IR 05000498/1978013

From kanterella
Jump to navigation Jump to search
IE Mgt Meeting Repts 50-498/78-13 & 50-499/78-13.Major Areas Discussed:Apparent Low Morale of Some Qa/Qc Personnel,Allegd Weaknesses in Implementing Site Civil Qa/Qc Program & Adequacy of Qa/Qc Staffing Level
ML20150A654
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 08/25/1978
From: Crossman W, Hubacek W, Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20150A651 List:
References
50-498-78-13, 50-499-78-13, NUDOCS 7809270400
Download: ML20150A654 (3)


Text

August 15, 1978

SUBJECT:

RESPONSE TO THE NRC INSPECTION FINDING S0tJ111 TEXAS PROJECT ELECTRIC GENERATING STATION DOCKET NOS. 50-498/79-01 AND 50-499/79-01

Dear Mr. Seidle:

!

The following is Houston Lighting 6 Power Company's (HL6P)

response to the infraction reported in IE Inspection Report Nos.

50-498/79-01 and 50-499/79-01 dated February 16, 1979.

Failure to Provide Procedures for a Quality Control Activity

!

1.

Corrective Action Taken Site h'ork Instruction 007-A (SWI) was issued February 5,1979, to control the transcription of cadwelding examination checklist records.

The SWI was implemented on February 7,1979, after a two hour training session on the SWI was held.

)

2.

Recurrence Control

.

.-

j To prevent future noncompliance, a new Cadwelding Inspection Report is being developed. This report

,

, -

'

Vi will eliminate the need for the information on the backside of the Examination Checklist Form. The replacement form will be included as an illustra-tion in the Cadwelding Quality Construction Proce-

% dure. Once incorporated in the Quality Control j

D po f

.

q90q

. u_

'

- - -.. -

- - - - - - - _

- _ _. _ - - -

_ _ _. - _. - - - _ -. - _ - _

. - - -. _ - -.

-

. _. -. - _ _ _ - - _,. -.. - _. -

,

.

.

(

{I

'

' Houston $ tin,g & Ptmer Company i

379

.f M March 12, 1979

'

Page Two Procedures, the need for a separate SNI will have been eliminated.

The' implementation of this new Cadwelding Inspection Report will be preceded by a training session and should be in effect by March 20, 1979.

Full compliance was achieved on February 7,1979, and the recurrence control should be completed by March 20, 1979.

Very truly yours,

. a. /w E. A. Turner, Vice President Power Plant Construction 6 Technical Services EAT:rka cc: Messrs. G. W. Oprea, Jr.

R. A. Frazar D. G. Barker

.

J. B. Poston (CPS)

R. C. Mecke (CPS)

R. L. Hancock (COA)

11. L. Peterson (COA)

M. L. Borchelt (CPL)

J. W. Moore (CPL)

,

C. W. Vincent (B6R)

STP RMS

.

O

__ - _