Major Areas Inspected:Inadvertent Radioactive Contamination of Portions of Auxiliary Steam Sys Condensate Return Flow Path & Inorganics Basin IR 05000498/19890331989-09-22022 September 1989 Insp Repts 50-498/89-33 & 50-499/89-33 on 890821-25. Violations Noted.Major Areas Inspected:Steam Generator Primary Manway Bolting Removal Problems & Inservice Insp Activities IR 05000498/19890371989-09-20020 September 1989 Insp Repts 50-498/89-37 & 50-499/89-37 on 890911-15. Violations Noted.Major Areas Inspected:Programs for Control of NDE Activities & Design Changes/Mods Activities IR 05000498/19890361989-09-0808 September 1989 Insp Repts 50-498/89-36 & 50-499/89-36 on 890821-25. Violations Noted.Major Areas Inspected:Control of Welding Activities IR 05000498/19890251989-09-0707 September 1989 Insp Repts 50-498/89-25 & 50-499/89-25 on 890724-28 & 0807-11.No Violations or Deviations Noted.Major Areas Inspected:Action on Previously Identified Items & self-assessment Capability IR 05000498/19890221989-08-31031 August 1989 Insp Repts 50-498/89-22 & 50-499/89-22 on 890710-14.No Violations or Deviations Noted.Major Areas Inspected: Followup,Review & Evaluation of Lers,Licensee Action on Previously Identified Insp Findings & Enforcement Action IR 05000498/19890261989-08-25025 August 1989 Insp Repts 50-498/89-26 & 50-499/89-26 on 890718-20.No Violations Noted.Major Areas Inspected:Failure of Unit 2 STP Generator Output Transformer 2A on 890713 IR 05000498/19890231989-08-10010 August 1989 Insp Repts 50-498/89-23 & 50-499/89-23 on 890701-31.No Violations Noted.Major Areas Inspected:Plant Status,Onsite Followup of Plant Events,Actions on Previous Insp Findings, Monthly Maint Observation & Operational Safety Verification IR 05000498/19890151989-08-0303 August 1989 Insp Repts 50-498/89-15 & 50-499/89-15 on 890607-30. Violations Noted.Major Areas Inspected:Followup of Previous Insp Findings,Operations Procedures & Two Amends to Tech Specs IR 05000498/19890141989-08-0202 August 1989 Insp Repts 50-498/89-14 & 50-499/89-14 on 890724-28.No Violations or Deviations Noted.Major Areas Inspected: Licensee Actions to Prevent & Respond to Loss of DHR Described in Generic Ltr 88-17 & Followup on Previous Insps ML20245L5741989-07-26026 July 1989 Insp Repts 50-498/89-17 & 50-499/89-17 on 890601-30. Violations Noted.Major Areas Inspected:Plant Status,Licensee Action on Previous Insp Findings,Operational Safety Verification & Monthly Maint & Surveillance Observations IR 05000498/19890181989-07-24024 July 1989 Insp Repts 50-498/89-18 & 50-499/89-18 on 890626-30 & 0710-14.No Violations or Deviations Noted.Major Areas Inspected:Unit 1 Inservice Testing Program for Pumps & Valves & Review of Previous Test Data IR 05000498/19890241989-07-24024 July 1989 NRC Insp Repts 50-498/89-24 & 50-499/89-24 Cancelled IR 05000498/19890201989-07-24024 July 1989 Insp Rept 50-498/89-20 & 50-499/89-20 on 890710-14.No Violations or Deviations Noted.Major Areas Inspected:Records & Document Control Programs IR 05000498/19890191989-07-0505 July 1989 Insp Repts 50-498/89-19 & 50-499/89-19 on 890619-23.No Violations or Deviations Noted.Major Areas Inspected: Followup,Review & Evaluation of LERs & One Open Item IR 05000498/19890131989-06-30030 June 1989 Insp Repts 50-498/89-13 & 50-499/89-13 on 890501-31.No Violations Noted.Major Areas Inspected:Plant Status,Onsite Followup of Plant Events,Esf Sys Walkdown & Monthly Maint Observation ML20245F2151989-06-21021 June 1989 Insp Repts 50-498/89-16 & 50-499/89-16 on 890605-09. Violations Noted.Major Areas Inspected:Audit,Procurement & Receipt,Storage & Handling of Equipment Matls Programs ML20244C3811989-05-26026 May 1989 Insp Repts 50-498/89-11 & 50-499/89-11 on 890401-30. Violations Noted.Major Areas Inspected:Plant Status,Followup of Events,Operational Safety Verification,Monthly Maint Observation & Surveillance Observation ML20244C1461989-05-18018 May 1989 Partially Withheld Insp Repts 50-498/89-10 & 50-499/89-10 on 890410-14 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Physical Security Program,Including Mgt Support, Security Program Plan & Protected Area Barriers ML20247K1991989-05-17017 May 1989 Insp Repts 50-498/89-12 & 50-499/89-12 on 890424-28.No Violations or Deviations Noted.Major Areas Inspected: Licensee Performance & Capabilities During Annual Exercise of Emergency Plan & Procedures IR 05000498/19890081989-05-0404 May 1989 Insp Repts 50-498/89-08 & 50-499/89-08 on 890301-31. Violations Noted.Major Areas Inspected:Plant Status,Licensee Action on Previously Identified Insp Items,Operational Safety Verification & Monthly Maint Observation IR 05000498/19890071989-04-28028 April 1989 Insp Repts 50-498/89-07 & 50-499/89-07 on 890313-17. Violations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings for Units 1 & 2 & Areas Including Control Room & Shift Turnover Observations for Unit 2 ML20245E9001989-04-19019 April 1989 Insp Repts 50-498/89-02 & 50-499/89-02 on 890101-31. Violations Noted.Major Areas Inspected:Plant Status,Esf Sys Walkdown,Monthly Maint & Surveillance Observation & Operational Safety Verififcation IR 05000498/19890041989-04-14014 April 