Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-458/89-15
ML20246M191
Person / Time
Site: River Bend Entergy icon.png
Issue date: 07/11/1989
From: Milhoan J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Deddens J
GULF STATES UTILITIES CO.
References
NUDOCS 8907190085
Download: ML20246M191 (2)


Text

._

., " .. > ;<

In Reply Refer To:

Docket: 50-458/89-15 Gulf States Utilities ATTN: Mr. James C. Deddens Senior Vice President (RBNG)

P.O. Box 220 St. Francisville, Louisiana 70775 Gentlemen.:

Thank you for your letter of June 16, 1989, in response to our letter and Notice of Violation dated May 17, 1989. We have reviewed your reply and find it responsive to the concerns raised in our Notice of Violation. We will review the implementation of your corrective actions during a future inspection to determine that full compliance has been achieved and will be maintaine

Sincerely, Gogon, eu James L. Milhoan, Director Division of Reactor Projects cc:

Gulf States Utilities ATTN: J. E. Booker, Manager-River Bend Oversight P.O. Box 2951 -

Beaumont, Texas 77704 Gulf States Utilities ATTN: Les England, Director Nuclear Licensing - RBNG P.O. Box 220 St.. Francisville, Louisiana 70775 Louisiana State University, Government Documents Department Louisiana Radiation Control Program Director ,

h l l RIMPS C: C:RPB 1/ bD:f S D:D P JKeYly/ sir JEve t BMurray OrBBe%ach JMilhoan 7/v/89 7 / 22 / 8 9

>

7/ /89 7/10/89 7/ll /89 8907190085 890711 gg PDR ADOCK 05000458 PDC

%\b, Q

u__ - k 1

_ . _ _ _ _ _ _ _ ,

(;

O'

'

< +. . .V Gulf States Utilitie bec to DMB (IE04)

bec distrib. by RIV:

R. D. Martin, RA DRP Resident Inspector Section Chief, DRP/C Lisa Shea, RM/ALF MIS System DRS RSTS Operator RPB-DRSS

. RIV File Inspector Section Chief B. Murray B. Beach Project Engineer, DRP/C

. W. Paulson, NRR Project Manager

.

h _m _ _ _ - _____.-_.______ . - _ _ . _ _ _ . _ _ _ . _ _ _ . _ - . _ _ __

_ _ _ _ . . _ _ _ ____ . _ . _ _ _ _ _ _ _ . - _ _ _ _ _ _ _ _ _ _ _

.- SAFZGT.E: Ds ..'TJO? NTION

/ .

~s~'4

,a

?

w??nes g..,

l GULF STATES UTILITIES COMPANY

!

~

June 16, 1989 i?b$@ 0W@  %

]

e os. G9.5, G15. M ,

h U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

RIVER BEND STATION - UNIT 1 REFER T0: REGION IV DOCKET NO. 50-458/ REPORT 89-15 This letter responds to the Nctice of Violation contained in NRC Inspection Peport No. 50-458/89-15. The inspection was performed by M James A. F. Kelly on April 2-6, 1989 of activities authorized by NRC Operating License NPF-47 for River Bend Station - Unit Gulf States Utilities Company's (GSU) response to Notice of Violatien 8915-01, " Inadequate ' Compensatory Measures", is provided in the encloseo attachment pursuant to 10CFR2.201. This completes GSU's responses to this ite In accordance with 10CFR73.21, information contained in the attachment has been determined to contain safeguards information and should be handled accordingl Should you have any questions, please contact Mr. R. J. King at (504)

381-414 Sincerel ,

J. C. Deddens Senior Vice President JEB/LAE/R$ LFG ML M/BBM/ns River Bend Nuclear Group Enclosure cc: Mr. Robert D. Martin, Regional Administrator U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011 NRC Senior Resident Inspector (w/o attachment)