V U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT Region I
~
Report No. 50-412/80-07 Docket No. 50-412 License No. CPPR-105 Priority
--
Category A
Licensee:
Duouesne Liaht Comoany 435 Sixth Avenue Pittsburgh, Pennsylvania 15219 Facility Name:
Beaver Valley Power Station, Unit 2 Inspection at:
Shippingport, Pennsylvania Inspection cond ed:
July 7-10, 1980 Inspectors:
1,c,u M
/2
~
L. Narrow, Reactor Inspector
'date figned date signed date signed Approved by: E.}Y, lNhus 7/,'ly/fD R. W. McGaughy/@f, Projects Section
' datd signed RC&ES Branch Inspection Summary:
Inspection on July 7-10. 1980 (Report No. 50-412/80-07)
Areas Inspected:
Routine, unannounced inspection by a regional based inspector
-
of structural steel installation and records; unloading and storage of equipment; and the status of outstanding items.
The inspection involved 28 inspector hours on site by one regional based inspector.
Results: No items of noncompliance were identified.
Region I Form 12 800910'O S p o (Rev. April 77)
_-
_ _. _.
_ _ _ _ _ _ _ _ _ _ _ _
__
.
,
DETAILS 1.
Persons Contacted Duquesne Light Company (DLC)
- R. Coupland, Director of Quality Control A. Cafardi QC Inspector
- C. R. Davis, Senior QA Engineer
- D. W. Denning, Assistant Director of Quality Control J. Etherige, QC Inspector D. Gasper, QC Inspector
-
J. Long, Inspection Supervisor, Structural
- A. F. Mosso, QA NDE Specialist D. Rohm, Quality Control Engineer J. Shoemaker, Supervisor, Receipt Inspection and Storage
- W. Sikorski, QA Supervisor
- R. J. Swiderski, Superintendent of Construction
- R. Washabaugh, Manager, Quality Assurance Department R. L. Williamson, Quality Control Inspector Stone and Webster (S&W)
- S. M. Dew, Head, Site Engineering Office J. Flynn, Rigging Supervisor A. C. McIn. tyre, Site Engineering Office
- J. E. Williams, Resident Manager S. Shuman, Power Engineer (Boston)
The inspectors also interviewed other licensee and contractor personnel
during the inspection.
- Denotes those present at the exit interview.
2.
Plant Tour The inspector observed work activities in progress, completed work, and construction status in several areas.
Work items were examined for obvious defects and for noncompliance with regulatory requirements and licensee commitments.
Specific activities observed by the inspector included welding of structural angle clips to embedment plates, installation of snubber supports and observation ~ of concrete placements following stripping of forms.
.
No items of noncompliance were identified.
.
.
3.
Vendor Documentation, Structural Steel and Concrete Embedments The inspector audited vendor documentation, as shown below, for a shipment (Shipping Notice No. 934, Issue No. 066) of structural steel from PBI Industries for the reactor building annulus.
Selected mill test reports for structural members.
.
DLC vendor surveillance certification dated April 21, 1980.
WP
.
A copy of a letter from PBI cated April 2,1979 stating that welding
.
procedures, a list of welder qualification records, and the gauge calibration records were on file at PBI Industries office.
Certificate of compliance datec November 3,1978 from Modulus Corporation
.
for A307 and A325 bolts.
Certificate of compliance dated April 2,1980 from Carboline Company
.
for paint.
These documents conform to the requirements of the S&W specification for structural steel 2 BVS-412.
The inspector also examined a certificate of compliance for Category I concrete embedments and product certifications for A36 steel and A325 bolts from Cives Steel Company, Northern Division.
This documentation conformed to the requirements of 2 BVS-416, " Category I Concrete Embedments".
No items of noncompliance were identified.
4.
Structural Steel SQL Records The inspector examined inspection reports (as shown below) of receiving, storage and installation of structural steel and embedments and discussed inspection of this work with QC personnel involved in performing these inspections.
Inspection S-2255 - Receiving and storage of structural steel shapes -
.
