Forwards IE Insp Rept 50-412/80-07 on 800707-10.No Noncompliance Noted
ML19332A144
Person / Time
Site: Beaver Valley
Issue date: 07/25/1980
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Woolever E
DUQUESNE LIGHT CO.
Shared Package
ML19332A145 List:
References
NUDOCS 8009100865
Download: ML19332A144 (2)


See also: IR 05000412/1980007

Text

s4

5.

cf"" N

UNITED STATES

b

NUCLEAR REGULATORY COMMisslON

l

y

,, j

REGION I

e

'f

$35 PARK AVENUE

i

KING OF PRUSSI A. PENN5Yt.VANI A 19406

i

JL'l S 5 la

Docket No. 50-412

Duquesne Light Company

ATTN: Mr. E. J. Woolever

Vice President

435 Sixth Avenue

Pittsburgh, PA 15219

Gentlemen:

Subject:

Inspection No. 50-412/80-07

Th.'s refers to the routine inspection conductu by Mr. L. Narrow of this office

on July 7-10. 1980 at the Beaver Valley Power Station, Unit 2, Shippingport,

Pennsylvania of activities authorized by NRC License No. CPPR-105 and to the

discussions of our findings held by Mr. Narrow with Mr. Washabaugh and other

members of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within

these areas, the inspection consisted of selective examinatiom of procedures

and representative records, interviews with personnel, and observations by the

inspector.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10. Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public LS:ument Room.

If this report contains

any information that you (or your contractor). believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must be

accompanied by an affidavit executed by the owner of the information, which

identifies the document or part sought to be withheld, and which contains a

.

statement of reasons which addresses with specificity the items which will be

i

considered by the Comission as listed in subparagraph (b) (4) of Section

2.790. The information sought to be withheld shall be incorporated as far as

possible into a separate part of the affidavit.

If we do not hear from you in

this regard within the specified period, the report will be placed in the Public

Document Room.

~

i

8009 10,9 ggg

-l

_

_ _-

_

___

.

e

Duquesne Light Company

2

No reply to this letter is required; however, should you have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

de -

Robert T. Carlson, Chief

Reactor Construction and Engineering

Support Branch

Enclosure:

Office of Inspection and Enforcement Inspection

Report Number 50-412/80-07

cc w/ encl:

R. J. Washabaugh, Quality Assurance Manager

,