IR 05000456/1986058

From kanterella
Jump to navigation Jump to search
Partially Withheld Preoperational Matl Control & Accountability Insp Rept 50-456/86-58 on 861008-09 (Ref 10CFR2.790).No Noncompliance Noted.Major Areas Inspected: SNM Control & Accounting
ML20215H303
Person / Time
Site: Braidwood Constellation icon.png
Issue date: 10/17/1986
From: Christoffer G, Creed J, Madeda T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19292G092 List:
References
50-456-86-58, NUDOCS 8610230086
Download: ML20215H303 (1)


Text

.

.. __

.

..

_

U.S. NUCLEAR REGULATORY COMMISSION

REGION III

.

Report No. 50-456/8605S(DRSS)

Licensee:

Commonwealth Edison Company Braidwood Nuclear Power Plant, Unit 1 Post-Office Box 767 Chicago, IL 60690 Facility Name:

Braidwood Nuclear Power Plant, Unit 1 Inspection At:

Braidwood Site Inspection Conducted:

October 8 and 9, 1986 Date of Last Safeguards Inspection:

Initial Inspection

~

Type of Inspection:

Announced Preoperational Material Control and Accountability Inspection Inspe'ctors:

u,, [ h oo/,,/s

/0//7/Ff T. J. fapeda'

~

Date

'

Physit Y Protection Specialist

- b-

/o

Lt L-G. M..Christoffer.

'

Date'

Physical Protection Specialist ApprovedBy:bhDeu0

/o/<7/86 J; R. Creed, Chief Date P'hysical Security Section Inspection Summary Inspection on October 8 and 9, 1986 (Report No. 50-456/86058(0RSS))

Areas Inspected:

Special Nuclear Materials Control and Accountability.

,

Results:

The licensee's program for controlling and accounting of Special Nuclear Material was found to be in compliance with NRC requirements in the areas examined during the inspection.

8610230086 861017 PDR ADOCK 05000456 G

PDR ATTAC" 5NT CONTAI'!S 10 CFP,2.790 INFON,.;;n

-

.