Shipping Notice No. 26, Shipping Release Tag 3-24.
Inspection S-2380 - Receiving and storage of structural steel shapes -
.
Shipping Notice No. 47, Shipping Release Tag 3-38.
Inspection S-2675 - Receiving and storage of structural steel shapes -
.
Shipping Notice No. 78, Shipping Release Tag 3-68.
,
, -.
.
.
4-PBI Drawings E-101, E-103. E-104, E-105. E-106, E-107 and E-It,;
.
showing the status of installation and bolt torquing of annulus platform steel at elevation'717.
IR S-2241 - Inspection of structural steel erection and bolt tightening,
.
elevation 717, Reactor Building Annulus.
i IR Nos. S-2644, S-2648, S-2652 and S-2659 for concrete placements of
.
Cranewall which include inspection of concrete embedments.
These records conform to the requirements of:
Receipt Inspection Plan RIP 416-1-R-4, dated August 14, 1979, " Structural
.
Steel Shapes".
Inspection Procedure IP-6.3, " Structural Steel Erection and Bolting".
.
Paragraph 5.6.4 of Inspection Procedure IP-6.2.3. "Preplacement, Place-
.
mant and Postolacement of Concrete".
No items of noncompliance were identified.
5.
Structural Steel Bolting Inspection The inspector witnessed bolt tightness tests of structural steel connections in the Reactor Building Annulus at elevation 735' 6" between column lines 3 and 4.
The tests were performed using torque wrench no. PA04CP1T-66 which had been calibrated earlier that day on a Skidmore torque wrench calibration device, Serial No. 1785, which had been calibrated on February 9, 1980.
The inspector reviewed the calibration records for the torque wrench.
No items of noncompliance were identified.
6.
Wampum Mine Storage Area The inspector observed storage conditions at the remote storage area in the Wampum Mine.
Equipment stored at this location is inspected for shipping damage, placed on hold and stored in the as-shipped conditions for inspection when moved to the site.
Equipment stored at this area does not require maintenance during storage. The inspector observed that all items have been tagged " Hold" and were adequately stored.
No items of noncompliance were identifie.
.
7.
Steam Generator Supports The inspector observed unloading of the steam generator supports which had arrived at the site by barge and~their storage on wood blocking in an area adjacent to the reactor building.
The inspector discussed preparations for the lift with the responsible inspector and reviewed his partially complete Inspection Report HE-AA-0010 which showed proof tests of the lifting slings and shackle and NT of the hook. The inspector also examined the Eauipment Lift Record Cards (ELRCs) for the 4600 W crawler crane and the 4100 V ringer crane which were used for the unloading and storage.
The rigging, inspection, and records conformed to the requirements of:
Specification 2 BVS 981, Storage and Maintenance During Storage of
.
Permanent Plant Equipment During the Construction Phase.
Field Construction Procedure FCP-901.5, " Offloading Steam Generator
.
Supports", which establishes requirements for ELRCs as a Class 'B'
specially designated lift.
FCP-702, " Rigging Guidelines" which designates the classification
.
of special lifts.
No items cf noncompliance were identified.
8.
Review of Deficiencies Reported by Vendors
.
During 1978 the Fairbanks Morse Engine Division of Colt Industries had reported deficiencies in its Type PC-2 Diesel Generators in accordance with 10 CFR 21. A number of these units have been furnished to or are on order for nuclear plants, including two units on order for the Beaver Valley 2 plant.
The deficiencies and corrective actions reported to have been taken consist of:
a.
Defects in fuel oil lines. This is written up on VSG N&D No. 23.
The oil lines have been replaced with a modified design. The engine was qualified by 300 start cests on Beaver Valley Unit B and other units.
b.
Defects in fuel injection pumps.
Injection pumps for all Engines were changed out. The engines were qualified by a 300 start test on a Seabrook Unit. VSG N&D No. 26 covers additional redesigned delivery valve springs.
c.
Defects in exhaust rocker arms.
The rocker arms were replaced on both BV-2 units.
