ML20236S782
| ML20236S782 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 11/23/1987 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Goldberg J HOUSTON LIGHTING & POWER CO. |
| Shared Package | |
| ML20236S784 | List: |
| References | |
| NUDOCS 8711300092 | |
| Download: ML20236S782 (3) | |
See also: IR 05000498/1987043
Text
.
.
. _ _ _
--
_ - _ _ _ _ _
-
gm
. .
..
,
,
-
m
,
.
,-
. N0y 2 3 'l987
In Reply Refer To:
Dockets:
50-498/87-43'
Doc &nent Contains-
.",
- 50-499/87-43
SAFEGUARDS INFORMATION-
Houston' Lighting & Power Company
'
y
ATTN:
J. H.;Goldberg, Group Vice
,
. President, Nuclear
i
P. O. Box 1700
Houston, Texas.
77001
>
Gentlemen:
l
- This. refers to the inspection conducted by Messrs. J. A. F. Kelly,
R. A. Caldwell, and A. B. Earnest of this office and other accompanying
personne1'during the period June 22 through August 20, 1987, of activities
authorized by NRC Construction, Permits CPPR-128 and CPPR-129 for the
South' Texas Project, and to the discussion'of our findings with Mr~ G. Vaughn
.
.
'and other members of your staff-during the' inspection and at the conclusion of-
each of'the several inspection phases.
'
Areas examined during the inspection l included security plans and procedures,
management effectiveness, security organization, audits, reports and records,-
. testing-and maintenance,! locking systems, physical barriers for both protected
-and vital areas, power supply, lighting, compensatory measures, assessment
aids, access control for personnel, packages and vehicles, detection aids for
both vital and protected areas, alarm stations, communications, personnel-
training land qualifications, safeguards contingency responses, and the
protection of safeguards information.
Within these areas, the inspection
'
consisted of. selective examination of procedures"and representative records,
- interviews with personnel, and observations by the NRC inspectors.
The
inspection'. findings are documented in the enclosed inspection report.
.Within the scope of the inspection, no violations or deviations were
'
identified.
We'have also examined actions you have taken with regard to previously
1
identified inspection findings.
The status of these items is identified in
2
paragraph 2 of the enclosed report.
l
)
- The material enclosed herewith contains Safeguards Information as defined by
110 CFR Part 73.21 end its disclosure to unauthorized individuals is prohibited
by Section 147 of the Atomic Energy Act of 1954, as amended.
Therefore, the
o
l'
material, with the exception of the report cover page which is an inspection
summary, will not be placed in the Public Document Room.
p
B'
RPSB
C: RPSB
C:fSh/
'JAF elly/tw
RACal
1
A
'
'e s t
LAYand
GLtafd.able
Q $87
%/Q 7
a/tr /87
p/\\b/87
n h3 /87
AC k
D:DRP$
)
MEEmerson
LJCal Ta'n
0 Q 87
l( $87
f
ENCLOSURE CONTAINS
1
If
Doe &nent Containt
SAFEGUARDS INFORMATION.
'
l
SAFEGUARDS INFORMATION
UPON SEPARATION THIS
ht$009287 y8
POCK O
PAGE IS DECONTROLLED.
/ 9
'
L
__-
___ _
.
.
Houston Lighting & Power Company
-2-
'Should you have'any questions concerning this inspection,'we will be pleased to
discuss them with you.
Sincerely,
Odginni Signed By
A. B. Beach gw
L. J. Callan, Director
Division of Reactor Projects
Enclosure:
Appendix - NRC Inspection Report
50-498/87-43
50-499/87-43
-cc w/ summary page only:
Houston Lighting & Power Company
ATTN:
M. Wisenberg, Manager,
Nuclear Licensing
P. O. Box 1700
Houston, Texas
77001
Houston Lighting & Power Company
ATTN:
Gerald E. Vaughn, Vice President
Nuclear Operations
P. O. Box 1700
4
l
Houston, Texas
77001
t
Central Power & Light Company
l
ATTN:
R. L. Range /R. P. Verret
1
P. O. Box 2121
Corpus Christi, Texas
78403
City Public Service Board
ATTN:
A. Von Rosenberg/M. T. Hardt
P. O. Box 1771
San Antonio, Texas
78296
i
City of Austin
ATTN:
M. B. Lee /J. E. Malaski
P. D. Box 1088
78767-8814
1
l
Texas Radiation Control Program Director
!
1
bec:
(see next page)
ENCLOSURE CONTAINS
l
SAFEGUARDS INFORMATION.
UPON SEPARATION THIS
PAGE IS DECONTROLLED.
1
_ _ _ _ _ _ _ _ _ _
_ _ _ _
m;m
.
a-
s
,
..~
'-
f
,
L .
!.; E,:]
. Houston Lighting &. Power Company 1
-3-
,
?
- bec:
Copy of' entire report:
RIV Security. File
.
>
'
.P.LA. Starcher,'RSGB/NRR
v
Resident: Inspector (5)
"
R.
D.' Martin,'.RA-
R.'L. Bangart, DRS&S:
Security Inspector-
Chief, RPSB
RPSB Security File
M. Emerson (2)
.bcc: -RIV
. Letter and Inspection Summary only w/766:
tPS/DL
D. Weiss, RM/ALF
-MISL
..
. .
RIV File
- Section' Chief, PS/D
RSTS Operator-
LRPSB-DRSS
' ~
R. E.
iall,.DRSS
Project Engineer, PS/D .
.
.
2bec:
RIV
Letter and. Inspection Summary only w/out 766:
,
- 6 6MB
IE04
.
DRS&PJ
.
P. Kadambi, NRR Project Inspector
.
,
,
ENCLOSURE CObn'AINS -
SAFEGUARDS INFORMATION.
UPON SEPARATION THIS
- PAGE IS DECONTROLLED.
<
""o
-
_.________._m
,