1989 Insp Repts 50-498/89-04 & 50-499/89-04 on 890201-28. Violation Noted.Major Areas Inspected:Plant Status,Esf Sys Walkdown,Monthly Maint Observations,Monthly Surveillance Observations & Operational Safety Verification IR 05000498/19890091989-04-12012 April 1989 Insp Repts 50-498/89-09 & 50-499/89-09 on 890327-31.No Violations or Deviations Noted.Major Areas Inspected: Precriticality Data Review & Startup Test Results Evaluation for Initial Plant Startup IR 05000498/19890011989-03-0909 March 1989 Insp Repts 50-498/89-01 & 50-499/89-01 on 890109-13 & 23-27. No Violations or Deviations Noted.Major Areas Inspected: Calibr Program & Preventive Maint Program Re Calibr of Plant Instrumentation for Components Not Addressed in Tech Spec IR 05000498/19890061989-03-0707 March 1989 Insp Repts 50-498/89-06 & 50-499/89-06 on 890213-17.No Violations or Deviations Noted.Major Areas Inspected: Receipt,Storage & Handling of Emergency Diesel Generator Fuel Oil & High Temp Inside Containment IR 05000498/19890051989-03-0303 March 1989 Insp Repts 50-498/89-05 & 50-499/89-05 on 890213-17.No Violations or Deviations Noted.Major Areas Inspected:Insp of Plant,Including Startup & Core Physics Testing IR 05000498/19890031989-02-28028 February 1989 Insp Repts 50-498/89-03 & 50-499/89-03 on 890206-10.No Violations or Deviations Noted.Major Areas Inspected: Licensee Radwaste Mgt Program,Including Liquid,Gaseous & Solid Radwaste Processing Sys IR 05000498/19880661988-11-0909 November 1988 Partially Withheld Physical Security Insp Repts 50-498/88-66 & 50-499/88-66 on 881017-21 (Ref 10CFR73.21). Violations Noted:Inadequate Compensatory Measures IR 05000498/19880621988-11-0707 November 1988 Page 7 to Insp Repts 50-498/88-62 & 50-499/88-62,correcting Illegibility of Previously Submitted Page IR 05000498/19880691988-11-0404 November 1988 Insp Repts 50-498/88-69 & 50-499/88-69 on 881017-21.No Violations or Deviations Noted.Major Areas Inspected: Preoperational Testing IR 05000498/19880631988-10-27027 October 1988 Insp Repts 50-498/88-63 & 50-499/88-63 on 880901-30.No Violations or Deviations Noted.Major Areas Inspected:Plant Status,Licensee Action on Previous Insp Findings,Monthly Surveillance Observation & Monthly Maint Observation ML20195D9521988-10-26026 October 1988 Insp Repts 50-498/88-62 & 50-499/88-62 on 880912-14 & 881010-14.No Violations or Deviations Noted.Major Areas Inspected:Qc Program & Preoperational Test Procedure Review, & Test Witnessing & Location of Manual Trip Circuit IR 05000498/19880611988-10-26026 October 1988 Insp Repts 50-498/88-61 & 50-499/88-61 on 881003-07.No Violations or Deviation Noted.Major Areas Inspected: Implementation of Fire Protection Program & Compliance W/ Requirements of 10CFR50,App R IR 05000498/19880521988-10-12012 October 1988 Insp Repts 50-498/88-52 & 50-499/88-52 on 880808-0902.No Violations or Deviations Noted.Major Areas Inspected:Maint Procedures,Emergency Procedures & Tech Specs Associated W/ Unit 2 IR 05000498/19880641988-10-12012 October 1988 Insp Repts 50-498/88-64 & 50-499/88-64 on 880921-24.No Violations or Deviations Noted.Major Areas Inspected:Unit 2 Structural Integrity Test & Containment Integrated Leak Rate Test IR 05000498/19880571988-09-30030 September 1988 Insp Repts 50-498/88-57 & 50-499/88-57 on 880829-0902.No Violations or Deviations Noted.Major Areas Inspected:Unit 1 Radwaste Treatment Sys & Preoperational Insp of Unit 2 Water Chemistry & Radiochemistry Programs IR 05000498/19880551988-09-29029 September 1988 Insp Repts 50-498/88-55 & 50-499/88-55 on 880801-31.No Violations or Deviations Noted.Major Areas Inspected:Loose Part Monitoring Sys Test,Remote Reactor Shutdown Test, Control Rod Sys Test & Fuel Handling Bldg Insp IR 05000498/19880541988-09-23023 September 1988 Insp Repts 50-498/88-54 & 50-499/88-54 on 880822-26. Violations Noted.Major Areas Inspected:Plant & Operating Procedures,Operator Readiness Training & Operational Staffing IR 05000498/19880601988-09-20020 September 1988 Partially Withheld Insp Repts 50-498/88-60 & 50-499/88-60 on 880906-07 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Fixed Site Physical Protection of SNM of Low Strategic Significance IR 05000498/19880511988-09-20020 September 1988 Insp Repts 50-498/88-51 & 50-499/88-51 on 880725-29.0808-12 & 0829-0901.No Violations or Deviations Noted.Major Areas Inspected:Records Review,Procedures Review,Instrumentation Components & Sys,Work Observations & Heat Shrinkable Tubing IR 05000498/19880591988-09-19019 September 1988 Insp Repts 50-498/88-59 & 50-499/88-59 on 880906-09.No Violations or Deviations Noted.Major Areas Inspected: Completed Preoperational Test Procedures & Review Procedures for & Observe Receipt & Storage of New Fuel 1990-09-20
