U.S. NUCLEAR REGULATORY COMMISSION
REGION III
.
Report No. 50-456/8605S(DRSS)
Licensee:
Commonwealth Edison Company Braidwood Nuclear Power Plant, Unit 1 Post-Office Box 767 Chicago, IL 60690 Facility Name:
Braidwood Nuclear Power Plant, Unit 1 Inspection At:
Braidwood Site Inspection Conducted:
October 8 and 9, 1986 Date of Last Safeguards Inspection:
Initial Inspection
~
Type of Inspection:
Announced Preoperational Material Control and Accountability Inspection Inspe'ctors:
u,, [ h oo/,,/s
/0//7/Ff T. J. fapeda'
~
Date
'
Physit Y Protection Specialist
- b-
/o
Lt L-G. M..Christoffer.
'
Date'
Physical Protection Specialist ApprovedBy:bhDeu0
/o/<7/86 J; R. Creed, Chief Date P'hysical Security Section Inspection Summary Inspection on October 8 and 9, 1986 (Report No. 50-456/86058(0RSS))
Areas Inspected:
Special Nuclear Materials Control and Accountability.
,
Results:
The licensee's program for controlling and accounting of Special Nuclear Material was found to be in compliance with NRC requirements in the areas examined during the inspection.
8610230086 861017 PDR ADOCK 05000456 G