IR 05000445/1988017
| ML20153H175 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 04/29/1988 |
| From: | Warnick R NRC OFFICE OF SPECIAL PROJECTS |
| To: | Counsil W TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| Shared Package | |
| ML20153H179 | List: |
| References | |
| NUDOCS 8805120160 | |
| Download: ML20153H175 (6) | |
Text
.
..
.
.
.
4.
jt
,
APR 2 91988
.
In Reply Refer To:
Dockets:
50-445/88-17
.
50-446/88-14 TU Electric ATTN:
Mr. W. G. Counsil Executive Vice President
'400 North Olive Street, Lock Box 81 Dallas, Texas 75201 Gentlemen:
This refers to the inspection conducted by Mr. H. S.
Phillips during the period March 2 through April 5, 1988, of activities authorized by NRC Construction Permits CPPR-126 and CPPR-127 for the Comanche Peak Steam Electric Station, Units 1 and 2, and to the discussion of our findings with you and other members of your staff at.the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during the inspection.
Within these areas, the inspection
'
consisted of selective examination of procedures and representative
'
records, interviews with personnel, and observations by the
inspectors.
During this inspection, it was found that certain of your
.
activities were in violation of NRC requirements, as specified in the enclosed Notice of Violation.
A written response to this violation is required.
,
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter, the enclosures, and your response to this letter will be placed in the NRC Public Document Room.
i The response directed by this letter and the accompanying Notice are not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, PL 96-5111.
i R CU)fu-RFlt)
IP:CPPD:OS IP:CPPD:OSP AD:IP:CPPD:OSP SPhillips HLivermore RWarnick 4/27/88 4/49/88 4/29/88
'
8805120160 000429
{DR ADOCK 05000445 PDR
_____ _ --_ _ -.. _ -___ --__
. '( '
..+
> s
,)'_
TU' Electric
_
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely, ORIGINAL SIGNED BY E F WEW R.
F. Warnick, Assistant Director for Inspection Programs Comanche Peak Project Division Office of Special Projects Enclosures:
Appendix A - Notice of Violation Appendix B Inspection Report 50-445/88-17; 50-446/88-14
-
cc w/ enclosures:
See next page
.
T l
.
l
,
i
>,
...
,
'
M N 4 UNITED STATES O
j, NUCLEAR REGULATORY COMMISSION j-
.. j
.
WASHINGTON, D. C 20555
e
'
O,
%..... * 'f APR 2 91988 In Reply Refer To:
Dockets:
50-445/88-17 50-446/88-14 TU Electric ATTN:
Mr. W. G. Counsil Executive Vice President 400 North Olive Street, Lock Box 81 Dallas, Texas 75201 Gentlemen:
This refers to the inspection conducted by Mr. H. S.
Phillips during the period March 2 through April 5, 1988, of activities authorized by NRC Construction Permits CPPR-126 and CPPR-127 for the Comanche Peak Steam Electric Station, Units 1 and 2, and to the discussion of our findings with you and other members of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during the inspection.
Within these areas, the inspection consisted of selective examination of procedures and representative records, interviews with personnel, and observations by the inspectors.
During this inspection, it was found that certain of your activities were in violation of NRC requirements, as specified in the enclosed Notice of Violation.
A written response to this violation is required.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter, the enclosures, and your response to this letter will be placed in the NRC Public Document Room.
The response directed by this letter and the accompanying Notice are not subject to the clearance procedures of the office of Management and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511 %
TU Electric
-
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
,
Sincerely, R F LOA R. F. Warnick, Assistant Director for Inspection Programs
!
comanche Peak project Division Office of Special Projects Enclosures:
Appendix A - Notice of Violation Appendix B - Inspection Report 50-445/88-17; 50-446/88-14 cc w/ enclosures:
See next page
,
u k
r
,
!
t
>
,
e
,
!
i
..
k 1NJ Elcctric cc w/ enclosure:
Roger D. Walker Nancy H. Hilliams Manager, Nuclear Licensing CYGNA Energy Services Texas Utilities Electric Company Suite 390 Skyway Tower 2121 N. California Blvd 400 North Olive Street, L.B. 81 Walnut Creek, CA 94596 Dallas, TX 75201 Robert A. Wooldridge, Esq.