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000498/19990161999-10-0707 October 1999 Insp Repts 50-498/99-16 & 50-499/99-16 on 990808-0918.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000498/19990151999-09-29029 September 1999 Insp Repts 50-498/99-15 & 50-499/99-15 on 990920-24.No Violations Noted.Major Areas Inspected:Licensed Operators Requalification Program IR 05000199/19990121999-09-14014 September 1999 Insp Repts 50-498/99-12 & 50-199/99-12 on 990816-19.Three Violations Noted & Being Treated as Ncvs.Major Areas Inspected:Access Authorization,Assessment Aids,Security Event Logs & Security Program Audits IR 05000499/19990141999-09-0303 September 1999 Insp Repts 50-499/99-14 & 50-499/99-14 on 990627-0807.NCVs Noted.Major Areas Inspected:Aspects of Licensee Operation, Maint,Engineering & Plant Support PNO-IV-99-037, on 990822,Region IV Dispatched Inspector to STP to Relieve Resident Inspectors & to Provide Assistance to STP Nuclear Operating Co,In Anticipation of Hurricane Bret.Representative Was Also Dispatched to FEMA Region VI1999-08-23023 August 1999 PNO-IV-99-037:on 990822,Region IV Dispatched Inspector to STP to Relieve Resident Inspectors & to Provide Assistance to STP Nuclear Operating Co,In Anticipation of Hurricane Bret.Representative Was Also Dispatched to FEMA Region VI IR 05000498/19990081999-08-16016 August 1999 Insp Repts 50-498/99-08 & 50-499/99-08 on 990517-21 & 0607- 10.No Violation Noted.Major Areas Inspected:Corrective Action Program Implementation at Plant IR 05000498/19993011999-07-26026 July 1999 Exam Repts 50-498/99-301 & 50-499/99-301 on 990706-15.Exam results:17 Applicants Passed Exams & Exhibited No Broad Knowledge or Training Weaknesses IR 05000498/19990131999-07-21021 July 1999 Insp Repts 50-498/99-13 & 50-499/99-13 on 990516-0626. Noncited Violations Noted Re Failure to Follow Procedures by Shift Supervisor Authorizing Deviation from Procedure Used to vacuum-fill RHR Sys & to Follow Plant Startup Procedure IR 05000498/19990111999-06-10010 June 1999 Insp Repts 50-498/99-11 & 50-499/99-11 on 990404-0515.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19990091999-05-25025 May 1999 Insp Repts 50-498/99-09 & 50-499/99-09 on 990503-06.No Violations Noted.Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program ML20206H6361999-05-0505 May 1999 Insp Repts 50-498/99-06 & 50-499/99-06 on 990221-0403. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000498/19990071999-04-22022 April 1999 Insp Repts 50-498/99-07 & 50-499/99-07 on 990405-09. Violations Noted.Major Areas Inspected:Radiation Protection Program Focusing on Unit 1 Refueling Outage Activities IR 05000498/19990101999-04-22022 April 1999 Insp Repts 50-498/99-10 & 50-499/99-10 on 990405-09.No Violations Noted.Major Areas Inspected:Review of Licensee Inservice Exam Program Plan & Schedule & Implementation of Program Plan for Facilities IR 05000498/19990051999-03-29029 March 1999 Insp Repts 50-498/99-05 & 50-499/99-05 on 990301-05.No Violations Noted.Major Areas Inspected:Engineering IR 05000498/19980191999-03-26026 March 1999 Insp Repts 50-498/98-19 & 50-499/98-19 on 990125-0317. Violations Noted.Major Areas Inspected:Operations & Engineering IR 05000498/19990041999-03-24024 March 1999 Insp Repts 50-498/99-04 & 50-499/99-04 on 990222-25. Violations Noted.Major Areas Inspected:Maint ML20205A1601999-03-24024 March 1999 Insp Repts 50-498/99-04 & 50-499/99-04 on 990222-25. Violations Noted.Major Areas Inspected:Maint IR 05000498/19980171999-03-23023 March 1999 Cancellation of Insp Repts 50-498/98-17 & 50-499/98-17.No Insp Rept Will Be Issued for Util with Listed Number IR 05000498/19990021999-03-16016 March 1999 Insp Repts 50-498/99-02 & 50-499/99-02 on 990110-0220. No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000498/19990031999-03-0404 March 1999 Insp Repts 50-498/99-03 & 50-499/99-03 on 990222-25.No Violations Noted.Major Areas Inspected:Plant Support ML20203D5711999-02-10010 February 1999 Insp Repts 50-498/98-15 & 50-499/98-15 on 990614-1123. Violations Noted.Major Areas Inspected:Review of Circumstances Surrounding 980614 Fire in Potential Transformer & Subsequent Deenergization of Switchgear E1B ML20203D5611999-02-10010 February 1999 Notice of Violation from Insp on 980614-1123.Violation Noted:From 980614-0615,period Greater than 8 Hours,Unit 1 Channel III 125-volt Battery Bank E1B11 Inoperable with Reactor in Mode 1 & Reactor Not Placed in Hot Standby IR 05000498/19980111999-02-0404 February 1999 Insp Repts 50-498/98-11 & 50-499/98-11 on 981129-990109.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000498/19990011999-01-27027 January 1999 Insp Repts 50-498/99-01 & 50-499/99-01 on 990104-07.No Violations Noted.Major Areas Inspected:Insp Reviewed Implementation of Solid Radwaste Mgt & Radioactive Matl Transportation Programs & Plant Support IR 05000498/19980161998-12-24024 December 1998 Insp Repts 50-498/98-16 & 50-499/98-16 on 981207-10.No Violations Noted.Major Areas Inspected:Plant Support, Including Alarm Stations,Security Equipment,Vital Area Barriers & Detection Aids & Security Event Logs IR 05000498/19980101998-12-22022 December 1998 Insp Repts 50-498/98-10 & 50-499/98-10 on 981018-1125.No Violations Noted.Major Areas Inspected:License Operations, Maint,Engineering & Plant Support ML20196G9171998-12-0202 December 1998 Notice of Violation from Insp on 981102-05.Violation Noted:Licensee Did Not Make Surveys to Ensure Compliance with 10CFR20.1902,requiring Posting of Each Radiation Area with Conspicuous Sign or Signs Bearing Radiation Symbol IR 05000498/19980201998-12-0202 December 1998 Insp Repts 50-498/98-20 & 50-499/98-20 on 981102-05. Violation Noted.Major Areas Inspected:Radiological Controlled Area Access Controls,Radiation Work Permits, Radiological Surveys & pre-job Health Physics Briefings IR 05000498/19980091998-11-12012 November 1998 Insp Repts 50-498/98-09 & 50-499/98-09 on 980906-1017. