Regulatory Operations Insp Repts 50-445/75-02 & 50-446/75-02 on 750117.No Violation Noted.Major Areas Inspected:Followup Review Re Previously Identified Unresolved Item 74-02/VII B, Brown & Root QA Program Manual
ML20212N894
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 01/21/1975
From: Crossman W, Stewart R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20212N850 List:
References
FOIA-87-119 50-445-75-02, 50-445-75-2, 50-446-75-02, 50-446-75-2, NUDOCS 8703130196
Download: ML20212N894 (7)


Text

_ - _ _ _ _ _ _ _ _

%

'

D f

f U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT

REGION IV

RO Inspection Report Nos. 50-445/75-02 Docket Nos. 50-445

.l 50-446/75-02 50-446 l

!

Applicant:

Texas Utilities Generating Company License No. None 1506 Commerce Street Dallas, Texas 75201 Category A2

.

Facility: Comanche Peak Steam Electric Station - Units 1 & 2

.

(

~

,

'

Location: Glen Rose, Texas Type of Licensee:

W, PWR,1161 MW(e)

,

Type of Inspection: Routine, Announced (Meeting)

.4'

.,

Dates of Inspection: January 17, 1975 Dates of Previous Inspection: January 8-9, 1974 3p

,

W4

/

/ 7[

.

Principal Inspector:

-

-

R. C. Stewart, Reactor I#spector Date

'

.q v

.

~"

Accompanying Inspector: None

,

!

Other Accompanying Personnel: None Reviewed By:

-

M I

?.

W. A. Crossman, Senior Reactor Inspector Date

,

2$

T.Q*l

,.-vy

@tj

?

Po LA}-Wl--llj

.

8703130196 870220 PDR FOIA l

WILLIAM 87-119 PDR

.

--_

J 6# > me e

64 ' M

'

b

' '

d-

.

,

,

.

.

.

.

.

2-

..

-

.

"

SUMMARY OF FINDINGS

~

I.

Enforcement Action A.

Violation

c

None I

B.

Infraction

.

None

]

C.

Deficiencies

,

None

.

II.

Licensee Action on Previously Identified Enforcement Matters i

None outstanding

.

.

III.

New Unresolved Items None

-

. 'I

. ;}

Status of Previously Reported Unresolved Items IV.

74-02/VII B Brown & Root (B &R) QA Program Manual

._ l The B&R " Quality Assurance / Control Manual for Nuclear i

Projects, Cordtruction Phase, Volume II", contains the B&R QA Program Policy and Commitments. The manual does not contain references to other B&R Quality Assurance /

Control Manuals in use, nor is it clear as to the manuals functional application to the Comanche Peak Project. These matters remain unresolved. (DETAILS, paragraph 2)

,

V.

Design Changes

.

ll ';

'

None C

??

VI.

Unusual Occurrences

,

j None

.

-

(continued)

.

I

--

--

_ _..... - -... - - - - -

_.....

.

,

,

.

- - - -

-, - -

as-

,--,-,m-www+y--,- - - -

-g--


y----

-- -, - -

,---,----v--

-w-T r-

=- -

---'~>r--Ar*--T

'

.

,. _

-.

.

-.

.

. -

. - - -. -.. -

.

.

-.

.

.) T

-

..

,

-

.g-4 t<

-

.

,

i.

}

REPORT DETAILS

'

!

'

Persons Contacted

,.

.t

.

-

~

The following individuals were in attendance during the meeting:

sp M

Texas Utilities Services, Inc. (TUSI)

'

,

?;

Mr. H. C. Schmidt, QA Manager u.

.

Mr. R. G. Tolson, QA Engineer M....

Mr. P. M. Milam, QA Engineer

{

-h j Mr. A. H. Boren, QA Engineer

>'

Mr. A. Vega, QA Engineer

v Brown & Root, Inc. (B&R)

'

Mr. C. L. Whitford, QA Manager j

Mr. P. L. Bussolini, Project QA Manager

.i Mr. R. A. Romeo, QA Supervisor

.

Report of Subjects Inspected e

-

,

~"i

~1.

Scope of Inspection

..

The inspection was limited to a follow-up review regarding the previously

,

j

[.

identified unresolved item, 74-02/VII B, " Brown & Root QA 1)rogram l

~;-

Manual".

_;

i

-

,

2.

B&R QA Program Manual (74-02/VII B)

{

..!

l l

On January 17, a meeting was held at the TUSI corporate offices to

f discuss matters regarding the RO inspector's concern in that the

<

recently revised B&R QA Manual, " Quality Assurance / Control Manual for Nuclear Projects, Construction Phase, Volume II" does not clearly

.

identify the functional application of the manual and commitments j

'

as an unresolved item 1/ during the previous inspection.

applicable to the Comanche Peak Project. This matter was identified

,

l

.

