Ack Receipt of Detailing Actions to Fulfill Commitments Documented in Insp Rept 50-458/89-45 Re dual-coil,solenoid-operated Valves Used to Control Msivs. Actions Acceptable
ML20043G782
Person / Time
Site: River Bend Entergy icon.png
Issue date: 06/21/1990
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Deddens J
GULF STATES UTILITIES CO.
References
NUDOCS 9006210128
Download: ML20043G782 (2)


Text

u

'

&

-

.

..

.

.

In Reply Refer To:

Docket: 50-458/89-45 Gulf States Utilities ATTN: James C. Deddens SeniorVicePresident(RBNG)

P.O. Box 220 St. Francisville, Louisiana 70775 Gentlemen:

Thank you for your letter dated June 1,1990, informing us of the status of your actions to fulfill comitments made to the NP.C. The commitments were documented in NRC Inspection Report 50-458/89-45 and dealt with the dual coil solenoid operated va"..es used to control the main steam isolation valves. We found your actions to date, to be acceptable. We will review the completion of the required actions during a subsequent inspection.

'

Sincerely

.

Original Signed By:

Samuel J. Collins Samuel J. Collins, Director Division of Reactor Projects CC Gulf States Utilities i

ATTN:

J. E. Booker, Manager-l Nuclear Industry Relations

'

P.O. Box 2951 Beaumont, Texas 77704 l

Conner and Wetterhahn ATTN: Troy B. Conner, Jr., Esq.

1747 Pennsylvania Avenue, NW Washington, D.C.

20006 Gulf States Utilities ATTN:

Les England, Director Nuclear Licensing P.O. Box 220 St. Francisville, Louisiana 70775 l

RIV:ASC*

D:DRS*

U:DRP*

!

PWagner/cjg LJCallan SJCollins i

/ /90

/ /90

/ /90

  • previously concurred 9006210128 900621 i

DR ADOCK 050004 8 l

j

p-

,

e.

, - -

.

L

'

,

'

Gulf States Utilities-20 Mr. J. David McNeill, III William G. Davis, Esq.

Department of Justice Attorney General's Office P.O. Box 94095 Baton Rouge, Louisiana 70804-9095 H. Anne P1ettinger 3456 Villa Rose Drive Baton Rouge, Louisiana 70806 President of West Feliciana Police Jury P.O. Box 1921 St. Francisville, Louisiana 70775 l

Cajun Electric Power Coop. Inc.

AT1N:' Philip G. Harris

.10719 Airline Highway P.O. Box 15540

Baton Rouge, Louisiana 70895 i

Department of Environmental Quality ATTN: William H. Spell, Administrator Nuclear Energy Division i

l P..0. Box 14690 Baton Rouge, Louisiana 70898 U.S. Nuclear Regulatory Comission

ATTN:

Resident Inspector

~

P.O. Box 1051 St. Francisv111e, Louisiana' 70775 U.S. Nuclear Regulatory Comission

]

ATTH: Regional Administrator. Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 bectoDMB(IE01)

bec distrib. by RIV:

R. D. Martin Resident Inspector DRP SectionChief(DRP/C)

Lisa Shea, RM/ALF MIS System DRSS-FRPS RSTS Operator ProjectEngineer(DRP/C)

RIY file DRS Senior Resident Inspector, Cooper Senior Resident Inspector, Fort Calhoun W.Paulson,NRRProjectManager(MS: 13-D-18)

P. Wagner (,

t

%

.-

-

_

--

-

q, I

(

o.

e.

.

'

Q)

GULF STATES UTIL1T1ES COMPANY

,

.,n n sw.ws

.w w zi r, :,,

g... sos.w.a.+.

w.m

. n n:i m

.nm mn

-

<> u u b5

4

.

JUN - 71990

'

]

' June 1,1990

-

PM-3 29 35 File No. G9.5, G15.4.1 U. S. Nuclear Regulatory Ccrmission Docurrent Control Desk Wa?M niton: D. C.

20555

,

Gentiment i

River Bend Station'- Unit 1 Refer to : Region IV

'

Docket No. 50-458/89-45 Gulf States Utilities Cmpany (GSU) is providihg this status of actions included in Inspection Report 89-45.

' Itis inspection

'

report dealt with dual coil solenoid operated valves (SOVs). used to control main steam isolation valves (MSIVs).

Actions to be taken by GSU were dcx umented in IR 89-45. 'Ihe following is a status of those actions.

IR 89-45 "The SOVs will be tested on approximately nonthly intervals until the mid-cycle outage."

Status:

Completed.

Testing of the dual coil SOVs was

,

performed nonthly prior to the mid-cycle outage.

IR 89-45 "The SOVs will be replaced with SOVs of a different j

design during the mid-cycle outage if replacment SOVs are available."

,

Status:

During the mid-cycle outage the dual coil SOVs on one inboard and one outboard MSIV were replaced with single coil SOVs.

l IR 89-45

"'Ihe SOVs will' be tested at quarterly intervals, if not replaced and provided the nonthly testing provided i

acceptable results, 6ntil the SOVs can be replaced

'

during the next refueling outage."

Status:

The r maining six dual coil SOVs will be replaced by single coil SOVs during the next refueling outage if the testing of the single coil SOVs proves thm to be a satisfactory replacement. hsting of the dual coil SOVs will continue on nonthly intervals.

S-7d'

M

[1t-90 9t t

_

'

.

..

_ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _

-t o.

o,

Should you have any questions, 'please contact Mr. David N.

'

Lorfing of my staff at (504) 381-4157.

,,

l_

Sincerely

,

hG

""

t J. C. Deddens

.

Senior Vice President

River Bend Nuclear Group

,

,

cc: U. S. Nuclear Regulatory Commission Reg <,,ty 611 ' tra Plaza Drive, Suite 1000 Arli.,gton, TX 76011

'

Senior Resident inspector Post Office Box 1051 St. Francisville, LA 70775