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20195F2921998-11-12012 November 1998 Notice of Violation from Insp on 980906-1017.Violation Noted:On 980922,Work Order BS-354091 Contained Maint Instructions That Were Inappropriate to Circumstances IR 05000498/19980181998-10-21021 October 1998 Insp Repts 50-498/98-18 & 50-499/98-18 Has Been Canceled.No Insp Rept Will Be Issued IR 05000498/19980081998-09-28028 September 1998 Insp Repts 50-498/98-08 & 50-499/98-08 on 980726-0905.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000498/19980141998-08-31031 August 1998 Insp Repts 50-498/98-14 & 50-499/98-14 on 980706-23.No Violations Noted.Major Areas Inspected:Engineering IR 05000498/19980131998-08-14014 August 1998 Insp Repts 50-498/98-13 & 50-499/98-13 on 980804-07.No Violations Noted.Major Areas Inspected:Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures IR 05000498/19980071998-08-11011 August 1998 Insp Repts 50-498/98-07 & 50-499/98-07 on 980614-0725.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19983011998-07-14014 July 1998 Insp Repts 50-498/98-301 & 50-499/98-301 on 980601-04.No Violations Noted.Major Areas Inspected:Examiners Evaluated Competency of 6 Senior Operator Applicants for Issuance of Operating Licenses at Plant,Units 1 & 2 & Operations ML20236M3011998-07-0808 July 1998 Notice of Violation from Insp on 980503-0613.Violation Noted:Fire Brigade Training Drill Did Not Assess Each Member'S Knowledge of Role in Fire Fighting Strategy for Area Assumed to Contain Fire IR 05000498/19980061998-07-0808 July 1998 Insp Repts 50-498/98-06 & 50-499/98-06 on 980503-0613. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20237E7231998-06-0202 June 1998 EN-98-042:informs Commission That NRC Will Issue Confirmatory Order Modifying Licensee (Effective Immediately) & Exercise Discretion IAW Section VII.B.6 of Enforcement Policy Not to Issue NOV IR 05000498/19980051998-05-18018 May 1998 Insp Repts 50-498/98-05 & 50-499/98-05 on 980322-0502. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20247M4751998-05-18018 May 1998 Notice of Violation from Insp on 980322-0502.Violation Noted:Combustible Matl,Specifically,Wood Scaffold Installed & Remained in safety-related 2A Isolation Valve Cubicle from Feb 1997 Until April 1998,unattended & W/O Evaluation IR 05000498/19980041998-04-20020 April 1998 Insp Repts 50-498/98-04 & 50-499/98-04 on 980214-0321. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support ML20217A8451998-04-20020 April 1998 Notice of Violation from Insp on 980214-0321.Violation Noted:Licensee Updated UFSAR to Reflect New LOCA Radiological Analysis,Which Increased Thyroid Dose to CR Operator,W/O Obtaining Prior NRC Review & Approval ML20217B5581998-03-24024 March 1998 Notice of Violation from Insp on 980104-0214.Violation Noted:Fire Hose Stations Listed in Addendum 3 of Procedure OPGP03-ZF-0018 Not Operable When Equipment in Area to Be Protected Required to Be Operable by TS IR 05000498/19980121998-03-24024 March 1998 Insp Repts 50-498/98-12 & 50-499/98-12 on 980223-27.No Violations Noted.Major Areas Inspected:Licensee Physical Security Program,Including Review of Access Authorization Program,Testing & Maint & Security Program Plans IR 05000498/19980031998-03-24024 March 1998 Insp Repts 50-498/98-03 & 50-499/98-03 on 980104-0214. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Emergency Facilities ML20202D7781998-02-12012 February 1998 Insp Repts 50-498/98-02 & 50-499/98-02 on 980112-15. Violations Noted.Major Areas Inspected:Operations & Plant Support Re Radiation Protection ML20202D7701998-02-12012 February 1998 Notice of Violation from Insp on 980112-15.Violation Noted: Radiation Workers Who Were Likely to Receive Occupational Dose in Excess of 100 Mrems Per Yr Were Not Informed of Presence of Airborne Radioactivity IR 05000498/19970081998-01-23023 January 1998 Insp Repts 50-498/97-08 & 50-499/97-08 on 971116-980103.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support ML20197F3461997-12-22022 December 1997 Notice of Violation from Insp on 971112.Violations Noted: Programmatic Calculation Deficiencies,First Identified in Observation 92-01-13 Not Promptly Corrected 1999-09-03
[Table view] |
Text
.
.. ..
APPENDIX B U.S. NUCLEAR REGULATORY COMMISSION
REGION IV
NRC Inspection Report: 50-498/87-77 Operating License: NPF-71 50-499/87-77 Construction Permit: CPPR-12 Dockets: 50-498 50-499 Licensee: Houston Lighting & Power Company (HL&P)
P.O. Box 1700 Houston, Texas 77001 Facility Name: South Texas Project (STP), Units 1 and 2 Inspection At: STP, Matagorda County, Texas
,
Inspection Conducted: December 14-15, 1987
. I Inspector: , d A E. Q4gliardo, Chief, Operational Program Section I/*/
Date Divisich of Rea tor Sa ty Approve
'
/)2) [h l 5 I .
