Forwards Insp Rept 50-424/86-54 Based on Review of Readiness Review Module 4 for Mechanical Equipment & Piping.Certain Deficiencies Exist Involving Adequacy of Identification & Verification of Commitments & Review of Design Documents
ML20210D915
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 01/30/1987
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: James O'Reilly
GEORGIA POWER CO.
Shared Package
ML20210D919 List:
References
NUDOCS 8702100191
Download: ML20210D915 (3)


See also: IR 05000424/1986054

Text

e

likN

'.

~

,

,

.

.

JAN 3 01987

Docket No. 50-424

License No. CPPR-108

Georgia Power Company

l#fTN: Mr. J. P. O'Reilly,

Senior Vice President

Nuclear Operations

'P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT: NRC REVIEW OF V0GTLE READINESS REVIEW MODULE 4 MECHANICAL

EQUIPMENT AND PIPING - NRC INSPECTION REPORT N0. 50-424/86-54

The NRC has completed a detailed review, inspection, and verification of the

rubject Module which you submitted to the NRC on June 25, 1985.

Inspections were

cenducted at the Vogtle site and the resultant findings were discussed with

members of your staff at the conclusion of these inspections. Technical reviews

were conducted primarily in NRC Bethesda and Region II offices and the findings

from these reviews have also been discussed with your staff.

Areas contained in the Module, which were reviewed, examined, and verified, are

identified in the enclosed report.

Within these areas, the inspection and

verification consisted of selected examinations of procedures and representative

records, discussions with personnel, observations of activities in progress, and

review of your licensing commitments.

The results of Module 4 reviews and inspections are summarized into the

categories of deficiencies, inspector followup items, and unresolved items.

These matters which have been pursued during subsequent reviews and inspections

and have been resolved.

Based upon the NRC review and assessment of the readiness review activities

described in Module 4, we have determined that certain deficiencies existed

(

involving the scope and depth of review by your readiness review team.

These

deficiencies involved the adequacy of:

the identification and verification of

7

i

-

commitments; review of design documents; and, resolution of design findings.

l

Appropriate corrective actions were taken by Georgia Power Company in the

performance of subsequent modules which were reviewed by the NRC.

!

We have determined, however, by an independent NRC evaluation that your activity

control programs for design and construction of Mechanical Equipment and Piping

at Vogtle Unit 1 are acceptable and comply with applicable regulatory require-

ments.

These conclusions are based on information currently available to the

i

inspectors and reviewers. Should information subsequently become available which

l

was not considered during this review or which conflicts with earlier infor-

l

mation, it will be evaluated to determine what effect it may have on the above

l

conclusion.

l

l

8702100191 87o130

'

PDR

ADOCK 05000424

O

PDR

L

,

-

-

,.

"

JAN t 01987

.

.

Georgia Power Company

2

Should you have any questions concerning this letter, please contact us.

Sincerely,

OPJG! MAL E3"O 1h

L NELSON GRACE

J. Nelson Grace

Regional Administrator

Enclosure:

-

NRC Inspection Report No. 50-424/86-54

cc w/ encl:

M . E. Conway, Senior Vice President &

Project Director

y&: Whitney, General Manager, Project

Support

f. D. Rice, Vice President, Project

Engineering

L.R. H. Pinson, Vice President, Project

Construction

f.W. Hayes,VogtleQuality

Assurance Manager

p '. B. Bockhold, General Manager,

G

Nuclear Operations

pt< Gucwa, Manager, Nuclear Safety

and Licensing

tf; A. Bailey, Project Licensing

Manager

4 W. Churchill, Esq., Shaw,

Pittman, Potts and Trowbridge

LJ< E. Joiner, Troutman, Sanders,

Lockerman and Ashmore

c4< G. Ledbetter, Ccmmissioner,

Department of Human Resources

C/ H. Badger, Office of Planning

and Budget

cDe Kirkland, III, Counsel,

Office of the Consumer's Utility

Council

[)P.Feig,GeorgiansAgainst

Nuclear Energy

LM. B. Margulies, Esq., Chairman,

Atomic Safety and Licensing Board

Panel

dr. O. H. Paris, Administrative Judge

Atomic Safety and Licensing Board

Panel

(R. A. Linenberger, Jr., Administrative Judge

Atomic Safety and Licensing Board

Panel

(bcc w/enci - see page 3)

JAN 3 0 #87

.

+

,

Georgia Power Company

3

bec w/ encl:

4.- Reis. G50

d.,M. Hill, IE

f. Miller, NRR

y Brach, ED0

gj Sinkule, RII

tr. Christnot, RII

> .

MCResidentInspector

Document Control Desk

State of Georgia

,

-

,

.

W

)

. lalke

h

Y

,'

EGirard:him

listrom

ias

AHerdt

VPanciera

10/27/86

'l/86

i/86

9 /86 l'Q/ p /86 1)/9 /86

.I

RII

RII

RI

RII

RII

RII

h

VBrob)hlee

MLh

MOS

W

1

MSinkuke

alker

TMNovak

BGRimes

EChristerbury

.

}L V

6/ /8}I

fl\\t/8fl

, //b /8$

lb/ /8$ }6/,y/8f flg/8)ii j

I

7

%

9

1

1

1 1b

7 1

1

1

l

.

h-k

.m w,

.

i

. _ . . _ . - _ _ _ _ _ . _ _ _ . - , _