Juanita Ellis Worsham, Forsythe, San:pels President - CASE and Wooldridge 1426 South Polk Street 2001 Bryan Tower Dallas, TX 75224 Suite 2500 Dallas, TX 75201 Susan M. Theisen Assistant Attorney General Mr. Homer C. Schmidt Environmental Protection Division Director of Nuclear P.O. Box 12548, Capitol Station Services Austin, TX 78711-2548 TU Electric Skyway Tower Administrative Judge Peter Bloch 400 N. Olive St.,
L.B.
U.S. Nuclear Regulatory Commission Dallas, TX 75201 Washington, DC 20555 Elizabeth B. Johnson Kenneth A. McCollom Administrative Judge Administrative Judge Oak Ridge National Laboratory 1107 West Knapp Post Office Box X, Building 3500 Stillwater, OK 74075 Oak Ridge, TN 37830 GDS Associates, Inc.
Jack R. Newman, Esq.
1850 Parkway Place, Suite 720 Newman i Holtzinger, P.C.
Marietta, GA 30067-8237 1615 L Street, N.W.,
Suite 1000 Washington, D.C.
20036 Mr. Robert E. Ballard, Jr.
Director of Projects Walter H. Jordan Gibbs and Hill, Inc.
Administrative Judge 11 Penn Plaza 881 West Outer Drive New York, NY 10001 Oak Ridge, Tennesee 37830 Mr. R.
S.
Howard Anthony 2. Roisman, Esq.
Westinghouse Electric Suite 600 Corporation 1401 New York Avenue, N. W.
Post Office Box 355 Washington, DC 20005 Pittsburgh, PA 15230 Ms. Billie Pirner Garde, Esq.
Lanny A. Sinkin Government Accountability Project Christic Institute Midwest Office 1324 N. Capitol Street 104 East Wisconsin Avenue - B washington, DC 20002 Appleton, WI 54911-4897
. _ -
_
_ _ _ _ _ _ _
.,
_
_
- - - - - _ _ _. _ - - _
.
-
TU Electric cc w/ enclosure:
(continued)
David R.-Pigott, Esq.
Orrick, Herrington & Sutcliffe 600 Montgomery Street San Francisco, CA 94111 Robert Jablon Bonnie S.
Blair j
Spiegel & McDiarmid 1350 New York Avenue, NW washington, DC 20005-4798 George A. Parker, Chairman Public Utility Committee Senior Citizens Allir.nce of Tarrant County, Inc.
6048 Wonder Drive Fort Worth, TX 76133 Joseph F.
Fulbright Fulbright & Jaworski 1301 McKinney Street Houston, TX 77010 Mr. Jack Redding c/o Bethesda Licensing TU Electric 3 Metro Center, Suite 610 Bethesda, MD 20814 William A. Burchette, Esq.
Counsel fer Tex-La Electric Cooperative of Texas Heron, Burchette, Ruckert &
Rothwell suite 700 1025 Thomas Jefferson St., NW Washington, DC 20007 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011
,
i
,
~ - - - - - -
- - - -
.... - -,,
,. - - - - - -. -,. -. - -. - - - ~ -
-- ---
50-445/79-/1 ; 50-446/fF-/#
DISTRIBUTION:
(Docket Files.(50-445/446)
NRC PDR Local PDR OSP Reading CPPD-LA CPPD Re'fing (HQ)
- Site Reading File AD for Projects
- Sr. Lead Insp. - CONST.
- Concurrence
- MIS System, RIV
- RSTS Operator, RIV DRP, RIV RIV Docket File
- LShea, ARM /LFMB JTaylor SEbneter/JAxelrad CGrimes PMcKee JLyons JWilson JMoore, OGC JGilliland, RIV FMiraglia EJordan JPartlow BHayes
- w/i66
,
I I
,