.filh n, Director, Division of Reacter Safety Date "
Inspection Summary Inspection Conducted December 14-15, 1987 (Report 50-498/87-77)
Areas Inspected: Special, unannounced inspection to followup on tha actions taken to correct the issues identified in the operational readiness inspection documented in NRC Inspection Report 50-498/87-4 Results: Within the area inspected, no violations were identified, but four deviations (failure to meet stated commitments, paragraph 2) were identifie Inspection Conducted December 14-15, 1987 (Report 50-499/87-77)
Areas Inspected: No inspection of Unit 2 was conducte Resuits: Not applicable, g20202sl 800127 g ADOCK 05000490 PDR
, _ _ _ _ . _ _ _ _
I t
4 DETAILS
- Persons Contacted Licensee Personnel R. Alfaro, Shift Administrative Aid P. Appleby, Manager, Nuclear Training C. Buede, Reactor Operator M. Carnley T&C Maintenance Division Manager L. Clark, Supervisory Project Engineer J. Constantin, Supervisor, Simulator Training M. Duke, Lead Electrical Engineer S. Eldridge, Unit 2 Operations Manager R. Ericson, Senior QA Specialist E. Fischer, Senior Engineering Specialist J. Gallagher, SAFETEAM Investigator Coordinator
- J. Geiger, General Manager, Nuclear Assurance J. Godsey, Reactor Performance Engineer
- J. Goldberg, Group Vice President, Nuclear J. Green. Manager Inspection & Surveillance R. Hamilton, Shift Supervisor
- S. Head, Supervising Engineer R. Hernandez, Senior QA Engineer t
H. Johnson, Unit 1 Operations Manager
- W. Kinsey, Plant Manager J. Kubenka, Training Manager Staff. Training Division
J. Loesch, Operations Manager
. M. Ludwig, Maintenance Department Manager N. Midkiff, Director, ISEG T. Morris, Maintenance Training Coordinator W. Mutz, Integrated Planning & Scheduling Manager E. Nichols, Electrical Maintenance Division Manager C. Ottino, Lead Investigator
- S. Rosen, General Manager, Operations Support M. Smith, Unit 1 Outage Manager K. Trippet, Lead Engineer
" 8. Turjillo, Analysis Project QA Supervisor
- Vaughn, Vice President, Nuclear Plant Operations J. Walker, Operations Support Manager G. Weldon, Training Manager, Operations Training Division R. Whitley, Senior QA Specialist
- J. Westermeier, General Manager, South Texas Project l F. Wiens, Support Technical Supervisor M. Wisenburg, Manager, Engineering & Licensing
- Denotes those individuals attending the exit meetin ,
The NRC inspector also contacted other licensee and contractor personnel during the course of the inspectio . Followup on Items Previously identified in the Operational Reediness Inspection This inspection involved the followup of the findings from the operational readiness inspection performed in July 1987. The findings which are documented in NRC Inspection Report 50-498;499/87-45 were also discussed in the exit interview on July 2, 198 The licensee responded to the findings discussed at the exit interview in a letter dated July 15, 1987 (ST-HL-AE-2298). This inspection reviewed the licensees corrective action and commitments as stated in the July 15 letter. The status of each of the stated observations is indicated belo (Closed) Observation No. 1: Only NP0D personnel had been provided the opportunity to view the video tapes discussing the transition to the operating phase and the experience of other recently licensed plant In response to this concern, the licensee committed to provide the opportunity for personnel in ISEG, QA, Licensing, and Engineering to view the tapes. The NRC inspector reviewed the Training Department records of those personnel who had viewed the three lessons learned video tapes which had been developed. The records showed that a substantial number of people in Engineering, Maintenance, QA, and ISEG had viewed the tape This issue is close .
(Closed) Observation No. 2: Additional personnel such as those on NRSB, PORC, QA, and ISEG who will be involved in the review of 10 CFR 50.59 safety evaluations need to be trained in their review responsibilitie The NRC inspector found that a training session (IP-3.20 Q) had been developed and presented to most of those individuals involved in 10 CFR 50.59 safety evaluation preparation and review. The training records reviewed indicated that a substantial number of personnel in the Engineering, QA, and ISEG organizations had satisfactorily completed the training. All of the current members of NSRB had also received the training. The NRC inspector was concerned that 2 of the 5 PORC members had not completed the training. Of the 12 alternate PORC members, 5 had also failed to complete this training. This item is considered closed but management needs to assure that all PORC members and their alternates have received this important trainin (0 pen) Observation No. 3: A weakness was identified regarding the adequacy of the training given to those individuals who prepare or review licensee event reports (LERs). In particular, emphasis was needed in determining the gen?ric implications and the root cause of event In the licensee's response to this observation a comitment was made to train personnel who are expected to be involved in preparing and reviewing
_ _ _ _ _ _ __ _-____ _ - _ _ _ _ _ _ _ _ -
i
. .