. '

The licensee initiated the meeting in order that the matter be further

!

l reviewed and discussed with the cognizant B&R and TUSI personnel.

,.

t I

The licensee provided the attendees with an agenda outline; however,

,

j.

the inspector's participation in the meeting was limited to the following j

topics:

'

t

=

l (continued)

-

!

1/ RO Inspection Report Nos. 50-445/75-01 and 50-446/75-01, dated 1/16/75,

'

'

Report Details, paragraph 2.

i i

!

.

J

.

)

_

_. _.. _ - _... _

- -.

--

,,, _ _,

-..;

e s.

v:

.

'

<

.

.

. -. - -.. - -. - -

,__.. --_ - -

-.

._.., - -

,

-

.9

.'

,

.

-

o

'"

-

..

-

.

'

VII.

- Other Significant Items Not applicable.

..

VIII.

Management Interview

,

,%:..1,.

Not appilcable

-

. I

-

.

..

b

.

i i.

+

i g n,q

......

  • Ls 't

'rL *.

's

, **,

_

M.

o

's I

.

1 e

,

4

.

i

'&*4*

-a*

...%o

_

,

r

.

e

~,

.

.

,

!'

O A

t' L

-

.

INSPECTION PLAN

'

-

(

we

,,

RO Inspection Report No.

50-3M /75-02 Licensee: Texas Utilities Generating Company (TUGCO)

Location:

Comanche Peak Steam Electric Station (CPSES) - Units 1 & 2 Facility:

Glen Rose, Texas

-

Type of Licensee:

W, PWR,1161 MWe Type of Inspection: Specialc, Announced

'

Dates of Inspection:

Janua ry 17, 1975

,

Dates of Previous Inspection:

January 8-9, 1975 SCOPE OF INSPECTION I

1.

Review contractor's QA Program as a result of unresolved matters identified in RO Report Nos. 50-445 and 50-446/75-01.

2.

Document Review (Individual in-office inspection effort)

Review PSAR Sections:

17.1. 3. 0

,

17.1.3.1 l

17.1. 3. 2

'

17.1. 3. 3 17.1.3.4 V

Review B&R QA Manual, Phase Volume II, Section 1. 0 "QA Program"

,[

as compared to above related PSAR requirements.

i i

I[

(continued)

,

Approve / Disapprove:

.-

R. C. Stewart

///7[7.s~

4. O (',,. y,..

////// f j

Reactor Inspect 8r Date Date

,

!

  • Review contractor's QA Program Manual relative to recent revisions.

I

-

!

... _ _ _

_.. _ _ _ _ _ _ _

_..

_

__

g

L

--

,

,

$.,

p 1,

-

-

.

,

--

,

,

.

'

.

Texas Utilities Generating Company-2-50-382/75-02 3',

Individual On-Site Inspection Effort a.

Review construction progress.

j

!

b.

Examine QA/QC on-site procedures for correction and consistency

,

of in-office Document Review.

  • c.

Examine construction QA/QC procedures for finalization

,

commensurate with progress of construction.

I t

n

.-:

.

I

,

<

.6

i

,. i

- u

.

  • .t n

.

__

-.

. -.

.. - -. - - -.

+

as ; y # 'p e

-S-

-

.,

Statement of the purpose of the meeting.

a.

i b.-

Discussions of TUSI's background involvement with B&R QA

,_ i

.

Program and status.

-

Clarifications as required by B&R.

_

-

c.

' N:

-

.'

d.

Discussion of AEC concerns over program status.

.

The significant subjects of the discussions centered on the B&R QA

'

..-

Program as described and contained in the Comanche Peak PSAR, s

'

Section 17.1. 3, and various B&R QA/QC Manuals. During the dis-cussions, the inspector emphasized, by demonstrative presentation of Section 17.1. 3 of the PSAR and B&R Documents, that the B&R QA Program appears to encompass B&R corporate manuals that may, or may not, be applicable to the Comanche Peak Project and as a result the B&R "QA Program" for the Comanche Peak Project requires definitive boundaries, including reference, or identity, of all applicable

' (' '

documents. At the conclusion of these discussions, the TUSI repre-sentative informed the inspector that further discussions will be

.

r"!

conducted by TUS1 representatives with the B&R representatives to

'

resolve the matter. This item remains unresolved pending a RO review during the next inspection.

lq

...t

.

h

!

.

e

>

4

,,

o-we-a*

' c-

,.

.

-.

,

.

.