Forwards Preoperational Safeguards Insp Rept 50-456/86-58 on 861008-09.No Violations Noted
ML20215H286
Person / Time
Site: Braidwood 
Issue date: 10/17/1986
From: Axelson W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML19292G092 List:
References
NUDOCS 8610230072
Download: ML20215H286 (2)


See also: IR 05000456/1986058

Text

DHB

O

4

0

0CT 171986

.

.

Docket No. 50-456

Commonwealth Edison Company

ATTN:

Mr. Cordell Reed

Vice President

>

Post' Office Box 767

.

Chicago, IL '60690

Gentlemen:

This refers to the preoperational safeguards inspection conducted by

Mr. T. J. Madeda and Ms. G. M. Christoffer of this office on October 8

and 9, 1986, of activities at the Braidwood Nuclear Power Plant, Unit 1

authorized by NRC Construction No. CPPR-132 and to the discussion of our

findings with Mr. E. Fitzpatrick and other members of your staff at the

conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection.

Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

Areas examined during the inspection concern a subject matter which is exempt

from disclosure according to Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations.

Consequently, our report of

this inspection will not be placed in the NRC Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

f

8610230072 e61017 ~

gp

PDR

ADOCK 05000456

jh.L.Axeson, Chief

hp

G

PDR

,

clear Materials Safety

'

~

and Safeguards Branch

/

Enclosure:

Inspection Report

No. 50-456/86058(DRSS)

1

(10 CFR 2.790ilNFORMATION)

?

.

See Attached Distribution

-f1W

J'grcg7RIII

III

RIII

RIII

c%

f

(A&

o

jeed

[Axelson

Madeda/mj

Christoffer

er

I

ATTACHME!1T CONTAlf15

10 CFR 2.790 IfiFORMATIO:{

_

._ _ _ _ _

._

_

__

-_-

.

-

..

.

.

b

'

Cormonwealth Edison Company

2

OCT 171986

,

.

Distribution

cc w/ enclosure:

D. L. Farrar, Director

of Nuclear Licensing

M. Wallace, Project Manager

D. Shamblin, Construction

Superintendent

E. E. Fitzpatrick, Station

Manager

P. L. Barnes, Regulatory

DCS/RSB (RIDS)pervisor

Assurance Su

cc w/o enclosure:

licensing Fee Management Branch

,

'

Resident Inspector, RIII

Braidwood

Resident Inspector, RIII Byron

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

D. W. Cassel, Jr., Esq.

J. W. McCaffrey, Chief, Public

Utilities Division

H. S. Taylor, Quality Assurance

Division

E. Chan, ELD

J. Moore, ELD

G. Berry, ELD

'

J. Stevens, NRR

The Hono*able Herbert Grossman, ASLB

The' Honorable A. Dixon Callihan, ASLB

,