. .1
l LER The commitment stated that the training would be completed b t initial criticality and would specifically address. generic implications
-
and root causs evaluation The NRC inspector was provided a copy of a memorandum dated August'10, 1987,-(M. McBurnett to M. Wisenburg) which included attendance sheets and a' sample handout for a training course entitled "Station Problem Reporting (IP 1.45Q). The procedure (IP 1.45Q), which was part of the handout,-
requires that !'the assigned Responsible Department / Divisions doing the investigation will determine the root cause(s) and generic implication (s)." There was no indication, however, that the training
'
included guidance as to how the root cause and generic implications would be determined. The NRC inspector reviewed the attendance sheets and found that apparently some of the PORC, NRSB, and ISEG members had not participated in this trainin This item will remain open until the above issues have been resolve (0 pen) Observation No. 4: The licensee was requested to consider the need for an independent overview of the activities of the Work Control Center (WCC) by QA and/or ISE In response to this observation, the licensee stated that QA had recently performed a review of WCC activities and that ISEG would be conducting an observation of WCC activities in the near futur The NRC inspector found
_'
that QA had assessed the Master Completion List (MCL) and Daily Work Activity Schedule (DWAS) process and documented these assessments in reports dated June 24 and July 23, 1987. The ISEG observation was conducted on September 1-3, 1987, and was documented in a report dated September 10, 198 The licensee also committed that "WCC activities are currently included in maintenance audit plans." The NRC inspecter found, however, that the
current maintenance audit plan "Audit D3 - Maintenance Activities," dated
- July 13, 1987, did not contain provisions for a review of WCC activities.
The Operations QA Manager also told the NRC inspector that he had never intended to audit WCC activities. The licensee's failure to include a review of WCC activities in their maintenance audit plans is an apparent deviation from the commitment stated above (498/8777-01). This observation will remain open until the oversight issue is resolve (Closed) Observation No. 5: A program is needed to identify and protect plant equipment which may contribute to spurious plant trips or safeguards
,
activation if not adequately posted or protected.
The licensee committed to form a review team to determine sensitive equipment and to recommend the appropriate physical protection, or warning
signs, to protect the equipment. The NRC inspector found that the
- committed review team had been formed and had begun the planned review.
1 The review was scheduled to be completed by December 31, 1987, which would j narrowly meet the committed deadline of initial criticality. The review team had already initiated action to place warning tape on sensitive
'
-- .. -- - . ._-.-. _ - - _ _
. .
equipmen Protective barriers that would be considered necessary by the review team were to be installed after the review was completed. This item is considered close (Closed) Observation No. 6: Additional emphasis is needed on the testing of the unique features of the plant desig The licensee coninitted to form a team to review the unique design features of the plant and determine the adequacy of the testing program. The NRC inspector found that the special review team had been formed and had reviewed the testing of the unique design features. The team issued a report dated November 11, 1987, which identified an additional test for the in-core neutron detectors. This item is considered close (Closed) Observation No. 7: The adequacy of the staffing level of ISEG was questione In response to this observation, the licensee noted that the ISEG staffing level was in compliance with TS requirements, but they committed to reassess the resource requirements of the group. The NRC inspector found tFat ISEG management had requested another person be added to their staffing leve This item is close (Closed) Observation No. 8: Additional training was needed for the training personnel involved in the training of the operating staf In response to this observation, the licensee noted that they were currently meeting the requirements of the requalification program for those instructors who are licensed SR0s. The NRC inspector reviewed the instructor training records and found no discrepancies. The licensee had also instituted a program which would have two instructors temporarily assigned to the operations staffing for a 3-month period. The program would be repeated twice to ultimately provide six instructors with augmented training. This item is close (Closed) Observation No. 9: The licensee needs to evaluate the need for placing protective covers over the sensitive switches on the main control panel, the licensee had formed a management review team to evaluate this issu The team walked down the panels and concluded that switch covers only hinder the operator's response capabilitie It was noted that in response to a similar observation made by the Project Review Team, a number of pushbutton switches had been recessed and the springs on other switches had been strengthened to prevent inadvertant actuation. This item is considered close (Closed) Observation No. 10: Apparent friction between the operations and training staff _ _ - _
a
- .
The licensee had. implemented a program of rotating individuals between the two organizations. The NRC inspector interviewed a number of individuals from both organizations and found that all believed that the situation has significantly improved. The licensee has comitted to continue monitoring this situation. This issue is considered close (Closed) Observation No. 11: Licensed Operators had received only one week of simulator training in calendar year 198 In response to this concern, the licensee stated that the licensed operators were scheduled for an additional week of simulator training beginning the week of July 13, 1987. The NRC inspector reviewed the records of Training Cycle 3 (703) and found that the training had begun on July 13 as committed. The NRC inspector also found that Cycle 4 was scheduled to begin in January 1988. This item is considered close (Closed) Observation No. 12: Simulator training should include the simulation of actual operating events in the industr In response to this observation, the licensee noted that the simulator training given to licensed operators had included specific events such as (1)theGinn.'steamgeneratortuberupture;(2)theSalemATWSevent; (3) the TMI stuck open PORV; and (4)-the STP water hammer event in the RHR system. The NRC inspector verified that the' committed training had been performed. Tha licensee has also committed to continue developing action plans for training operators. This item is considered close (Closed) Observation No. 13: Drawing controls for the control room and auxiliary operators needs to be improve The licensee had assigned shift administrative aides to each shift to support control room operators administratively. The drawing files in the control room had been removed and replaced with stick files. The NRC inspector interviewed an administrative aide and reviewed her shift check list. The control of drawings in the control room and for the plant operators had been significantly improved. This item is considered close (0 pen) Observation No. 14: Consideration should be given to placing an LC0 status board in the control roo In response to this observation, the licensee noted that they currently had procedures which provided for LCOs to be entered on a loa sheet. The licensee also noted that the Out of Service Log would be reviewed as part of shift turnover. Since the LC0 log sheet may not be visible to all operators in the control room, the licensee committed to have entries made in the Unit Supervisor and control room logs upon entry into an LCO and when exiting from an LCO. The NRC inspector found that the entry into and the exit from an LCO was not being entered into the control room log nor were such entries required by the existing control room procedure (OPSP03-7Q-0001 Revision 1, dated July 31,1987). The failure to require
i
. .