Replacement of rocker arm on BV-2 Unit B is covered by VSG N&D No. 24. The units were qualified by 300 start tests on BV-2 Unit B and other units.
a
a
d.
Lube oil header failure. Redesigned lub oil headers were installed on all units. The units were qualified by 300 start tests on a Seabrook Unit.
' Additional deficiencies in the same units were reported by Colt Industries in 1380. These deficiencies and the corrective actions reported to have been taken consist of:
a.
Omission of oil plugs.
The omission resulted in an inadequate aupply of oil to the thrust bearings.
Inspection of the BV-2 units showed the oil plugs to have been installed and no corrective action necessary.
b.
Failure of engine thrust bearing. This failure was identified on a SNUPPS unit and was determined by the manufacturer to be due to in-adequate clearance between the bearing halves to allow for thermal expansion. The failed unit was modified and was shop and contract tested to qualify the modification.
However, a 300 start test was not conducted on this unit or any of the units modified for failure of the thrust bearing. The BV-2 units are being modified to the revised design requirements.
c.
Failure of adaptor in the air start modification package. This failure was reportedly due to excessive drilling while preparing the female part for threading which resulted in insufficient wall thickness.
These adaptors have been replaced on the BV-2 units.
This item remains unresolved pending review by an NRC inspector of corrective actions taken and justification by the licensee for lack of requalification of the units by a 300 start test following replacement of the failed thrust bearing or performance of this test.
9.
Review of Nonroutine Events Reported by the Licensee On May 21, 1980, the licensee submitted a revision to their report of a significant deficiency which had been submitted in accordance with 10 CFR 50.55(e). The revision reported identification of 20 No. 11 bars of rein-forcing steel which had been omitted from a 10 foot section of a cubicle wall which frames into the crane wall.
The inspector examined an internal DLC-SQC memorandum which recommended that, in view of the reinforcing steel discrepancies on the crane wall a similar review be performed for all Category I concrete.
The initial review was limited to the reactor building.
The missing cubicle wall steel was identified and documented on N&D No.1204. Thereafter a random i
review of all Category I concrete placements was instituted. This review
.
is'still in progress. No additional nonconformances have been identified to date.
b
'
I#
__
_ _ _ - _ _ _ - _ _ _ _
,
.
The inspector had previously reviewed documentation and corrective actions concerning-this item during Inspections 79-08, 79-09 and 80-03.
The inspector examined N&D No.1204 which had been dispositioned, corrected and signed off; and also examined results of the service building concrete review.
The inspector had no further questions concerning this item.
10. Licensee Actions on Previour Inspection Findings (Closed) Unresolved Item (80-02-01):
Performance of internal audits by Power Piping Company (PPC). The inspector reviewed PPC Procedure AP-1,
" Procedure for Scheduling, Planning, Performing, Reporting and Documenting Management QA Internal and Vendor Audits and Reporting and Documenting External Audits". This procedure requires the use of Corrective Action Requests (CARS) to correct discrepancies identified during audits.
The DLC Audit No. DC-2-80-20, conducted during May 29-June 3,1980 verified the actions taken to correct the CARS identified durirg the 1979 PPC manage-ment audit.
In addition, the inspector verified that S&W had audited PPC QA program during July 20-27, 19/9 and had audited corrective actions on January 18, 1980.
The inspector had no further questions concerning this item.
(Closed) Unresolved Item (80-02-02):
PPC training prot, ram not adequate.
The inspector discussed the PPC training program, corrective action to correct the discrepancies identified during 1978, and reviewed a matrix developed by PPC to show the training required for each QC assignment.
During DLC Audit No. DC-2-80-20, the auditors had reviewed the training requirements of QC and production personnel and had audited the corrective action by PPC including a PPC audit of training conducted March 31-April 1,1980.
The inspector had no further questions concerning this item.
11.
Exit Interview The inspector met with licensee and contractor representatives (denoted in Paragraph 1) at the conclusion of the inspection on July 10, 1980.
The inspector sumarized the scope and findings of the inspection as described in this report.
._
__. _ _.
-
.-..