that entries be made in the control room log of entry into an LC0 and exit from an LC0 is a deviation (498/8777-02) from the above stated commitmen This item will remain open until the above issue is resolve (0 pen) Observation No. 15: The licensee should reevaluate the practice of not logging equipment clearances by syste In response to this observation, the licensee noted that although equipment clearances are not cataloged by system, each clearance has a designator for the system. They also stated that since a high percentage of clearances ultimately affect components of more than one system it is difficult to isolate clearances by system. The NRC inspector found that the clearance log did indicate the system that was most impacted by the clearance, but it did not indicate the other systems which were affected by the clearanc With this system, it would be difficult for an individual to determine all of the clearances which impact on a given system. This practice could result in undesirable events because of the difficulty to accurately determine system status. The NRC inspector asked the licensee to reevaluate their practic The licensee agreed to look at how other plants control clearances. This issue will remain open until the licensee has raevaluated their system for clearance contro (Closed) Observation No. 16: The licensee should reassess the frequency of plant walkdowns by the operating staf The NRC inspector found that the licensee had placed increased emphasis in this area. Two unit supervisors were assigned per shift, one of whom did plant rounds (tours) while the other remained in the control room. The reactor plant operators performed the required surveillances and the plant operators had specifically prescribed rounds to perform in the plan This item is considered close (Closed) Observation No. 17: Need for precautions to prevent cable damage due to personnel entry into the cable bridge storage vaul The licensee committed to administratively control entry into the cable bridge storage vault. The NRC inspector found that warning signs had been posted in the vault. Licensee representatives said that tape baricades were also put in place to restrict entry into the vault when the head was removed. This item is considered close (Closed) Observation No. 18: Hard to reach places needed additional cleanin The NRC inspector toured the plant and found that the cleanliness of the plant, including the hard to reach areas, had been considerably improve This item is close (Closed) Observation No. 19: Additional training is needed on feedwater control at low power level _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _
%
0 a
In response to this observation', the licensee noted that the licensed operators had been trained on the feedwater control system in the classroom and on the simulator. They also noted, however, that the simulator had only recently been modified to model the startup feed pum The NRC inspector found that a Westinghouse engineer had given additional training on the feedwater controls and the operators had also received simulator training on the startup feed pump controls during Cycle 3 retraining. This item'is considered close (0 pen) Observation No. 20: Investigating anonym us tips or allegations of drug usag The licensee's initial response to this observation (letter dated July 15, 1987) was not adequate and at the request of the inspector, their commitments were modified in a letter dated August 18, 198 The NRC inspector reviewed the revised fitness-for-duty policy and the revised SAFETEAM procedures to verify that all of the committed changes had been made. All of the comitted policy and procedure changes had been made as comitted. In the licensee's August 18 response, a statement was made that "In addition NSD will contact local law enforcement officials concerning the subject of the anonymous tip." The NRC inspector interviewed an NSD (Security) representative and found that NSD did not contact local law enforcement officials unless the allegations had been confirmed or a substantial amount of information was provided by the anonymous alleger. This is a deviation (498/8777-03) from the commitment made in the August 18, 1987, letter. This item will remain open until the issue is resolve (Closed) Observation No. 21: The licensee needs a program for processing additional concerns that are brought to the attention of a SAFETEAM investigator during investigation The licensee had revised Procedure ST-03 on November 1, 1987, to incorporate means for handling additional concerns. SAFETEAM investigators had been trained on the new procedures. The investigators were also interviewed to determine if additional concerns had been brought to them in the past and had not been fully investigated. Two concerns were identified by this process and were subsequently investigated. The I concerns were not substantiated. This item is considered closed.
!
l (Closed) Observation No. 22: The classification of concerns was not being l independently verified and two concerns were classified as Class 2 but
,
appeared to be Class 1.
l The General Manager, Nuclear Assurance (GMNA) and his staff reviewed 1161 i
past concerns to verify that the original classification was appropriat Of those concerns reviewed, 16 were found to be inappropriately classified and were reclassified as Class 1. These 16 concerns were investigated by SAFETEAM and appropriately dispositione The NRC inspector also noted l
. .
that Procedure ST-02 had been revised on November 1, 1987, to require that the GMNA review the classification of all new SAFETEAM concerns. This item is close (Closed) Observation No. 23: Root cause, generic implications, and the appropriate corrective action was not always determined, or taken, for significant concerns that had been substantiate The licensee established a special review team to evaluate the adequacy of the root cause and generic implication determinations of significant substantiated concerns. Eleven concerns were returned to SAFETEAM and reevaluated, and the appropriate corrective action was tcLen. This item is considered close (0 pen) Observation No. 24: The licensee needs to provide the means to cross-reference surveillance procedures to the TS sections which would be affected by failure of the surveillance tes In response to this observation, the licensee committed to review all surveillance procedures and revise them as necessary to ensure that all affected TS are referenced. The licensee comitted to complete this effort by the end of full-power testing. The NRC inspector reviewed the progress of this effort. The Reactor Operations Group had essentially completed their assigned reviews, but many of the other groups had not shown significant prooress in this effort. This item will remain open until significant progress has been shown in this effor (0 pen) Observation No. 25: The licensee needs to assure that positive indication of actual valve position is shown for those valves whose position is verified during surveillance testin In response to this observation, the licensee stated that the STP method for determining valve position are consistent with current industry practice, but an evaluation would be performed prior to initial criticality to determine if any valves do not have positive position indication. This review had been performed by the unit supervisor on shift as surveillance procedures were perfonted. The NRC inspector found no discrepancies in this practice, but a detailed review was not performed. The adequacy of this review should be evaluated by QA and/or ISEG. This will remain open pending further review by the licensee and the inspecto (Closed) Observation No. 26: The surveillance index did not reference all of the test procedures required to satisfy TS 4.7. The licensee revised the TS index for TS 4.7.1.5 to reference both of the
,
applicable test procedures. The QA group also reviewed all other l TS-required surveillances to assure that no other discrepancies exis This item is considered closed.
!
l t
!
7 -
. . ..
'
,,
(Closed) Observation No.-27: It appeared that the NRC may be unaware of the use of bypass switches to inhibit the torque switch function on motor operated velves (MOVs).
In response to this observation, the licensee noted that their practice was-addressed in their response to IEB 85-0 The NRC inspector verified that in the licensee's response to IEB 85-03, dated June 2, 1986, t h
- function of the torque bypass switches was clearly described. This item is considered close (Ciosed) Observation No. 28: Torque' and limit switch setpoints for MOVs were not readily available for use by the craft personnel who maintain the MOV The architect engineer (Bechtel) issued an MOV data base document-(1E321ELC101-R1) on September 11, 1987, which specified torque and limit switch se'ioints for all safety-related valve This data had been incorporated as a reference into the procedures for MOV maintenance. The NRC inspector noted that the crafts personnel had not yet been trained on the use of this data but the training was planned for early in 1988. This item is considered close (Closed) Observation No. 29: Torque switch settings on-BOP valves appeared to be set at the minimum valve The licensee argued in their response to this observation that the torque switch settings for 80P valves were set according to the instructions or per requirements established during preoperational testing. The NRC inspector interviewed licensee representatives who substantiated this ,
information. This item is considered close I (Closed) Observation No. 30: Some electrical maintenance personnel did not receive on-the-job training (0JT) during the preoperational testin The licensee's interim training program for the Maintenance Department was issued on May 20, 1987. A memo was issued to the department on July 24, 1987, emphasizing the need for OJT for maintenance personnel. The licensee began a reassessment of the treining program after the inspection. This reassessment was completed on October 30, 1987, and all maintenance foremen were retrained. A related training concern had been identified in NRC Inspection Report' 50-498/87-50 which involved training of electrical maintenance personnel on MOVs. The additional training indicated by that inspection had been essentially completed. This item is considered close (Closed) Observation No. 31: Some electrical maintenance personnel were not provided the opportunity to be involved in the development or walkdown of maintenance procedure In response to this observation, the licensee noted that "scheduling and manpower constraints had prevented all technicians from being involved
, . , ,
with procedural development. They noted that the normal development of the technicians through 0JT and formal classrcom training will assure adequate training for the performance of their activitie The NRC inspector verified that the licensee had developed an adequate 0JT program, but the program did not provide for supplemental training for those technicians who were not involved in procedural development. This item is closed, but the licensee should reevaluate the need for supplemental training for those technicians who were not involved in procedure developmen (Closed) Observation No. 32: The licensee needs to reevaluate the need for improved training of electricians i.. the methods of troubleshooting battery chargers and inverter The licensee had developed three courses on the theory and maintenance of solid state electronics equipment. The first two of these courses (Solid State I and Solid State II) had been presented to nine of the licensee's technicians. These courses were primarily theoretical, and did not provide detailed instructions on troubleshooting techniques for solid state equipment like the battery chargers and inverters. The third course (Solid State III) will provide training on the maint.enance and trouble-shooting techniques, but this course is not scheduled to be taught until July 198 The licensee argued that they have technicians who they believe were currently qualified or the battery chargers and inverter They also argued that they would bring in vendor representatives if necessary. This item is considered close (Closed) Observation No. 33: The inspection team questioned the licensee's intended actions in response to ISEG observations on reactor operator rounds and shift turnove In response to this observation, the licensee had two senior level managers go into the plant and accompany operators on their rounds. Upon completion of this effort, a meeting was held with the operations staff to discuss this concern. Additional on-shift training was held on this subject. This item is considered close (Closed) Observation No. 34: The inspection team questioned the licensee's intended actions in response to the ISEG assessment and subsequent concerns on manual valve reach rod In response to this observation, the licensee developed a list of the manual valves with reach rods and physically tested the operability of each valve. The NRC inspector found that all of the valves had been '
tested. Six problems were found which related to valve positio Maintenance work requests (PWRs) were issued and the six valves were repaired. The licensee has cocrnitted to perform post-maintenance tests on future valve repairs or installation. This item is close (0 pen) Observation No. 35: The inspection team was concerned that ISEG reports are not required to be addressed by the pl?nt staff, i
_ _ _ - _ - - - _ _ -
, v ,%
l
'
In response (letter of July 15,1987) to this observation, the licensee conmitted to write a procedure which would specify actions to be taken as a result of ISEG reports. The procedure was to be completed by September 30, 1987, and as an intorim measure responses for ISEG reports will be generated by responsible managers. The responses would address pertinent issues identified in the ISEG report. The NRC inspector found :
that the licensee had developed and issued an Interdepartmental Procedure IP-1.39 dated September 28, 1987, which addressed this concer The NRC inspector found, however, that ISEG had issued a report entitled l
"ISEG Observation of the Work Control Center," dated September 10, 1987, and that no response had been made to the report. The re; ort documented several findings which were pertinent to the operation of the WCC, but none of the four managers addressed on the repor', responded. The failure of any of these managers to respond to the ISEG report constitutes a deviation (498/8777-04) from the licensee's connitment as stated abov This item will remain open until the issue is resolve ,
I (Closed) Observation No. 36: The inspection team identified 12 open SAFETEAM concerns for which sufficient information wts not available to .
determine if the concern could affect fuel loa The NRC inspector reviewed the records of the subject concerns. All of i the concerns had been closed as of August 10, 1987. This item is considered close . Exit Interview ,
The NRC inspector met with the licensee representatives (denoted in paragraph 1) on December 15, 1987. The NRC inspector summarized the scope of the inspection and the findings. The NRC inspector expressed concern regarding the licensee's commitment tracking system as evidenced by the inspection finding .